Engineering PapersSearch

SEARCH · Engineering Papers

Results for “MANPOWER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

ISS Payload Operations: The Need for and Benefit of Responsive Planning

International Space Station (ISS) payload operations are controlled through implementation of a payload operations plan. This plan, which represents the defined approach to payload operations in general, can vary in terms of level of definition. The detailed plan provides the specific sequence and timing of each component of a payload's operations. Such an approach to planning was implemented in the Spacelab program. The responsive plan provides a flexible approach to payload operations through generalization. A responsive approach to planning was implemented in the NASA/Mir Phase 1 program, and was identified as a need during the Skylab program. The current approach to ISS payload operations planning and control tends toward detailed planning, rather than responsive planning. The use of detailed plans provides for the efficient use of limited resources onboard the ISS. It restricts flexibility in payload operations, which is inconsistent with the dynamic nature of the ISS science program, and it restricts crew desires for flexibility and autonomy. Also, detailed planning is manpower intensive. The development and implementation of a responsive plan provides for a more dynamic, more accommodating, and less manpower intensive approach to planning. The science program becomes more dynamic and responsive as the plan provides flexibility to accommodate real-time science accomplishments. Communications limitations and the crew desire for flexibility and autonomy in plan implementation are readily accommodated with responsive planning. Manpower efficiencies are accomplished through a reduction in requirements collection and coordination, plan development, and maintenance. Through examples and assessments, this paper identifies the need to transition from detailed to responsive plans for ISS payload operations. Examples depict specific characteristics of the plans. Assessments identify the following: the means by which responsive plans accommodate the dynamic nature of science programs and the crew desire for flexibility; the means by which responsive plans readily accommodate ISS communications constraints; manpower efficiencies to be achieved through use of responsive plans; and the implications of responsive planning relative to resource utilization efficiency.

Nahay, Ed

Demographics of Investigators Involved in OSSA-Funded Research

The birth of the U.S. civil space program and the subsequent, dramatic growth in the ranks of the space science research population occurred in the 1950s and 1960s'. The large, post- Sputnik/ Apollo buildup in space program manpower is now approximately one career-lifetime in the past. It is therefore natural to anticipate that a large fraction of the space program engineers, scientists, and managers who pioneered the early exploration of space are approaching retirement. Such a "retirement wave" bodes both a loss of manpower and, more fundamentally, a loss of experience from the civil-space manpower base. Such losses could play a critical role constraining in NASA's ability to expand or maintain its technical capabilities. If this indeed applies to the NASA space science research population, then the potential for problems is exacerbated by the anticipated growth in flight rates, data volume, and data-set diversity which will accompany the planned expansion in the OSSA science effort during the 1990s and 2000s. The purpose of this study was to describe the OSSA PI/Co-I population and to determine the degree to which the OSSA space science investigator population faces a retirement wave, and to estimate the future population of PIs in the 1990-2010 era. To conduct such a study, we investigated the present demographics of the PI and Co-1 population contained in the NASA/OSSA Announcement of Opportunity (AO) mailing list. PIs represent the "leadership" class of the OSSA scientific researcher population, and Co-Is represent one important, oncoming component of the "replacement" generation. Using the PI population data, we then make projection estimates of the future PI population from 1991 through 2010, under various NASA growth/PI demand scenarios.

Stern, S. Alan

Explanation of random experiment sheduling and its application to space station analysis

The capability of the McDonnell-Douglas Phase B space station concept to complete the Blue Book Experiment program is analyzed and the Random experiment program with Resource Impact (REPRI) which was used to generate the data is described. The results indicate that station manpower and electrical power are the two resources which will constrain the amount of the Blue Book program that the station can complete. The station experiment program and its resource requirements are sensitive to levels of manpower and electrical power 13.5 men and 11 kilowatts. Continuous artificial gravity experiments have much less impact on the experiment program than experiments using separate artificial gravity periods. Station storage volume presently allocated for the FPE's and their supplies (1600 cu ft) is more than adequate. The REPRI program uses the Monte Carlo technique to generate a set of feasible experiment schedules for a space station. The schedules are statistically analyzed to determine the impact of the station experiment program resource requirements on the station concept. Also, the sensitivity of the station concept to one or more resources is assessed.

Moore, J. E.

Automatic photointerpretation for land use management in Minnesota

The author has identified the following significant results. Progress is being made in the areas of sun angle and atmospheric effects on the data and its interpretation. The effort is aimed at correction using only navigation and calendar data needed for satellite operation and derivations from the MSS data. Water estimation of value to land planners and conservationists has been demonstrated with verification of performance by comparison with a concurrent study involving map planimetry, aerial photos, and field-checking. The satellite will provide seasonal and annual coverage with timely information in a way not now feasible by conventional methods. For example, the reference data were obtained using the most recent files, which date back to 1949, and from most recent photography taken in 1968. The calendar time involved was three to four months, which is a reflection on priority pressure on trained manpower available. ERTS-1 data can help relieve this problem by providing the needed information while freeing trained manpower for more appropriate parts of the effort.

