Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DEMOLITION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Experience in Remote Demolition of the Activated Biological Shielding of the Multi Purpose Research Reactor (MZFR) on the German Karlsruhe Site - 12208

In 2009, WAK Decommissioning and Waste Management GmbH (WAK) became owner and operator of the waste treatment facilities of Karlsruhe Institute of Technology (KIT) as well as of the prototype reactors, the Compact Sodium-Cooled Fast Reactor (KNK) and Multi-Purpose Reactor (MZFR), both being in an advanced stage of dismantling. Together with the dismantling and decontamination activities of the former WAK reprocessing facility since 1990, the envisaged demolishing of the R and D reactor FR2 and a hot cell facility, all governmentally funded nuclear decommissioning projects on the Karlsruhe site are concentrated under the WAK management. The small space typical of prototype research reactors represented a challenge also during the last phase of activated dismantling, dismantling of the activated biological shield of the MZFR. Successful demolition of the biological shield required detailed planning and extensive testing in the years before. In view of the limited space and the ambient dose rate that was too high for manual work, it was required to find a tool carrier system to take up and control various demolition and dismantling tools in a remote manner. The strategy formulated in the concept of dismantling the biological shield by means of a modified electro-hydraulic demolition excavator in an adaptable working scaffolding turned out to be feasible. The following boundary conditions were essential: - Remote exchange of the dismantling and removal tools in smallest space. - Positioning of various supply facilities on the working platform. - Avoiding of interfering edges. - Optimization of mass flow (removal of the dismantled mass from the working area). - Maintenance in the surroundings of the dismantling area (in the controlled area). - Testing and qualification of the facilities and training of the staff. Both the dismantling technique chosen and the proceeding selected proved to be successful. Using various designs of universal cutters developed on the basis of wall saws, both the activated steel liner and the inner reinforcing layer were cut remotely in one process. This allowed for the efficient execution of the following remote concrete removal steps using mining techniques. The electro-hydraulic demolition excavator that was purchased and then modified turned out to be an ideal tool carrier system with rapid-exchange coupling. Due to the high availability, no major delays occurred. This also was a result of the consistently implemented maintenance and repair concept. With the excavator installed in a modifiable scaffolding suspended from a rotating carrier ring, all dismantling areas could be reached and treated in spite of the small space. Thanks to an optimum organization of work-flows, routine change of dismantling work, and maintenance or repair, the iterative radiological measurement campaigns could be integrated in the whole activity without the dismantling work being disturbed significantly. The ventilation system with pressure grading and pre-filtration units ensured a low contamination level in the dismantling area. It was also possible to manage the dust formed by the milling of concrete surfaces. As it was possible to further cut metal parts and crushed concrete later on, residue flows were optimized. The planned overall period for testing, dismantling the bio-shield and removing the equipment was 36 months. The final duration was 39 months. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Safe, Reliable, and Versatile Explosive Demolition Initiation System

Demolition contractors have a need to simultaneously detonate many demolition charges safely, cheaply, and reliably. An explosive distribution company has contracted the Initiation Systems Group at Lawrence Livermore Laboratory as consultants. The task is to develop a new, safer initiation system to detonate anywhere from 1 to 2000 demolition charges. The primary user of the system will be the explosive demolition contractors.

42 ENGINEERING↗

Geophysical measurements of a demolition at NRF

On May 31 st , 2025, at approximately 14:40:00 UTC, the former Submarine First Westinghouse (SW1) structure housing a large crane was demolished at the Naval Reactors Facility (NRF) located within the perimeter of the Idaho National Laboratory (INL). Several targeted explosives were used to facilitate this demolition. The INL Seismic Monitoring Program (SMP) installed four temporary seismic instrument suites around the site of the demolition in order to monitor ground motion including measuring peak ground acceleration (PGA), peak ground velocity (PGV), and to calculate peak ground displacement (PGD). The demolition produced three types of waves: body waves, surface waves, and acoustic waves. The acoustic wave represents the largest signal received. The PGA, measured on the eastern component of the instrument located approximately 95m away from the demolition site, was 0.187g. The PGV measured was 0.0004 m/s, and the PGD was approximately 0.000006m. Rayleigh waves incident on an instrument located at the Advanced Test Reactor, about 7.6km away, were used to estimate a magnitude of 0.3 at the ATR, representing a yield of energy equivalent to approximately 3 grams of TNT.

