Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

EUROPA2: Plan Database Services for Planning and Scheduling Applications

NASA missions require solving a wide variety of planning and scheduling problems with temporal constraints; simple resources such as robotic arms, communications antennae and cameras; complex replenishable resources such as memory, power and fuel; and complex constraints on geometry, heat and lighting angles. Planners and schedulers that solve these problems are used in ground tools as well as onboard systems. The diversity of planning problems and applications of planners and schedulers precludes a one-size fits all solution. However, many of the underlying technologies are common across planning domains and applications. We describe CAPR, a formalism for planning that is general enough to cover a wide variety of planning and scheduling domains of interest to NASA. We then describe EUROPA(sub 2), a software framework implementing CAPR. EUROPA(sub 2) provides efficient, customizable Plan Database Services that enable the integration of CAPR into a wide variety of applications. We describe the design of EUROPA(sub 2) from the perspective of both modeling, customization and application integration to different classes of NASA missions.

Bedrax-Weiss, Tania

Planning Bias: Planning as a Source of Sampling Bias

Many data-driven planning methods are trained on data generated by planners. It is well known that many statistical learning methods are sensitive to sampling bias, and yet there has been little or no attention to planning as a sampling method and its role in introducing sampling bias into planner-generated training data. Recently, it has been demonstrated that A**,* in the presence of problems with variable heuristic error, prefers some solutions over other equally cost-optimal solutions. But, as we discuss in this paper, mitigation may not be as simple as resolving arbitrary tie-breaking by sampling from ties uniformly at random. In this paper, we formalize an intuition of planning bias. We focus on problems which output a single solution. Diverse planning only complicates the problem by generalizing it to bias in the set of sets; we show how it is subject to bias in the single solution. We make some useful observations about deterministic algorithms in contrast to non-deterministic algorithms. We explain how information entropy may be a good way to measure planning bias, and discuss some issues in evaluating practical approaches to measurement. We address the intuition that uniform random tiebreaking should mitigate bias; and sketch a novel approach to constructing an appropriate random distribution for duplicate detection during forward search for unbiased A*. Finally, we suggest directions for future work.

Planning Scheduling Algorithms

Space Station Mission Planning Study (MPS) development study. Volume 3: Software development plan

A software development plan is presented for the definition, design, and implementation of the Space Station (SS) Payload Mission Planning System (MPS). This plan is an evolving document and must be updated periodically as the SS design and operations concepts as well as the SS MPS concept evolve. The major segments of this plan are as follows: an overview of the SS MPS and a description of its required capabilities including the computer programs identified as configurable items with an explanation of the place and function of each within the system; an overview of the project plan and a detailed description of each development project activity breaking each into lower level tasks where applicable; identification of the resources required and recommendations for the manner in which they should be utilized including recommended schedules and estimated manpower requirements; and a description of the practices, standards, and techniques recommended for the SS MPS Software (SW) development.

Klus, W. L.

An allotment planning concept and related computer software for planning the fixed satellite service at the 1988 space WARC

The authors describe a two-phase approach to allotment planning suitable for use in planning the fixed satellite service at the 1988 Space World Administrative radio Conference (ORB-88). The two phases are (1) the identification of predetermined geostationary arc segments common to groups of administrations and (2) the use of a synthesis program to identify example scenarios of space station placements. The planning approach is described in detail and is related to the objectives of the conference. Computer software has been developed to implement the concepts, and the logic and rationale for identifying predetermined arc segments is discussed. Example scenarios are evaluated to give guidance in the selection of the technical characteristics of space communications systems to be planned. The allotment planning concept described guarantees equitable access to the geostationary orbit, provides flexibility in implementation, and reduces the need for coordination among administrations.

Miller, Edward F.

Application of heuristic satellite plan synthesis algorithms to requirements of the WARC-88 allotment plan

Creation of an Allotment Plan for the Fixed Satellite Service at the 1988 Space World Administrative Radio Conference (WARC) represented a complex satellite plan synthesis problem, involving a large number of planned and existing systems. Solutions to this problem at WARC-88 required the use of both automated and manual procedures to develop an acceptable set of system positions. Development of an Allotment Plan may also be attempted through solution of an optimization problem, known as the Satellite Location Problem (SLP). Three automated heuristic procedures, developed specifically to solve SLP, are presented. The heuristics are then applied to two specific WARC-88 scenarios. Solutions resulting from the fully automated heuristics are then compared with solutions obtained at WARC-88 through a combination of both automated and manual planning efforts.

