Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk Register”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

2023 Risk Management Plan and Register for Low-Power WEC for Non-Grid Applications

This is an updated risk management plan and risk register for the design, build and test of a novel, remote, low-power wave energy converter (WEC) for non-grid applications. This Columbia Power Technologies project seeks to develop a prototype low-power WEC that lowers the total cost of ownership and provides robust, new capabilities for customers in the maritime environment. The testing location for this prototype is the U.S. Navy Wave Energy Test Site (WETS) in Kaneohe Bay, O'ahu, Hawai'i. Detailed in the Risk Management Plan document is a Failure Modes, Effects, and Criticality Analysis (FMEC) that systematically identifies all potential failure modes and their effects on the system. Risk registers for major subsystems were completed according to the methodology described in the Risk Management Plan and are also included here.

16 TIDAL AND WAVE POWER↗

Rapid Response Risk Assessment Turnaround System (R3ATS)

The Rapid Response Risk Assessment Turnaround System (R3ATS) is a decision support system that can be used for cost and schedule risk assessment as prescribed by the US Department of Energy (DOE) Order 413.3A, Program and Project Management for the Acquisition of Capital Assets. Unlike complex and training-intensive project control and accounting risk systems - or naive and statistically incorrect risk assessment approaches - employed throughout the DOE complex R3ATS is a powerful and yet simple decision support system for conducting project risk assessments. Output from R3ATS include: (1) establishing a project risk register which can be periodically updated to regularly monitor and assess a dynamic risk picture, (2) producing statistically derived and justifiable cost and schedule contingency probability density functions, and (3) inclusion, via Bayesian updating, of significant trigger events that result in project cost, schedule or technical risk events. During FY2007, R3ATS was used by the Oak Ridge Transuranic (TRU) Waste Processing Center (TWPC) project to examine the FY 2008 through FY 2009 budget ({approx}$70 million) and the life cycle budget (over $500 million). In less than eight weeks, Oak Ridge DOE personnel and TWPC project management were trained on - and subsequently incorporated - the R3ATS approach thus demonstrating its significance as a viable and rapid turn-around decision support tool for cost and schedule risk assessment. In conclusion: The R3ATS was developed to meet the mission need for a defensible risk-oriented decision support system. We have demonstrated how R3ATS meets DOE ORO budget planning efforts associated with the TWPC life cycle from FY 2008 through FY 2018. We have further identified the critical shortcomings in the entire approach that DOE takes perform risk management. When we realized that DOE guidance for risk management is naive and can easily produce results are not reliable or repeatable, we applied a defensible systems engineering approach to develop R3ATS. The TWPC approach to risk management offers a risk-balancing approach for performance management and ensures that future investment in training enables all users to use risk management as a tool for successful TWPC mission accomplishment. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Risk Model for EM Decision Support Toolsets

The Government Office of Accountability (GAO) has published several reports identifying the need for the Department of Energy (DOE) Office of Environmental Management (EM) to address mounting costs for DoE's cleanup program. DOEEM could greatly benefit from independent decision tool-sets/models that would allow them to evaluate options and inform business decision at the enterprise level considering site-specific life cycle costs and system plans. Program goals: Develop a tool-set that enables EM to independently evaluate alternatives, assess outcomes from different contracting strategies, and inform critical decisions for the enterprise. Project goals: Adaption of a Risk Model for integration with complimentary tool-sets for project level decision making. Operational Events: Discrete event model that evaluates operational variables (e.g. capacity, throughput, maintenance constraints) and identify bottlenecks. Identifying and Bounding Project Risk: Identify risks that impact confidence in meeting goals (e.g. production). Life cycle Cost: Evaluate impacts of staffing levels, inventory, and capital investments on life cycle costs. Methods and approach: Monte Carlo Analysis is being executed to generate results: Input derives from Risk Register Data; Tied to Projected and Target Schedules; Incorporates float duration within the model. Assumes associated risk mitigation actions being completed within a timeline of five fiscal years. Metrics include: Confidence in Meeting Production Goal; Confidence in Safety Standards; Confidence in Continuous Operation; Other Metrics can be added as appropriate regarding specific site needs. The adapted risk model can be used as a stand alone decision tool or can be integrated complementary tool-sets (i.e. process and cost models) for project-specific decisions. These support tool-sets can then be integrated with others for site- and complex- level evaluations. Future work includes designing an adaptable and modular framework that would allow integration of multiple tool-sets for holistic and/or targeted evaluation of alternative strategies for decision making that could lead to risk and cost reduction across the enterprise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reducing Risk for the Next Generation Nuclear Plant

