Case Study of Integrating High-Temperature Heat Pump with LiBr-H2O Absorption Chiller for Data Center Liquid Cooling

Data centers (DCs) are physical infrastructures that support artificial intelligence workloads. The rapid growth of artificial intelligence is putting substantial pressure on the US power grid. Most of electricity consumed by IT equipment, accounting for 50%-60% of total DC power, ultimately becomes waste heat. This heat is dissipated by DC’s cooling facilities, accounting for an additional 30%-40% of total DC power. Recovering and repurposing this waste heat offers a significant opportunity to enhance energy efficiency and reduce operating costs of DCs. One potential pathway is converting heat to cold using thermal-driven absorption chillers, therefore, reducing the power consumption in DC cooling facilities. Existing studies mainly demonstrate the technical and economic feasibility of repurposing DC’s waste heat for cooling applications but provide limited technical details on how to integrate the thermal-driven absorption chillers with DC cooling systems. In addition, the low-grade waste heat available from DCs must be upgraded to higher temperatures suitable for absorption chillers. This paper presents a case study on integrating high-temperature heat pumps with a LiBr-H2O absorption chiller to use DC waste heat for cooling. A thermodynamic model of single-effect, LiBr-H2O absorption chiller and an empirical model of high-temperature heat pumps were built. The case study considers ASHRAE W17 liquid-cooled DC, with facility service water supplied at 17.0℃ and returned at 25.3℃. The thermal behaviors of absorption chiller components were predicted for the generation temperature ranging from 75.0℃ to 115.0℃. Based on the available waste heat in the integrated system, two waste heat recovery strategies were evaluated: a facility service water-based strategy and cooling water-based strategy. Results indicated that the cooling water-based strategy achieves higher Coefficient of Performance (COPs) than the facility service water-based strategy. The relatively low cooling COPs of single-effect LiBr-H2O absorption chillers could be offset by high heating COP of high temperature heat pumps. The maximum cooling COP of absorption chiller and the overall COP of integrated systems occur at lower generation temperatures, but these conditions also yield lower cooling capacities. In practice, system operation should balance the trade-off between the COP and cooling capacity

Wang, Pengtao [ORNL] (ORCID:0000000214713429)

Equipment List Comparing Balance of Plant Containing a Heat Pump against a Reference Electricity Generating Plant

Approximately two-thirds of U.S. energy consumption in the industrial and transportation sectors relies on fossil fuels. These sectors require high-quality heat, i.e., thermal energy at very high temperatures, for molecular transformation processes. The Integrated Energy Systems (IES) program aims to assess the economic potential of utilizing nuclear-grade heat from Advanced Reactors (ARs) to meet the high-quality heat demands. By having industrial processes (IPs) supplied with nuclear-generated heat, manufacturers could benefit from more stable and potentially lower energy costs, reducing reliance on volatile fossil fuel markets. The main outcome of the FY24 research was the thermodynamic assessment and gap analysis of steam generation for IP applications. The study completed in June 2024 demonstrated that the required steam temperatures could be achieved by integrating a heat pump into an AR power plant. After identifying the thermal demands of target IPs, multiple balance of plant configurations for the Xe-100 reactor by X-energy, incorporating a heat pump, were analyzed. Their technical feasibilities were assessed, including the design of suitable axial compressors for these applications. Comparative performance analysis showed that thermal efficiency alone is insufficient to evaluate system suitability. To address this, a new indicator (heat factor) was introduced in the report released in September 2024 to quantify the low-quality thermal power needed to produce one unit of high-quality heat for the IP. Results showed that integrating heat pumps into Rankine cycles enables higher steam temperatures, though at the expense of increased thermal energy input. This report builds upon and completes the foundational work previously undertaken. It focuses on the design of two Balance of Plant (BOP) configurations, both based on Rankine energy conversion cycles: “Case 1”, which involves electricity generation only, and “Case 2”, which combines electricity and high-temperature heat generation for industrial use. For each configuration, a comprehensive equipment list was developed, detailing all major components such as turbines, compressors, heat exchangers, pumps, and control systems. These lists will serve as the basis for future comparative cost analyses, with the goal of assessing the number and type of components required to integrate a heat pump into the Rankine cycle and to establish a heat transport system capable of delivering thermal energy from the nuclear plant to an industrial facility. Using the constitutive equations presented in the June 2024 milestone, the operating conditions of all BOP components for both “Case 1” and “Case 2” were evaluated. These parameters—such as temperature, pressure, mass flow rate, and steam quality—served as the basis for calculating the associated thermal and mechanical power flows. The net power required from the heat pump to raise the steam temperature to the target level was also determined. The thermodynamic performance of the configuration was then assessed using the heat factor metric. The key outcome of this analysis is a comparative table that presents the equipment that was used in the “Case 1” and “Case 2” configurations. This study offers a preliminary comparison of the two designs, providing insight into the impact of integrating a heat pump in terms of component requirements and thermal efficiency. This equipment list, together with the evaluated operating conditions, also serves as a foundation for the economic analyses scheduled for the current fiscal year.

