A multi-objective optimization approach to optimal sensor location problem in $\mathrm{IGCC}$ power plants

Integrated Gasification Combined Cycle (IGCC) power plants provide a cleaner and more efficient way to obtain energy from coal. In order to operate an IGCC power plant in a safe and stable manner, several input and output process parameters need to be monitored. However, due to economic and operational constraints, it is infeasible to place sensors at every input and output process parameter location. Hence, it becomes important to select the most effective sensor locations which lead to maximum information gain about the plant conditions. Practical issues present in an IGCC power plant, such as harsh physical conditions and variability in process parameters, make the optimal sensor location problem an especially complicated one. Further, sensors can have multiple objectives and they can produce uncertainties due to measurement errors. Here this work considers hybrid hardware and virtual sensing for advanced power systems with multiple objectives. In order to solve this real world large scale problem, we use a novel algorithm called Better Optimization of Nonlinear Uncertain Systems (BONUS). BONUS works in probability distribution space and avoids sampling for each optimization and derivative calculations iterations. A new algorithm for multi-objective optimization is also developed specifically for problem. The result of this nonlinear stochastic multi-objective problem is the non-dominated, or Pareto set, which provides trade-offs between various objectives like observability, cost, and thermal efficiency. This is the first attempt at solving the problem of optimal sensor deployment in advanced power plants, with consideration of hybrid hardware and virtual sensing and incorporation of uncertainty with multiple objectives.

01 COAL, LIGNITE, AND PEAT↗

Kemper County IGCC ™ Project: Preliminary Public Design Report

The Kemper County IGCC Project is an advanced coal technology project that is being developed by Mississippi Power Company (MPC). The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; Kellogg, Brown, and Root (KBR); and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The estimated nameplate capacity of the plant will be 830 MW with a peak net output capability of 582 MW. As a result of advanced emissions control equipment, the facility will produce marketable byproducts of ammonia, sulfuric acid, and carbon dioxide. 65 percent of the carbon dioxide (CO 2 ) will be captured and used for enhanced oil recovery (EOR), making the Kemper County facility’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. The commercial operation date (COD) of the Kemper County IGCC plant will be May 2014. This report describes the basic design and function of the plant as determined at the end of the Front End Engineering Design (FEED) phase of the project.

01 COAL, LIGNITE, AND PEAT↗

Model Based Optimal Sensor Network Design for Condition Monitoring in an IGCC Plant

This report summarizes the achievements and final results of this program. The objective of this program is to develop a general model-based sensor network design methodology and tools to address key issues in the design of an optimal sensor network configuration: the type, location and number of sensors used in a network, for online condition monitoring. In particular, the focus in this work is to develop software tools for optimal sensor placement (OSP) and use these tools to design optimal sensor network configuration for online condition monitoring of gasifier refractory wear and radiant syngas cooler (RSC) fouling. The methodology developed will be applicable to sensing system design for online condition monitoring for broad range of applications. The overall approach consists of (i) defining condition monitoring requirement in terms of OSP and mapping these requirements in mathematical terms for OSP algorithm, (ii) analyzing trade-off of alternate OSP algorithms, down selecting the most relevant ones and developing them for IGCC applications (iii) enhancing the gasifier and RSC models as required by OSP algorithms, (iv) applying the developed OSP algorithm to design the optimal sensor network required for the condition monitoring of an IGCC gasifier refractory and RSC fouling. Two key requirements for OSP for condition monitoring are desired precision for the monitoring variables (e.g. refractory wear) and reliability of the proposed sensor network in the presence of expected sensor failures. The OSP problem is naturally posed within a Kalman filtering approach as an integer programming problem where the key requirements of precision and reliability are imposed as constraints. The optimization is performed over the overall network cost. Based on extensive literature survey two formulations were identified as being relevant to OSP for condition monitoring; one based on LMI formulation and the other being standard INLP formulation. Various algorithms to solve these two formulations were developed and validated. For a given OSP problem the computation efficiency largely depends on the “size” of the problem. Initially a simplified 1-D gasifier model assuming axial and azimuthal symmetry was used to test out various OSP algorithms. Finally these algorithms were used to design the optimal sensor network for condition monitoring of IGCC gasifier refractory wear and RSC fouling. The sensors type and locations obtained as solution to the OSP problem were validated using model based sensing approach. The OSP algorithm has been developed in a modular form and has been packaged as a software tool for OSP design where a designer can explore various OSP design algorithm is a user friendly way. The OSP software tool is implemented in Matlab/Simulink© in-house. The tool also uses few optimization routines that are freely available on World Wide Web. In addition a modular Extended Kalman Filter (EKF) block has also been developed in Matlab/Simulink© which can be utilized for model based sensing of important process variables that are not directly measured through combining the online sensors with model based estimation once the hardware sensor and their locations has been finalized. The OSP algorithm details and the results of applying these algorithms to obtain optimal sensor location for condition monitoring of gasifier refractory wear and RSC fouling profile are summarized in this final report.

