Developing a Roadmap for Total Nuclear Plant Transformation

Abstract

Commercial nuclear power plants (NPPs) provide emission free, always-on electricity that must be part of the energy mix if U.S. industry and business are to remain competitive while enjoying the benefits of a clean environment. Most U.S. NPPs in operation today were licensed using state-of-the-art analog technology of the 1970’s. While these systems are well proven and designed with multiple redundant channels, they required extensive manual surveillance and testing procedures to demonstrate their continued functioning. All of this adds up to increasing labor costs as the only means to increase plant availability. The United States (U.S.) Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program is performing a study to determine how an NPP can fully modernize, improve safety, and improve efficiency enough to make nuclear power competitive with current and future market conditions. The study is a process improvement analysis whereby current operational processes are evaluated to identify where efficiencies and cost-savings can be realized. This report will describe a process that will provide each utility with the tools to evaluate their present state, set goals for where they want to be regarding Operation and Maintenance (O&M) costs, while offering transformative pathways to achieve these improvements. The transformative changes will be divided into 1) work process improvements, 2) technology solutions, and 3) regulatory reform. By applying these pathways in combination, NPPs can achieve the dramatic O&M savings needed to sustain safe and economic operation into the future.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Joe, Jeffrey C., Remer, S. Jason. 2019-07-30. Developing a Roadmap for Total Nuclear Plant Transformation. https://doi.org/10.2172/1545537

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Fire Protection Design

The purpose of this project is to design the demolition and installation of a deluge valve swap from a DV-5 to a DV-5A valve.

99 GENERAL AND MISCELLANEOUS↗