22 GENERAL STUDIES OF NUCLEAR REACTORS

Decarbonizing Industrial Heat and Electricity Applications Using Advanced Nuclear Energy

Idaho National Laboratory (INL) is investigating the technical pathways to assist industrial heat and electricity users to meet their decarbonization goals through integration with advanced nuclear power plants (NPPs). This project will deliver a library of process models and accompanying documents that guide specific industries in choosing potential nuclear technologies based on their needs. Considerations in providing this guidance include specific hazards from the industrial facility, heat transport requirements and associated technologies, and feasibility with site-specific demand profiles. The library of facility process models will be based on real data from industrial facilities in the United States. The industrial processes will be identified in this project based on the following: (1) operational heat characteristics that nuclear systems can provide, (2) sufficient energy requirements to merit the capital investment for nuclear plant construction, and (3) environmental benefits of replacing existing energy production with carbon-free nuclear power. Other decarbonization opportunities considered are the addition of nuclear-powered electrolysis processes or high-temperature electric heating where the thermal requirements exceed nuclear generation conditions. In addition to assessing the technical feasibility, INL is evaluating the impact of hazards introduced by the industrial facilities on the siting requirements of advanced NPPs. Site characterization of an industrial plant is essential to determine the feasibility and suitable integration methods for each industry. The assessment of siting and technical data will reveal opportunities for a single-use nuclear integration as well as integration of multiple industrial facilities with a single NPP.

02 PETROLEUM

Metrology for femtosecond pulsed x-ray heating in diamond anvil cell experiments at the European XFEL: Revisiting the iron phase diagram up to 150 GPa

The development of pulsed intense x-ray sources, such as free electron laser, offers new avenues for high pressure experiments. Here, we study the feasibility and metrology of x-ray heating in diamond anvil cells at the European x-ray free electron laser. This method enables one to volumetrically heat the sample while inhibiting chemical migration and probing the crystallographic structure of the sample throughout the heating with a high repetition rate. We focus our study on iron, whose phase diagram is well established up to 100 GPa, to explore the possibilities and limitations of this technique. We volumetrically heat iron samples at starting pressures ranging from 10 to 138 GPa, using the x-ray beam pulsed at 4.5 MHz in a serial pump-and-probe experimental design. Experimental challenges arise from temperature gradients within the sample, changes in temperature at the 100 ns timescale, the difficulty of direct temperature estimates, the effect of thermal pressure, and the presence of metastable crystallites due to rapid cycles of heating and cooling. Hence, we develop a multi-crystal-like data processing method that allows us to account for sample heterogeneity in probed conditions. We then calibrate our measurements using known physical properties of iron under pressure. Thermal pressure in our experiments increases from 4% of the isochoric prediction at 10 GPa to 23% at 138 GPa, and we show that our data are in agreement with most previous observations of iron in this pressure range. The method can now be implemented at higher pressures and temperatures and on materials with unknown phase diagrams.