Swanlund, G. D.

An integrated decision support system for TRAC: A proposal

Optimal allocation and usage of resources is a key to effective management. Resources of concern to TRAC are: Manpower (PSY), Money (Travel, contracts), Computing, Data, Models, etc. Management activities of TRAC include: Planning, Programming, Tasking, Monitoring, Updating, and Coordinating. Existing systems are insufficient, not completely automated, manpower intensive, and has the potential for data inconsistency exists. A system is proposed which suggests a means to integrate all project management activities of TRAC through the development of a sophisticated software and by utilizing the existing computing systems and network resources. The systems integration proposal is examined in detail.

Mukkamala, Ravi

OCAM - A CELSS modeling tool: Description and results

Controlled Ecological Life Support System (CELSS) technology is critical to the Space Exploration Initiative. NASA's Kennedy Space Center has been performing CELSS research for several years, developing data related to CELSS design. We have developed OCAM (Object-oriented CELSS Analysis and Modeling), a CELSS modeling tool, and have used this tool to evaluate CELSS concepts, using this data. In using OCAM, a CELSS is broken down into components, and each component is modeled as a combination of containers, converters, and gates which store, process, and exchange carbon, hydrogen, and oxygen on a daily basis. Multiple crops and plant types can be simulated. Resource recovery options modeled include combustion, leaching, enzyme treatment, aerobic or anaerobic digestion, and mushroom and fish growth. Results include printouts and time-history graphs of total system mass, biomass, carbon dioxide, and oxygen quantities; energy consumption; and manpower requirements. The contributions of mass, energy, and manpower to system cost have been analyzed to compare configurations and determine appropriate research directions.

Drysdale, Alan

HL-20 operations and support requirements for the Personnel Launch System mission

The processing, mission planning, and support requirements were defined for the HL-20 lifting-body configuration that can serve as a Personnel Launch System. These requirements were based on the assumption of an operating environment that incorporates aircraft and airline support methods and techniques that are applicable to operations. The study covered the complete turnaround process for the HL-20, including landing through launch, and mission operations, but did not address the support requirements of the launch vehicle except for the integrated activities. Support is defined in terms of manpower, staffing levels, facilities, ground support equipment, maintenance/sparing requirements, and turnaround processing time. Support results were drawn from two contracted studies, plus an in-house analysis used to define the maintenance manpower. The results of the contracted studies were used as the basis for a stochastic simulation of the support environment to determine the sufficiency of support and the effect of variance on vehicle processing. Results indicate the levels of support defined for the HL-20 through this process to be sufficient to achieve the desired flight rate of eight flights per year.

Morris, W. D.

Advanced automation for in-space vehicle processing

The primary objective of this 3-year planned study is to assure that the fully evolved Space Station Freedom (SSF) can support automated processing of exploratory mission vehicles. Current study assessments show that required extravehicular activity (EVA) and to some extent intravehicular activity (IVA) manpower requirements for required processing tasks far exceeds the available manpower. Furthermore, many processing tasks are either hazardous operations or they exceed EVA capability. Thus, automation is essential for SSF transportation node functionality. Here, advanced automation represents the replacement of human performed tasks beyond the planned baseline automated tasks. Both physical tasks such as manipulation, assembly and actuation, and cognitive tasks such as visual inspection, monitoring and diagnosis, and task planning are considered. During this first year of activity both the Phobos/Gateway Mars Expedition and Lunar Evolution missions proposed by the Office of Exploration have been evaluated. A methodology for choosing optimal tasks to be automated has been developed. Processing tasks for both missions have been ranked on the basis of automation potential. The underlying concept in evaluating and describing processing tasks has been the use of a common set of 'Primitive' task descriptions. Primitive or standard tasks have been developed both for manual or crew processing and automated machine processing.

Sklar, Michael

Operations automation

This is truly the era of 'faster-better-cheaper' at the National Aeronautics and Space Administration/Jet Propulsion Laboratory (NASA/JPL). To continue JPL's primary mission of building and operating interplanetary spacecraft, all possible avenues are being explored in the search for better value for each dollar spent. A significant cost factor in any mission is the amount of manpower required to receive, decode, decommutate, and distribute spacecraft engineering and experiment data. The replacement of the many mission-unique data systems with the single Advanced Multimission Operations System (AMMOS) has already allowed for some manpower reduction. Now, we find that further economies are made possible by drastically reducing the number of human interventions required to perform the setup, data saving, station handover, processed data loading, and tear down activities that are associated with each spacecraft tracking pass. We have recently adapted three public domain tools to the AMMOS system which allow common elements to be scheduled and initialized without the normal human intervention. This is accomplished with a stored weekly event schedule. The manual entries and specialized scripts which had to be provided just prior to and during a pass are now triggered by the schedule to perform the functions unique to the upcoming pass. This combination of public domain software and the AMMOS system has been run in parallel with the flight operation in an online testing phase for six months. With this methodology, a savings of 11 man-years per year is projected with no increase in data loss or project risk. There are even greater savings to be gained as we learn other uses for this configuration.

