Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DEMOLITION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Controlled Demolition and Reconstruction of Imidazolate and Carboxylate Metal–Organic Frameworks by Acid Gas Exposure and Linker Treatment

The metal-linker coordination bond in metal–organic frameworks (MOFs) can be unstable in humid and acid gas environments, leading to loss of crystallinity and porosity. This degradation is not necessarily irreversible; solvent-assisted crystal redemption (“SACRed”) has been shown to recover the physical and chemical properties of ZIF-8 exposed to humid SO 2 . This approach can also be useful in creating mixed-linker materials that might be challenging to produce via de novo synthesis. Here, we expand more generally the concept of controlled degradation of a MOF with acid gas, followed by treatment with a fresh linker solution, to the use of different template MOFs (ZIFs, UiO-66, and UiO-67) and acid gases (SO 2 and NO 2 in dry and humid conditions). Significant losses in porosity and crystallinity along with structural changes (acid gas-linker complexes and linker functionalizations) are observed in the acid gas-exposed MOF templates, and SACRed is shown to reconstruct these partially demolished MOFs with a high degree of structural recovery. Detailed structural and spectroscopic characterizations of the controlled degradation and subsequent recovery are presented and analyzed. Furthermore, these findings indicate the generality of controlled degradation and reconstruction as a means for linker replacement in a wider variety of MOFs and also create the potential for linker substitutions (with non-native linkers) to obtain new hybrid MOFs.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Use of Source Term and Air Dispersion Modeling in Planning Demolition of Highly Alpha-Contaminated Buildings

The current cleanup of structures related to cold-war production of nuclear materials includes the need to demolish a number of highly alpha-contaminated structures. The process of planning for the demolition of such structures includes unique challenges related to ensuring the protection of both workers and the public. Pre-demolition modeling analyses were conducted to evaluate potential exposures resulting from the proposed demolition of a number of these structures. Estimated emission rates of transuranic materials during demolition are used as input to an air-dispersion model. The climatological frequencies of occurrence of peak air and surface exposures at locations of interest are estimated based on years of hourly meteorological records. The modeling results indicate that downwind deposition is the main operational limitation for demolition of a highly alpha-contaminated building. The pre-demolition modeling directed the need for better contamination characterization and/or different demolition methods—and in the end, provided a basis for proceeding with the planned demolition activities. Post-demolition modeling was also conducted for several contaminated structures, based on the actual demolition schedule and conditions. Comparisons of modeled and monitoring results are shown. Recent monitoring data from the demolition of a UO3 plant shows increments in concentrations that were previously identified in the pre-demolition modeling predictions; these comparisons confirm the validity and value of the pre-demolition source-term and air dispersion computations for planning demolition activities for other buildings with high levels of radioactive contamination.

air exposure↗

Lessons Learned from Demolition of Hanford's Plutonium Finishing Plant - 20507

U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC), a Jacobs owned company, is making significant progress demolishing the Plutonium Finishing Plant (PFP), which has long been known as one of the most hazardous buildings in the DOE Environmental Management Complex (DOE Complex). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut down in 1996, and material processing was completed in 2004. After approximately 25 years of demolition preparations, open-air demolition of the main portions of the Hazard Category II nuclear facility began in November 2016. To prepare the PFP for demolition, CHPRC employees performed some of the most hazardous work across the DOE Complex. In addition to extensive demolition preparations, including a wide-reaching communication strategy across the Hanford Site, CHPRC implemented robust controls and monitoring during demolition, and when necessary, adjusted demolition practices and sequence to maintain employee safety and project efficiency. Demolition of the main PFP building began in November 2016. The technical complexity, high hazards and radiological concerns have all led to a difficult demolition environment. Following a spread of contamination at the project site beyond the radiological boundaries in December 2017, work was halted and a recovery plan was generated to allow the demolition work to continue. After the implementation of additional controls and concurrence from regulatory agencies and DOE, the demolition was ready to resume work and reinitiated in August 2018. There are a number of lessons learned from the demolition activities and recovery plan process. This paper allows CHPRC and DoE's Richland Operations Office (RL) to share lessons learned and progress to date with other challenging and hazardous projects across the DOE Complex. Understanding the risk acceptance level is critical to execution of any open-air demolition project and is unique to each facility. Four key lessons learned from this project include: 1) plan execution issues, 2) stakeholder communication issues, 3) watching for summit fever and 4) minimizing exposed contaminated surfaces during demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Open-air Demolition: Validation of EPA Approved Alternative Method for Emission Estimation - 19397