Materials science

Multi-objective Decisions on Integrated Energy Systems Planning and Operation for Industrial Combined Heat and Power Supply

Unlike the power sector—which can transmit electricity over long distances via established grids—the industrial sector poses a unique challenge due to its geographically concentrated large-scale heat processes. Enhancing energy security in such industrial parks provides a dual benefit: reduced exposure to volatile fossil fuel prices and improved economic viability, largely driven by economies of scale in energy supply and distribution. This study presents a comprehensive technoeconomic analysis of a nuclear energy hub, employing a mechanism-focused approach to evaluate uncertainties in operational strategies and capacity optimization. Load profiles from three major energy intesive industries—chemical, refinery, and steelmaking—are examined, each presenting unique challenges and opportunities for nuclear energy integration. We adopt a multi-objective optimization framework, converting multiple objectives into a single objective function through the e-constraint method. The findings highlight clear trade-offs between system conditions and varying levels of energy independence. Overall, this analysis is granular enough to address industry-specific concerns yet sufficiently generalizable to provide actionable insights into the feasibility of nuclear-based clean heat solutions for the industrial sector.

25 - ENERGY STORAGE

Stochastic Thermo-Hydro Modeling and Neural Network Surrogate Development for Thermal Resource Assessment of the Galleries-to-Calories Geobattery

The Galleries-to-Calories Geobattery concept explores the use of abandoned coal mine workings for large-scale thermal energy transport and storage. The system involves injecting waste heat from a supercomputing facility into flooded mine galleries, where groundwater flow can store and transport thermal energy for potential recovery in downgradient district heating and cooling applications. To evaluate the feasibility and performance of the Geobattery under geological and operational uncertainty, we developed a suite of stochastic thermo-hydrological (TH) simulations using Monte Carlo sampling of key uncertain parameters (e.g., permeability, porosity, thermal conductivity, specific heat capacity) and operating conditions (e.g., injection rate, injection temperature). Results identified injection rate and temperature as the most influential parameters governing thermal front propagation, while the geometry of the room-and-pillar structure played a critical role in directing the extent and orientation of thermal advancement. Optimal combinations of material properties for maximizing heat recovery were also determined. To address the high computational cost of coupled-process stochastic modeling, we trained a neural network surrogate model on 24,000 physics-based realizations, achieving an R² > 0.99 and MAE < 0.1 for temperature predictions at monitoring locations. This surrogate enabled an additional 100,000 realizations for global sensitivity analysis and probabilistic thermal resource assessment. The integrated stochastic physics–surrogate modeling framework offers a computationally efficient tool for quantifying uncertainty, identifying key drivers, and informing early-stage design decisions for Geobattery systems.

15 - GEOTHERMAL ENERGY

Detection of trace contaminants released from rapidly heated pulsed power electrodes by laser diagnostics

Development of a capability to measure trace gas contaminants released from pulsed power electrodes would immediately impact Sandia pulsed power research. These releases occur during ultra-fast heating of metal electrodes during pulsed power discharges and can lead to substantial power losses through plasma formation. Detection of contaminants is a formidable challenge due to the need for in-situ spatially and temporally resolved measurements of trace gases in the extreme environment of ultra-fast heated metal surfaces. We investigate the feasibility of laser diagnostics for detecting contaminants, including H-atom, OH, and H 2 O. Laser-induced fluorescence and photofragmentation fluorescence showed significant plasma emission interferences and did not yield any detectable H-atom, OH, or H 2 O. Our newly developed H-atom detection using femtosecond degenerate four-wave mixing suppressed interferences and enabled detection of H-atoms. A few shots showed large signals in the near-surface region of metal foils, suggesting the formation of a wave of H-atoms from the metal.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

Latent heat thermal energy storage performance maps enabling fast & accurate building energy simulations

