At least 37 records · Page 2

Guidance on Including Social, Organizational and Technical Influences in Nuclear Utility and Plant Modernization Plans

The objective of this report is to provide the nuclear power industry with guidance on including socio-technical issues in plans developed for current and future modernization efforts. Socio-technical issues of concern include social, organizational and related technical aspects of modernized systems. These can be addressed using a set of systematic analysis and design methods developed to address socio-technical issues of the sort facing the nuclear power industry. The next phase of this work will involve developing and implementing a modernization plan that includes socio-technical tools and methods identified and discussed in a report by Dainoff and colleagues (2020). The plan is expected to be developed and implemented in cooperation with a nuclear utility that has expressed interest in participating. The Dainoff et al report provides the foundation for the present effort and presents a methodological tool set for analyzing socio-technical issues applicable to many modernization efforts. The tools described by Dainoff et al are based on principles of human factors engineering, safety engineering, and systems engineering and are discussed within the specific context of nuclear utility modernization and transformation efforts. It is expected that the plan and the concepts described in the current report will be developed and implemented with a nuclear utility partner. The plan developed with the nuclear utility partner will have a substantially higher level of detail than the guidance provided in this report, particularly with regard to details of plan logistics, etc.

99 GENERAL AND MISCELLANEOUS↗

A Business Case for Nuclear Plant Control Room Modernization

This paper presents a generic business case for implementation of technology that supports Control Room Modernization (CRM). The analysis presented in two forms; 1) a standalone technology upgrade, and 2) a technology upgrade that is built upon and incremental to a prior business case created for Mobile Work Packages (MWP). The business case contends that advanced communication and networking and analytical technologies will allow NPP to conduct control room operations with improved focus by reducing human factors and redundant manpower, and therefore operate with fewer errors. While some labor savings can be harvested in terms of overtime, the majority of savings are demonstrated as reduced time to take the plant off line and bring back on line in support of outages. The benefits are quantified to a rough order of magnitude that provides directional guidance to NPPs that are interested in developing a similar business case. This business case focuses on modernization of the operator control room and does not consider a complete overhaul and modernization of a plants instrument and control systems. While operators may be considering such an investment at their plants, the sizable capital investment required is not likely supported by a cost/benefit analysis alone. More likely, it is driven by obsolescence and reliability issues, and requires consideration of mechanical condition of plant systems, capital depreciation, financing, relicensing and overall viability of the plant asset over a 20-year horizon in a competitive market. Prior studies [REF] have indicated that such a modernization of plant I&C systems, alone or as part of a larger modernization effort, can yield very significant reductions in O&M costs. However, the depth of research and analysis required to develop a meaningful business case for a plant modernization effort is well beyond the scope of this study. While CRM as considered in this study can be easily integrated as part of grander plant modernization effort, it can also be considered as a stand-alone project, implemented as a supervisorial layer over and above existing systems. CRM is enabled by a suite of technologies, which are described in further detail in the body of this report. They include: • Modernized control room with interactive displays • High-bandwidth wireless networks • Mobile devices • Component identification technology • Mobile wireless video cameras • Smart or task based operator displays • Computer-Based Procedures (CBP)/Automated Mobile Work Packages (MWP) • Intelligent plant configuration • Advanced data analytics An analysis was conducted to determine how these technologies might impact outage operations at an NPP. The analysis concluded that outage management capabilities would be improved with application of these technologies, and result in annual benefits for the plant. These improved capabilities were identified and described in further detail in this report. • Reduction in need redundant manpower (verification, etc) • Improved critical path shutdown and restart duration during outages • Reduction in human factors and errors • Remote watches • Paperless outage coordination • Bulk work optimization

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Establishing a value chain for human factors in nuclear power plantcontrol room modernization

Commercial nuclear power plants in the United States (U.S.) have operated reliably and efficiently for decades. With the life extensions of plants now being planned for operation beyond their original operating licenses, there are opportunities to achieve even greater efficiencies, while maintaining high operational reliabilities, with strategic, risk- and economically-informed, upgrades to plant systems and infrastructure. The U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) program supports the commercial nuclear industry’s modernization efforts through research and development (R&D) activities across many areas to help establish the technical and economic bases for modernization activities. The Advanced Instrumentation, Information, and Control Systems Technologies pathway is one R&D focus area for the LWRS program, and has researchers at Idaho National Laboratory working with select utility partners to use human factors and instrumentation and controls R&D to help modernize the plant’s main control room. However, some in the nuclear industry have not been as enthusiastic about using human factors R&D to inform life extension decision making. Part of the reason for this may stem from uncertainty decision-makers have regarding how human factors fits into the value chain for nuclear power plant control room modernization. This paper reviews past work that has attempted to demonstrate the value of human factors, and then describes the value chain concept, how it applies to control room modernization, and then makes a case for how and why human factors is an essential link in the modernization value chain.

