Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Evaluating CO 2 mitigation strategies in SAF biorefineries: Techno-economic and life cycle analysis

The aviation sector requires scalable decarbonization strategies, and lignocellulosic sustainable aviation fuel (SAF) represents a promising pathway. This study comparatively evaluates the techno-economic analysis and life cycle assessment (LCA) of three CO 2 management strategies integrated within a U.S.-based gasification–Fischer–Tropsch SAF biorefinery: (i) catalytic hydrogenation of captured CO 2 to methanol, (ii) geological CO 2 sequestration, and (iii) mineralization to sodium bicarbonate (NaHCO 3 ). Techno-economic analysis indicates that methanol synthesis requires approximately 26% higher capital investment and 33% higher operating costs than mineralization. Although methanol co-production generates the highest gross revenue, NaHCO 3 production reduces the SAF minimum selling price by approximately 38% relative to both methanol synthesis and geological sequestration pathways, reflecting a more balanced cost allocation through mineral co-product valorization. Geological sequestration lowers operating costs by nearly 50% compared with methanol synthesis but remains highly dependent on carbon credit mechanisms. LCA reveals substantial divergence in climate performance. Relative to methanol synthesis, sequestration improves net greenhouse gas performance by approximately 163%, transitioning the system from net-positive to net-negative emissions. Mineralization further enhances carbon mitigation, achieving roughly 85% greater carbon reduction than sequestration and over sixfold improvement relative to methanol synthesis within the defined system boundary. Sensitivity analysis identified hydrogen price, co-product market value, and process emissions as dominant drivers. Under baseline assumptions, CO 2 mineralization is found to offer the most balanced pathway.

Carbon capture and storage↗

Distributed Solar Utility Tariff and Revenue Impact Analysis: A Guidebook for International Practitioners

Depending on a range of technical, economic, policy, regulatory, and market-related factors, the adoption of DPV may have a net positive or negative financial impact on utilities and ratepayers. This guidebook provides a methodological approach for quantifying the net financial impact of DPV on utilities (in the form of “net revenue losses”) and ratepayers (in the form of “net tariff impacts”). Written for technical staff at utilities, regulatory bodies, energy ministries, research institutes, and civil society organizations who wish to better understand the financial impacts of DPV in their jurisdiction, this guidebook can be used to inform important decisions regarding DPV compensation, tariff design, and regulatory cost allocations, among other aspects. It is focused exclusively on customer-sited DPV systems and adopts a primarily cost-based (as opposed to an equally valid value-based) perspective to understanding DPV financial impacts. The approach for calculating net revenue losses can be applied in nearly any utility jurisdiction, regardless of institutional arrangements, business models, or regulatory paradigms.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Review of a Draft - Avoiding the Impossible: Re-focusing a Non-Feasible Mission 2-Hrs into a 3-Day Engineering Session

Concurrent engineering offers a great many benefits to engineers and mission designers throughout the world of aerospace. The only downside of concurrent engineering, and this is somewhat unavoidable, is that you don’t know the results of a design session until the end when it is completed. Usually, this is not a problem – you wouldn’t start building a spacecraft before the design is finished. However, within mass and cost constrained systems, you may end up with a final design that although technically sound – is not feasible due to mass or cost limits. Employing in-session mass and cost models with flexible inputs that refine their estimates and variance as more detailed information comes in throughout a design session allows major design changes to be made when the probability of breaching a mass or cost cap exceeds a threshold level. This enables mission designers to re-focus the study, and avoid spending 3-days with 15 engineers designing a non-feasible mission. By understanding key correlations and nested relationships within mass or cost, and specifically mass or cost allocations per mission element by mission type, it’s possible to get flexible-input, statistically based mass and cost estimates very early in the design process. Baseline models are seeded using mission characteristics and general parameters (outer planetary orbiter-probe mission, $500M cost cap for example) to provide a rough estimate of the expected mass or cost. As information gets solidified during the session, it gets added to the model and the estimates are updated. Continuing the orbiter-probe mission example, modeling probe heat shield cost as a percent of total probe cost, and probe cost as a percent of total flight system cost, and total flight system cost as a percent of total mission cost allows a design team to roll-up solidified information to estimate the probability of fitting within a mass or cost constraint early in a concurrent design session. When only the heat shield cost is known, the variance of the final estimate is higher, whereas when the full probe gets defined, naturally, the variance of the estimate decreases. A methodology, model, verification and demo implementation for cost limit breach are presented.