20 FOSSIL-FUELED POWER PLANTS↗

Optimal Integrated Design of Air Separation Unit and Gas Turbine Block for IGCC Systems

The Integrated Gasification Combined Cycle (IGCC) systems are considered as a promising technology for power generation. However, they are not yet in widespread commercial use and opportunities remain to improve system feasibility and profitability via improved process integration. This work focuses on the integrated design of gasification system, air separation unit (ASU) and the gas turbine (GT) block. The ASU supplies oxygen to the gasification system and it can also supply nitrogen (if required as a diluent) to the gas turbine block with minimal incremental cost. Since both GT and the ASU require a source of compressed air, integrating the air requirement of these units is a logical starting point for facility optimization (Smith et al., 1997). Air extraction from the GT can reduce or avoid the compression cost in the ASU and the nitrogen injection can reduce NOx emissions and promote trouble-free operation of the GT block (Wimer et al., 2006). There are several possible degrees of integration between the ASU and the GT (Smith and Klosek, 2001). In the case of 'total' integration, where all the air required for the ASU is supplied by the GT compressor and the ASU is expected to be an elevated-pressure (EP) type. Alternatively, the ASU can be 'stand alone' without any integration with the GT. In this case, the ASU operates at low pressure (LP), with its own air compressor delivering air to the cryogenic process at the minimum energy cost. Here, nitrogen may or may not be injected because of the energy penalty issue and instead, syngas humidification may be preferred. A design, which is intermediate between these two cases, involves partial supply of air by the gas turbine and the remainder by a separate air compressor. These integration schemes have been utilized in some IGCC projects. Examples include Nuon Power Plant at Buggenum, Netherlands (both air and nitrogen integration), Polk Power Station at Tampa, US (nitrogen-only integration) and LGTI at Plaquemine, US (stand-alone). However, there is very little information on systematic assessment of air extraction, nitrogen injection and configuration and operating conditions of the ASU and it is not clear which scheme is optimal for a given IGCC application. In this work, we address the above mentioned problem systematically using mixed-integer optimization. This approach allows the use of various objectives such as minimizing the investment and operating cost or SOx and NOx emissions, maximizing power output or overall efficiency or a weighted combination of these factors. A superstructure is proposed which incorporates all the integration schemes described above. Simplified models for ASU, gas turbine system and steam cycle are used which provide reasonable estimates for performance and cost (Frey and Zhu, 2006). The optimal structural configuration and operating conditions are presented for several case studies and it is observed that the optimal solution changes significantly depending on the specified objective.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal integrated design of air separation unit and gas turbine block for IGCC systems