Emissions from open-air demolition of US Department of Energy (DOE) facilities are regulated by the US Environmental Protection Agency (EPA) under 40 CFR 61 subpart H. This regulation requires that facilities estimate emissions using an EPA approved method from activities such as open-air demolition prior to commencing the activity. Should those emissions exceed certain thresholds, the facility may be required to obtain an Approval to Construct or Modify the facility and/or installed monitoring methods meeting methods acceptable to EPA. There are no EPA approved methods that are specific to open-air demolition methods. For this project the DOE and CH2M Hill BWXT elected to prepare an alternative method specific to open-air demolition. EPA conditionally approved the method but required validation of the method during the demolition of the Vitrification Facility at the West Valley Demonstration Project (WVDP) before use for open-air demolition at other WVDP structures. The validation method included detailed source characterization, close-in ambient samplers, and a comparison of measured results to predicted emissions using AERMOD (American Meteorological Society (AMS) and U.S. Environmental Protection Agency (EPA) Regulatory Model). The methods evaluated include hydraulic hammers, mechanical shears, load out of waste and handling of the debris piles. The validation method involved the collection and analysis of ambient air samples from air samplers located at strategic locations within the projected plume path of the demolition activities. The analytical results from the air samplers were then compared to ambient air concentrations predicted at the sampler locations with the EPA model AERMOD. The input to the AERMOD software is a source term developed weekly using the alternative method and material at risk disturbed during each week. To account for the building wake effects of the surrounding structures, virtual point sources were developed in the AERMOD model and placed at the locations of the demolition, debris piles, debris handling and load out areas. It was found that the factors used for hydraulic hammering were extremely conservative and that emissions from the debris pile were not only the primary emission source, but that the moisture content of the debris pile and the wind speed were critical factors that must be considered in future open-air demolition projects. Based on the results of the validation process, adjustments were made to the alternative method. The final validated alternative method provides an approach for estimating airborne emissions from open-air demolition methods and techniques. The method will be used in lieu of 40 CFR 61 Appendix D to estimate emissions from future open-air demolition projects at the WVDP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Demolition Strategy and Progress at Hanford's Plutonium Finishing Plant - 17161

U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CH2M) is currently demolishing the Plutonium Finishing Plant (PFP). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1988, the facility was formally shut-down in 1996 and material processing completed in 2004. In November 2016, the project team, partnering with DOE-Richland Operations Office (DOE-RL) began demolition of the building. CH2M and DOE-RL will demolish PFP as a Hazardous Category II nuclear facility (HazCat II). The PFP is considered one of the most hazardous buildings on the Hanford site; employees have performed some of the most hazardous work anywhere across the DOE Environmental Management complex. Since 2008, employees have removed much of the plutonium-processing infrastructure. Four main buildings make up the majority of the PFP complex. As of November 2016, one building is undergoing demolition, another is ready for demolition and, concurrently, demolition preparations continue in the remaining two buildings. That hazard mitigation work includes removing contaminated ventilation duct work, process lines and performing asbestos abatement. To ensure safe and compliant demolition, CH2M employees researched, trained and deployed personal protective equipment never before used on the Hanford Site to complete some of the most hazardous demolition preparations. Project management commissioned the development of an air dispersion model that dictated ready-for-demolition criteria and established conservative demolition parameters. Management also sequenced project work to allow demolition to occur while demolition preparations continue a safe distance away in adjacent buildings. This paper will allow CH2M and DOE-RL to share lessons learned and progress to date with other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Establishing no credible risk of inadvertent criticality for the K-25 demolition project - 14310