Control room modernization↗

Automation Technologies Impact on the Work Process of Nuclear Power Plants

The current cost associated with the work process of nuclear power plants necessities modernizing the work process by augmenting it with automation technologies. This work was performed to assess various automation technologies and the means by which they assimilate into the work process in order to make gains in cost savings in modern nuclear power plants. The goal was to identify key informational items that would be useful to members of industry who are undertaking the large effort to reduce costs through automation by identifying technology maturity levels, recent research, and an analysis of cost impacts of the work process. The technologies cost saving was categorized into low, medium, and high cost savings. Through this effort, a substantive literature review and analysis of recent technological and market trends was performed. The key areas of cost impact were identified through communication with users in industry from operations and maintenance organizations. The results were assembled into a list of work process steps and technologies that are ready be implemented or researched for the automating aspects of that step. This effort aims to present to utilities opportunities of cost saving that are achievable in the short term, and gaps for research organizations and vendors to consider for further research and development. The results of this effort generated a list of technologies that fit each of the three cost saving categories. Electronic work packages remain a high cost saving technology, but data mining and integration, smart scheduling, and dynamic risk models are also indicated to yield a high cost savings. Video applications, spatial mapping, and image processing and identification technologies appear to provide solid cost savings in the medium category, and rounding out the low cost saving areas are deployable technologies such as bar codes, communication tools, and electronic tags.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A human factors meta model for U.S. nuclear power plant control room modernization - 350

Over the last several years, the United States (U.S.) Department of Energy (DOE) has sponsored human factors research and development (R and D) and human factors engineering (HFE) activities through its Light Water Reactor Sustainability (LWRS) program to modernize the main control rooms (MCR) of commercial nuclear power plants (NPP). Idaho National Laboratory (INL), in partnership with numerous commercial nuclear utilities, has conducted some of this R and D to enable the life extension of NPPs (i.e., provide the technical basis for the long-term reliability, productivity, safety, and security of U.S. NPPs). From these activities performed to date, a human factors meta model for U.S. NPP control room modernization can now be formulated. This paper discusses this emergent HFE meta model for NPP control room modernization, with the goal of providing an integrated high-level road map and guidance on how to perform human factors R and D and HFE for those in the U.S. nuclear industry engaged in the process of upgrading their MCRs. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A HUMAN FACTORS META MODEL FOR U.S. NUCLEAR POWER PLANT CONTROL ROOM MODERNIZATION

Over the last several years, the United States (U.S.) Department of Energy (DOE) has sponsored human factors research and development (R&D) and human factors engineering (HFE) activities through its Light Water Reactor Sustainability (LWRS) program to modernize the main control rooms (MCR) of commercial nuclear power plants (NPP). Idaho National Laboratory (INL), in partnership with numerous commercial nuclear utilities, has conducted some of this R&D to enable the life extension of NPPs (i.e., provide the technical basis for the long-term reliability, productivity, safety, and security of U.S. NPPs). From these activities performed to date, a human factors meta model for U.S. NPP control room modernization can now be formulated. This paper discusses this emergent HFE meta model for NPP control room modernization, with the goal of providing an integrated high level roadmap and guidance on how to perform human factors R&D and HFE for those in the U.S. nuclear industry that are engaging in the process of upgrading their MCRs.

99 GENERAL AND MISCELLANEOUS↗

Analog, Digital, or Enhanced Human-System Interfaces? Results of an Operator-in-the-Loop Study on Main Control Room Modernization for a Nuclear Power Plant