Thermal energy storage (TES) using phase change materials (PCMs) has gained attention as an effective approach to manage energy demand fluctuations and shift peak building loads. PCM embedded heat exchangers (PCM-HXs) offer high energy storage density and low temperature variation during phase change, being suitable for load-shifting applications. However, this component is typically evaluated using computationally expensive methods, which present significant challenges when the ultimate goal is to assess the performance of PCM-HX integrated thermal energy storage systems in the full building context. In this paper, we present a methodology to generate highly accurate and computationally efficient PCM-HX performance maps which can be easily integrated into building energy simulation tools to analyze the feasibility of space conditioning systems with latent heat PCM-based TES. The performance maps are generated using a computationally efficient PCM-HX simulation tool based on a Generalized Resistance-Capacitance Model (GRCM) which can simulate arbitrary PCM-HXs with high accuracy and significantly less computational effort compared to full CFD simulations. The methodology was verified for a case study considering a 5-ton (~17.5 kW) air-to-water heat pump-thermal energy storage system (HP-TES), which was co-simulated in Modelica for a DOE prototype small-office building in Vienna, Austria, using Spawn of EnergyPlus™. The TES performance maps provided accurate predictions of PCM-HX behavior when used as Modelica component, with deviations within 2-4% while also achieving at least 103 computational time reduction. Leveraging this faster prediction capability, four PCMs with different melting temperatures for cooling (12°C, 16°C) and heating (31°C, 36°C) were assessed to investigate their impact on system performance. This work highlights the importance of robust PCM-HX models for efficient and high-fidelity building-level simulations, presenting new opportunities for advanced control strategy development and parametric analysis of TES configurations in a computationally efficient manner

Modelica Building Simulations

Ground-Truthing: Exploratory Borehole Characterization and Modeling to Verify and Expand Techno-Economic Evaluation of Earth Source Heat at Cornell U

This report documents the successful completion of DOE award DE-EE0009255: Ground- Truthing: Exploratory Borehole Characterization and Modeling to Verify and Expand Techno- Economic Evaluation of Earth Source Heat at Cornell University . Cornell University is evaluating the technical and economic feasibility of using deep direct-use (DDU) geothermal energy, referred to locally as Earth Source Heat (ESH), to serve as a renewable energy source for campus heating. To meet this objective, Cornell drilled an approximately 3-kilometer-deep exploratory borehole: the Cornell University Borehole Observatory (CUBO), or ESH-1. The team conducted an extensive suite of geophysical, hydrologic, thermal, mechanical, and geochemical measurements to evaluate subsurface conditions and geothermal development potential. This report summarizes the well drilling and testing tasks, findings, and conclusions.

15 GEOTHERMAL ENERGY

Ion Cyclotron Heating in a Levitated Dipole Fusion Reactor

OpenStar Technologies is pursuing the levitated dipole (LD) as a highly modular, loosely-coupled system that leverages their expertise in high temperature superconductor (HTS) technology. The next generation experiment at OpenStar, Tahi (Ma¯ori for “first”), will demonstrate the generation and confinement of fast ions in a levitated dipole for the first time. Ion cyclotron range of frequency (ICRF) heating is a leading candidate for energetic ion formation in Tahi. A frequency in the 10 MHz range will be used for H minority heating or D majority heating with waves launched from an antenna located above the floating coil. Unlike a tokamak, where the targeted cyclotron resonance is typically a vertical path through the center of the plasma, in a dipole the resonance location follows a C-shaped path from the separatrix to the center of the plasma. The value of B also varies significantly within the confined plasma resulting in a large number of cyclotron harmonics present in the low field region. Furthermore, levitated dipoles contain a “first closed flux surface” surrounding the floating coil, in addition to the traditional separatrix /last closed flux surface. Simulation e ff orts using full-wave ICRF codes show that ICRF heating of a levitated dipole reactor is feasible using a pair of toroidal current straps phased to launch the appropriate parallel ( i.e. poloidal) refractive index.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

Nuclear Thermal Energy Storage Configurations for Industrial Combined Heat and Power Supply: Conceptual Study and Engineering Designs