Boreham, Charles Thomas

Space Station Furnace Facility Management Information System (SSFF-MIS) Development

This report summarizes the chronology, results, and lessons learned from the development of the SSFF-MIS. This system has been nearly two years in development and has yielded some valuable insights into specialized MIS development. General: In December of 1994, the Camber Corporation and Science Applications International Corporation (SAIC) were contracted to design, develop, and implement a MIS for Marshall Space Flight Center's Space Station Furnace Facility Project. The system was to be accessible from both EBM-Compatible PC and Macintosh platforms. The system was required to contain data manually entered into the MIS as well as data imported from other MSFC sources. Electronic interfaces were established for each data source and retrieval was to be performed at prescribed time intervals. The SOW requirement that predominantly drove the development software selection was the dual-platform (IBM-PC and Macintosh) requirement. The requirement that the system would be maintained by Government personnel influenced the selection of Commercial Off-the-shelf software because of its inherent stability and readily available documentation and support. Microsoft FoxPro Professional 2.6 for Windows and Macintosh was selected as the development tool. This is a software development tool that has been in use for many years. It is stable and powerful. Microsoft has since released the replacement for this product, Microsoft Visual FoxPro, but at the time of this development, it was only available on the Windows platform. The initial contract included included the requirement for capabilities relating to the Work- and Organizational Breakdown Structures, cost (plan and actuals), workforce (plan and actuals), critical path scheduling, trend analysis, procurements and contracts, interface to manufacturing, Safety and Mission Assurance, risk analysis, and technical performance indicators. It also required full documentation of the system and training of users. During the course of the contract, the requirements for Safety and Mission Assurance interface, risk analysis, and technical performance indicators were deleted. Additional capabilities were added as reflected in the Contract Chronology below. Modification 4 added the requirement for Support Contractor manpower data, the ability to manually input data not imported from non-nal sources, a general 'health' indicator screen, and remote usage. Mod 6 included the ability to change the level of planning of Civil Service Manpower at any time and the ability to manually enter Op Codes in the manufacturing data where such codes were not provided by the EMPACS database. Modification 9 included a number of changes to report contents and formats. Modification 11 required the preparation of a detailed System Design Document.

Meade, Robert M.

Using Common Graphics Paradigms Implemented in a Java Applet to Represent Complex Scheduling Requirements

The experiments planned for the International Space Station promise to be complex, lengthy and diverse. The scarcity of the space station resources will cause significant competition for resources between experiments. The scheduling job facing the Space Station mission planning software requires a concise and comprehensive description of the experiments' requirements (to ensure a valid schedule) and a good description of the experiments' flexibility (to effectively utilize available resources). In addition, the continuous operation of the station, the wide geographic dispersion of station users, and the budgetary pressure to reduce operations manpower make a low-cost solution mandatory. A graphical representation of the scheduling requirements for station payloads implemented via an Internet-based application promises to be an elegant solution that addresses all of these issues. The graphical representation of experiment requirements permits a station user to describe his experiment by defining "activities" and "sequences of activities". Activities define the resource requirements (with alternatives) and other quantitative constraints of tasks to be performed. Activities definitions use an "outline" graphics paradigm. Sequences define the time relationships between activities. Sequences may also define time relationships with activities of other payloads or space station systems. Sequences of activities are described by a "network" graphics paradigm. The bulk of this paper will describe the graphical approach to representing requirements and provide examples that show the ease and clarity with which complex requirements can be represented. A Java applet, to run in a web browser, is being developed to support the graphical representation of payload scheduling requirements. Implementing the entry and editing of requirements via the web solves the problems introduced by the geographic dispersion of users. Reducing manpower is accomplished by developing a concise representation which eliminates the misunderstanding possible with verbose representations and which captures the complete requirements and flexibility of the experiments.

