Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “IGCC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Rigorous Kinetic Modeling and Optimization Study of a Modified Claus Unit for an Integrated Gasification Combined Cycle (IGCC) Power Plant with CO{sub 2} Capture

The modified Claus process is one of the most common technologies for sulfur recovery from acid gas streams. Important design criteria for the Claus unit, when part of an Integrated Gasification Combined Cycle (IGCC) power plant, are the ability to destroy ammonia completely and the ability to recover sulfur thoroughly from a relatively low purity acid gas stream without sacrificing flame stability. Because of these criteria, modifications to the conventional process are often required, resulting in a modified Claus process. For the studies discussed here, these modifications include the use of a 95% pure oxygen stream as the oxidant, a split flow configuration, and the preheating of the feeds with the intermediate pressure steam generated in the waste heat boiler (WHB). In the future, for IGCC plants with CO{sub 2} capture, the Claus unit must satisfy emission standards without sacrificing the plant efficiency in the face of typical disturbances of an IGCC plant, such as rapid change in the feed flow rates due to load-following and wide changes in the feed composition because of changes in the coal feed to the gasifier. The Claus unit should be adequately designed and efficiently operated to satisfy these objectives. Even though the Claus process has been commercialized for decades, most papers concerned with the modeling of the Claus process treat the key reactions as equilibrium reactions. Such models are validated by manipulating the temperature approach to equilibrium for a set of steady-state operating data, but they are of limited use for dynamic studies. One of the objectives of this study is to develop a model that can be used for dynamic studies. In a Claus process, especially in the furnace and the WHB, many reactions may take place. In this work, a set of linearly independent reactions has been identified, and kinetic models of the furnace flame and anoxic zones, WHB, and catalytic reactors have been developed. To facilitate the modeling of the Claus furnace, a four-stage method was devised so as to determine which set of linearly independent reactions would best describe the product distributions from available plant data. Various approaches are taken to derive the kinetic rate expressions, which are either missing in the open literature or found to be inconsistent. A set of plant data is used for optimal estimation of the kinetic parameters. The final model agrees well with the published plant data. Using the developed kinetics models of the Claus reaction furnace, WHB, and catalytic stages, two optimization studies are carried out. The first study shows that there exists an optimal steam pressure generated in the WHB that balances hydrogen yield, oxygen demand, and power generation. In the second study, it is shown that an optimal H{sub 2}S/SO{sub 2} ratio exists that balances single-pass conversion, hydrogen yield, oxygen demand, and power generation. In addition, an operability study has been carried out to examine the operating envelope in which both the H{sub 2}S/SO{sub 2} ratio and the adiabatic flame temperature can be controlled in the face of disturbances typical for the operation of an IGCC power plant with CO{sub 2} capture. Impact of CO{sub 2} capture on the Claus process has also been discussed.

20 FOSSIL-FUELED POWER PLANTS↗

Techno-Economic Analysis of an Intensified Integrated Gasification Combined Cycle (IGCC) Power Plant Featuring a Combined Membrane Reactor - Adsorptive Reactor (MR-AR) System

In this work, the novel concept of a combined membrane-adsorptive reactor sequence (MRAR) is developed and implemented in an Integrated Gasification Combined Cycle (IGCC) plant. This novel MR-AR IGCC plant is subsequently analyzed from an economic viewpoint through a techno-economic analysis (TEA) of the proposed plant. This novel design can achieve over 90% carbon capture without the use of a Dual-Stage Selexol unit. The resultant intensified design is more efficient from both an economic and power production perspective than the traditional IGCC plants with pre-combustion Carbon-Capture Storage (CCS) technology. The COMSOL software package is utilized to simulate the MR-AR sequence proposed in this work, and the UNISIM software (HoneywellTM) is used to create an intensified process flowsheet of the proposed MR-AR IGCC plant, which is subsequently heat-integrated. The TEA developed for the MR-AR IGCC power plant will be used to identify the extent of process intensification the proposed design has over the traditional IGCC plants with pre-combustion CCS. Furthermore, the results demonstrate a reduction in both the cost-of-electricity (COE) and in the capital cost of the proposed design over the baseline case.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Control system design for maintaining CO{sub 2} capture in IGCC power plants while loading-following