The Next Generation Nuclear Plant (NGNP) Project, managed by the Idaho National Laboratory (INL), is directed by the Energy Policy Act of 2005, to research, develop, design, construct, and operate a prototype forth generation nuclear reactor to meet the needs of the 21st Century. As with all large projects developing and deploying new technologies, the NGNP has numerous risks that need to be identified, tracked, mitigated, and reduced in order for successful project completion. A Risk Management Plan (RMP) was created to outline the process the INL is using to manage the risks and reduction strategies for the NGNP Project. Integral to the RMP is the development and use of a Risk Management System (RMS). The RMS is a tool that supports management and monitoring of the project risks. The RMS does not only contain a risk register, but other functionality that allows decision makers, engineering staff, and technology researchers to review and monitor the risks as the project matures.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk-based System Upgrade Planning for AOT-IC Presentation [Slides]

The number of deployed systems and different HW/SW form factors makes it difficult to maintain a complete understanding of their health which leads to a reduced level of certainty when assessing risk and trying to prioritize system upgrade efforts. AOT-IC must constantly plan and execute system upgrade and replacement projects to ensure the longevity of the control system. There are many more projects needed than the group can realistically accomplish given schedule and resource constraints. The group must prioritize their upgrade projects to choose only the highest priority projects to execute each year. Currently plans upgrade and replacement projects based on alignment with mission needs, group vision, resource availability, and qualitative risk assessments based on SME estimates. The group maintains a risk register. This is useful as a tool for shaping strategic planning but currently lacks the quantitative data and process needed to generate accurate risk assessments.

43 PARTICLE ACCELERATORS↗

Evaluation of Contamination Inspection and Analysis Methods through Modeling System Performance

Contamination is usually identified as a risk on the risk register for sensitive space systems hardware. Despite detailed, time-consuming, and costly contamination control efforts during assembly, integration, and test of space systems, contaminants are still found during visual inspections of hardware. Improved methods are needed to gather information during systems integration to catch potential contamination issues earlier and manage contamination risks better. This research explores evaluation of contamination inspection and analysis methods to determine optical system sensitivity to minimum detectable molecular contamination levels based on IEST-STD-CC1246E non-volatile residue (NVR) cleanliness levels. Potential future degradation of the system is modeled given chosen modules representative of optical elements in an optical system, minimum detectable molecular contamination levels for a chosen inspection and analysis method, and determining the effect of contamination on the system. By modeling system performance based on when molecular contamination is detected during systems integration and at what cleanliness level, the decision maker can perform trades amongst different inspection and analysis methods and determine if a planned method is adequate to meet system requirements and manage contamination risk.

Seasly, Elaine↗

LANSCE Facility Longevity Assessment

This LANSCE Facility Longevity Assessment examined 34 total systems critical to the operation of the LANSCE accelerator complex. These systems are primarily owned, operated, and maintained by AOT Division. Based on the criteria used in this assessment, there are 12 AOT Division systems that are potential high risk as related to longterm LANSCE operations. These systems may also impact the success of LAMP. Also summarized in this report are the facility activities planned over the next decade. These include general facility maintenance and infrastructure upgrades, as well as planned electrical system upgrades. The LANSCE Facility Operations (LFO) Division is responsible for this activity scope and budget planning. Most of the planned activities are general in nature and should have little impact on accelerator operations or LAMP activities as currently envisioned. However, close coordination with between AOT, LFO, and LAMP would be prudent. A next step should be to develop an actionable plan to address the high-risk systems. Potential criteria for developing such a plan could include: (1) Evaluating the global impact of the system (operations, program, safety, etc.), (2) Ranking by impact (ranked now by risk), (3) Estimating cost to implement the corrective actions (Is there already a plan or not?), and (4) Estimating the time required for corrective actions. An alternative could include integration of the assessment data into both the Asset Management System and the Maintenance Analytics Risk Register.