Heyward, Ann O.

Application of heuristic satellite plan synthesis algorithms to requirements of the WARC-88 allotment plan

Creation of an Allotment Plan for the Fixed Satellite Service at the 1988 Space World Administrative Radio Conference (WARC) represented a complex satellite plan synthesis problem, involving a large number of planned and existing systems. Solutions to this problem at WARC-88 required the use of both automated and manual procedures to develop an acceptable set of system positions. Development of an Allotment Plan may also be attempted through solution of an optimization problem, known as the Satellite Location Problem (SLP). Three automated heuristic procedures, developed specifically to solve SLP, are presented. The heuristics are then applied to two specific WARC-88 scenarios. Solutions resulting from the fully automated heuristics are then compared with solutions obtained at WARC-88 through a combination of both automated and manual planning efforts.

Heyward, Ann O.

The planning coordinator: A design architecture for autonomous error recovery and on-line planning of intelligent tasks

Developing a robust, task level, error recovery and on-line planning architecture is an open research area. There is previously published work on both error recovery and on-line planning; however, none incorporates error recovery and on-line planning into one integrated platform. The integration of these two functionalities requires an architecture that possesses the following characteristics. The architecture must provide for the inclusion of new information without the destruction of existing information. The architecture must provide for the relating of pieces of information, old and new, to one another in a non-trivial rather than trivial manner (e.g., object one is related to object two under the following constraints, versus, yes, they are related; no, they are not related). Finally, the architecture must be not only a stand alone architecture, but also one that can be easily integrated as a supplement to some existing architecture. This thesis proposal addresses architectural development. Its intent is to integrate error recovery and on-line planning onto a single, integrated, multi-processor platform. This intelligent x-autonomous platform, called the Planning Coordinator, will be used initially to supplement existing x-autonomous systems and eventually replace them.

Farah, Jeffrey J.

Alternatives to Re-Planning: Methods for Plan Re-Evaluation at Runtime

Current planning algorithms have difficulty handling the complexity that is due to an increase in domain uncertainty, and especially in the case of multi-dimensional continuous spaces. Therefore, they produce plans that do not take into account numerous situations that can occur at runtime, such as faults or other changes in the planning domain itself. Thus there is a gap between the plan generation and the reality experienced at runtime. Here we present two methods that allow the plan conditionals to be revised w.r.t. uncertainty on the system as estimated at runtime.

Benazera, Emmanuel

The National Transmission Planning Study: Chapter 2: Long-Term U.S. Transmission Planning Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI

Launch vehicle test and checkout plan. - Volume 2: Saturn 1B launch vehicle Skylab R (rescue) and AS-208 flow plan and listings

The launch operations test and checkout plan is a planning document that establishes all launch site checkout activity, including the individual tests and sequence of testing required to fulfill the development center and KSC test and checkout requirements. This volume contains the launch vehicle test and checkout plan encompassing S-1B, S-4B, IU stage, and ground support equipment tests. The plan is based upon AS-208 flow utilizing a manned spacecraft, LUT 1, and launch pad 39B facilities.

Source record

An allotment planning concept and related computer software for planning the fixed satellite service at the 1988 space WARC

Described is a two-phase approach to allotment planning suitable for use in establishing the fixed satellite service at the 1988 Space World Administrative Radio Conference (ORB-88). The two phases are (1) the identification of predetermined geostationary arc segments common togroups of administrations, and (2) the use of a synthesis program to identify example scenarios of space station placements. The planning approach is described in detail and is related to the objectives of the confernece. Computer software has been developed to implement the concepts, and a complete discussion on the logic and rationale for identifying predetermined arc segments is given. Example scenarios are evaluated to give guidance in the selection of the technical characteristics of space communications systems to be planned. The allotment planning concept described guarantees in practice equitable access to the geostationary orbit, provides flexibility in implementation, and reduces the need for coordination among administrations.

Miller, Edward F.

Alaska SAR Facility Mission planning software - An interactive mission planning system

The Alaska Synthetic Aperture Radar (SAR) Facility Mission Planning Subsystem is an interactive mission planning software system on the VAXStation 2000. This system has the capability to generate satellite ephemerides and mission parameters related to synthetic aperture radar missions. The mission data can be viewed as overlays on the world map in various projections and zooms. The system also provides schedule planning capabilities, using the INGRES DBMS to keep track of the various plans and schedules generated by the mission planner.