The industries examined in this report primarily rely on moderate-temperature heat provided by gas- or coal-fired boilers and combined heat and power (CHP) plants, delivered through standard process steam systems. High-temperature energy demands are often industry-specific and typically exceed the capabilities of high-temperature gas-cooled reactors (HTGRs). While it is technically feasible to replace process steam from fossil-based heat sources with nuclear energy, certain industries, such as methanol production and pulp and paper, face technoeconomic challenges in integrating nuclear energy without major changes or a technological shift. This is mainly due to the limited external energy demand remaining after the use of internal byproducts, waste heat recovery, and simple efficiency improvements. Achieving full decarbonization of these processes with nuclear energy would require significant technological advancements, involving experimental technology and substantial investments, making widespread adoption in existing industrial plants unlikely in the near term. This study reviews TES options in the context of enabling a flexible CHP supply while maintaining a steady nuclear heat input. Heat storage systems that interface between the reactor primary fluid and the CHP system offer superior performance and flexibility. Specifically, steam extraction downstream of the reheater with a two-tank molten-salt TES appears as the best solution regarding thermodynamic system benefits and system drawbacks. Using selected system configurations, a conceptual design of an industrial energy park was developed for industries with varying energy demands, such as steel production plants utilizing electric arc furnaces (EAFs) and chemical plants, as well as for those with constant energy demands, like petroleum refineries. This design highlights the capabilities of TES and explores its potential business cases. The study also conceptually develops the potential for integrating additional energy sources with nuclear systems through the implementation of TES. The potential of the HTGR-TES-CHP system was also evaluated considering key uncertainties such as industrial demand profiles, external grid access availability, and eligible tax credit levels, using the Holistic Energy Resource Optimization Network. Sensitivity of net present value to these uncertainties was analyzed to determine the optimal number of nuclear reactors (and CHP systems) and the suitable TES capacity. The results were interpreted from a decision-maker’s perspective, focusing on three key areas: deployment strategy (oversized units vs. undersized units with TES support), industrial process characteristics (thermal-intensive single profiles vs. electricity-intensive combined profiles), and operational goals (maximizing profits vs. minimizing natural gas (NG) consumption or external grid dependence). The optimization results indicate that the HTGR-TES-CHP system significantly reduces reliance on NG boilers for individual industrial processes by 9-60% (in NG capacity factor), with an average reduction of 38%, compared to standalone NG boiler operation case (Business As Usual [BAU]). For combined industrial processes, the reduction ranges from 37-77%, with an average of 60%. Additionally, the system greatly reduces dependence on external grids. In meeting industrial electrical demands, a 33-100% self-sufficient internal electricity supply is achieved for single industrial process, with an average of 74%, compared to the BAU scenario, where 100% of electricity is imported. For combined processes, 35-100% of internal electricity demands are met by the reactor, with an average of 73%. At last, the relative NG price levels at which the proposed HTGR-TES-CHP system can cost-effectively enter the market currently dominated by existing NG boilers were estimated. For a moderate HTGR CAPEX level ($\$$2500/kWth, $\$$6329/kWe), the analysis suggests that NG prices must be 2.5 to 7 times higher than HTGR variable operating and maintenance costs for single industrial process, and 5.5 to 9.5 times higher for a combined process scenario. Tax credit modeling shows that the Investment Tax Credit significantly reduces the price threshold needed to break even, making the system competitive with NG boilers in certain cases.