58 - GEOSCIENCES↗

Mitigation of Hexavalent Chromium in Storm Water Resulting from Demolition of Large Concrete Structure at the East Tennessee Technology Park - 12286

American Recovery and Reinvestment Act (ARRA) funding was provided to supplement the environmental management program at several DOE sites, including the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Demolition of the ETTP K-33 Building, the largest building to be demolished to date in Oak Ridge, was awarded to LSRS in FY-2010 under the ARRA program. The K-33 building was an 82 foot tall 2-story structure covering approximately 32 acres. Once this massive building was brought down to the ground, the debris was segregated and consolidated into piles of concrete rubble and steel across the remaining pad. The process of demolishing the building, tracking across concrete debris with heavy equipment, and stockpiling the concrete rubble caused it to become pulverized. During and after storm events, hexavalent chromium leached from the residual cement present in the large quantities of concrete. Storm water control measures were present to preclude migration of contaminants off-site, but these control measures were not designed to control hexavalent chromium dissolved in storm water from reaching nearby receiving water. The following was implemented to mitigate hexavalent chromium in storm water: - Steel wool was distributed around K-33 site catch basins and in water pools as an initial step in addressing hexavalent chromium. - Since the piles of concrete were too massive and unsafe to tarp, they were placed into windrows in an effort to reduce total surface area. - A Hach colorimetric field meter was acquired by the K-33 project to provide realtime results of hexavalent chromium in site surface water. - Three hexavalent chromium treatment systems were installed at three separate catch basins that receive integrated storm water flow from the K-33 site. Sodium bisulfite is being used as a reducing agent for the immobilization of hexavalent chromium while also assisting in lowering pH. Concentrations initially were 310 - 474 ppb of hexavalent chromium in surface water at the out-falls that discharge to nearby receiving water. After implementation of the actions described above, concentrations of hexavalent chromium have been effectively reduced to less than 25 ppb at the out-falls. The LSRS team completed demolition of K-33 five months ahead of schedule, and debris removal was completed three months ahead of schedule. A total of 164,000 tons of steel and concrete from the building demolition, accounting for 13,000 shipments, were disposed to the EMWMF. Because of the high toxicity of hexavalent chromium at low concentrations, hexavalent chromium had to be controlled at ppb levels. Hexavalent chromium contaminant concentrations were successfully reduced by over 90% in surface water discharged from the K-33 demolition site into nearby receiving water. Initial efforts of wind-rowing debris piles and obtaining real-time hexavalent chromium measurements to focus initiatives coupled with placement of steel wool in pools or catch basins had some effectiveness. More significant reductions were obtained as the debris piles were removed/disposed in EMWMF, and treatment of surface water with sodium bisulfite in integrated manholes occurred. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Expedited Demolition Notification for 2nd Quarter CY 2012 Structures

The National Nuclear Security Administration and Los Alamos National Security, LLC (LANS) (collectively the Permittees) are informing the New Mexico Environment Department Hazardous Waste Bureau (NMED-HWB) of the need to expedite the demolition of structures summarized in the enclosures. These structures have been identified to receive funding and be demolished prior to the 3rd Quarter Demolition Notification (June 30, 2012). This letter is a follow up to the email that was sent to the NMED-HWB on April 17, 2012. The enclosures attached to this letter satisfy the reporting requirements as outlined in Section 1.17 of the LANL Hazardous Facility Waste Permit (Permit). Demolition of buildings that appear on this list will not occur until 30 days after NMED has received this notification.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