The second Operator Study of System Overviews (OSSO-2) was conducted with a three-person reactor operator crew in the Human Systems Simulation Laboratory (HSSL) at Idaho National Laboratory (INL) in August, 2017. The study supported control room modernization at a nuclear power plant and featured a benchmark comparison of three variants of a turbine control system (TCS): the existing analog TCS, a proposed standalone digital TCS with two displays, and the digital TCS with the addition of a third display consisting of a system overview screen. TCS prototypes were developed at INL to allow evaluation of operator performance and preferences during realistic turbine scenarios in the full-scope simulator. The study revealed that completion of turbine startup was several minutes faster with the digital TCS variants than with the conventional analog TCS. Eye tracking scan paths were more widely distributed in the overview vs. standalone TCS condition, suggesting the overview screen was cueing reactor operators to verify values across the boards. There was no significant difference in workload or situation awareness across the three interfaces. Reviewing key plant parameters showed smoother transitions during load following for the digital vs. analog TCS. Despite some performance advantages for the digital TCS variants, operators preferred the existing analog TCS. Open-ended responses suggested this finding may be more an artifact of familiarity than a reflection of dissatisfaction with the new TCS. OSSO-2 provides compelling evidence that the new digital TCS was used successfully by the operators without extensive training of rewriting of the operating procedures, suggesting high usability for the digital TCS design. Further advantages were realized through the addition of the system overview screen to provide crews with at-a-glance indicators of key turbine parameters.

99 GENERAL AND MISCELLANEOUS↗

Ergonomic Safety and Health Activities to Support Commercial Nuclear Power Plant Control Room Modernization in the United States

Affordable, abundant, and reliable electricity generation is essential to fueling a nation’s robust and globally competitive economy. In the United States (U.S.), commercial nuclear power plants (NPPs) account for approximately 19% of reliable and cost-competitive baseload electricity generation. Other technologies that reduce reliance on fossil fuels and provide baseload electricity cost-competitively at a national scale are still under development. Thus, without suitable replacements for nuclear power, the generating capacity of nuclear energy in the U.S. must be continued through the safe and efficient operation of commercial NPPs. The U.S. De-partment of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) research and development (R&D) program provides the technical bases for the long-term, safe, and economical operation of NPPs. One area in the LWRS program is the Plant Modernization pathway, which includes human factors R&D, human factors engineering (HFE), and ergonomics to enable the modernization of the instrumentation and control (I&C) technologies in NPP main control rooms (MCRs). DOE researchers, including ergonomics specialists at Idaho National Laboratory (INL) have collaborated with nu-merous commercial NPP utilities over the last few years on control room modernization. This paper summarizes recent ergonomics safety and health R&D and HFE performed in collaboration with a U.S. commercial utility to modernize their NPP MCRs.

99 GENERAL AND MISCELLANEOUS↗

Nuclear Power Plant Control Room Modernization - Simulation Based Design

As many plants age and equipment modifications are implemented, the industry has the opportunity to address the issue of control room obsolescence through technology application and enhanced engineering techniques using existing systems. This paper addresses the practice of Simulation Based Design (SBD) for control room modernization driven by plant modifications and upgrades.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Guide for Selecting Appropriate Human Factors Methods and Measures in Control Room Modernization Efforts in Nuclear Power Plants

Abstract. Many of the U.S. nuclear power plants are approaching the end of their 60-year licensing period. The U.S. Department of Energy Light Water Reactor Sustainability Program is conducting targeted research to extend the lives and ensure long-term reliability, productivity, safety, and security of these plants through targeted research, such as with integrating advanced digital instrumentation and control technologies in the main control room. There are many challenges to this, one being the integration of human factors engineering in the design and evaluation of these upgrades. This paper builds upon recent efforts in developing utility-specific guidance for integrating human factors engineering in the control room modernization process by providing commonly used data collection methods that are applicable at various phases of the upgrade process. Advantages and disadvantages of each method is provided for consideration of an optimal human factors evaluation plan to be used throughout the lifespan of the upgrade process.

99 GENERAL AND MISCELLANEOUS↗

On-line monitoring for static and dynamic performance verification of I and C systems at Sizewell B nuclear power station - 329