43 PARTICLE ACCELERATORS↗

Ensuring Flexibility and Security in SDN-Based Spacecraft Communication Networks Through Risk Assessment

Software-defined networking (SDN) has enabled elastic networking and resource distribution in cloud computing. The centralization and separation of the Control Plane also offers a high degree of network configurability and management, which can be used to mitigate and manage threats to the network. Space communication networks have historically been restricted and circuit switching in these networks has been a manual process. This study evaluates the potential role of SDN in space communication networks from a networking security standpoint. The evaluation covers the networking security needs of spacecraft missions and their associated assets. The results from the evaluation lead to a risk assessment that identifies vulnerabilities in an SDN-based communications architecture. Security challenges introduced into the network from integrating SDN are also considered. A risk register summarizes the severity of the attack outcomes, as well as occurrence likelihood. The study identifies Denial-of-Service (DoS) attacks as a new threat (presently unmitigated by existing security controls) that would be prevalent in an SDN-based space communication environment. A Mininet-based emulation testbed is built to demonstrate the susceptibility of spacecraft flight software to a flooding DoS attack when on an interconnected SDN-managed network. This type of attack would be highly consequential to mission assets, and therefore SDN-based space communications would need to be resilient to such attacks. Future work will need to be performed to fully characterize DoS attack methods that can apply to the space communication scenario, as well as to devise a comprehensive DoS-resilient solution.

Baker, Dylan Z.↗

An Analysis of Exploration Capability Gaps for Future Habitation Systems to Inform Risk Assessment and Development Priorities

Within NASA, exploration capability gaps are defined as the difference between the current state-of-the-art in capabilities and the anticipated needs of future human spaceflight architectures. As NASA and its partners’ capabilities for human exploration of deep space continue to mature, it is necessary to understand the capability gaps that require closure to support future habitation systems, such as the Lunar Surface Habitat (SH) and Mars Transit Habitat (TH) currently in concept development. This paper will identify high-priority capability gaps for exploration habitation and show potential options for gap closure through investment in technology, development, and testing. High-priority capability gaps are divided into the following general taxonomy areas: human health/life support/habitation systems, flight computing and avionics, power and energy storage, communications and navigation, thermal management systems, human exploration destination systems, autonomous systems, sensors and instruments, GNC (guidance, navigation, and control), robotic systems, ground and uncrewed surface systems, and materials/structures/mechanical systems/manufacturing. In the gap identification process, teams of discipline experts from across NASA reviewed the latest habitation architecture needs against current capabilities to understand where gaps may exist. The results of the assessment established a basis for the current state-of-the-art within each gap and identified the capability needs of the proposed exploration missions the gap links to. An assessment of how each test platform (e.g., Ground, International Space Station (ISS), Commercial Low Earth Orbit (LEO) Destinations, Gateway) may be leveraged to mature capabilities and potentially provide a route to gap closure will be discussed. The notional timeline for gap closure to support reference missions and impacts to overall schedule are also assessed where appropriate. Based on the capability gap analysis described above, the paper summarizes important technology maturation considerations for human exploration architectures, with a focus on the Mars TH. The previously published NASA habitation ground rules and assumptions document is used as the basis to classify gaps as enabling, enhancing, or “push” opportunities for a particular architecture. Stepwise technology maturation plans/considerations are presented for some selected critical gaps. Overall, the analysis in this paper is intended to help influence development priorities for habitation systems, where high-priority, critical gaps are those currently assessed as having a low probability of closure by the anticipated need date. Capability gap analysis also informs the risk register for exploration habitation systems and mitigation strategies to ensure readiness of key technologies to support future mission timelines. Linkage between capability gaps for Moon and Mars is noted, as closure of a gap at a Lunar destination may subsequently enable or enhance Mars TH architectures.

technology development↗

An Analysis of Exploration Capability Gaps for Future Habitation Systems to Inform Risk Assessment and Development Priorities

