Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

PST and PARR: Plan specification tools and a planning and resource reasoning shell for use in satellite mission planning

Plan Specification Tools (PST) are tools that allow the user to specify satellite mission plans in terms of satellite activities, relevent orbital events, and targets for observation. The output of these tools is a set of knowledge bases and environmental events which can then be used by a Planning And Resource Reasoning (PARR) shell to build a schedule. PARR is a reactive planning shell which is capable of reasoning about actions in the satellite mission planning domain. Each of the PST tools and PARR are described as well as the use of PARR for scheduling computer usage in the multisatellite operations control center at Goddard Space Flight Center.

Mclean, David

A mission planning concept and mission planning system for future manned space missions

The international character of future manned space missions will compel the involvement of several international space agencies in mission planning tasks. Additionally, the community of users requires a higher degree of freedom for experiment planning. Both of these problems can be solved by a decentralized mission planning concept using the so-called 'envelope method,' by which resources are allocated to users by distributing resource profiles ('envelopes') which define resource availabilities at specified times. The users are essentially free to plan their activities independently of each other, provided that they stay within their envelopes. The new developments were aimed at refining the existing vague envelope concept into a practical method for decentralized planning. Selected critical functions were exercised by planning an example, founded on experience acquired by the MSCC during the Spacelab missions D-1 and D-2. The main activity regarding future mission planning tasks was to improve the existing MSCC mission planning system, using new techniques. An electronic interface was developed to collect all formalized user inputs more effectively, along with an 'envelope generator' for generation and manipulation of the resource envelopes. The existing scheduler and its data base were successfully replaced by an artificial intelligence scheduler. This scheduler is not only capable of handling resource envelopes, but also uses a new technology based on neuronal networks. Therefore, it is very well suited to solve the future scheduling problems more efficiently. This prototype mission planning system was used to gain new practical experience with decentralized mission planning, using the envelope method. In future steps, software tools will be optimized, and all data management planning activities will be embedded into the scheduler.

Wickler, Martin

Integrating Resilience Planning in Distribution System Planning

Electric utilities, regulators, and stakeholders face increasing risks of severe storms, freezes, floods, and heat waves damaging grid infrastructure and causing power outages—and increasing risks of utility equipment igniting wildfires. At the same time, customer electricity rates have risen substantially in recent years, due in part to replacing aging infrastructure and improving resilience to natural hazards and physical threats. To address these challenges, utilities are beginning to move beyond traditional, siloed planning processes to balance resilience with other fundamental grid objectives such as affordability, reliability, safety, and serving new loads. This study presents a framework for states and utilities that want to advance integration of resilience and distribution planning processes to improve planning efficiency, better prioritize cost-effective grid expenditures, and balance planning objectives. The framework includes 7 key integration points between these planning processes: -Strategy process -Data -Threat assessments -Solution identification and prioritization -Optimization opportunities -Consideration of other grid needs -Metrics Lawrence Berkeley National Laboratory reviewed utility distribution system plans and interviewed subject matter experts to identify emerging practices for each of the 7 integration points. This report presents these practices, which can be used as a guide toward more holistic planning and cohesive investment strategies. It also includes 3 case studies to provide practical examples of how utilities apply such integrated planning processes: two pole hardening programs and one microgrid planning effort. The report concludes by identifying opportunities for future research.

24 POWER TRANSMISSION AND DISTRIBUTION

En Route Descent Advisor Multi-Sector Planning Using Active and Provisional Controller Plans

As decision support tools are developed to support controllers in complex air traffic control environments, new approaches to maintaining situation awareness and managing traffic planning must be developed to handle the ever-increasing amounts of alerting and advisory data. Within high-density metering and other environments where flight path changes are the rule, not the exception, and where interactions between these changes are required, current trial planning approaches are limited by potential increases in workload. The Enroute Descent Advisor (EDA) is a set of decision support tool capabilities for managing high-density en route traffic subject to metering restrictions. The EDA system s novel approach builds aircraft plans from combinations of user intent data and builds controller plans from combinations of aircraft plans to effectively maintain situation awareness during traffic planning. By maintaining both active (current) and provisional (proposed) controller plans, EDA supports controllers in coordinated traffic planning both within and between sectors. Ultimately, EDA s multi-sector planning approach will facilitate a transition from current sector-oriented operations to a new trajectory-oriented paradigm, enabling new levels of efficiency and collaboration in air traffic control.