Plant operations and maintenance (O and M) activities account for nearly 75% of the generation cost of a modern nuclear power plant (NPP). This is largely due to time-based maintenance strategies that are expensive, time-consuming, prone to error, and sometimes detrimental to plant equipment. In contrast, condition-based maintenance via on-line monitoring (OLM) can reduce costs, increase equipment availability, and improve safety. OLM uses signals from existing plant sensors to verify the performance of plant instrumentation and equipment while the plant is operating. The Sizewell B nuclear power station in the United Kingdom, a four-loop pressurized water reactor (PWR), uses OLM techniques for several condition-based performance verification activities including pressure, level, and flow transmitter calibration monitoring, resistance temperature detector (RTD) cross calibration, and dynamic performance monitoring of pressure, level, and flow sensing systems. The implementation of OLM has enabled the plant to extend the calibration intervals of its pressure, level, and flow transmitters from 18 to 54 months and has significantly reduced the amount of critical path time needed to perform RTD cross calibration testing (up to 36 hours). Dynamic performance monitoring of its pressure, level, and flow transmitters with OLM has enabled the plant to monitor transmitter and sensing line response degradation while the plant is operating at 100% power and has dramatically reduced testing time versus the traditional hydraulic ramp testing method. The Sizewell B OLM implementation provides valuable insights into on how to overcome the technical and regulatory challenges for widespread OLM adoption by the nuclear industry. This paper describes the technical and regulatory aspects of this implementation and includes detailed examples of static and dynamic performance testing results to demonstrate the types of capabilities of OLM. Analyzing existing signals with OLM technologies can provide significant cost and safety benefits for the existing fleet of nuclear power plants. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Developing a Roadmap for Total Nuclear Plant Transformation

Commercial nuclear power plants (NPPs) provide emission free, always-on electricity that must be part of the energy mix if U.S. industry and business are to remain competitive while enjoying the benefits of a clean environment. Most U.S. NPPs in operation today were licensed using state-of-the-art analog technology of the 1970’s. While these systems are well proven and designed with multiple redundant channels, they required extensive manual surveillance and testing procedures to demonstrate their continued functioning. All of this adds up to increasing labor costs as the only means to increase plant availability. The United States (U.S.) Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program is performing a study to determine how an NPP can fully modernize, improve safety, and improve efficiency enough to make nuclear power competitive with current and future market conditions. The study is a process improvement analysis whereby current operational processes are evaluated to identify where efficiencies and cost-savings can be realized. This report will describe a process that will provide each utility with the tools to evaluate their present state, set goals for where they want to be regarding Operation and Maintenance (O&M) costs, while offering transformative pathways to achieve these improvements. The transformative changes will be divided into 1) work process improvements, 2) technology solutions, and 3) regulatory reform. By applying these pathways in combination, NPPs can achieve the dramatic O&M savings needed to sustain safe and economic operation into the future.

99 GENERAL AND MISCELLANEOUS↗

Demonstration and Evaluation of the Human-Technology Integration Guidance for Plant Modernization

The significance of nuclear power in its role producing carbon-free electricity to the U.S. cannot be overstated. However, with changes in the energy market coupled with changes in incentives given to certain resources like solar and wind, the operating and maintenance costs for these sources have seen a significant reduction, which has consequently negatively impacted the economic viability of the existing U.S. nuclear power plant fleet. Digital instrumentation and control (I&C) and control room modernization is a major critical work domain to reduce operating and maintenance costs. Existing nuclear power plants are commonly configured with mostly legacy analog I&C as well as isolated pockets of digital I&C (a plant process computer, digital recorders, etc.). One challenge with this analog I&C is that replacement parts are becoming prohibitively more expensive and difficult to obtain. Moreover, a significant challenge with the existing analog I&C is that the way in which plants are currently operated and maintained is no longer competitive with other electricity generating sources, like natural gas, where advanced digital I&C technologies are commonplace. This gap between the waynuclear power plants are operated compared to other electricity generating sources significantly challenges the economic viability of the nuclear industry. Indeed, digital I&C systems can fundamentally change the way the plant is operated (i.e., the concept of operation). The introduction of digital I&C technologies offers a wealth of benefits to the nuclear industry. However, it is important to emphasize that, to realize these benefits, a careful understanding of how to integrate technology in a collaborative way that leverages the capabilities of people and technologies is necessary. Human-technology integration applies human factors engineering methods and tools to ensure the safe and reliable use of these technologies while ensuring that the inherent features of the technologies that provide economic value are not missed. The scope of this work documents the demonstration of the recently developed human and technology integration methodology, as applied to developing a new vision and concept of operations for a major U.S. nuclear power plant fleet. This report focuses on the methodological aspects of developing a vision and concept of operations. This report shares the tools, activities, and lessons learned during a modernization currently underway for industry as a whole to consider when planning any significant digital modification and developing a new vision and concept of operations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis and Planning Framework for Nuclear Plant Transformation