Load-following requirements for future integrated gasification combined cycle (IGCC) power plants with precombustion CO{sub 2} capture are expected to be far more challenging as electricity produced by renewable energy is connected to the grid and strict environmental limits become mandatory requirements. In this work, loadfollowing studies are performed using a comprehensive dynamic model of an IGCC plant with pre-combustion CO{sub 2} capture developed in Aspen Engineering Suite (AES). Considering multiple single-loop controllers for power demand load following, the preferred IGCC control strategy from the perspective of a power producer is gas turbine (GT) lead with gasifier follow. In this strategy, the GT controls the load by manipulating its firing rate while the slurry feed flow to the gasifier is manipulated to control the syngas pressure at the GT inlet. The syngas pressure control is an integrating process with significant time delay mainly because of the large piping and equipment volumes between the gasifier and the GT inlet. A modified proportional–integral–derivative (PID) control is considered for IGCC syngas pressure control. The desired CO{sub 2} capture rate must be maintained while the IGCC plant follows the load. For maintaining the desired CO{sub 2} capture rate, the control performance of PID control is compared with linear model predictive control (LMPC). The results show that the LMPC outperforms PID control for maintaining CO{sub 2} capture rates in an IGCC power plant while load following.

20 FOSSIL-FUELED POWER PLANTS↗

Economic Evaluation of Flexibility in the Design of IGCC Plants with Integrated Membrane Reactor Modules

ABSTRACT Integrated Gasification Combined Cycle with embedded membrane reactor modules (IGCC‐MR) represents a new technology option for the coproduction of electricity and pure hydrogen endowed with enhanced environmental performance capacity. It is viewed as an alternative to conventional coal‐ and gas‐fired power generation technologies. An IGCC‐MR power plant needs to be techno‐economically evaluated in the presence of irreducible regulatory and fuel market uncertainties for the potential deployment of an initial fleet of demonstration plants at the commercial scale. This paper applies a systematic methodological framework to assess the economic value of flexible alternatives in the design and operation of an IGCC‐MR plant under the aforementioned sources of uncertainty. The main objective is to demonstrate the potential value enhancements associated with the long‐term economic performance of flexible IGCC‐MR project investments, by managing the uncertainty associated with future environmental regulations and fuel costs. The paper provides an overview of promising design flexibility concepts for IGCC‐MR power plants and focuses on operational and constructional systems flexibility. Operational flexibility is realized through temporary plant shutdown with considerations of regulatory and market uncertainties. Constructional flexibility is realized by considering the installation of a Carbon Capture and Storage (CCS) unit at three strategic periods: (1) installation at the initial construction phase, (2) retrofitting at a later stage, and (3) retrofitting at a later stage with preinvestment. Monte Carlo simulations and financial analysis demonstrate that, in the presence of irreducible uncertainty, the most economically advantageous flexibility option is to install CCS in the initial IGCC‐MR construction phase.