The Integrated Gasification Combined Cycle (IGCC) systems are considered as a promising technology for power generation. However, they are not yet in widespread commercial use and opportunities remain to improve system feasibility and profitability via improved process integration. This work focuses on the integrated design of gasification system, air separation unit (ASU) and the gas turbine (GT) block. The ASU supplies oxygen to the gasification system and it can also supply nitrogen (if required as a diluent) to the gas turbine block with minimal incremental cost. Since both GT and the ASU require a source of compressed air, integrating the air requirement of these units is a logical starting point for facility optimization (Smith et al., 1997). Air extraction from the GT can reduce or avoid the compression cost in the ASU and the nitrogen injection can reduce NOx emissions and promote trouble-free operation of the GT block (Wimer et al., 2006). There are several possible degrees of integration between the ASU and the GT (Smith and Klosek, 2001). In the case of 'total' integration, where all the air required for the ASU is supplied by the GT compressor and the ASU is expected to be an elevated-pressure (EP) type. Alternatively, the ASU can be 'stand alone' without any integration with the GT. In this case, the ASU operates at low pressure (LP), with its own air compressor delivering air to the cryogenic process at the minimum energy cost. Here, nitrogen may or may not be injected because of the energy penalty issue and instead, syngas humidification may be preferred. A design, which is intermediate between these two cases, involves partial supply of air by the gas turbine and the remainder by a separate air compressor. These integration schemes have been utilized in some IGCC projects. Examples include Nuon Power Plant at Buggenum, Netherlands (both air and nitrogen integration), Polk Power Station at Tampa, US (nitrogen-only integration) and LGTI at Plaquemine, US (stand-alone). However, there is very little information on systematic assessment of air extraction, nitrogen injection and configuration and operating conditions of the ASU and it is not clear which scheme is optimal for a given IGCC application. In this work, we address the above mentioned problem systematically using mixed-integer optimization. This approach allows the use of various objectives such as minimizing the investment and operating cost or SOx and NOx emissions, maximizing power output or overall efficiency or a weighted combination of these factors. A superstructure is proposed which incorporates all the integration schemes described above. Simplified models for ASU, gas turbine system and steam cycle are used which provide reasonable estimates for performance and cost (Frey and Zhu, 2006). The optimal structural configuration and operating conditions are presented for several case studies and it is observed that the optimal solution changes significantly depending on the specified objective.

97 MATHEMATICS AND COMPUTING↗

Optimal control system design of an acid gas removal unit for an IGCC power plants with CO2 capture

Future IGCC plants with CO{sub 2} capture should be operated optimally in the face of disturbances without violating operational and environmental constraints. To achieve this goal, a systematic approach is taken in this work to design the control system of a selective, dual-stage Selexol-based acid gas removal (AGR) unit for a commercial-scale integrated gasification combined cycle (IGCC) power plant with pre-combustion CO{sub 2} capture. The control system design is performed in two stages with the objective of minimizing the auxiliary power while satisfying operational and environmental constraints in the presence of measured and unmeasured disturbances. In the first stage of the control system design, a top-down analysis is used to analyze degrees of freedom, define an operational objective, identify important disturbances and operational/environmental constraints, and select the control variables. With the degrees of freedom, the process is optimized with relation to the operational objective at nominal operation as well as under the disturbances identified. Operational and environmental constraints active at all operations are chosen as control variables. From the results of the optimization studies, self-optimizing control variables are identified for further examination. Several methods are explored in this work for the selection of these self-optimizing control variables. Modifications made to the existing methods will be discussed in this presentation. Due to the very large number of candidate sets available for control variables and due to the complexity of the underlying optimization problem, solution of this problem is computationally expensive. For reducing the computation time, parallel computing is performed using the Distributed Computing Server (DCS®) and the Parallel Computing® toolbox from Mathworks®. The second stage is a bottom-up design of the control layers used for the operation of the process. First, the regulatory control layer is designed followed by the supervisory control layer. Finally, an optimization layer is designed. In this paper, the proposed two-stage control system design approach is applied to the AGR unit for an IGCC power plant with CO{sub 2} capture. Aspen Plus Dynamics® is used to develop the dynamic AGR process model while MATLAB is used to perform the control system design and for implementation of model predictive control (MPC).

97 MATHEMATICS AND COMPUTING↗

Optimal control system design for IGCC power plants with CO2 capture

Designing an optimal control system for an integrated gasification combined cycle (IGCC) power plant with CO2 capture addresses the challenge of efficiently operating and controlling a coal-fed IGCC plant with the desired extent of CO2 capture in the face of disturbances without violating operational and environmental constraints. The control system design needs to optimize a desired scalar objective function while satisfying all the operational and environmental constraints in the presence of measured and unmeasured disturbances. Various objective functions can be considered for the control system design such as maximization of profit, maximization of the power produced, or minimization of the auxiliary power. The design of such a control system makes the plant suitable to play an active role in the smart grid era as the plant will have the required agility. In addition, other penalty function(s) such as emission penalties for CO2 or other criteria pollutants can be considered in the framework as well as losses associated with any hydrogen or carbon monoxide loses. The proposed control system design is performed in two stages. In the first stage, a top-down analysis is performed to generate a list of controlled, manipulated, and disturbance variables considering a scalar operational objective and other process constraints. In the second stage, a bottom-up approach for simultaneous design of the control structure and the controllers is used. In this paper, the first stage of the two-stage approach is applied to the IGCC’s acid gas removal (AGR) process which removes both H2S and CO2 from the shifted synthesis gas. While these results are still preliminary, they demonstrate the application of the proposed approach for a commercial-scale plant and show some interesting results related to controlled variable selection. Such an approach can be followed not only to design control systems for new power plants, but also to retrofit control systems for existing plants with suitable modifications.