Demolition of the K-25 Gaseous Diffusion Plant required establishing a non-credible risk of inadvertent criticality because a Criticality Accident Alarm System (CAAS) could not be reliably maintained operable as the building was being torn down. Preparation for, and demolition of, the facility was a multi-year long effort with significant changes in approach. The most significant change was to demolish the facility with as much of the process gas equipment and piping left in the facility as possible, rather than removing all process gas equipment and piping from the facility prior to demolishing the building structure only. The contractor had to adapt their approach to accommodate these changes. The normal approach to demolition was to remove all process gas equipment and piping prior to demolition, using Nuclear Criticality Safety (NCS) controls based on the double contingency principle, while CAAS coverage was intact. Then, the building structure was demolished with no requirement for a CAAS. This was the method used to demolish the K-33 Building, for example. In the case of K-25 demolition, all equipment and piping that met the Environmental Management Waste Management Facility (EMWMF) disposal cell Waste Acceptance Criteria (WAC) was left in the building and removed as part of the building demolition process. This resulted in significant quantities of fissionable material remaining in the building and being handled during demolition. The NCS Organization worked closely with several groups during preparation activities. A Data Management organization was established to specifically identify every piece of process gas equipment and piping in the facility so that it could be accounted for and characterized. Deactivation and Decommissioning (D and D) personnel conducted internal visual inspections, by remote camera, of all process gas equipment and piping larger than 3' diameter, to reveal any large deposits that would require removal. Non-Destructive Assay (NDA) of the vast majority of equipment and piping was required to quantify the amount of fissionable material remaining. Finally, all process gas equipment and piping larger than 3'' diameter was internally filled with foam, which was credited by NCS with immobilizing the remaining fissionable material such that large migration and accumulation could not occur during demolition activities. NCS personnel worked closely with all of these groups in order to acquire the data and information needed to establish a non-credible risk of inadvertent criticality during building demolition. Good communication and a close working relationship between NCS, the various D and D/characterization personnel, and the Department of Energy (DOE) ensured the success of the modified approach to building demolition. The same successful approach is currently underway in the K-27 Building as well. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Demolition of the K-27 Building at the East Tennessee Technology Park (ETTP) - 17423

On February 8, 2016, URS - CH2M Oak Ridge LLC (UCOR) initiated the demolition of the East Tennessee Technology Park's (ETTP's) final gaseous diffusion building in DOE's Oak Ridge Environmental Management program. Building K-27 was a 35,582 m{sup 2} (383,000 ft{sup 2}) gaseous diffusion building that contained approximately 92,903 m{sup 2} (1 million ft{sup 2}) of floor space. It was one of five gaseous diffusion buildings at the site, formerly known as the Oak Ridge Gaseous Diffusion Plant. The actual demolition of this facility took approximately seven months to complete; however, planning and preparation took more than three years. The deactivation process was a critical element in preparing the building for demolition. UCOR's K-27 deactivation activities began in April 2012 with the installation of safe walking paths and fall protection systems to allow safe work access. Next, all mechanical and electrical systems associated with the facility were shut down and isolated, a process known as 'cold and dark.' More than 19.3 km (12 mi) of process piping and components were marked and measured. Additionally, workers performed nondestructive assay (NDA) and vent-purge-and-drain activities and applied foam to piping and components as needed [1]. Based on characterization results, approximately 4.8 km (3 mi) of process piping, and 372 converters and compressors were removed and shipped offsite prior to demolition. Lower-hazard materials and equipment were demolished with the building structure and transported to onsite disposal facilities. Upfront waste characterization and ongoing monitoring were key to the successful disposal of demolition debris at onsite facilities. Due to process improvements in waste loading recommended by work crews, the project achieved a 50 percent improvement in the daily hauling rate during the 9,000-truckload shipping campaign. Crews worked in high-risk, high-hazard conditions and were exposed to radiological and chemical contaminants, extreme temperatures, and deteriorating infrastructure. However, the hazard controls that were put in place, based on the Integrated Safety Management System (ISMS) walk-downs and hazard determination, made the effort manageable. The overall safety performance during demolition of the facility was excellent, with no significant injuries, and exceeded industry standards and DOE target levels. Outstanding safety performance was a testament to the dedication of the workforce, given the significant hazards presented by the demolition of the Hazard Category 2 nuclear facility. Another key element to the success of the K-27 demolition was the support and approval of all stakeholders involved in this effort, including DOE, the surrounding communities, the State of Tennessee, the UCOR management team, and, most importantly, the workforce that performed this highly hazardous work. This $52 million demolition project was completed ahead of schedule with no significant injuries and in compliance with all DOE orders, site procedures, and environmental controls. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overcoming Technical Challenges During Demolition of the West Valley Vitrification Facility - 19387