Zhang, Juzheng↗

Advanced CO 2 Capture Technology for Low Rank Coal IGCC System

The overall objective of the project is to demonstrate the technical and economic viability of a new Integrated Gasification Combined Cycle (IGCC) power plant designed to efficiently process low rank coals. The plant uses an integrated CO 2 scrubber/Water Gas Shift (WGS) catalyst to capture over90 percent capture of the CO 2 emissions, while providing a significantly lower cost of electricity (COE) than a similar plant with conventional cold gas cleanup system based on Selexol TM technology and 90 percent carbon capture. TDA’s system uses a high temperature physical adsorbent capable of removing CO 2 above the dew point of the synthesis gas and a commercial WGS catalyst that can effectively convert CO in The overall objective of the project is to demonstrate the technical and economic viability of a new Integrated Gasification Combined Cycle (IGCC) power plant designed to efficiently process low rank coals. The plant uses an integrated CO 2 scrubber/Water Gas Shift (WGS) catalyst to capture over90 percent capture of the CO 2 emissions, while providing a significantly lower cost of electricity (COE) than a similar plant with conventional cold gas cleanup system based on Selexol TM technology and 90 percent carbon capture. TDA’s system uses a high temperature physical adsorbent capable of removing CO 2 above the dew point of the synthesis gas and a commercial WGS catalyst that can effectively convert CO in bituminous coal the net plant efficiency is about 2.4 percentage points higher than an Integrated Gasification Combined Cycle (IGCC) plant equipped with Selexol TM to capture CO 2 . We also previously completed two successful field demonstrations: one at the National Carbon Capture Center (Southern- Wilsonville, AL) in 2011, and a second demonstration in fall of 2012 at the Wabash River IGCC plant (Terra Haute, IN). In this project, we first optimized the sorbent to catalyst ratio used in the combined WGS and CO 2 capture process and confirmed the technical feasibility in bench-scale experiments. In these tests, we did not observe any CO breakthrough both during adsorption and desorption steps indicating that there is complete conversion of CO to CO 2 and H 2 . The overall CO conversions above 90 percent were observed. The sorbent achieved a total CO 2 loading of 7.82 percent wt. of which 5.68 percent is from conversion of CO into CO 2 . The results of the system analysis suggest that the TDA combined shift and high temperature PSA-based Warm Gas Clean-up technology can make a substantial improvement in the IGCC plant thermal performance for a plant designed to achieve near zero emissions (including greater than 90 percent carbon capture). The capital expenses are also expected to be lower than those of Selexol. The higher net plant efficiency and lower capital and operating costs result in substantial reduction in the COE for the IGCC plant equipped with the TDA combined shift and high temperature PSA-based carbon capture system.

01 COAL, LIGNITE, AND PEAT↗

NETL to establish Dynamic Simulation Research and Training Center to promote IGCC technology with CO2 cpture

To meet increasing demand for education and experience with commercial-scale, coal-fired, integrated gasification combined cycle (IGCC) plants with CO2 capture, the Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) is leading a project to deploy a generic, full-scope, real-time IGCC dynamic plant simulator for use in establishing a world-class research and training center, and to promote and demonstrate IGCC technology to power industry personnel. The simulator, being built by Invensys Process Systems (IPS), will be installed at two separate sites, at NETL and West Virginia University (WVU), and will combine a process/gasification simulator with a power/combined-cycle simulator together in a single dynamic simulation framework for use in engineering research studies and training applications. The simulator, scheduled to be launched in mid-year 2010, will have the following capabilities: High-fidelity, dynamic model of process-side (gasification and gas cleaning with CO2 capture) and power-block-side (combined cycle) for a generic IGCC plant fueled by coal and/or petroleum coke. Highly flexible configuration that allows concurrent training on separate gasification and combined cycle simulators, or up to two IGCC simulators. Ability to enhance and modify the plant model to facilitate studies of changes in plant configuration, equipment, and control strategies to support future R&D efforts. Training capabilities including startup, shutdown, load following and shedding, response to fuel and ambient condition variations, control strategy analysis (turbine vs. gasifier lead, etc.), representative malfunctions/trips, alarms, scenarios, trending, snapshots, data historian, etc. To support this effort, process descriptions and control strategies were developed for key sections of the plant as part of the detailed functional specification, which is serving as the basis of the simulator development. In this paper, we highlight the contents of the detailed functional specification for the simulator. We also describe the engineering, design, and expert testing process that the simulator will undergo in order to ensure that maximum fidelity is built into the generic simulator. Future applications and training programs associated with gasification, combined cycle, and IGCC simulations are discussed, including plant operation and control demonstrations, as well as education and training services.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advanced virtual energy simulation training and research: IGCC with CO2 capture power plant