Jaap, John

Automation of the Environmental Control and Life Support System

The objective of the Environmental Control and Life Support System (ECLSS) Advanced Automation Project is to recommend and develop advanced software for the initial and evolutionary Space Station Freedom (SSF) ECLS system which will minimize the crew and ground manpower needed for operations. Another objective includes capturing ECLSS design and development knowledge for future missions. This report summarizes our results from Phase I, the ECLSS domain analysis phase, which we broke down into three steps: 1) Analyze and document the baselined ECLS system, 2) envision as our goal an evolution to a fully automated regenerative life support system, built upon an augmented baseline, and 3) document the augmentations (hooks and scars) and advanced software systems which we see as necessary in achieving minimal manpower support for ECLSS operations. In addition, Phase I included development of an advanced software life cycle testing tools will be used in the development of the software. In this way, we plan in preparation for phase II and III, the development and integration phases, respectively. Automated knowledge acquisition, engineering, verification, and can capture ECLSS development knowledge for future use, develop more robust and complex software, provide feedback to the KBS tool community, and insure proper visibility of our efforts.

Dewberry, Brandon S.

Humans to Mars, but How Many? Using Imprint Human Performance Models to Inform Crew Size

HUMANS TO MARS, BUT HOW MANY? USING IMPRINT HUMAN PERFORMANCE MODELS TO INFORM CREW SIZE Missions to Mars will differ from previous human spaceflight missions in that the onboard crew of astronauts will be required to operate in an Earth-independent manner due to long communication delays. Without a systematic, repeatable process to determine the number and composition of crew necessary to successfully accomplish these missions, NASA increases the risk that crew sizes may be too small to meet primary mission objectives under nominal conditions and, more consequentially, that crewmembers may not have the expertise needed to successfully respond to unforeseen failures without the real-time expertise of the Mission Control Central (MCC) team NASA currently relies upon. The NASA Engineering and Safety Center (NESC) is developing a methodology for assessing the trade space of factors that affect the number of crew for future missions. This methodology includes the consideration of results from three human performance models developed using the Improved Performance Research and Integration Tool (IMPRINT) modeling platform as well as a custom-built model on expertise trained within the crew. The custom-built crew expertise model results will be presented in the training sub-tag. Here we present results of the three IMPRINT models. Two of these models were built using IMPRINT’s Operations Model capability, with detailed task networks for specific systems and scenarios allowing for a comprehensive mental workload analysis on certain crew positions. The third model was built using IMPRINT’s Force Model capability, allowing for a higher-level manpower analysis based on crew engagement in activities performed over a longer Mars transit scenario, and how those activities may be impacted by unplanned events and new tasking unique to the Mars mission. Differences between the models will be presented, as well as examples of model results and a discussion of how those results may inform future Mars mission manpower requirements, system design, and operating procedures.

Donna L Dempsey

Workforce planning: a review of methodologies

Workforce planning deals with determining the number of employees and associated skills necessary to meet the future operational needs of an organization. A workforce system consists of six elements: recruitment, attrition, promotion, training, retention, and scheduling. Historically, several workforce modeling and analysis methodologies have been developed to capture these elements. This paper reviews the results of workforce and manpower models published within peer-reviewed literature between 1959 and 2021 to provide an in-depth analysis of current models. The focus of this review is on analytical, simulation, and empirical models found in literature that were collected based on a citation requirement and keyword search criteria. Results demonstrate the trends in workforce modeling research and discuss the common uses of each model type and the advantages/disadvantages related to each model. Based on the common attributes of workforce systems, the discussion focuses on the most frequently used model type for each element and the best use for each model. Lastly, recommendations are made for the development of workforce models that allow the most comprehensive view of the workforce systems of the future.

42 ENGINEERING

Fundamental Studies of Soiling and Cementation of PV Cover Glass Materials: Addressing Reliability with Advanced X-ray Scattering/Spectroscopy and First Principles Modeling (Final Technical Report)

Accumulation of soils and other particulate matter on the front cover glass of solar photovoltaic (PV) modules results in transmission losses that detrimentally affect the power output of PV installations. The conventional solution to this problem is manual abrasive scrubbing of modules, which entails significant water usage and manpower. To further combat this issue, there is a concerted effort within the PV industry to develop anti-soiling (AS) coatings to mitigate power losses due to soiling of PV modules, which can exceed 35% in some cases. However, relatively little is known about the fundamental physical and chemical mechanisms that enable anti-soiling behavior. In this project, a combination of advanced X-ray analysis tools and first principles computational modeling has employed to understand the physical and chemical interactions between environmental soils and PV cover glass materials. The specific objectives were: 1) investigate soiling interactions and cementation behavior of relevant PV materials, including bare glass, conventional antireflective (AR) coatings, and a commercial AS coating, using a library of representative particulate soils, and 2) utilize first principles computational spectroscopy modeling to interpret the experimental X-ray spectroscopy measurements and determine the detailed surface chemistry changes that occur on these surfaces in the presence of soiling and cementation.

14 SOLAR ENERGY