Vivona, Robert

Planning to Explore: Using a Coordinated Multisource Infrastructure to Overcome Present and Future Space Flight Planning Challenges

Few human endeavors present as much of a planning and scheduling challenge as space flight, particularly manned space flight. Just on the operational side of it, efforts of thousands of people across hundreds of organizations need to be coordinated. Numerous tasks of varying complexity and nature, from scientific to construction, need to be accomplished within limited mission time frames. Resources need to be carefully managed and contingencies worked out, often on a very short notice. From the beginning of the NASA space program, planning has been done by large teams of domain experts working months, sometimes years, to put together a single mission. This approach, while proven very reliable up to now, is becoming increasingly harder to sustain. Elevated levels of NASA space activities, from deployment of the new Crew Exploration Vehicle (CEV) and completion of the International Space Station (ISS), to the planned lunar missions and permanent lunar bases, will put an even greater strain on this largely manual process. While several attempts to automate it have been made in the past, none have fully succeeded. In this paper we describe the current NASA planning methods, outline their advantages and disadvantages, discuss the planning challenges of upcoming missions and propose a distributed planning/scheduling framework (CMMD) aimed at unifying and optimizing the planning effort. CMMD will not attempt to make the process completely automated, but rather serve in a decision support capacity for human managers and planners. It will help manage information gathering, creation of partial and consolidated schedules, inter-team negotiations, contingencies investigation, and rapid re-planning when the situation demands it. The fist area of CMMD application will be planning for Extravehicular Activities (EVA) and associated logistics. Other potential applications, not only in the space flight domain, and future research efforts will be discussed as well.

Balaban, Edward

Comparison of chain sampling plans with single and double sampling plans

The efficiency of chain sampling is examined through matching of operating characteristics (OC) curves of chain sampling plans (ChSP) with single and double sampling plans. In particular, the operating characteristics of some ChSP-0, 3 and 1, 3 as well as ChSP-0, 4 and 1, 4 are presented, where the number pairs represent the first and the second cumulative acceptance numbers. The fact that the ChSP procedure uses cumulative results from two or more samples and that the parameters can be varied to produce a wide variety of operating characteristics raises the question whether it may be possible for such plans to provide a given protection with less inspection than with single or double sampling plans. The operating ratio values reported illustrate the possibilities of matching single and double sampling plans with ChSP. It is shown that chain sampling plans provide improved efficiency over single and double sampling plans having substantially the same operating characteristics.

Stephens, K. S.

PLAN-IT-2: The next generation planning and scheduling tool

PLAN-IT is a scheduling program which has been demonstrated and evaluated in a variety of scheduling domains. The capability enhancements being made for the next generation of PLAN-IT, called PLAN-IT-2 is discussed. PLAN-IT-2 represents a complete rewrite of the original PLAN-IT incorporating major changes as suggested by the application experiences with the original PLAN-IT. A few of the enhancements described are additional types of constraints, such as states and resettable-depletables (batteries), dependencies between constraints, multiple levels of activity planning during the scheduling process, pattern constraint searching for opportunities as opposed to just minimizing the amount of conflicts, additional customization construction features for display and handling of diverse multiple time systems, and reduction in both the size and the complexity for creating the knowledge-base to address the different problem domains.

Eggemeyer, William C.