22 GENERAL STUDIES OF NUCLEAR REACTORS

Carbondale Community Geothermal Coalition – Replicable Models for Decarbonizing Mixed-Use Rural Communities

The Carbondale Community Geothermal Coalition (CCGC) set out to prove that a fifth-generation geothermal district heating & cooling (5G GDHC) network can be technically feasible, cost-effective, and socially equitable for a small, mixed-use rural community. During Budget Period 1 (Planning & Design) the team: ● Completed a 449 ft thermal-response test confirming excellent ground conductivity (k = 1.69 Btu ft -1 hr -1 °F -1 ) and a benign 56.3 °F undisturbed temperature. Page 1 Final Technical Report for Award Number: DE-EE0010663 ● Built a fully calibrated digital twin (URBANopt → Modelica) for 240 k ft 2 of existing + future buildings. ● Designed a 75-borehole ambient-temperature loop (ATL) augmented by 75 solar-thermal panels, supplying 44 % of district heating and 100 % cooling in Stage-1. ● Produced retrofit bid-ready drawings for the Third Street Center and Second Street Townhomes. ● Reached > 200 community stakeholders and exceeded equity targets (46 % Hispanic/Latinx participation). ● Drafted a multi-tiered workforce plan aligned with Colorado Mountain College (Hispanic Serving Institution) and IGSHPA certifications.

15 GEOTHERMAL ENERGY

FEED Study of CarbonCapture Inc DAC and CarbonCure Utilization Technologies Using United States Steel’s Gary Works Plant Waste Heat (Final Report)

The University of Illinois at Urbana-Champaign (UIUC) led this project to produce a front-end engineering design (FEED) study of an advanced Direct Air Capture and Utilization System (DACUS) system that can remove a minimum of 5,000 tonnes/yr net of carbon dioxide from air (based on cradle-to-gate LCA) and utilizing the CO 2 to produce low carbon intensity ready mix concrete. The designed system, if built, would be larger than any currently existing Direct Air Capture (DAC) collector in the U.S. Such carbon capture technologies are critical to meeting the goals of the DOE’s program to accelerate climate-critical technology. In addition to the power sector, industrial facilities for the manufacture of steel and cement/concrete are among the major sources of anthropogenic CO 2 . DAC is a promising new technology for reducing CO 2 , a potent greenhouse gas, in the atmosphere but is expensive, in part due to the energy required to adsorb and desorb captured CO 2 during cycles. By integrating CarbonCapture Inc. (CCI) DAC modules at United States Steel's Gary Works (USS) and utilizing the site's waste heat, energy, and location this project evaluates the feasibility of utilizing the captured CO 2 and the logistics of transportation. CarbonCapture Inc. has developed an innovative DAC system using novel adsorbents to cost-effectively capture CO 2 . The captured, liquified gas will be trucked to ready-mix concrete plants within the region, the closest of which is approximately 3.5 miles away, where CarbonCure will inject it into concrete during the mixing process at the facilities. The carbon dioxide reacts with concrete, mineralizing into calcium carbonate (CaCO 3 ), permanently locking the greenhouse gas into the matrix of the building material. This FEED study demonstrated a full CO 2 value chain for DACUS from industrial facilities. It also provided a means for Visage Energy Corp. (Visage) to assess the impact of this holistic approach on job creation, regional economic impact, and environmental justice. The project team also included Sargent & Lundy (S&L) to provide the constructability review and costing of the integration of the DAC with the steel plant. Ecotek Engineering USA, LLC designed the outside battery limit (OSBL) infrastructure to connect the DAC and the plant. Activities performed during the project included: (1) Project Management Plan; (2) Technology Maturation Plan (TMP); (3) Initial Workforce Readiness Plan; (4) Workforce Readiness Plan; (5) Front-End Engineering Design (FEED) Study; (6) Project Design Basis; (7) Hazards and Operability (HAZOP) Study; (8) Constructability Review; (9) Project Cost Assessment; (10) Logistics Analysis of CO 2 Transportation to the Utilization Site; (11) Business Case Analysis; (12) Life Cycle Analysis (LCA); (13) Environmental Health and Safety (EH&S) Analysis; (14) Environmental Justice Analysis; and (15) Economic Revitalization and Job Creation Outcomes Analysis. This report provides a summary of the outcomes and results of the project, which was performed between Oct. 1, 2022, through Sept. 30, 2024.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

The Effects of Turbulence on Heliosheath Ions and Implications for Energetic Neutral Atoms

