Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MANPOWER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Development of evaluation models of manpower needs for dismantling the dry conversion process-related equipment in uranium refining and conversion plant (URCP)

Evaluation models for determining the manpower needs for dismantling various types of equipment in uranium refining and conversion plant (URCP) have been developed. The models are widely applicable to other uranium handling facilities. Additionally, a simplified model was developed for easily and accurately calculating the manpower needs for dismantling dry conversion process-related equipment (DP equipment). It is important to evaluate beforehand project management data such as manpower needs to prepare an optimized decommissioning plan and implement effective dismantling activity. The Japan Atomic Energy Agency (JAEA) has developed the project management data evaluation system for dismantling activities (PRODIA code), which can generate project management data using evaluation models. For preparing an optimized decommissioning plan, these evaluation models should be established based on the type of nuclear facility and actual dismantling data. In URCP, the dry conversion process of reprocessed uranium and others was operated until 1999, and the equipment related to the main process was dismantled from 2008 to 2011. Actual data such as manpower for dismantling were collected during the dismantling activities, and evaluation models were developed using the collected actual data on the basis of equipment classification considering the characteristics of uranium handling facility. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Projecting manpower to attain quality

The resulting model is useful as a projection tool but must be validated in order to be used as an on-going software cost engineering tool. A procedure is developed to facilitate the tracking of model projections and actual data to allow the model to be tuned. Finally, since the model must be used in an environment of overlapping development activities on a progression of software elements in development and maintenance, a manpower allocation model is developed for use in a steady state development/maintenance environment. In these days of soaring software costs it becomes increasingly important to properly manage a software development project. One element of the management task is the projection and tracking of manpower required to perform the task. In addition, since the total cost of the task is directly related to the initial quality built into the software, it becomes a necessity to project the development manpower in a way to attain that quality. An approach to projecting and tracking manpower with quality in mind is described.

Rone, K. Y.↗

Evaluation of the HARDMAN comparability methodology for manpower, personnel and training

The methodology evaluation and recommendation are part of an effort to improve Hardware versus Manpower (HARDMAN) methodology for projecting manpower, personnel, and training (MPT) to support new acquisition. Several different validity tests are employed to evaluate the methodology. The methodology conforms fairly well with both the MPT user needs and other accepted manpower modeling techniques. Audits of three completed HARDMAN applications reveal only a small number of potential problem areas compared to the total number of issues investigated. The reliability study results conform well with the problem areas uncovered through the audits. The results of the accuracy studies suggest that the manpower life-cycle cost component is only marginally sensitive to changes in other related cost variables. Even with some minor problems, the methodology seem sound and has good near term utility to the Army. Recommendations are provided to firm up the problem areas revealed through the evaluation.

Zimmerman, W.↗

Manpower Allocation and Reporting

Interactive Manpower Allocation and Reporting System (MARS) helps planners make manpower allocation decisions. Includes provisions to enter overall constraints for projects and persons, assign individuals to projects, compute automatically overhead category, report on deviations from constraints, and generate manpower resource allocation reports.

Merwarth, P. D.↗

Manpower and project planning

The purpose was to study how manpower and projects are planned at the Facilities Engineering Division (FENGD) within the Systems Engineering and Operations Directorate of the LaRC and to make recommendations for improving the effectiveness and productivity ot the tools that are used. The existing manpower and project planning processes (including the management plan for the FENGD, existing manpower planning reports, project reporting to LaRC and NASA Headquarters, employee time reporting, financial reporting, and coordination/tracking reports for procurement) were discussed with several people, and project planning software was evaluated.

Johnson, David W.↗

Manpower forecast program

Program reports distribution of actual manpower levels in each section versus accounts, projects versus sections, sections versus manpower classes, and project offices versus sections.

Mc Cornock, M. D.↗

Manpower management information system /MIS/

System of programs capable of building and maintaining data bank provides all levels of management with regular manpower evaluation reports and data source for special management exercises on manpower.

Gravette, M. C.↗

Final report for LDRD project 11-0783 : directed robots for increased military manpower effectiveness.