97 MATHEMATICS AND COMPUTING↗

Dynamic simulation and load-following control of an integrated gasification combined cycle (IGCC) power plant with CO{sub 2} capture

Load-following control of future integrated gasification combined cycle (IGCC) plants with pre-combustion CO{sub 2} capture is expected to be far more challenging as electricity produced by renewable energy is connected to the grid and strict environmental limits become mandatory requirements. To study control performance during load following, a plant-wide dynamic simulation of a coal-fed IGCC plant with CO{sub 2} capture has been developed. The slurry-fed gasifier is a single-stage, downward-fired, oxygen-blown, entrained-flow type with a radiant syngas cooler (RSC). The syngas from the outlet of the RSC goes to a scrubber followed by a two-stage sour shift process with inter-stage cooling. The acid gas removal (AGR) process is a dual-stage physical solvent-based process for selective removal of H{sub 2}S in the first stage and CO{sub 2} in the second stage. Sulfur is recovered using a Claus unit with tail gas recycle to the AGR. The recovered CO{sub 2} is compressed by a split-shaft multistage compressor and sent for sequestration after being treated in an absorber with triethylene glycol for dehydration. The clean syngas is sent to two advanced “F”-class gas turbines (GTs) partially integrated with an elevated-pressure air separation unit. A subcritical steam cycle is used for heat recovery steam generation. A treatment unit for the sour water strips off the acid gases for utilization in the Claus unit. The steady-state model developed in Aspen Plus® is converted to an Aspen Plus Dynamics® simulation and integrated with MATLAB® for control studies. The results from the plant-wide dynamic model are compared qualitatively with the data from a commercial plant having different configuration, operating condition, and feed quality than what has been considered in this work. For load-following control, the GT-lead with gasifier-follow control strategy is considered. A modified proportional–integral–derivative (PID) control is considered for the syngas pressure control. For maintaining the desired CO{sub 2} capture rate while load-following, a linear model predictive controller (LMPC) is implemented in MATLAB®. A combined process and disturbance model is identified by considering a number of model forms and choosing the final model based on an information-theoretic criterion. The performance of the LMPC is found to be superior to the conventional PID control for maintaining CO{sub 2} capture rates in an IGCC power plant while load following.

01 COAL, LIGNITE, AND PEAT↗

State estimation of an acid gas removal (AGR) plant as part of an integrated gasification combined cycle (IGCC) plant with CO2 capture

An accurate estimation of process state variables not only can increase the effectiveness and reliability of process measurement technology, but can also enhance plant efficiency, improve control system performance, and increase plant availability. Future integrated gasification combined cycle (IGCC) power plants with CO2 capture will have to satisfy stricter operational and environmental constraints. To operate the IGCC plant without violating stringent environmental emission standards requires accurate estimation of the relevant process state variables, outputs, and disturbances. Unfortunately, a number of these process variables cannot be measured at all, while some of them can be measured, but with low precision, low reliability, or low signal-to-noise ratio. As a result, accurate estimation of the process variables is of great importance to avoid the inherent difficulties associated with the inaccuracy of the data. Motivated by this, the current paper focuses on the state estimation of an acid gas removal (AGR) process as part of an IGCC plant with CO2 capture. This process has extensive heat and mass integration and therefore is very suitable for testing the efficiency of the designed estimators in the presence of complex interactions between process variables. The traditional Kalman filter (KF) (Kalman, 1960) algorithm has been used as a state estimator which resembles that of a predictor-corrector algorithm for solving numerical problems. In traditional KF implementation, good guesses for the process noise covariance matrix (Q) and the measurement noise covariance matrix (R) are required to obtain satisfactory filter performance. However, in the real world, these matrices are unknown and it is difficult to generate good guesses for them. In this paper, use of an adaptive KF will be presented that adapts Q and R at every time step of the algorithm. Results show that very accurate estimations of the desired process states, outputs or disturbances can be achieved by using the adaptive KF.