Commercial nuclear power in the United States has been an unqualified success by any measure, providing low cost, carbon-free, and safe baseload electricity for decades. The industry today is at the peak of its historical performance in terms of generation output, reliable operations, and demonstrated nuclear safety. However, it is no longer among the lowest-cost electric generation sources with the emergence of subsidized renewables and shale gas generation. The business model that has served the operating nuclear fleet so well over its life is now a drag on cost performance due to its reliance on a large highly skilled labor force. In contrast, digital technology and innovation are enabling dramatic efficiencies in energy production, resulting in fierce competition for a commodity such as electricity. The nuclear power industry has responded to this challenge with many initiatives to improve efficiency and modernize plant equipment, especially where reliability and obsolescence issues are pressing. However, it would be a missed opportunity to merely modernize the plant components and the work processes of an outdated business model that was formulated to manage the technology of the 1960s. Rather, the greater opportunity is to transform that business model to one that fully exploits the capabilities of modern digital technology, resulting in substantially lower production costs and sustainable market viability. One successful example of such transformation is the concept of Integrated Operations, which was introduced into the North Sea oil and gas industry a couple of decades ago when the profitability of operating these fields was severely threatened by low world petroleum prices and the high overhead of operating the offshore oil and gas platforms. This effort resulted in significant changes to how these oil fields were operated and allowed the industry to continue profitable operation of these platforms. This example has some remarkable parallels to the U.S. commercial nuclear industry as described in the next section. This report provides an analysis and planning framework for such a nuclear plant operating model transformation based on the transferable learnings from the North Sea transformation. This framework is termed Integrated Operations for Nuclear or ION. This report describes the key principles and methods of Integrated Operations and how they are being applied in a collaboration between the DOE Light Water Reactor Sustainability Program and Xcel Energy in an initiative to transform its operating model for performance improvement and long-term sustainability. It describes a method to bring the operating costs of a nuclear fleet in line with market-based pricing, transforming work functions to reduce cost with technology innovations. This initiative will continue over the next several years in the detailed development of transformative concepts for nuclear plants, which will be published as follow-up to this initial report on Integrated Operations for Nuclear.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Planning and Analyses Performed to Install Halden’s Advanced Control Room Concept in the Human Systems Simulation Laboratory

The United States (U.S.) Department of Energy (DOE) sponsors the Light Water Reactor Sustainability (LWRS) Program, which has the goal of sustaining U.S. nuclear assets through conducting high-quality, value-added research and development (R&D) that provides the technical bases to extend the operating life of commercial NPPs. One area in the LWRS program is the Plant Modernization pathway, which includes human factors R&D, human factors engineering (HFE), and ergonomics, conducts targeted R&D to address aging and reliability concerns with the legacy instrumentation and control (I&C) and related information systems in NPPs. LWRS program researchers have been conducting R&D that enables the modernization of the I&C technologies in NPP main control rooms and have authored numerous reports on those research activities. Interestingly, however, virtually all of the control room modernization activities that have been researched in collaboration with various U.S. utility partners has been on upgrades that are the first steps to position these legacy control rooms for further full nuclear plant modernization. So, while many nuclear utility owners and operators have taken the first steps toward the digitalization of the control room I&C, LWRS program researchers are not aware of what any utility’s end-state vision is for full control room modernization. Thus, the purpose of this LWRS R&D activity is to start developing an advanced control room interface concept for legacy NPPs and to demonstrate it in the Human Systems Simulation Laboratory (HSSL) at Idaho National Laboratory (INL) so that utility partners can see what a potential end state is for their control room upgrade activities. The end state shows what a fully modernized control room looks like and how it works, and is the result of HFE and I&C work to transition the existing control room and its concept of operations to a new advanced control room configuration. This report documents the planning and analyses performed to install an advanced control room concept in the HSSL. Future LWRS reports will document the process to set up the HSSL and the gPWR with the HSI developed in Halden, and then document how LWRS program researchers at INL and Halden are supporting the capability to conduct future studies by creating additional HSIs that support control room modernization.