In this presentation, we highlight the deployment of a real-time dynamic simulator of an integrated gasification combined cycle (IGCC) power plant with CO{sub 2} capture at the Department of Energy's (DOE) National Energy Technology Laboratory's (NETL) Advanced Virtual Energy Simulation Training and Research (AVESTARTM) Center. The Center was established as part of the DOE's accelerating initiative to advance new clean coal technology for power generation. IGCC systems are an attractive technology option, generating low-cost electricity by converting coal and/or other fuels into a clean synthesis gas mixture in a process that is efficient and environmentally superior to conventional power plants. The IGCC dynamic simulator builds on, and reaches beyond, conventional power plant simulators to merge, for the first time, a 'gasification with CO{sub 2} capture' process simulator with a 'combined-cycle' power simulator. Fueled with coal, petroleum coke, and/or biomass, the gasification island of the simulated IGCC plant consists of two oxygen-blown, downward-fired, entrained-flow, slagging gasifiers with radiant syngas coolers and two-stage sour shift reactors, followed by a dual-stage acid gas removal process for CO{sub 2} capture. The combined cycle island consists of two F-class gas turbines, steam turbine, and a heat recovery steam generator with three-pressure levels. The dynamic simulator can be used for normal base-load operation, as well as plant start-up and shut down. The real-time dynamic simulator also responds satisfactorily to process disturbances, feedstock blending and switchovers, fluctuations in ambient conditions, and power demand load shedding. In addition, the full-scope simulator handles a wide range of abnormal situations, including equipment malfunctions and failures, together with changes initiated through actions from plant field operators. By providing a comprehensive IGCC operator training system, the AVESTAR Center is poised to develop a workforce well-prepared to operate and control commercial-scale gasification-based power plants capable of 90% pre-combustion CO{sub 2} capture and compression, as well as low sulfur, mercury, and NOx emissions. With additional support from the NETL-Regional University Alliance (NETL-RUA), the Center will educate and train engineering students and researchers by providing hands-on 'learning by operating' experience The AVESTAR Center also offers unique collaborative R&D opportunities in high-fidelity dynamic modeling, advanced process control, real-time optimization, and virtual plant simulation. Objectives and goals are aimed at safe and effective management of power generation systems for optimal efficiency, while protecting the environment. To add another dimension of realism to the AVESTAR experience, NETL will introduce an immersive training system with innovative three-dimensional virtual reality technology. Wearing a stereoscopic headset or eyewear, trainees will enter an interactive virtual environment that will allow them to move freely throughout the simulated 3-D facility to study and learn various aspects of IGCC plant operation, control, and safety. Such combined operator and immersive training systems go beyond traditional simulation and include more realistic scenarios, improved communication, and collaboration among co-workers.

01 COAL, LIGNITE, AND PEAT↗

Advanced regulatory control and coordinated plant-wide control strategies for IGCC targeted towards improving power ramp-rates

As part of ongoing R&D activities at the National Energy Technology Laboratory's (NETL) Advanced Virtual Energy Simulation Training & Research (AVESTAR™) Center, this paper highlights strategies for enhancing low-level regulatory control and system-wide coordinated control strategies implemented in a high-fidelity dynamic simulator for an Integrated Gasification Combined Cycle (IGCC) power plant with carbon capture. The underlying IGCC plant dynamic model contains 20 major process areas, each of which is tightly integrated with the rest of the power plant, making individual functionally-independent processes prone to routine disturbances. Single-loop feedback control although adequate to meet the primary control objective for most processes, does not take into account in advance the effect of these disturbances, making the entire power plant undergo large offshoots and/or oscillations before the feedback action has an opportunity to impact control performance. In this paper, controller enhancements ranging from retuning feedback control loops, multiplicative feed-forward control and other control techniques such as split-range control, feedback trim and dynamic compensation, applicable on various subsections of the integrated IGCC plant, have been highlighted and improvements in control responses have been given. Compared to using classical feedback-based control structure, the enhanced IGCC regulatory control architecture reduces plant settling time and peak offshoots, achieves faster disturbance rejection, and promotes higher power ramp-rates. In addition, improvements in IGCC coordinated plant-wide control strategies for “Gasifier-Lead”, “GT-Lead” and “Plantwide” operation modes have been proposed and their responses compared. The paper is concluded with a brief discussion on the potential IGCC controller improvements resulting from using advanced process control, including model predictive control (MPC), as a supervisory control layer.