Planning for New Primary Airports in the United States: A Survey of Metropolitan Planning Organizations

Airport congestion at primary airports in major metropolitan areas was analyzed in a report prepared by the Transportation Research Board (TRB) in 1990. Taking the top twenty-three most congested airports from this study, a questionnaire was prepared and sent to the metropolitan planning organizations (MPOS) for twenty of the twenty-three metropolitan areas represented in the TRB study. The questionnaire focused on the role of the MPOs in planning for new primary airports in the United States, including questions about the status of the most recent MPO airport system plan, whether or not the latest plan recommends a new primary airport, and whether or not any other entities in the MPO areas are recommending new primary airports. The results indicated that 44.4 percent of the eighteen respondent MPOs have airport system plans that are five years old or older. Also, only two of the respondent MPOs have recommended a new primary airport in their latest regional airport system plan and only one of these two is a common recommendation in the Federal Aviation Administration's National Plan of Integrated Airport System.

NewMeyer, David A.

Planning for New Primary Airports in the United States: A Survey of Metropolitan Planning Organizations

Airport congestion at primary airports in major metropolitan areas was analyzed in a report prepared by the Transportation Research Board (TRB) in 1990. Taking the top twenty-three most congested airports from this study, a questionnaire was prepared and sent to the metropolitan planning organizations (MPOs) for twenty of the twenty-three metropolitan areas represented in the TRB study, The questionnaire focused on the role of the MPOs in planning for new primary airports in the United States, including questions about the status of the most recent MPO airport system plan, whether or not the latest plan recommends a new primary airport, and whether or not any other entities in the MPO areas are recommending new primary airports. The results indicated that 44.4 percent of the eighteen respondent MPOs have airport system plans that are five years old or older. Also, only two of the respondent MPOs have recommended a new primary airport in their latest regional airport system plan and only one of these two is a common recommendation in the Federal Aviation Administration's National Plan of Integrated Airport System.

NewMyer, David A.

Plan-graph Based Heuristics for Conformant Probabilistic Planning

In this paper, we introduce plan-graph based heuristics to solve a variation of the conformant probabilistic planning (CPP) problem. In many real-world problems, it is the case that the sensors are unreliable or take too many resources to provide knowledge about the environment. These domains are better modeled as conformant planning problems. POMDP based techniques are currently the most successful approach for solving CPP but have the limitation of state- space explosion. Recent advances in deterministic and conformant planning have shown that plan-graphs can be used to enhance the performance significantly. We show that this enhancement can also be translated to CPP. We describe our process for developing the plan-graph heuristics and estimating the probability of a partial plan. We compare the performance of our planner PVHPOP when used with different heuristics. We also perform a comparison with a POMDP solver to show over a order of magnitude improvement in performance.

Ramakrishnan, Salesh

Formulation of consumables management models: Test plan for the mission planning processor working model

The test plan and test procedures to be used in the verification and validation of the software being implemented in the mission planning processor working model program are documented. The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. An overview of the working model is presented. Execution of the test plan will comprehensively exercise the working model software. An overview of the test plan, including a testing schedule, is presented along with the test plan for the unit, module, and system levels. The criteria used to validate the working model results for each consumables subsystem is discussed.

Connelly, L. C.

Communications Contingency Plan: Planning for Crises and Controversy

Interviews were conducted with a variety of Marshall Space Flight Center personnel and local media representatives in Huntsville, Alabama, in order to identify the current perceptions of these individuals regarding communication effectiveness between MSFC and the media. The purposes of the Phase One report are to (1) assess the need for a contingency plan for communicating in situations of crisis and controversy; (2) identify goals and objectives for the planning process; and (3) provide recommendations for future planning activities to achieve the goals and objectives outlined in Phase One. It is strongly recommended that MSFC personnel who are involved in communications with the media participate in a facilitated, strategic communications planning process in order to develop Phase Two of the Communications Contingency Plan (CCP). Phase Two will address (1) the categorizing, ranking and prioritizing of crises and controversies; (2) the development of action steps and implementation strategies for the CCP; and (3) the development of a monitoring and evaluation process for ongoing plan effectiveness.