Hihn, Jairus M.↗

Rapid, Comprehensive, Mission Architecting at the Jet Propolusion Laboratory

One of the first multi-disciplinary optimization challenges a mission concept faces is finding an initial system level architecture that simultaneously satisfies the constraints of cost, the requirements of science, and the capabilities of engineering. Compounding this challenge, especially in the early formulation of an architecture, is communicating amongst all key stakeholders, in this multidimensional space of constraints and requirements, where the current architecture is not yet adequately defined, or if it is defined, where it is broken. Recently, a factor of two improvement in the speed of development of the engineering architecture, while also comprehensively considering scientific performance and cost, has been achieved through a single screen visualization dashboard (“S-Chart”), a cost allocation tool, segment level analogy databases and parametric relationships for segment technical capabilities and their technical (Size, Weight, Power, and Data) and financial (Cost) capabilities and/or accommodation requirements.

Nash, Alfred E.↗

Storing Affordability: Battery Storage as an Asset to Reduce Data Center Cost Shifts

This report examines how battery energy storage systems (BESS) can help utilities accommodate large load growth while protecting affordability for existing ratepayers. Rapid growth in electricity demand from artificial intelligence (AI) data centers is straining the U.S. grid. Furthermore, many new data centers are entering rural markets, which could offer economic benefits but may also pose implementation challenges for smaller utilities. At the same time, retail electricity prices are increasing faster than inflation, elevating customer affordability as a key challenge. While data centers have not been the primary driver of increases in residential prices to date, they have pushed wholesale energy and capacity prices higher in several markets. Fundamental utility cost-allocation principles show that data center growth can be rate-positive for existing customers only if new peak demand grows faster than the costs a utility must incur to serve it. Several factors, including a utility’s degree of wholesale market exposure, forecast uncertainty and stranded-asset risk, and tariff design can determine the outcome of load growth on retail rates. Energy storage can make several affordability contributions in the face of this landscape of uncertainty and market volatility, including deferral of higher-cost grid investments through improved utilization of existing assets and flexibility of new large loads, insulation from volatile wholesale prices through peak shaving, and reliability support to address grid risks stemming from the behavior of AI data center loads. Different potential BESS deployment pathways—utility-scale front-of-the-meter systems, aggregated small-scale storage installations, and data center-sited behind-the-meter storage—are compared against each other and against conventional capacity alternatives. This framework is intended as a conceptual resource to utilities, particularly smaller public utilities with rural service territories, who may be considering the role that energy storage can play in insulating existing ratepayers from data center cost shifts.

25 ENERGY STORAGE↗

Bayesian Rules of Thumb: Robust Uncertainty Quantification in Early Project Cost Estimation

Systems engineers often make use of cost Rules ofThumb in order to estimate cost during early phases of projectformulation. These Rules of Thumb typically take the form ofa sequence of percentages over which a total cost is allocatedacross NASA WBS elements. Rules of Thumb can then be usedto extrapolate cost from one or more known WBS elements tothe remaining unknown WBS elements, assisting early projectformulation architecture studies (such as those in JPL’s Team Xand A Team).A number of issues can arise when generating and using costRules of Thumb. For example, many records of project costsconsist of incomplete data. Typical methods of dealing withincomplete cost allocation data include (a) ignoring missionswith incomplete data, or (b) taking averages of the non-zero percentagesacross missions, but both of these methods can result inbiased estimates if the existence of incomplete data correlateswith total mission cost or any particular WBS element. Anothercommon example is cost reported in one or more incorrect WBSelements. This is especially prevalent in smaller missions whereit is more common for engineers to perform tasks that fall underthe purview of multiple WBS elements.Furthermore, a Rule of Thumb estimate is typically reported asa point estimate; there is no reported uncertainty around thepercentages used to generate an allocation. Even in the rarecase in which confidence intervals around mean percentages areprovided, there may be positive or negative correlations betweenWBS elements which can skew estimates.Here we attempt to address these problems by formulatingprobabilistic Rules of Thumb in which a distribution of allocationschemes, rather than a single allocation scheme, is generated.We use a bootstrap imputation method to simultaneouslyaccount for uncertainty in the missing data while using allavailable information contained in the dataset. The imputeddatasets are then input into a multivariate Bayesian modelwhich accounts for correlations between WBS elements andproperly accounts for uncertainty in the final Rule of Thumbpercentages and predictions. We describe the mathematicalmodel and provides snippets of R code utilizing the brms(Bayesian Regression Models using Stan) package. To illustratethis model, we generate a Bayesian Level 2 WBS Cost Rule ofThumb for MIDEX (Medium-Class Explorers) missions withdata extracted from NASA’s CADRe. We then compare thismethod’s performance with the classical Rule of Thumb method.

