Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Land Use Control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Sustainable Transactions - The Fine Art of the Forever Deal - 19569

The U.S. Department of Energy Office of Legacy Management (LM) has various real property interests at the 92 sites within its current portfolio. Because of its unique mission, LM does not own most of the sites for which it has responsibility for long-term surveillance and maintenance (LTS and M). In addition to the sites it does own, LM works with various federal, state, local, and private entities to execute its obligations. Each site has its own narrative with respect to the real property assets: how they were acquired, how they are sustained, and how they were or will be dispositioned. Since the regulatory time frame for LTS and M activities at some sites can be in perpetuity, durable and effective instruments and documentation are necessary to support LM's mission as a federal land manager and steward. In addition, more than half of the sites currently in LM's inventory do not allow unrestricted use because of residual contamination from historical activities, and institutional controls are required to limit human and environmental exposures to residual contamination by controlling land use, restricting access to potential hazards, and making the public aware of potential dangers from the residual contamination. Thus, the overall real property interests and transactions associated with these sites not only have to address the environmental concerns associated with protection of human health and the environment but also how best to position LM's real property assets to support the mission for future generations. These types of transactions are often complex, requiring the negotiation of numerous documents to achieve and sustain protection of human health and the environment while allowing for future use. Such planning needs to be flexible enough to envision that the original transaction will likely change over time due to changing regulations, communities, stakeholders, and site conditions as operation and maintenance activities are performed. Planning for the integration of these requirements with the needs of the end users, stakeholders, and communities is paramount to a successful project, and various transactional considerations impact how best to achieve this goal. As such, these transactions have to be sustainable. Real property interests change over time, with new owners, operators, regulators, and stakeholders. Determining the sustainability of these real property interests, therefore, calculates the sustainability of each asset's physical attributes and also the sustainability of the various legal instruments and arrangements that are put in place at each site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Perpetual factors involved in performance of air traffic controllers using a microwave landing system

The task involved the control of two simulated aircraft targets per trial, in a 37.0 -km radius terminal area, by means of conventional radar vectoring and/or speed control. The goal was to insure that the two targets crossed the Missed Approach Point (MAP) at the runway threshold exactly 60 sec apart. The effects on controller performance of the MLS configuration under wind and no-wind conditions were examined. The data for mean separation time between targets at the MAP and the range about that mean were analyzed by appropriate analyses of variance. Significant effects were found for mean separation times as a result of the configuration of the MLS and for interaction between the configuration and wind conditions. The analysis of variance for range indicated significantly poorer performance under the wind condition. These findings are believed to be a result of certain perceptual factors involved in radar air traffic control (ATC) using the MLS with separation of targets in time.

Gershzohn, G.↗

Preparing the FUSRAP Colonie Interim Storage Site for Transfer Back to the US Department of Energy Office of Legacy Management - 19215