Within NASA, exploration capability gaps are defined as the difference between the current state-of-the-art in capabilities and the anticipated needs of future human spaceflight architectures. As NASA and its partners’ capabilities for human exploration of deep space continue to mature, it is necessary to understand the capability gaps that require closure to support future habitation systems, such as the Lunar Surface Habitat (SH) and Mars Transit Habitat (TH) currently in concept development. This paper will identify high-priority capability gaps for exploration habitation and show potential options for gap closure through investment in technology, development, and testing. High-priority capability gaps are divided into the following general taxonomy areas: human health/life support/habitation systems, flight computing and avionics, power and energy storage, communications and navigation, thermal management systems, human exploration destination systems, autonomous systems, sensors and instruments, GNC (guidance, navigation, and control), robotic systems, ground and uncrewed surface systems, and materials/structures/mechanical systems/manufacturing. In the gap identification process, teams of discipline experts from across NASA reviewed the latest habitation architecture needs against current capabilities to understand where gaps may exist. The results of the assessment established a basis for the current state-of-the-art within each gap and identified the capability needs of the proposed exploration missions the gap links to. An assessment of how each test platform (e.g., Ground, International Space Station (ISS), Commercial Low Earth Orbit (LEO) Destinations, Gateway) may be leveraged to mature capabilities and potentially provide a route to gap closure will be discussed. The notional timeline for gap closure to support reference missions and impacts to overall schedule are also assessed where appropriate. Based on the capability gap analysis described above, the paper summarizes important technology maturation considerations for human exploration architectures, with a focus on the Mars TH. The previously published NASA habitation ground rules and assumptions document is used as the basis to classify gaps as enabling, enhancing, or “push” opportunities for a particular architecture. Stepwise technology maturation plans/considerations are presented for some selected critical gaps. Overall, the analysis in this paper is intended to help influence development priorities for habitation systems, where high-priority, critical gaps are those currently assessed as having a low probability of closure by the anticipated need date. Capability gap analysis also informs the risk register for exploration habitation systems and mitigation strategies to ensure readiness of key technologies to support future mission timelines. Linkage between capability gaps for Moon and Mars is noted, as closure of a gap at a Lunar destination may subsequently enable or enhance Mars TH architectures.

technology development↗

One System Overview - 16579

The U.S. Department of Energy (DOE), Office of River Protection (ORP) is responsible for managing and completing the River Protection Project mission, which is to 'safeguard the nuclear waste stored in Hanford's 177 underground tanks, and to manage the waste safely and responsibly until it can be treated in the Waste Treatment and Immobilization Plant for final disposition'. The Office of River Protection's work scope is currently performed through two primary contracts: - The Tank Operations Contract, held by Washington River Protection Solutions LLC, (WRPS) includes the construction, operation, and maintenance activities necessary to safely store, retrieve, and transfer tank wastes; provide supplemental tank waste treatment; provide storage and/or disposal of primary and secondary waste streams; design, construction and commissioning of the Low-Activity Waste Pretreatment System; and support ORP to integrate Hanford Tank Waste Treatment and Immobilization Plant (WTP) completion and startup with Tank Farms operations. - The WTP Contract, held by Bechtel National, Inc. (BNI), includes the design, construction, and commissioning of a Pretreatment Facility, two vitrification facilities (one for high-level waste and one for low-activity waste), a dedicated analytical laboratory, and supporting facilities to treat radioactive tank wastes by immobilizing them into a stable glass waste form. One System was established as a means to improve the integration between the tank farms and the WTP project to support its safe and successful startup. One System's scope and purpose focus on mission integration consistent with DOE's plans to treat tank waste in phases, starting with direct feed of the low-activity waste stream to the WTP's Low-Activity Waste (LAW) Vitrification Facility (referred to as DFLAW). The One System organization now has four major focus areas: - Flowsheet Integration? Integrated River Protection Project (RPP) flowsheet development and management; developing a gaps, risks, and opportunities management plan and technical roadmap; and waste feed qualification. - Mission Analysis and Planning? Strategic planning, system planning, and modeling integration. - WTP Startup, Commissioning, and Operations Integration? Interface Control Document (ICD) management, coordinating facilities startup-to-commissioning-to-operations, contract directives and standards identification, and DFLAW program integration. - Project Integration and Controls? Integrated schedule, metrics/dashboards monitoring, and One System risk register. ORP established the DFLAW Program Office in February 2015 as one of its key performance goals. ORP staff, along with contractor managers, have identified roles and responsibilities for the each of the four major focus areas. One System has established an Executive Council and Governance Board to drive program progress and make decisions on DFLAW. This approach allows appropriate government and contractor senior management involvement in the DFLAW Program. Monthly critical path analysis on the integrated DFLAW schedule is being performed. Interface control documents specific to DFLAW have been developed, and system planning and modeling tools are being used to help define the DFLAW flowsheet. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of a Multi-Institutional Benchmark Test for Cranial CT/MR Image Registration