97 MATHEMATICS AND COMPUTING↗

Enhanced IGCC regulatory control and coordinated plant-wide control strategies for improving power ramp rates

As part of ongoing R&D activities at the National Energy Technology Laboratory’s (NETL) Advanced Virtual Energy Simulation Training & Research (AVESTAR™) Center, this paper highlights strategies for enhancing low-level regulatory control and system-wide coordinated control strategies implemented in a high-fidelity dynamic simulator for an Integrated Gasification Combined Cycle (IGCC) power plant with carbon capture. The underlying IGCC plant dynamic model contains 20 major process areas, each of which is tightly integrated with the rest of the power plant, making individual functionally-independent processes prone to routine disturbances. Single-loop feedback control although adequate to meet the primary control objective for most processes, does not take into account in advance the effect of these disturbances, making the entire power plant undergo large offshoots and/or oscillations before the feedback action has an opportunity to impact control performance. In this paper, controller enhancements ranging from retuning feedback control loops, multiplicative feed-forward control and other control techniques such as split-range control, feedback trim and dynamic compensation, applicable on various subsections of the integrated IGCC plant, have been highlighted and improvements in control responses have been given. Compared to using classical feedback-based control structure, the enhanced IGCC regulatory control architecture reduces plant settling time and peak offshoots, achieves faster disturbance rejection, and promotes higher power ramp-rates. In addition, improvements in IGCC coordinated plant-wide control strategies for “Gasifier-Lead”, “GT-Lead” and “Plantwide” operation modes have been proposed and their responses compared. The paper is concluded with a brief discussion on the potential IGCC controller improvements resulting from using advanced process control, including model predictive control (MPC), as a supervisory control layer.

20 FOSSIL-FUELED POWER PLANTS↗

Feasibility studies to improve plant availability and reduce total installed cost in IGCC plants

The main purpose of this project is to look at technologies and philosophies that would help reduce the costs of an Integrated Gasification Combined Cycle (IGCC) plant, increase its availability or do both. GE’s approach to this problem is to consider options in three different areas: 1) technology evaluations and development; 2) constructability approaches; and 3) design and operation methodologies. Five separate tasks were identified that fall under the three areas: Task 2 – Integrated Operations Philosophy; Task 3 – Slip Forming of IGCC Components; Task 4 – Modularization of IGCC Components; Task 5 – Fouling Removal; and Task 6 – Improved Slag Handling. Overall, this project produced results on many fronts. Some of the ideas could be utilized immediately by those seeking to build an IGCC plant in the near future. These include the considerations from the Integrated Operations Philosophy task and the different construction techniques of Slip Forming and Modularization (especially if the proposed site is in a remote location or has a lack of a skilled workforce). Other results include ideas for promising technologies that require further development and testing to realize their full potential and be available for commercial operation. In both areas GE considers this project to be a success in identifying areas outside the core IGCC plant systems that are ripe for cost reduction and ity improvement opportunities.

01 COAL, LIGNITE, AND PEAT↗

Development of a plant-wide dynamic model of an integrated gasification combined cycle (IGCC) plant