The purpose of this LDRD is to develop technology allowing warfighters to provide high-level commands to their unmanned assets, freeing them to command a group of them or commit the bulk of their attention elsewhere. To this end, a brain-emulating cognition and control architecture (BECCA) was developed, incorporating novel and uniquely capable feature creation and reinforcement learning algorithms. BECCA was demonstrated on both a mobile manipulator platform and on a seven degree of freedom serial link robot arm. Existing military ground robots are almost universally teleoperated and occupy the complete attention of an operator. They may remove a soldier from harm's way, but they do not necessarily reduce manpower requirements. Current research efforts to solve the problem of autonomous operation in an unstructured, dynamic environment fall short of the desired performance. In order to increase the effectiveness of unmanned vehicle (UV) operators, we proposed to develop robots that can be 'directed' rather than remote-controlled. They are instructed and trained by human operators, rather than driven. The technical approach is modeled closely on psychological and neuroscientific models of human learning. Two Sandia-developed models are utilized in this effort: the Sandia Cognitive Framework (SCF), a cognitive psychology-based model of human processes, and BECCA, a psychophysical-based model of learning, motor control, and conceptualization. Together, these models span the functional space from perceptuo-motor abilities, to high-level motivational and attentional processes.

99 GENERAL AND MISCELLANEOUS↗

FORTRAN manpower account program

Computer program for determining manpower costs for full time, part time, and contractor personnel is discussed. Twelve different tables resulting from computer output are described. Program is written in FORTRAN 4 for IBM 360/65 computer.

Strand, J. N.↗

Orbital transfer vehicle launch operations study: Manpower summary and facility requirements, volume 5

All manpower numbers, number of heads (by skill), serial time and manhours have been accumulated and compiled on a per subtask basis in spreadsheet format for both the ground based and the space based data flows. To aid in identifying the facility resources required to process the Ground Based Orbital Transfer Vehicle (GBOTV) and/or the space based orbital transfer vehicle (SBOTV) through the ground facilities at Kennedy Space Center (KSC), a software application package was developed using a general purpose data base management system known as Data Flex. The facility requirements are used as the basic input to this software application. The resources of the KSC facility that could be used by orbital transfer vehicle program were digitized in the same format used to identify facility requirements. The facility capabilities were digitized in this format for subsequent, automated comparative analyses. Composite facility requirements are compared to each of the baseline facility capabilities and the system generates a relative score that indicates how each facility weighs against the composite requirements in relation to the other facilities in the set.

Source record↗

Launch operations manpower yesterday, today and tomorrow

The manpower to accomplish spacecraft launch operations was analyzed. It seems that the ratio of personnel to launches was much higher in the beginning of the space program than in later years. The analysis was performed to see why the operational efficiency was better then than now and how that efficiency can be reattained.

Ojalehto, George↗

SU-F-P-13: NRG Oncology Medical Physics Manpower Survey Quantifying Support Demands for Multi Institutional Clinical Trials

Purpose: A survey was taken by NRG Oncology to assess Full Time Equivalent (FTE) contributions to multi institutional clinical trials by medical physicists.No current quantification of physicists’ efforts in FTE units associated with clinical trials is available. The complexity of multi-institutional trials increases with new technologies and techniques. Proper staffing may directly impact the quality of trial data and outcomes. The demands on physics time supporting clinical trials needs to be assessed. Methods: The NRG Oncology Medical Physicist Subcommittee created a sixteen question survey to obtain this FTE data. IROC Houston distributed the survey to their list of 1802 contact physicists. Results: After three weeks, 363 responded (20.1% response). 187 (51.5%) institutions reporting external beam participation were processed. There was a wide range in number of protocols active and supported at each institution. Of the 187 clinics, 134 (71.7%) participate in 0 to 10 trials, 28 (15%) in 11 to 20 trials, 10 (5.3%) in 21 to 30 trials, 9 (4.8%) had 40 to 75 trials. On average, physicist spent 2.7 hours (SD: 6.0) per week supervising or interacting with clinical trial staff. 1.25 hours (SD: 3.37), 1.83 hours (SD: 4.13), and 0.64 hours(SD: 1.13) per week were spent on patient simulation, reviewing treatment plans, and maintaining a DICOM server, respectively. For all protocol credentialing activities, physicist spent an average of 37.05 hours (SD: 96.94) yearly. To support dosimetrists, clinicians, and therapists, physicist spend on average 2.07 hours (SD: 3.52) per week just reading protocols. Physicist attended clinical trial meetings for on average 1.13 hours (SD: 1.85) per month. Conclusion: Responding physicists spend a nontrivial amount of time: 8.8 hours per week (0.22 FTE) supporting, on average, 9 active multi-institutional clinical trials.

60 APPLIED LIFE SCIENCES↗

Probabilistic approach to long range planning of manpower

Publication presents a total long range planning model for project oriented organizations. The total model consists of planning systems which originate - /1/ at the project level and consolidate into an overall plan, and /2/ from a budetary ceiling and allocate to the individual projects. Analysis of /1/ and /2/ is provided for management decision making.

Lejk, R. A.↗