Purpose: Variability in computed tomography/magnetic resonance imaging (CT/MR) cranial image registration was assessed using a benchmark case developed by the Quality Assurance Review Center to credential institutions for participation in Children's Oncology Group Protocol ACNS0221 for treatment of pediatric low-grade glioma. Methods and Materials: Two DICOM image sets, an MR and a CT of the same patient, were provided to each institution. A small target in the posterior occipital lobe was readily visible on two slices of the MR scan and not visible on the CT scan. Each institution registered the two scans using whatever software system and method it ordinarily uses for such a case. The target volume was then contoured on the two MR slices, and the coordinates of the center of the corresponding target in the CT coordinate system were reported. The average of all submissions was used to determine the true center of the target. Results: Results are reported from 51 submissions representing 45 institutions and 11 software systems. The average error in the position of the center of the target was 1.8 mm (1 standard deviation = 2.2 mm). The least variation in position was in the lateral direction. Manual registration gave significantly better results than did automatic registration (p = 0.02). Conclusion: When MR and CT scans of the head are registered with currently available software, there is inherent uncertainty of approximately 2 mm (1 standard deviation), which should be considered when defining planning target volumes and PRVs for organs at risk on registered image sets.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Risk Inventory for Commercial Storage Projects

The “Southeast Regional CO2 Utilization and Storage Acceleration Partnership” (SECARB USA) project supports the U.S. Department of Energy (DOE) Odice of Fossil Energy's (FE) mission to help the United States meet its need for secure, adordable, and environmentally sound fossil energy supplies by utilizing the advancements made since 2003 by the Regional Carbon Sequestration Partnership (RCSP) Initiative to continue to identify and address knowledge gaps. The SECARB-USA regional initiative encompasses the states of Alabama, Arkansas, Florida, Georgia, Louisiana, Mississippi, North Carolina, South Carolina, Tennessee, Virginia, and portions of Kentucky, Missouri, Oklahoma, Texas, and West Virginia as noted in Figure 1. The primary objective of the project is to identify and address regional onshore storage and transport challenges facing commercial deployment of carbon dioxide (CO2) capture, utilization, and storage (CCUS) technologies.

42 ENGINEERING↗

H3 StingRAY Final Design and Technical Report - Section 13 Appendices

These documents are referenced in the public version of the H3 StingRAY Final Design and Technical Report (Linked Dataset can be found in Resources section, below), and are submitted separately to allow for public release of head document. The display names have the corresponding section number for easy reference.

16 TIDAL AND WAVE POWER↗

CalWave - Reports and Plans for xWave Device Demonstration at PacWave South Site

CalWave has developed a submerged pressure differential type Wave Energy Converter (WEC) architecture called xWave. The single body device oscillates submerged, is positively buoyant, and taut moored to the sea floor and integrates novel features such as absorber submergence depth control. Since participation in the US Wave Energy Prize, CalWave has evolved the design and successfully concluded a scaled 10-month open ocean pilot. CalWave recently concluded the final design phase of a scaled up WEC version for PacWave and started component order/build of the WEC towards the grid-connected demonstration at PacWave. Documentation and data here includes: a system certification plan, a risk registry in the form of an FMECA (Failure Mode, Effects, and Criticality Analysis) table, an updated LCOE content model, a report on performance metrics, and a risk management plan.