The Formerly Utilized Sites Remedial Action Program (FUSRAP) Colonie Interim Storage Site was transferred from the US Department of Energy (US DOE) to the US Army Corps of Engineers (USACE) in 1997. The USACE initiated remediation efforts at the Site under FUSRAP. The Site was separated into three distinct operable units (OU) to more efficiently manage the remedial process: 1) Groundwater OU, 2) Main Site Soils OU, and 3) Vicinity Property OU. The USACE has completed remedial actions at each of these three OUs and has advanced the OU remedies at the Site to the long-term stewardship stage to be executed by the US DOE Office of Legacy Management (LM). The US DOE LM is the current real property owner of record of the Colonie Main Site. A summary of each OU and the activities needed to prepare for site transfer follows: OU 1 - USACE issued the Colonie Groundwater OU Record of Decision (ROD) (USACE 2010a) on April 9, 2010. The Groundwater ROD remedy is monitored natural attenuation (MNA) and long-term monitoring (LTM) of groundwater after source removal completion. Results of groundwater monitoring indicate reductions in concentrations of contaminants of concern (COC). Based on the marked progress to date, USACE has optimized the groundwater LTM program (USACE, 2014) by reducing the well network, sampling frequency, and analytical parameters, and by abandoning wells that are no longer needed. A Groundwater ROD Five-Year Review report was submitted to the New York State Department of Environmental Conservation (NYSDEC) for review in 2018. NYSDEC agreed that MNA is still an appropriate remedial method although it is progressing at a slower rate than predicted. OU 2 - From 1999 to 2007, USACE completed the large-scale removal of soil at the Main Site, which included the adjacent Town of Colonie Vicinity Property. Radioactively contaminated soil along with accessible metals-contaminated soil and soil containing volatile organic compounds (VOC) were removed during this effort. A total of 103,402 cubic meters (m{sup 3}) of soil was excavated and disposed offsite. On March 26, 2015, USACE signed the Main Site Soils OU ROD (USACE, 2015a). The ROD remedy included provisions for Land Use Controls (LUC) consisting of institutional controls (IC) through an Environmental Easement for management of three small and discrete inaccessible locations within three of the 27 Final Status Survey units of the Main Site. The Environmental Easement provides a means of protection based on both current and future land use by placing restrictions on soil excavation and reuse. The easement and a supporting Site Management Plan (SMP) will be finalized by LM in coordination with NYSDEC. OU 3 - the Vicinity Property OU ROD was signed on 20 September 2017. This ROD declared No Action (NA) for dust and No Further Action (NFA) for soil and other media for the Vicinity Properties. Prior to the ROD, USACE performed dust sampling and other characterization activities at representative commercial and residential Vicinity Property locations. These efforts were reported in the Colonie FUSRAP Site Vicinity Property Operable Unit Remedial Investigation Summary Report (USACE, 2016). A Site Closeout Report (SCOR) was issued to NYSDEC and approved in 2018. The approval of this report starts the transfer process back to the LM. Ongoing and future transfer activities include records retention and management, preparation and filing of real estate records, physical site management (fencing, landscape maintenance, well abandonment) and coordination with state regulators and LM staff. This presentation is intended to make all stakeholders aware of the necessary steps for site transfer from the USACE back to the LM. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oil and Natural Gas Development near and beneath Uranium Tailings Cells and Other Remediated Sites - 20358

DOE LM is responsible for maintaining remedies at more than 50 remediated sites that require active long-term surveillance and maintenance (LTS and M). Institutional controls (ICs) were established to limit human and environmental exposures to residual contamination by controlling land use, restricting access to potential hazards, and making the public aware of potential dangers from the residual contamination. ICs for each site were developed based on current and foreseeable conditions; however, these controls should evolve to mitigate potential human health and other environmental risks from unanticipated changes in activities or site conditions. Activities conducted beyond the DOE long-term care boundaries by non-DOE parties may impact the effectiveness of ICs or even the long-term stability of disposal cells and groundwater remedies. Several sites that LM manages or that will transfer to LM for LTS and M are in active oil and gas production basins. The sites are associated with uranium ore milling or nuclear test sites and have been remediated or are in the process of remediation and have no ongoing DOE mission. Particularly since 2005, hydraulic fracturing ('fracking') combined with directional drilling has dramatically increased oil and natural gas (oil/gas) production in the United States, now making it the number one hydrocarbon-producing country. Fracking has allowed production from shale and other rocks of low natural permeability that were historically not considered viable oil/gas resources. Also, because wellbores can now be drilled as many as 5 kilometers or more horizontally, hydrocarbons can be recovered from zones without having access to the surface above them. Drilling activity near Rulison, Colorado, the location of an underground nuclear detonation managed by LM, has raised public concerns that remnant radioactivity in the detonation zone could migrate to producing wells and enter the natural gas distribution system. At sites like the Falls City, Texas, Disposal site, transitioned to LM with a split estate, increased production in the region has resulted in wellbores beneath the long-term care boundary of the site. While the DOE license for Falls City was approved by the NRC in 1997 without the acquisition of the subsurface rights, NRC has raised concerns on whether this activity impacts the integrity of the cell and/or groundwater remedies. In Wyoming, LM is anticipating receiving the license for the Bear Creek site and manages the Spook site, both locations of uranium mill tailings disposal cells. These Wyoming sites are in an active region of major oil and gas development. This change in surrounding land use will require LM to work collaboratively with NRC to address these concerns. At several DOE sites radioactive waste, and often intermixed nonradioactive constituents, is permanently isolated in engineered disposal cells. At other sites, residual contamination can be present in groundwater, blast cavities, and infinite amounts within soil. Areas targeted for oil and gas development at the Texas and Wyoming sites range from depths of 2440 to 3350 meters (8000-11000 feet) below ground surface. When most site remedies were designed, oil and gas development was not considered to be an issue within the site boundary. With the more recent uses of directional drilling, fracking, and associated wastewater injections, the evaluative criteria for incoming sites and ICs for managing long-term protectiveness and regulatory compliance are changing. Although DOE surface ownership was previously thought to be a robust IC to prevent surface and subsurface development, particularly at disposal sites, that may no longer be the case. Whereas the subsurface development at Texas and Wyoming sites is currently occurring at thousands of meters beneath the surface, shallower and direct onsite development would be more of a concern for LM. The energy introduced when a well is hydraulically fractured causes microseismic events (magnitude -2 to 1.0) as the fractures propagate but does not directly cause seismic events (earthquakes) of sufficient magnitude to damage surface structures. Additionally, the extent of the hydraulic fractures is limited to the targeted depths, which are far below the surface. However, earthquakes of sufficient magnitude to damage surface structures have been attributed to the injection of wastewater into disposal wells. States that have experienced these effects have enacted regulations that limit the rate and pressures that wastewater can be injected into disposal wells. Items LM may consider are the need for monitoring the volume of water injected into nearby disposal wells and possibly installing seismic stations at sites most susceptible to damage. While the need to demonstrate that no impact from oil and gas extraction activities on a site groundwater remedy or disposal cells will vary from site to site, LM is assessing risk criteria for this activity. Though LM has not experienced an issue yet at a uranium tailings disposal site, it cannot assume that there will be none, and must address NRC concerns. LM is building on past experiences at other sites and beginning to form new processes with the hope that these concepts can be applied for other future sites. (authors)