ACCELERATED PILOT PROJECT FOR U CANYON DEMOLITION

At the U.S. Department of Energy's Hanford Site in southeast Washington State, CH2M HILL Plateau Remediation Company (CH2M HILL) is underway on a first-of-a-kind project with the decommissioning and demolition of the U Canyon. Following the U.S. Environmental Protection Agency's Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) Record of Decision for the final remediation of the canyon, CH2M HILL is combining old and new technology and techniques to prepare U Canyon for demolition. The selected remedial action called first for consolidating and grouting equipment currently in the canyon into lower levels of the plant (openings called cells), after which the cell galleries, hot pipe trench, ventilation tunnel, drains and other voids below the operating deck and crane-way deck levels will be filled with approximately 20,000 cubic yards of grout and the canyon roof and walls demolished down to the approximate level of the canyon deck. The remaining canyon structure will then be buried beneath an engineered barrier designed to control potential contaminant migration for a 500-year life. Methods and lessons learned from this project will set the stage for the future demolition of Hanford's four other canyon-type processing facilities.

54 ENVIRONMENTAL SCIENCES↗

Management of technetium contaminated demolition debris from the gaseous diffusion plants at the east Tennessee Technology Park - 15422

The demolition of the final section of the gaseous diffusion plant (GDP) facility formerly known as K-25 at the East Tennessee Technology Park was completed in December of 2013, with the final shipment of waste completed only six months later in June 2014. While most of the radioactive waste shipments would be considered 'routine' by today's standards (lower activity waste was disposed onsite at the Environmental Management Waste Management Facility [EMWMF] and at some offsite commercial disposal facilities with higher activity waste making its way across country to the Nevada National Security Site [NNSS] disposal facility) the final section of K-25, consisting of six cascade 'units', presented some unique technical and stakeholder challenges. Portions of this final section of K-25 were presumed to be heavily contaminated with Technetium-99 (Tc-99) based on sampling and analysis activities conducted during facility deactivation. Tc-99 is known to be highly mobile under a variety of environmental conditions, and is suspected to be potentially mobile in unmitigated landfill conditions, resulting in the need to implement additional engineered controls during facility demolition as well as throughout the management of the resultant waste. A variety of controls were implemented to ensure Tc-99 mobility was controlled and possible consequences mitigated, including isolation and offsite shipment of highest Tc-99 concentration components, as well as construction of a 'cell within a cell' at the EMWMF. This paper will examine the process utilized to develop the controls for management of Tc-99 contaminated waste and will describe those controls. Additionally, it will describe the stakeholder involvement and approval process as well as examining and documenting the efficacy of the controls that were implemented. Finally, this paper will discuss lessons learned from this first of a kind demolition effort and how this experience can be utilized to further refine the Tc-99 waste management approach for the remaining GDPs at ETTP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Section 106 Recordation, Interpretation, and Documentation for the Demolition of Buildings 9201-5 and 9204-4, Y-12 National Security Complex, Oak Ridge, Tennessee

In 2019 and 2020, Cultural Resource Analysts, Inc. (CRA), began preparing recordation packages for 18 World War II and Cold War Era buildings slated for demolition at the request of Consolidated Nuclear Security, LLC (CNS), on behalf of the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA). The recordations for these 18 buildings, which are located within what is now known as the Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee, were prepared and submitted in two separate packages. The first report (EC-NP-004) was prepared as a mitigation measure to address adverse effects that will result from the proposed demolition of 16 support and ancillary buildings. The current report is the second of the two packages and addresses the last two of the 18 buildings slated for demolition (9201-5 and 9204-4), which are two of the large process buildings located at Y-12. All 18 of these buildings have previously been determined eligible for listing in the National Register of Historic Places (NRHP). The two buildings, Building 9201-5 and Building 9204-4, are located south of Bear Creek Road and west of the main Y-12 entrance gate. Both buildings were constructed as uranium enrichment facilities in support of the Manhattan Project, a top-secret World War II mission to develop the world’s first nuclear weapons. Building 9201-5, completed in October 1944, is the Alpha-5 process facility and Building 9204-4, completed in Fall 1945, is the Beta-4 process facility. Over the years, these facilities were repurposed for a number of different functions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Phased Construction Completion Report for Decontamination Laundry Demolition at the Oak Ridge National Laboratory