In February 2019, CH2M Hill BWXT West Valley, LLC will complete demolition and waste disposal of the first vitrification facility in the history of the United States. This project marked the largest and most complex radiological demolition project undertaken at the U.S. Department of Energy-led West Valley Demonstration Project (WVDP) to date. Provisions put in place during demolition monitored for and mitigated contamination migration during demolition. The work was carried out in a well-planned manner to address specific areas where higher levels of radiological activity were known to exist and where difficult and oversized equipment removal or sensitive items required special handling. Inaccessible contamination on ceiling mounted equipment, controlled removal of two massive steel shield doors, intact removal of lead glass shield windows and a confined demolition boundary area were some of the limiting factors that required special consideration during demolition. This paper contains a discussion of planning and implementation of special handling techniques utilized during some of the more difficult evolutions encountered during open-air demolition of the Vitrification Facility. The work techniques, provisions to mitigate inclement weather and lessons learned have been incorporated into the planning for follow-on radiological demolition work at the WVDP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preparing for safe and compliant open air demolition at Hanford's plutonium finishing plant - 15100

The Plutonium Finishing Plant (PFP), located in the 200 West Area of the U.S. Department of Energy (DOE) Hanford Site, began operations in 1949 and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut-down in 1996, and material stabilization completed in 2004. DOE contractor CH2M HILL Plateau Remediation Company (CH2M HILL) is tasked with the plant's deactivation, decommissioning, decontamination and demolition, to be completed by September 30, 2016. The project team, partnering with DOE-Richland Operations Office (DOE-RL), is exploring, evaluating and implementing efficiencies to safely and compliantly prepare the facility for demolition. Since 2008, employees have prepared approximately 75 percent of the complex for demolition. More than 90 percent of the 232 glove boxes have been removed from ventilation and more than 80 percent of pencil tank units have been dispositioned. As decontamination, deactivation and removal nears completion on the remaining glove boxes, pencil tanks and other radiological and chemical processing infrastructure, CH2M HILL and DOE-RL are making preparations to demolish PFP itself, a Hazardous Category II nuclear facility (HazCat II). Conventional techniques used to demolish buildings heavily contaminated with radiological hazards typically involve extensive hands-on work to remove Material at Risk (MAR) and decontaminate the building to low levels before conventional demolition techniques can be used to remove the building. A safe and more cost effective approach is packaging MAR located in hard to access areas of the plant and removing it during demolition. That process, combined with affixing remaining contamination to walls, floors and equipment, performing detailed air dispersion modeling before demolition and air monitoring and dust suppression during demolition, will reduce employee risk and is more efficient in demolishing a HazCat II facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Influence of construction and demolition waste management on the environmental impact of buildings