Lo, Martin W.

Mission planning for Shuttle Imaging Radar-C (SIR-C) with a real-time interactive planning software

The Shuttle Imaging Radar-C (SIR-C) mission will operate from the payload bay of the space shuttle for 8 days, gathering Synthetic Aperture Radar (SAR) data over specific sites on the Earth. The short duration of the mission and the requirement for realtime planning offer challenges in mission planning and in the design of the Planning and Analysis Subsystem (PAS). The PAS generates shuttle ephemerides and mission planning data and provides an interactive real-time tool for quick mission replanning. It offers a multi-user and multiprocessing environment, and it is able to keep multiple versions of the mission timeline data while maintaining data integrity and security. Its flexible design allows one software to provide different menu options based on the user's operational function, and makes it easy to tailor the software for other Earth orbiting missions.

Potts, Su K.

NASCOM system development plan: System description, capabilities, and plans, FY 94-2

The Nascom System Development Plan (NSDP) for FY 94-2 contains 17 sections. It is a management document containing the approved plan for maintaining the Nascom Network System. Topics covered include an overview of Nascom systems and services, major ground communication support systems, low-speed data system, voice system, high-speed data system, Nascom support for NASA networks, Nascom planning for NASA missions, and network upgrade and advanced systems developments and plans.

Source record

Three Dimensional Rover/Lander/Orbiter Mission-Planning (3D-ROMPS) System: A Modern Approach to Mission Planning

NASA's current mission planning system is based on point design, two-dimensional display, spread sheets, and report technology. This technology does not enable engineers to analyze the results of parametric studies of missions plans. This technology will not support the increased observational complexity and data volume of missions like Cassini, Mars Reconnaissance Orbiter (MRO), Mars Science Laboratory (MSL), and Mars Sample Return (MSR). The goal of the 3D-ROMPS task has been to establish a set of operational mission planning and analysis tools in the Image Processing Laboratory (IPL) Mission Support Area (MSA) that will respond to engineering requirements for planning future Solar System Exploration (SSE) missions using a three-dimensional display.

Scharfe, Nathan D.

Remotely Operated Aircraft (ROA) Impact on the National Airspace System (NAS) Work Package, 2005: Composite Report on FAA Flight Plan and Operational Evaluation Plan. Version 7.0

The purpose of this document is to present the findings that resulted from a high-level analysis and evaluation of the following documents: (1) The OEP (Operational Evolution Plan) Version 7 -- a 10-year plan for operational improvements to increase capacity and efficiency in U.S. air travel and transport and other use of domestic airspace. The OEP is the FAA commitment to operational improvements. It is outcome driven, with clear lines of accountability within FAA organizations. The OEP concentrates on operational solutions and integrates safety, certification, procedures, staffing, equipment, avionics and research; (2) The Draft Flight Plan 2006 through 2010 -- a multi-year strategic effort, setting a course for the FAA through 2001, to provide the safest and most efficient air transportation system in the world; (3) The NAS System Architecture Version 5 -- a blueprint for modernizing the NAS and improving NAS services and capabilities through the year 2015; and (4) The NAS-SR-1000 System Requirements Specification (NASSRS) -- a compilation of requirements which describe the operational capabilities for the NAS. The analysis is particularly focused on examining the documents for relevance to existing and/or planned future UAV operations. The evaluation specifically focuses on potential factors that could materially affect the development of a commercial ROA industry, such as: (1) Design limitations of the CNS/ATM system, (2) Human limitations, The information presented was taken from program specifications or program office lead personnel.

Source record

Deep Impact Sequence Planning Using Multi-Mission Adaptable Planning Tools With Integrated Spacecraft Models

The Deep Impact mission was ambitious and challenging. JPL's well proven, easily adaptable multi-mission sequence planning tools combined with integrated spacecraft subsystem models enabled a small operations team to develop, validate, and execute extremely complex sequence-based activities within very short development times. This paper focuses on the core planning tool used in the mission, APGEN. It shows how the multi-mission design and adaptability of APGEN made it possible to model spacecraft subsystems as well as ground assets throughout the lifecycle of the Deep Impact project, starting with models of initial, high-level mission objectives, and culminating in detailed predictions of spacecraft behavior during mission-critical activities.

Deep Impact Mission