04 OIL SHALES AND TAR SANDS↗

Results of the OECD-NEA Initiative 'Preservation of RK and M Across Generations' - 18084

The OECD Nuclear Energy Agency (NEA) has co-ordinated an international initiative to develop understanding and guidelines related to the long-term preservation of records, knowledge and memory (RK and M) for radioactive waste repositories. The initiative will come to a close in April 2018. Currently, a number of deliverables are in the process of publication and a preview and overview is presented in this paper. Central is the 'Final Report of the RK and M Initiative', which sets out the RK and M fundamentals, including basic principles of RK and M preservation, the concept of oversight and the relevant time frames, the mediated and non-mediated transmission of messages, and ultimately the need for a systemic strategy. Furthermore, it presents a menu of approaches and mechanisms of RK and M preservation, such as markers, time capsules, archives, the Key Information File (KIF), education, art, land use control, and monitoring. Finally, the main report provides suggestions on how to develop a systemic strategy. A bibliography and a regulatory catalogue on RK and M preservation, and concept reports describing the KIF and the Set of Essential Records (SER), will complement the set of deliverables of the RK and M Initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical/ administrative options for managing tritium MCL exceedances in P-area groundwater and Steel Creek

This white paper was requested by the Core Team (United States Department of Energy [USDOE], United States Environmental Protection Agency [USEPA], and South Carolina Department of Health and Environmental Control [SCDHEC]) at the P-Area Groundwater (PAGW) Operable Unit (OU) Scoping Meeting held in January 2017 to discuss recent data and potential alternatives in support of a focused Corrective Measures Study/Feasibility Study (CMS/FS). This white paper presents an overview of the problem, and a range of technical and administrative options for addressing the tritium contamination in groundwater and Steel Creek. As tritium cannot be treated practicably, alternatives are limited to media transfer, containment and natural attenuation principally relying on radioactive decay. Using other groundwater OU decisions involving tritium as precedent, Savannah River Nuclear Solutions (SRNS) recommends that final tritium alternatives be evaluated in a CMS/FS, understanding that the likely preferred remedy will include natural attenuation with land use controls (LUCs). This is based on the inability to significantly reduce tritium impact to Steel Creek using an engineered solution as compared to natural attenuation. The timing of this evaluation could be conducted concurrently with the final remedy evaluation for volatile organic compounds (VOCs).