Treise, Deborah

EUROPA2: Plan Database Services for Planning and Scheduling Applications

NASA missions require solving a wide variety of planning and scheduling problems with temporal constraints; simple resources such as robotic arms, communications antennae and cameras; complex replenishable resources such as memory, power and fuel; and complex constraints on geometry, heat and lighting angles. Planners and schedulers that solve these problems are used in ground tools as well as onboard systems. The diversity of planning problems and applications of planners and schedulers precludes a one-size fits all solution. However, many of the underlying technologies are common across planning domains and applications. We describe CAPR, a formalism for planning that is general enough to cover a wide variety of planning and scheduling domains of interest to NASA. We then describe EUROPA(sub 2), a software framework implementing CAPR. EUROPA(sub 2) provides efficient, customizable Plan Database Services that enable the integration of CAPR into a wide variety of applications. We describe the design of EUROPA(sub 2) from the perspective of both modeling, customization and application integration to different classes of NASA missions.

Bedrax-Weiss, Tania

Space Station Mission Planning Study (MPS) development study. Volume 3: Software development plan

A software development plan is presented for the definition, design, and implementation of the Space Station (SS) Payload Mission Planning System (MPS). This plan is an evolving document and must be updated periodically as the SS design and operations concepts as well as the SS MPS concept evolve. The major segments of this plan are as follows: an overview of the SS MPS and a description of its required capabilities including the computer programs identified as configurable items with an explanation of the place and function of each within the system; an overview of the project plan and a detailed description of each development project activity breaking each into lower level tasks where applicable; identification of the resources required and recommendations for the manner in which they should be utilized including recommended schedules and estimated manpower requirements; and a description of the practices, standards, and techniques recommended for the SS MPS Software (SW) development.

Klus, W. L.

An allotment planning concept and related computer software for planning the fixed satellite service at the 1988 space WARC

The authors describe a two-phase approach to allotment planning suitable for use in planning the fixed satellite service at the 1988 Space World Administrative radio Conference (ORB-88). The two phases are (1) the identification of predetermined geostationary arc segments common to groups of administrations and (2) the use of a synthesis program to identify example scenarios of space station placements. The planning approach is described in detail and is related to the objectives of the conference. Computer software has been developed to implement the concepts, and the logic and rationale for identifying predetermined arc segments is discussed. Example scenarios are evaluated to give guidance in the selection of the technical characteristics of space communications systems to be planned. The allotment planning concept described guarantees equitable access to the geostationary orbit, provides flexibility in implementation, and reduces the need for coordination among administrations.

Miller, Edward F.

Application of heuristic satellite plan synthesis algorithms to requirements of the WARC-88 allotment plan

Creation of an Allotment Plan for the Fixed Satellite Service at the 1988 Space World Administrative Radio Conference (WARC) represented a complex satellite plan synthesis problem, involving a large number of planned and existing systems. Solutions to this problem at WARC-88 required the use of both automated and manual procedures to develop an acceptable set of system positions. Development of an Allotment Plan may also be attempted through solution of an optimization problem, known as the Satellite Location Problem (SLP). Three automated heuristic procedures, developed specifically to solve SLP, are presented. The heuristics are then applied to two specific WARC-88 scenarios. Solutions resulting from the fully automated heuristics are then compared with solutions obtained at WARC-88 through a combination of both automated and manual planning efforts.

Heyward, Ann O.

Application of heuristic satellite plan synthesis algorithms to requirements of the WARC-88 allotment plan

Creation of an Allotment Plan for the Fixed Satellite Service at the 1988 Space World Administrative Radio Conference (WARC) represented a complex satellite plan synthesis problem, involving a large number of planned and existing systems. Solutions to this problem at WARC-88 required the use of both automated and manual procedures to develop an acceptable set of system positions. Development of an Allotment Plan may also be attempted through solution of an optimization problem, known as the Satellite Location Problem (SLP). Three automated heuristic procedures, developed specifically to solve SLP, are presented. The heuristics are then applied to two specific WARC-88 scenarios. Solutions resulting from the fully automated heuristics are then compared with solutions obtained at WARC-88 through a combination of both automated and manual planning efforts.

Heyward, Ann O.