The distribution of ions in the heliosheath—the region between the heliospheric termination shock and the heliopause—is important for understanding remote observations of energetic neutral atoms (ENAs). The ion distributions were estimated previously based on hybrid simulations of the heating and evolution of solar wind and interstellar pickup ions across the solar wind termination shock, but these estimates only provide the distributions near the shock. In this work, we use self-consistent hybrid kinetic simulations to investigate the effects of turbulence on ion distributions in the heliosheath. The simulations are compared against Voyager observations, constraining the feasible amplitude and compressibility of turbulence. We find that the heating due to turbulent dissipation can lead to a significant increase in the temperature of thermal solar wind ions. Both turbulent velocity fluctuations and the heating of solar wind ions increase the charge-exchange source for ENAs at low energies (around 100 eV), where current ENA models underpredict observations by more than an order of magnitude. However, the effects of turbulence are likely not strong enough to fully explain these discrepancies.

79 ASTRONOMY AND ASTROPHYSICS

Numerical Modeling & Size Optimization of Thermal Energy Storage for Iron & Steel Production

Iron and steel production are responsible for 90 million MtCO2 per year in the United States. Hydrogen direct reduction of iron (H2DRI) is a promising pathway for a more sustainable iron production than commercially deployed technologies which rely on natural gas. The H2DRI process requires hydrogen at a temperature of up to 950 degrees C fed into a reduction furnace to produce pellets or briquettes that are used in the downstream iron and steelmaking process. In this work, we propose to use an electrical thermal energy storage (ETES) system, that can use renewable electricity to store high-temperature heat and dispatch it upon demand. Such a system can buffer the H2DRI plant from the variability of electricity prices by charging during curtailment and running the plant from storage during times of peak electricity price. We have developed heat transfer models for two different ETES systems that can be used to heat up hydrogen to the required temperatures: a particle-based ETES and a firebrick ETES. These models are used to evaluate the performance of such a system and support the sizing and preliminary cost estimation. The preliminary results using both models show that designing ETES systems for an industrial-scale H2DRI furnace is feasible. The firebrick ETES system has limited operational duration, which might limit the price buffering effect unless significantly oversized. The particle ETES system heat exchanger has industry-feasible dimensions, but its storage capacity would be decided upon the number of particle storage silos.

25 ENERGY STORAGE

Divertor shaping with neutral baffling as a solution to the tokamak power exhaust challenge

Exhausting power from the hot fusion core to the plasma-facing components is one fusion energy’s biggest challenges. The MAST Upgrade tokamak uniquely integrates strong containment of neutrals within the exhaust area (divertor) with extreme divertor shaping capability. By systematically altering the divertor shape, this study shows the strongest evidence to date to our knowledge that long-legged divertors with a high magnetic field gradient (total flux expansion) deliver key power exhaust benefits without adversely impacting the hot fusion core. These benefits are already achieved with relatively modest geometry adjustments that are more feasible to integrate in reactor designs. Benefits include reduced target heat loads and improved access to, and stability of, a neutral gas buffer that ‘shields’ the target and enhances power exhaust (detachment). Analysis and model comparisons shows these benefits are obtained by combining multiple shaping aspects: long-legged divertors have expanded plasma-neutral interaction volume that drive reductions in particle and power loads, while total flux expansion enhances detachment access and stability. Containing the neutrals in the exhaust area with physical structures further augments these shaping benefits. These results demonstrate strategic variation in the divertor geometry and magnetic topology is a potential solution to one of fusion’s power exhaust challenge.

magnetically confined plasmas

Glass Furnace Decarbonization Technology Stack (Final Technical Report)

This report summarizes the objectives, approach, and outcomes of the Glass Furnace Decarbonization Technology Stack project undertaken by Owens-Brockway Glass Container Incorporated under award number DE-CD0000093. The project aimed to implement a pioneering combination of furnace technologies at the Zanesville, OH manufacturing site to reduce carbon intensity (CI) by 20–40% compared to baseline operations. The proposed Furnace Technology Stack included a Gas/Oxy-fuel system, OPTIMELT™ Heat Recovery System, raw material pre-heating, electric boosting, and forehearth electrification—designed to demonstrate commercial feasibility and drive industry-wide decarbonization.