54 ENVIRONMENTAL SCIENCES↗

Colonie, New York, FUSRAP Site: Pathway from Remediation to Redevelopment - 19465

The Colonie, New York, Formerly Utilized Sites Remedial Action Program (FUSRAP) Site consists of a 4.5-hectare (11.2-acre) US Department of Energy (DOE)-owned vacant property (Main Site) and 56 commercial and residential vicinity properties (VPs). The site was owned and operated by National Lead Industries (NL) from 1937 to 1984. The Main Site was used for manufacturing fuel and weapons components using uranium and thorium. Depleted uranium dust was emitted from exhaust stacks that contaminated the site and the VPs. NL also filled in portions of the site with industrial waste and released contaminants to groundwater. The state court shut the plant down in 1984. The site was acquired by DOE in 1985, which remediated the VPs and began to remediate the Main Site up to 1997. The US Army Corps of Engineers (USACE) undertook remedial actions beginning in 1997. The site has three Operable Units (Main Site, Groundwater, and VPs). The Main Site soil was remediated to residential standards except for three small easement areas. The soils in the easement areas are safe for exposure to workers. There is a groundwater plume beneath the site that will require the use of monitoring and temporary land use controls until cleanup standards are met. The VPs require no further action. A 2-year transition period from USACE to the DOE Office of Legacy Management (LM) began on June 18, 2018, with the receipt of the Site Closeout Report from USACE. LM has determined that the 4.5-hectare site is excess to its mission needs and intends to pursue sale of the property for redevelopment. There are several processes required before the disposal can occur. Organizations with similar sites that are federally owned and ready for private redevelopment may benefit from reviewing the Colonie site disposition processes. This paper will discuss (1) Determining disposal alternatives for the Colonie, New York, site. (2) Describing the federal requirements for the disposal of excess real property. (3) Communicating to stakeholders that the site is ready for disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Changes in Cleanup Strategies and Long-Term Monitoring Costs for DOE FUSRAP Sites - 17241

The Department of Energy (DOE) Office of Legacy Management (LM) is responsible for the post-closure management of remediated DOE sites. LM's objective for Formerly Utilized Sites Remedial Action Program (FUSRAP) includes the long-term surveillance and maintenance (LTSM) of sites that have been remediated by the US Army Corps of Engineers (USACE). FUSRAP was initiated in 1974 by the US Atomic Energy Commission, a predecessor agency of DOE. FUSRAP was managed by DOE from 1981 to 1997. Through a congressional act, the scope to remediate FUSRAP sites was transferred to USACE in 1997. By 1997, DOE had completed the cleanup of 25 of the 46 sites that were active within the program, and had begun cleanups at 13 additional sites. USACE assumed responsibility for the cleanup of the 21 remaining FUSRAP sites, and 8 additional sites that have been recommended for cleanup. Presently, LM provides long-term stewardship for 30 completed FUSRAP sites while USACE is actively remediating 23 sites. FUSRAP sites are typically privately-owned factories or research facilities. However, there are four DOE owned FUSRAP sites. These sites are Maywood and Middlesex in New Jersey, and Colonie and Niagara Falls in New York. In support of LM's Beneficial Reuse strategic mission, the site in Wayne, New Jersey has been transferred to a municipality and the site in New Brunswick, New Jersey has been sold. Historically, most sites in FUSRAP were remediated to 'unlimited exposure and unrestricted use' cleanup levels consistent with residential use. Some sites were remediated using supplemental limits due to inaccessible areas while remaining sites have been remediated to other-than residential standards based on site-specific long-term land use assumptions. Of the 31 completed FUSRAP sites under LM stewardship, one site requires land-use controls and no site requires groundwater monitoring. Over the next 10 years USACE plans to transfer 11 sites to LM. Several of these sites will have additional long-term monitoring requirements as per their Records of Decisions (RODs). These transitioning sites include the Colonie, New York site, the Maywood and Deepwater, New Jersey, sites and the St. Louis, Missouri site. The additional stewardship requirements will include groundwater monitoring, enforcement of institutional and engineered controls, and five-year reviews. In addition to these sites, more than 100 vicinity properties will also be transferred to LM for stewardship. Given the increase in long-term stewardship activities for these sites and their associated vicinity properties, initiatives are under way to incorporate the additional LTSM requirements into the program's out-year planning. LM will be evaluating several methods to customize LTSM cost and liability estimates for all of the completed FUSRAP sites, planning to address the sites not yet transferred and those that are in LM's custody. Where necessary, LM will use remedial process optimization techniques and evaluate monitored natural attenuation protocols to reduced long-term monitoring costs. Methods for identifying costs include the cost estimates provided in RODs, cost estimates refined during remediation, operation and maintenance costs provided by USACE prior to transition, and presumptive remedies using USACE and Environmental Management / LM historic costs at similar sites. On the basis of this evaluation, a strategy for estimating site-specific LTSM costs will be selected. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regional Application of an Ecosystem Production Model for Studies of Biogeochemistry in the...