99 GENERAL AND MISCELLANEOUS↗

Integrated Operations for Nuclear: Work Reduction Opportunity Demonstration

Integrated Operations for Nuclear: Work Reduction Opportunity Demonstration The DI BCA document also identifies specific, digitally enabled WRO categories for further study. These were selected as most relevant by Reference Plant personnel from a larger list of WRO areas identified across the nuclear industry as captured INL/RPT-21-64134, “Process for Significant Nuclear Work Function Innovation Based on Integrated Operations Concepts.” This ION WRO demonstration report was developed to provide illustrative, specific, and actionable direction for intertwined PTPG changes associated with digital modernization efforts. The coordinated changes in these areas are intended to maximize safe plant operational and economic performance. This includes enabling WROs associated with detailed configuration, implementation, and use of digital systems and how they are supported over their lifecycle. Illustrating this direction through a minimum set of advanced technology examples establishes a model PTPG framework that can be leveraged across the spectrum of nuclear plant digital modernization efforts going forward. This document addresses many related concepts. To promote an integrated understanding of the topics that make up this work, this document contains an extensive set of internal hyperlinks. This set includes hyperlinks to page numbers in the table of contents, section numbers, items in lists, figures, tables, and references to other documents within the report. When hovering the cursor above hyperlinked text in Adobe, the cursor will change from “ ” to “ .” When the “ ” appears, a left mouse click will take the reader to the referenced location in the document. To return to the original location in the document, the reader need only press and hold the “alt” button on the keyboard and then simultaneously press the “<” directional key on the keyboard.

42 ENGINEERING↗

FY 2018 Summary Report on Industrial and Regulatory Engagement Activities

The Plant Modernization Pathway of the Light Water Reactor Sustainability (LWRS) Program conducts a vigorous engagement strategy with the U.S. nuclear power industry, including the nuclear operating companies, major support organizations, the Nuclear Regulatory Commission (NRC), and suppliers. The goal of this engagement strategy is to develop a shared vision and common understanding across the nuclear industry of the need for plant modernization, the performance improvement that can be attained, and the opportunities for collaboration to enact this vision. In FY 2018, the vision, strategy, and project work was communicated to a number of key organizations, including the major industry support organizations, and a number of important industry conferences that are attended by leaders in nuclear plant modernization. This report presents the specific engagement activities that occurred in FY 2018 to promote awareness and participation by the nuclear power industry in the activities of the Plant Modernization Pathway.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Thermal Aging Degradation of Cast Stainless Steels in LWR Systems

Cast austenitic stainless steels (CASSs) have been extensively used for the large components of light water reactor (LWR) power plants such as primary coolant piping and pump casing. Since a large number of massive CASS components are installed in every modern nuclear power plant, any significant degradation of CASS components will raise serious concerns on the integrity of the entire power plant. Upon the presumption that the replacement cost of such massive components is prohibitive, therefore, thorough scientific understanding and systematic monitoring the thermal aging degradation of CASS components should be essential requirements for assessing the plant safety. In the past few decades many researches have concluded that the formation of Cr-rich α-phase by Spinoidal decomposition of δ-ferrite phase, which is formed in high temperature region during cooling, is the primary mechanism for the thermal embrittlement. Cracking mechanism in the thermally-embrittled duplex stainless steels consists of cleavage initiation at ferrite and crack propagation via separation of ferrite-austenite interphase. It has been known, however, that such thermal aging embrittlement is observed only in accelerated aging conditions and the cast stainless steel grades used in nuclear plants have performed well without experiencing real embrittlement. It has been speculated that long-term thermal aging for ≥ 60 years could lead to further decomposition of designed phases and increase of precipitation. This will result in significantly increased susceptibility to embrittlement or other degradation due to thermal aging-radiation synergistic effect, irradiation-induced degradation, stress-corrosion cracking, and general corrosion. Currently, therefore, the thermal embrittlement of CASS components is one of the most serious concerns for extended operation of nuclear power plants. A scientific research is underway to address the issues related to the thermal aging degradation of CASS components. The research aims to provide knowledge-based conclusive prediction for the integrity of the CASS components of LWR power plants during extended operation up to and beyond 60 years. This presentation intends to provide an introductory overview on the thermal aging phenomena in LWR relevant conditions and discussion on the measurements of mechanical property degradation after accelerated and LWR relevant thermal aging treatments. First, the thermal aging effect on toughness is discussed in terms of the causes of embrittlement and influential parameters. Second, the talk will include a comprehensive discussion on the thermal aging effects in different CASS grades (i.e., CF3, CF3M, CF8, and CF8M), which will focus on the influence of alloying elements such as molybdenum and carbon. Third, approximate analysis on thermal reaction in CASS was carried out using Arrhenius equation to decide the effective temperature range for accelerated aging experiments to simulate 60 and 80 years of services in limited time frame. The results will provide valuable insights in the degree of thermal aging. Fourth, calculation on equilibrium precipitation was performed for model CASS alloys using the CALPHAD program, and the results will be used to describe the precipitation behaviors in association with the degradation in mechanical properties. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