16 TIDAL AND WAVE POWER↗

H3 Final Design and Technical Report

The goal of this Project was to develop a standards-compliant, fabrication-ready design of Columbia Power Technologies’ (C·Power) next-generation wave energy converter (WEC), the StingRAY H3p. The H3p is a design iteration of C·Power’s StingRAY WEC and is intended for electrical power generation suitable for micro-grids or remote loads. The H3p was designed for grid-connection and at least two years of continuous testing and operation at the proposed PacWave-South (PWS) test site.

16 TIDAL AND WAVE POWER↗

SU-E-I-54: Effective Dose and Radiation Cancer Risks for Scoliosis Patients Undergoing Full Spine Radiography

Purpose: Scoliotic patients underwent a lot of radiologic examinations during the control and treatment periods. This study used the PCXMC program to calculate the effective dose of the patients and assess the radiation cancer risks. Methods: Seventy five scoliotic patients were examined using CR or DR systems during the control and treatment periods in Chang Gung Memorial Hospital. The technical factors were recorded for each patient during his/her control and treatment period. The entrance surface dose was measured using thermoluminence dosimeters and derived from technical factors and irradiated geometry. The effective dose of patients and relative radiation cancer risks were calculated by the PCXMC program. All required information regarding patient age and sex, the x-ray spectra, and the tube voltage and current were registered. The radiation risk were estimated using the model developed by the BEIR VII committee (2006). Results: The effective doses of full spine radiography with anteroposterior and lateral projections were 0.626 mSv for patients using DR systems, and 0.483mSv for patients using CR systems, respectively. The dose using DR system was 29.6% higher than those using CR system. The maximum organ dose was observed in the breast for both projections in all the systems. The risk of exposure—induced cancer death (REID) of patients for DR and CR systems were 0.009% and 0.007%, respectively. Conclusion: The risk estimates were regarded with healthy skepticism, placed more emphasis on the magnitude of the risk. The effective doses estimated in this study could be served as a reference for radiologists and technologists and demonstrate the necessity to optimize patient protection for full spine radiography though the effective doses are not at the level to induce deterministic effects and not significant in the stochastic effect. This study was supported by the grants from the Chang Gung Memorial Hospital (CMRPD1D0421)

60 APPLIED LIFE SCIENCES↗

Preradiotherapy Calcium Scores of the Coronary Arteries in a Cohort of Women With Early-Stage Breast Cancer: A Comparison With a Cohort of Healthy Women

Purpose: Breast cancer radiotherapy has been associated with an increased risk of cardiac toxicity. However, no data are available on the probability of developing coronary artery disease (CAD) in breast cancer patients when compared with healthy women. Therefore, baseline coronary artery calcium (CAC) scores, as an accepted tool to predict CAD, were determined and compared with the CAC scores of a healthy, asymptomatic cohort, the Multi-Ethnic Study of Atherosclerosis (MESA) cohort. Methods and Materials: Eighty consecutive patients with ductal carcinoma in situ or infiltrative breast cancer referred for radiotherapy after breast-conserving surgery were included in our study. Their cardiovascular risk profile was registered, and a 64 multislice CT scan was performed. The CAC scores of an unselected (Caucasian only) Radiotherapy Centre West (RCWEST) cohort, as well as of those of a selected (comorbidity and race adjusted) RCWEST cohort, were determined. The scores of both cohorts were compared with those of the female (Caucasian only) MESA cohort. Results: For the unselected RCWEST cohort (n = 62) we found significant (p < .01) higher scores for women in the 55-64 age category compared with those of the MESA cohort. In the selected cohort (n = 55) the CAC scores of the women in the age category 55-64 were significantly (p = .02) higher compared with the MESA cohort. No significant differences were noted in the other age categories. Conclusion: Both cohorts revealed that CAC scores in the 55-64 age category were significantly higher than the CAC scores in the asymptomatic (female) MESA population. These data suggest that breast cancer patients bear a higher risk of developing coronary heart disease before the start of radiotherapy. Therefore, measures to decrease cardiac dose further in breast cancer radiotherapy are even more important.

62 RADIOLOGY AND NUCLEAR MEDICINE↗