Highlights: Black-Right-Pointing-Pointer Environmental impacts of different demolition practices. Black-Right-Pointing-Pointer 'Top-down' approach to the Life Cycle Analysis methodology. Black-Right-Pointing-Pointer Results based on real buildings measurements and demolition contractor activities. Black-Right-Pointing-Pointer Not every type of selective demolition brings about environmental benefits. - Abstract: The purpose of this study is to quantify comparable environmental impacts within a Life Cycle Analysis (LCA) perspective, for buildings in which the first (Materials) and last (End of Life) life cycle stages are adjusted to several waste/material management options. Unlike most LCAs, the approach is 'top-down' rather than 'bottom-up', which usually involves large amounts of data and the use of specific software applications. This approach is considered appropriate for a limited but expedient LCA designed to compare the environmental impacts of different life cycle options. Present results, based on real buildings measurements and demolition contractor activities, show that shallow, superficial, selective demolition may not result in reduced environmental impacts. Calculations actually show an increase (generally less than 5%) in most impact categories for the Materials and End of Life stages because of extra transportation needs. However, core material separation in demolition operations and its recycling and/or reuse does bring environmental benefits. A reduction of around 77% has been estimated in the climate change impact category, 57% in acidification potential and 81% in the summer smog impact (for the life cycle stages referred).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Radioactive Releases During Proposed Demolition Activities for the 224-U and 224-UA Buildings - Addendum

A post-demolition modeling analysis is conducted that compares during-demolition atmospheric concentration monitoring results with modeling results based on the actual meteorological conditions during the demolition activities. The 224-U and 224-UA Buildings that were located in the U-Plant UO3 complex in the 200 West Area of the Hanford Site were demolished during the summer of 2010. These facilities converted uranyl nitrate hexahydrate (UNH), a product of Hanford’s Plutonium-Uranium Extraction (PUREX) Plant, into uranium trioxide (UO3). This report is an addendum to a pre-demolition emission analysis and air dispersion modeling effort that was conducted for proposed demolition activities for these structures.

54 ENVIRONMENTAL SCIENCES↗

Air Dispersion Modeling of Radioactive Releases During Proposed PFP Complex Demolition Activities

This report is part of the planning process for the demolition of the 234-5Z, 236-Z, 242-Z, and 291-Z-1 structures at the Plutonium Finishing Plant (PFP) on the Hanford Site. Pacific Northwest National Laboratory (PNNL) supports the U.S. Department of Energy (DOE) and the CH2M HILL Plateau Remediation Company (CHPRC) demolition planning effort by making engineering estimates of potential releases for various potential demolition alternatives. This report documents an analysis considering open-air demolition using standard techniques. It does not document any decisions about the decommissioning approaches; it is expected that this report will be revisited as the final details of the demolition are developed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Air Monitoring Modeling of Radioactive Releases During Proposed PFP Complex Demolition Activities

This report is part of the planning process for the demolition of the 234-5Z, 236-Z, 242-Z, and 291-Z-1 structures at the Plutonium Finishing Plant (PFP) facilities on the Hanford Site. Pacific Northwest National Laboratory (PNNL) supports the U.S. Department of Energy (DOE) and the CH2M HILL Plateau Remediation Company (CHPRC) demolition planning effort by making engineering estimates of potential releases for various potential demolition alternatives. This report documents an analysis considering open-air demolition using standard techniques. It does not document any decisions about the decommissioning approaches; it is expected that this report will be revisited as demolition plans are finalized.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Final Demolition and Disposition of 209-E Critical Mass Laboratory - 12267