97 MATHEMATICS AND COMPUTING↗

Kemper County IGCC Final Public Design Report

The Kemper County IGCC plant is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; KBR; and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The plant is owned by Mississippi Power Company (MPC) and has a calculated nameplate capacity of 830 MW with a peak net output of 582 MW. As a result of advanced emissions-control equipment, the facility is designed to produce marketable products of ammonia (NH3), sulfuric acid (H 2 SO 4 ), and carbon dioxide (CO 2 ). The plant is designed to capture 65 percent of the carbon entering to sell for enhanced oil recovery (EOR), which makes the Kemper County plant’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. This report describes the basic design and function of the plant as determined at the end of the Detailed Design phase of the project. The technical sections of the report were completed in October 2013, and the cost information was incorporated into Section 6.0 in March 2018.

01 COAL, LIGNITE, AND PEAT↗

Topical Report: Kemper County IGCC Final Public Design Report

The Kemper County IGCC plant is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; KBR; and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The plant is owned by Mississippi Power Company (MPC) and has a calculated nameplate capacity of 830 MW with a peak net output of 582 MW. As a result of advanced emissions-control equipment, the facility is designed to produce marketable products of ammonia (NH 3 ), sulfuric acid (H 2 SO 4 ), and carbon dioxide (CO 2 ). The plant is designed to capture 65 percent of the carbon entering to sell for enhanced oil recovery (EOR), which makes the Kemper County plant’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. This report describes the basic design and function of the plant as determined at the end of the Detailed Design phase of the project. The technical sections of the report were completed in October 2013, and the cost information was incorporated into Section 6.0 in March 2018.

01 COAL, LIGNITE, AND PEAT↗

Topical Report: Kemper County IGCC Commissioning and Startup Report

The Kemper County IGCC plant was a lignite-fueled 2 x 1 Integrated Gasification Combined-Cycle (IGCC) facility that demonstrated the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company, KBR, Inc. (KBR), and the U.S. Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Ala. The plant is owned by Mississippi Power Company (MPC) and has a calculated nameplate capacity of 830 MW with a peak net output of 582 MW. As a result of advanced emissions control equipment, the facility is designed to produce marketable products of ammonia (NH 3 ), sulfuric acid (H 2 SO 4 ), and carbon dioxide (CO 2 ). The plant is designed to capture 65 percent of the carbon producing a CO 2 stream for use in enhanced oil recovery (EOR), making the plant carbon emissions comparable to those of a natural gas-fired combined cycle power plant. This report describes the unit commissioning activities from the end of construction through first coal operations to the gasifier. These activities include precommissioning planning, commissioning of major equipment, and operation of processes leading up to first coal feed.

01 COAL, LIGNITE, AND PEAT↗

Analyses of hot/warm CO2 removal processes for IGCC power plants

Abstract Compared with a pulverized coal power plant, the integrated gasification combined cycle (IGCC) has several advantages, including, among others better environmental performance and low CO 2 capture cost. Hot/warm CO 2 removal from syngas has also been a subject of research due to its potentially higher thermal efficiency. In this study, we proposed a generic adsorption based hot/warm CO 2 removal process for IGCC power plants. Through analyses of the proposed generic process we have demonstrated that higher temperature of the hot/warm CO 2 removal process will results in larger heat of adsorption, which in turns may increase energy consumption of the process. Under most of the operating temperature range, hot/warm CO 2 removal process will lead to more electricity loss compared to the baseline Selexol process. However, if the adsorption step takes place at a temperature close to or higher than the highest steam temperature in steam cycle, our analysis indicates that the process may lead to minimal electricity loss. The study also provided some other insights into the pathways for hot/warm CO 2 removal process to improve its energy performance through process and sorbent designs. Graphical Abstract

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Kemper County IGCC (Final Project Report)

The Kemper County IGCC plant was a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility that demonstrated the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company, KBR, Inc. (KBR), and the U.S. Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Ala. The plant is owned by Mississippi Power Company (MPC) and has a calculated nameplate capacity of 830 MW with a peak net output of 582 MW. As a result of advanced emissions control equipment, the facility is designed to produce marketable products of ammonia (NH 3 ), sulfuric acid (H 2 SO 4 ), and carbon dioxide (CO 2 ). The plant is designed to capture 65 percent of the carbon producing a CO 2 stream for use in enhanced oil recovery (EOR), making the plant carbon emissions comparable to those of a natural gas-fired combined cycle power plant. This report describes operation activities post commissioning of the plant and through suspension of the facility. This includes first coal feed testing and syngas production for combustion within the combustion turbine up to the final day of operation.