In this presentation, development of a plant-wide dynamic model of an advanced Integrated Gasification Combined Cycle (IGCC) plant with CO2 capture will be discussed. The IGCC reference plant generates 640 MWe of net power using Illinois No.6 coal as the feed. The plant includes an entrained, downflow, General Electric Energy (GEE) gasifier with a radiant syngas cooler (RSC), a two-stage water gas shift (WGS) conversion process, and two advanced 'F' class combustion turbines partially integrated with an elevated-pressure air separation unit (ASU). A subcritical steam cycle is considered for heat recovery steam generation. Syngas is selectively cleaned by a SELEXOL acid gas removal (AGR) process. Sulfur is recovered using a two-train Claus unit with tail gas recycle to the AGR. A multistage intercooled compressor is used for compressing CO2 to the pressure required for sequestration. Using Illinois No.6 coal, the reference plant generates 640 MWe of net power. The plant-wide steady-state and dynamic IGCC simulations have been generated using the Aspen Plus{reg_sign} and Aspen Plus Dynamics{reg_sign} process simulators, respectively. The model is generated based on the Case 2 IGCC configuration detailed in the study available in the NETL website1. The GEE gasifier is represented with a restricted equilibrium reactor model where the temperature approach to equilibrium for individual reactions can be modified based on the experimental data. In this radiant-only configuration, the syngas from the Radiant Syngas Cooler (RSC) is quenched in a scrubber. The blackwater from the scrubber bottom is further cleaned in the blackwater treatment plant. The cleaned water is returned back to the scrubber and also used for slurry preparation. The acid gas from the sour water stripper (SWS) is sent to the Claus plant. The syngas from the scrubber passes through a sour shift process. The WGS reactors are modeled as adiabatic plug flow reactors with rigorous kinetics based on the mid-life activity of the shift-catalyst. The SELEXOL unit consists of the H2S and CO2 absorbers that are designed to meet the stringent environmental limits and requirements of other associated units. The model also considers the stripper for recovering H2S that is sent as a feed to a split-flow Claus unit. The tail gas from the Claus unit is recycled to the SELEXOL unit. The cleaned syngas is sent to the GE 7FB gas turbine. This turbine is modeled as per published data in the literature. Diluent N2 is used from the elevated-pressure ASU for reducing the NOx formation. The heat recovery steam generator (HRSG) is modeled by considering generation of high-pressure, intermediate-pressure, and low-pressure steam. All of the vessels, reactors, heat exchangers, and the columns have been sized. The basic IGCC process control structure has been synthesized by standard guidelines and existing practices. The steady-state simulation is solved in sequential-modular mode in Aspen Plus{reg_sign} and consists of more than 300 unit operations, 33 design specs, and 16 calculator blocks. The equation-oriented dynamic simulation consists of more than 100,000 equations solved using a multi-step Gear's integrator in Aspen Plus Dynamics{reg_sign}. The challenges faced in solving the dynamic model and key transient results from this dynamic model will also be discussed.

97 MATHEMATICS AND COMPUTING↗

Modeling and optimization of a modified claus process as part of an integrted gasification combined cycle (IGCC) power plant with CO2 capture

The modified Claus process is one of the most common technologies for sulfur recovery from acid gas streams. Important design criteria for the Claus unit, when part of an Integrated Gasification Combined Cycle (IGCC) power plant, are the ability to destroy ammonia completely and recover sulfur thoroughly from a relatively low purity acid gas stream without sacrificing flame stability. Due to these criteria, modifications are often required to the conventional process, resulting in a modified Claus process. For the studies discussed here, these modifications include the use of a 95% pure oxygen stream as the oxidant, a split flow configuration, and the preheating of the feeds with the intermediate pressure steam generated in the waste heat boiler (WHB). In the future, for IGCC plants with CO2 capture, the Claus unit must satisfy emission standards without sacrificing the plant efficiency in the face of typical disturbances of an IGCC plant such as rapid change in the feed flowrates due to load-following and wide changes in the feed composition because of changes in the coal feed to the gasifier. The Claus unit should be adequately designed and efficiently operated to satisfy these objectives. Even though the Claus process has been commercialized for decades, most papers concerned with the modeling of the Claus process treat the key reactions as equilibrium reactions. Such models are validated by manipulating the temperature approach to equilibrium for a set of steady-state operating data, but are of limited use for dynamic studies. One of the objectives of this study is to develop a model that can be used for dynamic studies. In a Claus process, especially in the furnace and the WHB, many reactions may take place. In this work, a set of linearly independent reactions has been identified and kinetic models of the furnace flame and anoxic zones, WHB, and catalytic reactors have been developed. To facilitate the modeling of the Claus furnace, a four-stage method was devised so as to determine which set of linearly independent reactions would best describe the product distributions from available plant data. Various approaches are taken to derive the kinetic rate expressions which are either missing in the open literature or found to be inconsistent. A set of plant data is used for optimal estimation of the kinetic parameters. The final model agrees well with the published plant data. Using the developed kinetics models of the Claus reaction furnace, WHB, and catalytic stages, two optimization studies are carried out. The first study shows that there exists an optimal steam pressure generated in the WHB that balances hydrogen yield, oxygen demand, and power generation. In the second study, it is shown that an optimal H2S/SO2 ratio exists that balances single-pass conversion, hydrogen yield, oxygen demand, and power generation. In addition, an operability study has been carried out to examine the operating envelope in which both H2S/SO2 ratio and adiabatic flame temperature can be controlled in the face of disturbances typical for the operation of an IGCC power plant with CO2 capture. Impact of CO2 capture on the Claus process has also been discussed.