The 209-E Critical Mass Laboratory was constructed in 1960 to provide a heavy shielded reactor room where quantities of plutonium or uranium in solution could be brought to near-critical configurations under carefully controlled and monitored conditions. In the late 1980's, the responsible contractor, Pacific Northwest National Laboratory (PNNL), was directed by the Department of Energy (DOE) to prepare the facility for unoccupied status. The facility was demolished under a Removal Action Work Plan pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The funding for this project was provided by the American Recovery and Reinvestment Act (ARRA). The primary rooms of concern with regards to contamination in 209-E facility, which is over 9,000 square feet, are the criticality assembly room (CAR), the mix room, and the change room. The CAR contained two reactor hoods (HO-140 and HO-170), which each had a high efficiency particulate air (HEPA) filter system. The CAR contained 13 tanks ranging from 38 L (10 gal) to 401 L (106 gal). Tanks TK-109 and TK-110 are below grade, and were removed as part of this demolition and disposition remedy. Nonradiological and radiological hazardous substances were removed, decontaminated, or fixed in place, prior to demolition. Except for the removal of below grade tanks TK-109 and TK-110, the facility was demolished to slab-on-grade. PNNL performed stabilization and deactivation activities that included removal of bulk fissile material and chemicals, flushing tanks, stabilizing contamination within gloveboxes and hoods, and packaging and removing waste. The removal of the contaminated plutonium equipment and materials from the 209E facility presented a number of challenges similar in nature to those associated with the inventory reduction and cleanup activities at the Plutonium Finishing Plant. Although there were no bulk fissile materials or chemicals within the facility, there were residual radiological materials (isotopes of plutonium and americium) in the tanks and hoods. The complexity of the remedy was present because of the various configurations of the tanks and hoods, combined with the residual contaminants. Because of the weight and dimensional configuration, size reduction of the slab tanks, as well as removal and disposal of the different material used for moderation and absorption, were two examples of challenges that were resolved to complete the remedy. One of the key methods developed and implemented at the facility was the design and construction of a shroud to allow the cutting of the Pu contaminated tanks. The shroud design, development and implementation at the 209E Project was an example of enhanced work planning and task hazards analysis with worker involvement. This paper will present the lessons learned from the 209E facility inventory reduction activities including the shroud and other methodologies used. The initial Lessons Learned discussion for this project was scheduled for late January 2012. This facility is the first open-air demolition of a highly contaminated plutonium-contaminated facility accomplished by CH2M Hill under the Plateau Remediation Contract. The demolition was completed without spread of contamination to the workers and the surrounding area. As with any project of this complexity, there are significant accomplishments, as well as experience that can be applied to future demolition of plutonium-contaminated facilities on the Hanford Site. These experiences will be documented at a later date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Walls Come Tumbling Down: Decontamination and Demolition of 29 Manhattan Project and Cold War-Era Buildings and Structures at Los Alamos National Laboratory-12301

When the nation's top scientists and military leaders converged on Los Alamos, New Mexico in the 1943, to work on the Manhattan Project, the facilities they used to conduct their top-secret work were quickly constructed and located in the middle of what eventually became the Los Alamos town site. After one of these early facilities caught on fire, it seemed wise to build labs and production facilities farther away from the homes of the town's residents. They chose to build facilities on what was then known as Delta Prime (DP) Mesa and called it Technical Area 21, or TA-21. With wartime urgency, a number of buildings were built at TA-21, some in as little as a few months. Before long, DP Mesa was populated with several nondescript metal and cinder-block buildings, including what became, immediately following the war, the world's first plutonium production facility. TA-21 also housed labs that used hazardous chemicals and analyzed americium, tritium and plutonium. TA-21 was a bustling center of research and production for the next several decades. Additional buildings were built there in the 1960's, but by the 1990's many of them had reached the end of their service lives. Labs and offices were moved to newer, more modern buildings. When Los Alamos National Laboratory received $212 million in funding from the American Recovery and Reinvestment Act in July 2009 for environmental cleanup projects, about $73 million of the funds were earmarked to decontaminate and demolish 21 of the old buildings at TA-21. Although some D and D of TA-21 buildings was performed in the 1990's, many of the facilities at DP Site remained relatively untouched for nearly three decades following their final operational use. In 2006, there were over three dozen buildings or structures on the mesa to be removed so that soil cleanup could be completed (and the land made available for transfer and reuse). The total footprint of buildings across the mesa was approximately 18,580 m{sup 2} (200,000 ft{sup 2}). The initially approved baseline for the ARRA D and D Project was to remove 22 buildings and structures that included approximately 14,680 m{sup 2} (158,000 ft{sup 2}) of footprint. By employing efficiencies during subcontracting, demolition, and waste segregation, the savings allowed an additional 1,580 m{sup 2} (17,000 ft{sup 2}) of footprint to be removed using ARRA funds. Additionally, the lessons learned from this experience were used to apply NNSA funding to the removal of six additional non-contaminated buildings and structures. In the end, 29 buildings and structures, including stacks, cooling towers and tanks, were removed from the mesa. The entire DP East area was cleared of buildings and sub-grade structures and the soils cleaned to residential standards. The total footprint reduction at TA-21 as a result of this effort was in excess of 17,650 m{sup 2} (190,000 ft{sup 2}). The use of a Laboratory self-performance team to start demolition of non-contaminated structures resulted in steady work performance early in the project while subcontracts were being put in place to perform more complicated abatement and contaminated demolition activities. Most importantly, there were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals or radioactive contamination were released and radiological dose to the public was negligible. The ARRA demolition activities were completed six months in advance of the deadline for employing ARRA funds. Additionally, over 17,585 m{sup 3} (23,000 yds{sup 3}) of building demolition debris was safely removed from DP Mesa. All of the major buildings have been removed, unencumbered access to the SWMUs that are required to be cleaned up by the Consent Order with the state of New Mexico, has been achieved, and a significant portion of the mesa has been prepared to support a process that will eventually transfer this land from federal government control for further use. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mechanical Demolition of Buildings with Concrete Asbestos Board Siding: Methodology, Precautions, and Results at the Hanford Central Plateau - 12417