20 FOSSIL-FUELED POWER PLANTS↗

Cost and Performance of PC and IGCC Plants for a Range of Carbon Dioxide Capture - Rev. 1

The objective of this study was to establish the cost and performance for a range of carbon dioxide (CO 2 ) capture levels for new supercritical (SC) pulverized coal (PC) and integrated gasification combined cycle (IGCC) power plants. The SC PC cases (Case 1 series) utilize Fluor’s Econamine FG Plus SM process for post-combustion CO 2 capture via temperature swing absorption with a 30 wt% monoethanolamine (MEA) solution as the chemical solvent. The IGCC cases (Case 2 series) employ a slurry-fed, entrained-flow General Electric Energy (GEE) gasifier and leverage UOP’s (formerly Universal Oil Products) two-stage Selexol™ process for bulk CO 2 capture and selective hydrogen sulfide (H 2 S) removal via pressure swing absorption. The Selexol™ process uses dimethyl ether of polyethylene glycol (DEPG) as a physical solvent for pre-combustion capture.

01 COAL, LIGNITE, AND PEAT↗

Aerodynamics and Heat Transfer Studies of Parameters Specific to the IGCC-Requirements: Endwall Contouring, Leading Edge and Blade Tip Ejection under Rotating Turbine Conditions

This report deals with the specific aerodynamics and heat transfer problematic inherent to high pressure (HP) turbine sections of IGCC-gas turbines. Issues of primary relevance to a turbine stage operating in an IGCC-environment are: (1) decreasing the strength of the secondary flow vortices at the hub and tip regions to reduce (a), the secondary flow losses and (b), the potential for end wall deposition, erosion and corrosion due to secondary flow driven migration of gas flow particles to the hub and tip regions, (2) providing a robust film cooling technology at the hub and that sustains high cooling effectiveness less sensitive to deposition, (3) investigating the impact of blade tip geometry on film cooling effectiveness. The document includes numerical and experimental investigations of above issues. The experimental investigations were performed in the three-stage multi-purpose turbine research facility at the Turbomachinery Performance and Flow Research Laboratory (TPFL), Texas A&M University. For the numerical investigations a commercial Navier-Stokes solver was utilized.

42 ENGINEERING↗

Abradable Sealing Materials for Emerging IGCC-Based Turbine Systems (Final Report)

Reducing the gap between rotating and stationary parts in gas turbine engines, and mitigating gas leakage via these paths, can significantly increase the performance and attendant efficiency. One approach to reducing such gaps is to deploy abradable coatings on the stationary shroud components as seals, to reduce the blade-tip clearances under operational conditions. Abradable coatings must be able to withstand high temperature oxidation, thermal cycling, and erosion, while providing optimal controlled abrasion and associated shape retention. Existing abradable seals utilized in power generation turbines have generally been optimized for use with natural gas-fired systems; however, preliminary testing of syngas and high-hydrogen-content (HHC) fired turbines has shown that the stability of hot-section materials (and presumably abradable sealing materials) may be substantially altered due to characteristic changes in the combustion by-products (partial pressures of water vapor, etc.) as well as characteristic impurities and particulate matter entrained in the fuel. The primary focus of this research program has been to develop a mechanistic understanding of how the altered combustion environments modify the thermo-mechanical stability and performance of the sealing materials, including the requisite abradable sealing behavior. A key component of the research program carried out has been an exploration of mechanisms underpinning observed degradation processes, and an assessment of connections to the combustion environments and characteristic non-combustible constituents. The ultimate goal of the project has been to advance the goals of the Advanced Turbine Program by developing materials design protocols leading to turbine hot-section components with improved resistance to service lifetime degradation under advanced fuels exposures. This research program has evaluated the performance and degradation of ceramic abradable seals used in the high-temperature turbine sections of gas turbine engines. The focus has been two-fold: (1) to understand performance of such materials in relation to the turbines operating on coal-derived syngas and high hydrogen content (HHC) fuels, ultimately seeking an improved understanding of factors that control performance and durability of abradable seal materials for these combustion environments (and play into materials design protocols); and (2) to evaluate the potential of alternative materials as abradable seals for the higher temperatures expected with IGCC and HHC fueled turbine systems. In particular, we carried out an initial assessment of multi-layered systems of existing abradable seal materials (YSZ) and other ceramics. The research program also investigated several classes of abradable coatings under simulated exposures to syngas-based combustion environments, evaluating the relevant wear behavior, hardness, stability under cyclic oxidation, and general thermo-mechanical behavior. The research also attempted to develop alternatives to carrying out full-scale combustion-based abradability test rig exposures to evaluate materials system performance. The research has been focused on correlating the measured thermo-mechanical behavior, and controlled abrasive wear, with the intrinsic properties of the multilayer coatings and processing-controlled microstructural features that have shown attractive machinability characteristics based on weak interfacial bonding between the constituent phases at elevate temperatures (while maintaining thermochemical stability). This program has resulted in an improved mechanistic understanding of factors governing performance of high temperature abradable seals, and degradation mechanisms unique to IGCC-based power generation turbine systems and the realization of coal-derived syngas and HHC-based combustion environments – ultimately with the goal of developing a knowledge base upon which the design of coatings that retain optimal sealing characteristics and are more resistant to the observed wear/attack mechanisms, important aspects of advancing the goals of the DOE Advanced Turbine Program.