The degree to which primary production, soil carbon, and trace gas fluxes in tropical forests of the Amazon are limited by moisture availability and other environmental factors was examined using an ecosystem modeling application for the country of Brazil. A regional geographic information system (GIS) serves as the data source of climate drivers, satellite images, land cover, and soil properties for input to the NASA Ames-CASA (Carnegie-Ames-Stanford Approach) model over a 8-km grid resolution. Simulation results supports the hypothesis that net primary production (NPP) is limited by cloud interception of solar radiation over the humid northwestern portion of the region. Peak annual rates for NPP of nearly 1.4 kg C m-2yr -1are localized in the seasonally dry eastern Amazon in areas that we assume are primarily deep-rooted evergreen forest cover. Regional effects of forest conversion on NPP and soil carbon content are indicated in the model results, especially in seasonally dry areas. Comparison of model flux predictions along selected eco-climatic transects reveal moisture, soil, and land use controls on gradients of ecosystem production and soil trace gas emissions (CO2, N2O, and NO). These results are used to formulate a series of research hypotheses for testing in the next phase of regional modeling, which includes recalibration of the light-use efficiency term in CASA using field measurements of NPP, and refinements of vegetation index and soil property (texture and potential rooting depth) maps for the region.

Potter, C. S.↗

Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report Kennedy Space Center, Florida

This Corrective Measures Implementation (CMI) Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site. Applicable meeting minutes are provided as Appendix A. The following EE ADPs for CRHE are included with this CMI Progress Report: center dot Supplemental Site Characterization ADP (Step 1 EE) (Appendix B) center dot Site Characterization ADP (Step 1 EE) for Hot Spot 1 (HS1) (Appendix C) center dot Remedial Alternatives Evaluation (Step 2 EE) ADP for HS1 (Appendix D) center dot Interim Measures Work Plan (Step 3 EE) ADP for HS1 (Appendix E) center dot Site Characterization ADP (Step 1 EE) ADP for Hot Spot 2 (HS2), High Concentration Plume (HCP), and Low Concentration Plume (LCP) (Appendix F) A summary of direct-push technology (DPT) and groundwater monitoring well sampling results are provided in Appendices G and H, respectively. The Interim Land Use Control Implementation Plan (LUCIP) is provided as Appendix I. Monitoring well completion reports, other applicable field forms, survey data, and analytical laboratory reports are provided as Appendices J through M, respectively, in the electronic copy of this document. Selected Site photographs are provided in Appendix N. The interim groundwater monitoring plan and document revision log are included as Appendices O and P, respectively. KSC Electronic Data Deliverable (KEDD) files are provided on the attached compact disk.

Johnson, Jill W.↗

Firex Water Tank, SWMU 069, Confirmatory Sampling Report

The National Aeronautics and Space Administration (NASA) Resource Conservation and Recovery Act (RCRA) permit requires identification and evaluation of known Solid Waste Management Units (SWMU) located at the Kennedy Space Center (KSC). Firex Water Tank (FWT), or the “site,” is designated as SWMU 069 under the NASA RCRA permit. This report summarizes the results of the Confirmatory Sampling (CS) field activities carried out during Fall 2021, at FWT, SWMU 069, KSC, Florida. Three locations of concern (LOCs) were identified by screening historical sample results to current State of Florida soil cleanup target levels (SCTL). A total of 18 soil samples were collected to investigate the historical exceedance locations. Samples at LOC 1 and 2 were analyzed for arsenic and the results for all were below the SCTL. Samples at LOC 3 were analyzed for polynuclear aromatic hydrocarbons and it was determined that certain locations have results that remain above the SCTL. The current land use controls will remain in place at FWT to mitigate potential risks.