Since the start of its contract in 2008, the CH2M Hill Plateau Remediation Company (CH2M HILL) has demolished 25 buildings with concrete asbestos board (CAB) siding using mechanical means. While the asbestos contained in CAB siding is not friable in its manufactured form, concerns persist that mechanical methods of demolition have the potential to render the asbestos friable and airborne, therefore posing a health risk to demolition workers and the public. CH2M HILL's experience demonstrates that when carefully managed, mechanical demolition of CAB siding can be undertaken safely, successfully, and in compliance with regulatory requirements for the disposal of Class II Asbestos-Containing Material (ACM). While the number of buildings demolished at Hanford and the number of samples collected does not make a conclusive argument that CAB cannot be made friable with normal demolition techniques, it certainly provides a significant body of evidence for the success of the approach. Of course, there are many factors that affect how to demolish a structure and dispose of the waste. These factors will impact the success depending on each site. The most obvious factors which contribute to this success at Hanford are: 1. The availability of onsite waste disposal where the handling and cost of asbestos-containing waste is not much different than other potentially contaminated waste. Therefore, segregation of demolition debris from the potential asbestos contamination is not necessary from a debris handling or asbestos disposal aspect. 2. The space between structures is typically significant enough to allow for large exclusion zones. There are not many restrictions due to cohabitation issues or potential contamination of adjacent facilities. 3. The willingness of the regulators and client to understand the industrial safety issues associated with manual CAB removal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A BIM-based system for demolition and renovation waste estimation and planning

Highlights: ► We developed a waste estimation system leveraging the BIM technology. ► The system can calculate waste disposal charging fee and pick-up truck demand. ► We presented an example scenario demonstrating this system. ► Automatic, time-saving and wide applicability are the features of the system. - Abstract: Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C and D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D and R) works and the growing amount of D and R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D and R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D and R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progression of Safe and Compliant Demolition of Hanford's Plutonium Finishing Plant - 16566

Department of Energy contractor CH2M HILL Plateau Remediation Company (CH2M) is about to begin demolition of the Plutonium Finishing Plant (PFP). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1988, the facility was formally shut-down in 1996 and material processing completed in 2004. The project team, partnering with DOE-Richland Operations Office (DOE-RL), is in the final stages of preparing to demolish the building by the Tri-Party Agreement Milestone date of September 30, 2016. Since 2008, employees have prepared approximately 85 percent of the building for demolition. All of the 52 pencil-shaped processing tanks and 95 percent of the 238 glove boxes have been removed. Work is progressing on dispositioning remaining glove boxes, filter boxes and ventilation ducts and chemical and drain lines. Demolition is scheduled to start in early 2016. In addition to wrapping up tasks like source term removal (or preparation for removal during pre-demolition) and decontamination, the project is also developing the strategy and process to perform physical open air demolition, including the use of 3D renderings and computer generated illustrations of building infrastructure to safely and compliantly demolish the building. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