42 ENGINEERING

Site Integration and Regulatory Considerations for an NPP Colocated with a Petroleum Refinery, Methanol Plant, and Wood Pulp Plant

This research explores the colocation of nuclear power plants (NPPs) with industrial applications. Three existing industrial sites were considered to demonstrate the siting process and illuminate technological gaps for future work. The three applications demonstrated for colocation here are a petroleum refinery, a methanol production plant, and a pulp and paper plant. This study uses a modified version of the EPRI siting criteria to explore the geological and demographic characteristics of the location of the current industrial site, as well as exploring external hazards from the industrial plant and its surrounding land use. Data was collected from public databases to estimate site characteristics. We then discuss how the site characteristics may impact the ability to colocate an NPP with an industrial application. The application site and 5 additional sites were explored for each application to give a general indication of the siting implications for an NPP in each area. The hazards for each industrial application was also explored to determine how colocation may impact reactor safety. The following gaps have been identified and should be explored in future research on colocation of NPPs with petroleum refineries, methanol plants, and pulp and paper plants: - There is a variety of industrial use, hazards, and pipelines in the surrounding area. A more thorough review of these hazards should be considered for colocation. - In general, the whole region around some applications seems to have softer soil, with implications for large site preparation costs. Further site investigations should prioritize looking into the geotechnical conditions. - Applications along coastlines are susceptible to flooding and hurricanes. The benefits of colocation should be weighed against the potential design implications. - The benefits of natural gas pipeline infrastructure in place should be explored further. If heat supply from the NPP is not required or not feasible due to the distance between the NPP and the application, there may be an opportunity to supply hydrogen to the plant through an existing pipeline. - Because there are several collocated industrial plants in the regions for the refinery and methanol plant, the benefits of sharing resources from the NPP should be explored further. This may open up additional sites for colocation. The following knowledge gaps were identified for the colocation of NPPs with these three industries, and industrial applications in general. These gaps are: - While the STAND tool contains many important characteristics for the reactor siting process, it is not calibrated for the colocation of NPPs with industrial facilities. - There are aspects of both the NPP and industrial application that need to be quantified for a siting analysis. Particularly, we need to understand the water intake requirements for NPPs and each application. - Further work may focus on adapting the STAND site comparison methodology to comparison of sites for co-location. This will involve using the data documented in this report as a starting point and performing a comprehensive and quantitative comparison. - Without spending significant resources, it would be impossible to gather data for each site to evaluate all aspects of siting. One approach to finding data and understanding its implications to siting is looking at FSARs for existing plants. For example, most sites considered in this study have small Vs30 values, indicating soft soil. However, there are NPPs located in the vicinity of most of the sites (e.g., Waterford Steam Electric Station near New Orleans) and reviewing available site characteristics and geotechnical data for these NPPs, might provide further information for siting. - The siting analysis in this study indicates that colocation of the NPP with the industrial site could be difficult based on external hazards, cooling requirements, weather, or population. We need to determine the impact of distance between the two facilities on cost and quality of energy transport. - This study did not touch on socioeconomic impacts for NPP colocation with industrial facilities. The input-output analysis methodology could be applied to the communities referenced in this study to determine the socioeconomic impact of these projects. - Similarly, the impacts of colocation on emergency planning was not explored in this study. The impacts on emergency planning infrastructure are somewhat related to the socioeconomic impacts, and could be explored using a similar methodology. - This study also did not address physical and cybersecurity, which will be important aspects of co-location [ref] . Cybersecurity will be important, regardless of the distance, but physical security will be important if the facilities are located very closely. Physical security might also be important for the steam lines between the plants, unless they are determined to be non-safety significant. - In many site l

08 - HYDROGEN