This Phased Construction Completion Report (PCCR) documents completion of demolition, waste disposition, and slab stabilization activities of Building 2523 (Decontamination Laundry) for the Oak Ridge National Laboratory (ORNL). The Decontamination Laundry is located directly north of the intersection of White Oak Avenue and the 2519 Access Road. This demolition scope included the removal of the above-grade structures and facility components associated with Building 2523. This scope included the removal of Building 2523 (and all remaining contents inside), Trailer 2523A (and all remaining contents inside), an above-grade wastewater tank, and a wooden access porch connecting Buildings 2523 and Trailer 2523A. On the north side of Building 2523, above-grade portions of selected remaining foundations/stairs were removed from former Building 2517 to make room to stage waste containers. Building 2621 is west of the Laundry Building and Buildings 2547 and 2649 are to the east, while Building 2525 is to the north. Building 2523 is located within Bethel Valley Exposure Unit (EU) 3. The total area of the EU is approximately 39 acres. The area within EU 3 is bounded by First Street on the west, Central Avenue on the north, Third Street on the east and south. The slab of Building 2523 has been stabilized with a cap of flowable fill concrete and asphalt to contain residual radiological contamination and to provide surface suitable for vehicle parking. No below-grade demolition actions were performed during this task.

99 GENERAL AND MISCELLANEOUS↗

Building rehabilitation versus demolition and new construction: Economic and environmental assessment

Since the end of the twentieth century, discussion on dwelling rehabilitation versus its demolition and new construction has been steadily increasing in intensity, which is especially due to the necessity for the regeneration of urban centres. However, rehabilitation is not always considered the most economical solution, and demolition and new construction may constitute a better option. In the present work, a multi-family building in Seville, Spain, is used as a case study. After having suffered damage from a construction failure, it is assessed for its complete rehabilitation. Defective maintenance has worsened the bad condition of the building. A model is proposed, from the project budget perspective, that allows the environmental (Ecological Footprint indicator) and the economic (project's bill of quantities) assessment of the recovery of the dwelling. In the case study, the rehabilitation Ecological Footprint and the project cost are 0.06 gha/m{sup 2} of floor area (457.22 EUR/m{sup 2}) and 0.14 gha/m{sup 2} (576.33 EUR/m{sup 2}) for a new building on the same plot, respectively. It can be deduced that, even with a severely damaged building, the repair and retrofit work incurs a lower economic and environmental impact than that of the total replacement with a new construction.

54 ENVIRONMENTAL SCIENCES↗

DOE's Oak Ridge Site Kick Off Demolition of the K-27 Building

DOE's Oak Ridge Office of Environmental Management kicked off demolition of the K-27 Building this month, moving closer to fulfilling Vision 2016 — removal of all gaseous diffusion buildings from the site by year’s end. As the site's last uranium enrichment building falls, it will mark the first-ever demolition and cleanup of a gaseous diffusion complex anywhere.

54 ENVIRONMENTAL SCIENCES↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bat Surveys of Retired Facilitiies Scheduled for Demolition by Washington Closure Hanford

This project was conducted to evaluate buildings and facilities remaining in the Washington Closure Hanford (WCH) deactivation, decontamination, decommissioning, and demolition schedule for bat roost sites. The project began in spring of 2009 and was concluded in spring of 2011. A total of 196 buildings and facilities were evaluated for the presence of bat roosting sites. The schedule for the project was prioritized to accommodate the demolition schedule. As the surveys were completed, the results were provided to the project managers to facilitate planning and project completion. The surveys took place in the 300 Area, 400 Area, 100-H, 100-D, 100-N, and 100-B/C Area. This report is the culmination of all the bat surveys and summarizes the findings by area and includes recommended mitigation actions where bat roosts were found.