Firex↗

Shallow Soil Polychlorinated Biphenyl Site Assessment Report

This report presents a summary of the shallow soil polychlorinated biphenyl (PCB) site assessment activities that occurred from December 2020 through July 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit (SWMU) 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, three separate shallow soil plumes, known as the Northeast Shallow Soil PCB Plume, Southeast Shallow Soil PCB Plume, and West Shallow Soil PCB Plume, were identified for this site. The activities presented in this report include seven field events conducted between December 2020 and July 2022, which include shallow soil sample collection in the Northeast, Southeast, and West Shallow Soil PCB Plumes. AECOM Technical Services, Inc., personnel collected 330 soil samples from 118 boring locations. The samples were collected at 0.5-foot depth intervals to various depths based on analytical results and depth to groundwater. The soil samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. Several soil samples had PCB concentrations above the State of Florida Direct Exposure Residential and Industrial Soil Cleanup Target Levels (SCTLs), and two soil samples had PCB concentrations above the State of Florida Leachability for Groundwater. No soil borings were located beneath impervious surfaces, such as concrete or asphalt. The current Land Use Control Implementation Plan (LUCIP) covers PCBs in soils above the residential SCTL, which includes the paved areas.

PCBs↗

Shallow Soil Polychlorinated Biphenyl Site Assessment Report: General Services Administration Reclamation Yard Solid Waste Management Unit 010

This report presents a summary of the shallow soil polychlorinated biphenyl (PCB) site assessment activities that occurred from December 2020 through July 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit (SWMU) 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, three separate shallow soil plumes, known as the Northeast Shallow Soil PCB Plume, Southeast Shallow Soil PCB Plume, and West Shallow Soil PCB Plume, were identified for this site. The activities presented in this report include seven field events conducted between December 2020 and July 2022, which include shallow soil sample collection in the Northeast, Southeast, and West Shallow Soil PCB Plumes. AECOM Technical Services, Inc., personnel collected 330 soil samples from 118 boring locations. The samples were collected at 0.5-foot depth intervals to various depths based on analytical results and depth to groundwater. The soil samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. Several soil samples had PCB concentrations above the State of Florida Direct Exposure Residential and Industrial Soil Cleanup Target Levels (SCTLs), and two soil samples had PCB concentrations above the State of Florida Leachability for Groundwater. No soil borings were located beneath impervious surfaces, such as concrete or asphalt. The current Land Use Control Implementation Plan (LUCIP) covers PCBs in soils above the residential SCTL, which includes the paved areas.

soil assessment↗

Improved aircraft dynamic response and fatigue life during ground operations using an active control landing gear system

A three-degree-of-freedom aircraft landing analysis incorporating a series-hydraulic active control main landing gear has been developed and verified using preliminary experimental data from drop tests of a modified main landing gear from a 2722 kg (6000 lbm) class of airplane. The verified analysis was also employed to predict the landing dynamics of a supersonic research airplane with an active control main landing gear system. The results of this investigation have shown that this type of active gear is feasible and indicate a potential for improving airplane dynamic response and reducing structural fatigue damage during ground operations by approximately 90% relative to that incurred with the passive gear.

Mcgehee, J. R.↗

Application of QFT to the Problem of Failed In-Flight Controllers During Approach and Landing of a B720 Aircraft

Previous studies by NASA Dryden have shown the use of throttles for emergency flight control to be extremely difficult, especially for landing. Flight control using only the throttles to achieve safe landing for a large jet transport airplane, the Boeing 720, is investigated using Quantitative Feedback Theory (QFT). Results are compared to an augmented control developed in a previous study. The controller corrected unsatisfactory open-loop characteristics by increasing system bandwidth and damping, but improving the control bandwidth substantially proved very difficult. The pitch controller is robust in conditions of no or moderate turbulence. The roll controller performed well in conditions of no turbulence, but is sensitive to moderate turbulence. Handling qualities of the augmented control for approach and landing were evaluated by piloted simulation flights.

Chou, Hwei-Lan↗

Modeling and Validation of a Navy A6-Intruder Actively Controlled Landing Gear System

Concepts for long-range air travel are characterized by airframe designs with long, slender, relatively flexible fuselages. One aspect often overlooked is ground-induced vibration of these aircraft. This paper presents an analytical and experimental study of reducing ground-induced aircraft vibration loads by using actively controlled landing gear. A facility has been developed to test various active landing gear control concepts and their performance, The facility uses a Navy A6 Intruder landing gear fitted with an auxiliary hydraulic supply electronically controlled by servo valves. An analytical model of the gear is presented, including modifications to actuate the gear externally, and test data are used to validate the model. The control design is described and closed-loop test and analysis comparisons are presented.

Horta, Lucas G.↗