36 MATERIALS SCIENCE↗

Combined Sorbent/WGS-based CO 2 Capture Process with Integrated Heat Management for IGCC Systems

Southern Research has developed a combined CO 2 capture water-gas shift (WGS) process for integrated gasification combined cycle (IGCC) applications. A highly efficient regenerable magnesium based sorbent was prepared to remove CO 2 . It offers high and stable CO 2 capacity with minimum requirement for temperature and pressure swings. Under optimized conditions, the sorbents achieved up to 8 mmol/g of CO 2 working capacity and remained stable over 500 cycles of adsorption and regeneration. The selected WGS process achieved 96% CO per pass conversion and remained isothermal during the test duration that lasted over 500 cycles. The approach showed potential to reduce cost of electricity (COE) compared to the baseline carbon capture approaches. The process is for bench-scale and pilot development. In a commercial embodiment, syngas from the gasifier is cooled to warm gas conditions. It then enters the CO 2 sorbent-shift reactor that uses an efficient MgO-based CO 2 sorbent and a commercial catalyst to shift the CO to CO 2 and capture 90% + of the carbon. Using a dual-bed arrangement, the sorbent is regenerated periodically by a combination of pressure and temperature swing to maintain steady state conditions and produce a 95+ % CO 2 stream for sequestration. The hydrogen rich syngas is sent to the IGCC for power production. In addition to consolidating CO 2 capture with WGS, the proposed process reduces parasitic energy losses by operating at warm gas temperatures and reduces parasitic plant load (i.e., steam and auxiliary power) by reducing energy required for regeneration. The project consisted of 3 budget periods (BP) of laboratory-scale research and testing with go/no-go decisions after BP-1 and BP-2. In the 12 month BP-1, it was shown show that one promising sorbent maintained the required CO 2 capacity and durability of >1.5 mmol/g over 100 cycles. Also based on sorbent and WGS experiments in separate reactors and combined reactor modeling, it was shown that the process had the potential to capture 90% of the CO 2 at a lower than conventional amine-based approach. In the 18 month BP-2, a lab scale combined sorbent/WGS reactor system was built, commissioned, and tested with the promising sorbent from BP-1. 90% carbon capture was demonstrated over 100 cycles and it was shown that the process continued to have potential to capture 90% of the carbon at a cost that was less than the conventional amine-based approach. In the 6 month BP-3, a long term test was conducted using the best SR sorbent. The required durability of > 2 mmol/g was demonstrated after 500 cycles. Also, 90% carbon capture and 96% CO conversion was maintained over 1000 cycles. A technical and economic feasibility study was carried out to compare the proposed pre-combustion approach to a gasification plant employing a conventional pre-combustion approach and a conventional pulverized caol (PC) plant employing a conventional post combustion CO 2 capture approach.

01 COAL, LIGNITE, AND PEAT↗