08 HYDROGEN↗

Chemical Looping Coal Gasification Sub-Pilot Unit Demonstration and Economic Assessment for IGCC applications (Final Report)

The Ohio State University (OSU) coal to syngas (CTS) technology is an advanced air separation process that can be applied for electricity production via an integrated gasification combined cycle (IGCC). The objective of the proposed project is to enable the OSU CLG technology for a commercially relevant demonstration by 2020. In order to accomplish this objective, small pilot scale demonstration of the CLG reactor system was performed. The small pilot test unit incorporates commercially scalable non-mechanical gas sealing and solids flow control components for extended operations of the integrated reactor system. A cumulative demonstration of greater than 100 hours was performed to confirm the reliability of the reactors (reducer and oxidizer) and non-mechanical devices in maintaining controlled solid circulation, gas sealing, and coal distribution in the reactor (reducer) as well as to confirm sustained syngas product performance. A comprehensive techno-economic analysis (TEA) of the OSU CLG process for IGCC application was conducted with the support of WorleyParsons, Ltd. (WP) and compared to the Department of Energy (DOE) baseline IGCC report. Using the data gained from the small pilot demonstration, a complete comprehensive techno-economic analysis (TEA) of the CLG process was conducted. The evaluation was used as basis to attract utilities and coal industries in Ohio. The project duration lasts 30 months (6 months of no cost extension). Ohio coal was used in the integrated CLG small pilot unit to convert to high hydrogen syngas. A demonstration of the integrated chemical looping reactor system at the 15 kW th scale accelerates technology commercialization in the near term. The 15 kWth demonstration addressed several major technology gaps, such as coal injection and distribution in the reducer, controllable solids circulation with the desired fuel to solids ratio, system pressure distribution for proper gas sealing, effects of contaminants and fuel/oxygen carrier residence time requirements. The fates of impurities, such as SO x and NO x was also investigated in unit demonstrations. WP conducted a comprehensive system TEA to optimize the OSU CLG process design for efficient electricity generation with greater than 90% CO 2 capture in IGCC applications. The conclusion of this project supports the further scale-up of the technology to a commercially applicable large pilot scale test unit for operation by 2020. More importantly, it benefits Ohio as it provides an economically competitive mean for power generation with carbon capture. Given the rise of natural gas usage and strict environmental regulations, the use of Ohio coal is expected to decrease and thus impact the coal economy in Ohio. The conclusion of this project provided way for Ohio coal to compete in the future and secure jobs in the energy sector.

01 COAL, LIGNITE, AND PEAT↗

IGCC performance comparison for variations in gasifier type and gas turbine firing temperature

Performance estimates were made for a series of integrated coal gasification combined cycle (IGCC) power systems using three generic types of coal gasification subsystems. The objectives of this study were (1) to provide a self consistent comparison of IGCC systems using different types of gasifiers and different oxidants and (2) to use this framework of cases to evaluate the effect of a gas turbine firing temperature and cooling approach an overall system efficiency. The basic IGCC systems considered included both air and oxygen blown versions of a fluidized bed gasifier, represented by the Westinghouse design, and an entrained bed gasifier, represented by the Texaco design. Also considered were systems using an oxygen blown, fixed bed gasifier, represented by the British Gas Corporation (BGC) slagging gasifier. All of these gasifiers were integrated with a combined cycle using a gas turbine firing temperature of 1700 K (2600 F) and a compressor pressure ratio of 16:1. Steam turbine throttle conditions were chosen to be 16.6 MPa/811 K (2400 psia/1000 F) with a single reheat to 810 K (1000 F). Some of these cases were modified to allow the evaluation of the effect of gas turbine firing temperature. Turbine firing temperatures from state of the art 1365 K (2000 F) to an advanced technology 1920 K (3000 F) were analyzed. A turbine cooling technology that maintains metal temperatures below acceptable limits was assumed for each level of firing temperature. System performance comparisons were made using three advanced turbine cooling technologies for the 1920 K (3000 F) firing temperature. The results indicate that the IGCC using the BGC gasifier had the highest net system efficiency (42.1 percent) of the five gasification cases considered.