100 Area↗

Discovery of Contamination Spread at the Plutonium Finishing Plant during Demolition Activities

Between December 14 and December 18, 2017, contamination was detected outside of the Contamination Area (CA) at the Plutonium Finishing Plant (PFP) demolition zone, including around the PFP offices and on multiple vehicles located outside the radiological boundary. The consequences of this event were personnel exposure and potential radiological contamination leaving the Hanford Site. The scope of this causal analysis is focused at the events leading up to and including the contamination spread outside the PFP CA and development of the corrective actions to prevent recurrence. Specific methods to be used upon resumption of demolition activities are under development at the time that this report is approved and will be fully vetted by the DOE-RL and the DOE Expert Panel. It should also be noted that studies of radiological emissions from Hanford are part of the routine National Emission Standards for Hazardous Air Pollutants Compliance Monitoring (NESHAPS) Program and are not addressed in this report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Decommissioning and Demolition of a Redundant UK Research Facility at AWE Aldermaston - 12453

The redundant two-storey brick built research facility on the AWE Site at Aldermaston, UK is in the closing stages of decommissioning and demolition. The facility was used for a variety of purposes up to 1995 predominately involving the use of alpha-emitting isotopes. The two main areas of alpha-based contamination have been decommissioned with the removal of hot -boxes and fume cupboards on the ground floor and HEPA filter units and ventilation equipment on the first floor. Many of these activities were undertaken using both airline fed suits, (supplied via a free standing mobile unit), and full face respirators. Asbestos materials were located and cleared from the first floor by specialist contractor. All sections of active drain running from the building to the site active effluent disposal system were removed early in the program using established techniques with specialist monitoring equipment used to provide confidence in the data required for disposal of the decommissioning debris. In particular a dedicated High Resolution Gamma Spectrometer (radioactive materials scanning unit) was utilized to categorise waste drums and wrapped packages. The building has been decommissioned and the monitoring and sampling of the structure was completed in November 2011 - the results demonstrating that the building was clear of contamination in accordance with UK clearance and exemption requirements. The demolition plan was developed and implemented in December with site excavation of foundations and site clearance currently ongoing in preparation for final site backfill activities and project close. A number of useful lessons have been learnt during the operations and are set out at the rear of the main text. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overall assessment of alkali-silica reaction affected recycled concrete aggregate mixtures derived from construction and demolition waste

A large amount of research has been conducted on the reuse of construction and demolition waste (CDW) in concrete. Yet, CDW may display pre-existing damage which raises concerns on its use. In this work, coarse recycled concrete aggregate (RCA) is reclaimed from distinct members of an alkali-silica reaction (ASR) affected overpass. RCA mixtures incorporating 50 and 100% replacement are then manufactured and stored in conditions enabling further ASR development. Mechanical (Stiffness Damage Test- SDT) and microscopic (Damage Rating Index- DRI) analyses are conducted at a fixed “secondary” induced expansion. Results indicate that the overall damage of ASR-affected RCA mixtures is different from conventional concrete and depends upon the “past” RCA condition. Furthermore, the DRI can capture the “past” and “secondary” expansion while the SDT simply detects the “secondary” distress. Finally, an adapted DRI version is proposed to better evaluate and distinguish “past” and “secondary” damage in ASR-affected recycled concrete.

36 MATERIALS SCIENCE↗

Reactivity in cement pastes bearing fine fraction concrete and glass from construction and demolition waste: Microstructural analysis of viability

Converting construction and demolition waste (CDW) into secondary raw materials is one of the priorities of environmental policy and circular economy strategy. This study analysed the variation in eco-efficient paste reactivity with OPC replacement ratio (5% to 10%) and hydration time (2 d, 28 d and 90 d). Three types of CDW were explored: two (calcareous and siliceous) consisting of fine (4 AH{sub 13} and C{sub 4}AcH{sub 11}, ettringite and portlandite, were the same as observed in OPC hydration. These findings attest to the scientific viability recycling such CDWs as mineral additions in eco-cement manufacture and consequently eliminating the need for stockpiling these materials at recycling/storage plants.

36 MATERIALS SCIENCE↗