Stochl, R. J.↗

Transient studies of an Integrated Gasification Combined Cycle (IGCC) plant with CO2 capture

Next-generation coal-fired power plants need to consider the option for CO2 capture as stringent governmental mandates are expected to be issued in near future. Integrated gasification combined cycle (IGCC) plants are more efficient than the conventional coal combustion processes when the option for CO2 capture is considered. However, no IGCC plant with CO2 capture currently exists in the world. Therefore, it is important to consider the operability and controllability issues of such a plant before it is commercially built. To facilitate this objective, a detailed plant-wide dynamic simulation of an IGCC plant with 90% CO2 capture has been developed in Aspen Plus Dynamics{reg_sign}. The plant considers a General Electric Energy (GEE)-type downflow radiant-only gasifier followed by a quench section. A two-stage water gas shift (WGS) reaction is considered for conversion of CO to CO2. A two-stage acid gas removal (AGR) process based on a physical solvent is simulated for selective capture of H2S and CO2. Compression of the captured CO2 for sequestration, an oxy-Claus process for removal of H2S and NH3, black water treatment, and the sour water treatment are also modeled. The tail gas from the Claus unit is recycled to the SELEXOL unit. The clean syngas from the AGR process is sent to a gas turbine followed by a heat recovery steam generator. This turbine is modeled as per published data in the literature. Diluent N2 is used from the elevated-pressure ASU for reducing the NOx formation. The heat recovery steam generator (HRSG) is modeled by considering generation of high-pressure, intermediate-pressure, and low-pressure steam. All of the vessels, reactors, heat exchangers, and the columns have been sized. The basic IGCC process control structure has been synthesized by standard guidelines and existing practices. The steady state results are validated with data from a commercial gasifier. In the future grid-connected system, the plant should satisfy the environmental targets and quality of the feed to other sections, wherever applicable, without violating the operating constraints, and without sacrificing the efficiency. However, it was found that the emission of acid gases may far exceed the environmental targets and the overshoot of some of the key variables may be unacceptable under transient operation while following the load. A number of operational strategies and control configurations is explored for achieving these stringent requirements. The transient response of the plant is also studied by perturbing a number of key inputs.

97 MATHEMATICS AND COMPUTING↗

Plant-wide dynamic simulation of an IGCC plant with CO2 capture

To eliminate the harmful effects of greenhouse gases, especially that of CO2, future coalfired power plants need to consider the option for CO2 capture. The loss in efficiency for CO2 capture is less in an Integrated Gasification Combined Cycle (IGCC) plant compared to other conventional coal combustion processes. However, no IGCC plant with CO2 capture currently exists in the world. Therefore, it is important to consider the operability and controllability issues of such a plant before it is commercially built. With this objective in mind, a detailed plant-wide dynamic simulation of an IGCC plant with CO2 capture has been developed. The plant considers a General Electric Energy (GEE)-type downflow radiant-only gasifier followed by a quench section. A two-stage water gas shift (WGS) reaction is considered for conversion of about 96 mol% of CO to CO2. A two-stage acid gas removal (AGR) process based on a physical solvent is simulated for selective capture of H2S and CO2. The clean syngas is sent to a gas turbine (GT) followed by a heat recovery steam generator (HRSG). The steady state results are validated with data from a commercial gasifier. A 5 % ramp increase in the flowrate of coal is introduced to study the system dynamics. To control the conversion of CO at a desired level in the WGS reactors, the steam/CO ratio is manipulated. This strategy is found to be efficient for this operating condition. In the absence of an efficient control strategy in the AGR process, the environmental emissions exceeded the limits by a great extent.

01 COAL, LIGNITE, AND PEAT↗