Hooke, Melissa A↗

Adaptive function allocation reduces performance costs of static automation

Adaptive automation offers the option of flexible function allocation between the pilot and on-board computer systems. One of the important claims for the superiority of adaptive over static automation is that such systems do not suffer from some of the drawbacks associated with conventional function allocation. Several experiments designed to test this claim are reported in this article. The efficacy of adaptive function allocation was examined using a laboratory flight-simulation task involving multiple functions of tracking, fuel-management, and systems monitoring. The results show that monitoring inefficiency represents one of the performance costs of static automation. Adaptive function allocation can reduce the performance cost associated with long-term static automation.

Parasuraman, Raja↗

Enabling human–infrastructure interfaces for inspection using augmented reality

Decaying infrastructure maintenance cost allocation depends heavily on accurate and safe inspection in the field. New tools to conduct inspections can assist in prioritizing investments in maintenance and repairs. The industrial revolution termed as “Industry 4.0” is based on the intelligence of machines working with humans in a collaborative workspace. Contrarily, infrastructure management has relied on the human for making day-to-day decisions. New emerging technologies can assist during infrastructure inspections, to quantify structural condition with more objective data. However, today’s owners agree in trusting the inspector’s decision in the field over data collected with sensors. If data collected in the field is accessible during the inspections, the inspector decisions can be improved with sensors. New research opportunities in the human–infrastructure interface would allow researchers to improve the human awareness of their surrounding environment during inspections. This article studies the role of Augmented Reality (AR) technology as a tool to increase human awareness of infrastructure in their inspection work. The domains of interest of this research include both infrastructure inspections (emphasis on the collection of data of structures to inform management decisions) and emergency management (focus on the data collection of the environment to inform human actions). This article describes the use of a head-mounted device to access real-time data and information during their field inspection. The authors leverage the use of low-cost smart sensors and QR code scanners integrated with Augmented Reality applications for augmented human interface with the physical environment. This article presents a novel interface architecture for developing Augmented Reality–enabled inspection to assist the inspector’s workflow in conducting infrastructure inspection works with two new applications and summarizes the results from various experiments. The main contributions of this work to computer-aided community are enabling inspectors to visualize data files from database and real-time data access using an Augmented Reality environment.

Maharjan, D.↗

Optimal Gas-Electric Energy System Decarbonization Planning

As energy utilities implement climate change mitigation policies, system planners require strategies for achieving affordable emissions reductions. Coordinated planning of electric power and natural gas systems will allow synergistic investments to address cross-sector operational constraints, competing uses for net-zero emissions fuels, and shifts in energy demands across energy carriers. In this study, we develop a novel optimization program that finds the cost-minimizing mix of infrastructure expansion or reduction across gas and electric systems to satisfy sector-specific emissions constraints. Alongside energy supply resources, our framework allows for central-planning of end-use equipment stocks to allow switching between gas and electric appliances upon failure or premature replacement. The proposed model is used to simulate case study scenarios for a benchmark 24-pipe gas network coupled to a 24-node power system test network. We find that electrification of greater than 80% of core gas demands is a component of the least-cost solution for modeled energy systems. Despite this substitution, the gas system is maintained to service difficult-to-electrify customers and to deliver net-zero emissions gas to electricity generators in times of peak electricity demand. Restricting electrification of gas appliances increases reliance on power- to-gas technologies and increases annual costs by 15% in 2040. Neglecting constraints on pipeline blending of hydrogen can produce a misleading result that relies on hydrogen blend fractions of greater than 50%. In all cases, we find the average costs of delivered gas increase nearly 5-fold across the decarbonization transition, highlighting the importance of future work investigating cost-allocation strategies for ensuring an equitable energy transition.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Revisiting the relationship between demand growth and electricity prices

Here, in this Commentary, we aim to clarify the relationship between electricity demand and prices in the short- and longer-term. We outline three dimensions that shape this relationship: system capacity utilization, system expansion costs, and cost allocation in the rate design process. We explain why demand growth has historically been largely associated with falling electricity prices and explore arguments that future C&I demand growth may increase prices.

O'Shaughnessy, Eric [Lawrence Berkeley National La↗

Evaluating Interconnection Queue Impacts Using Hosting Capacity Analysis

The interconnection queue has been identified as a bottleneck in the efforts to shift the nations generation resources towards renewable sources and meet various state and federal goals. Efforts such as the interconnection innovation e-Xchange (i2X) are therefore trying to come up with ways in which the queue could be altered to make interconnection faster, cheaper, and fairer. This paper proposes using hosting capacity analysis methods to simulate the evolution of a power system as new resources are added. Modeling the interconnection process in this way enables simulation based study of various policy decisions for queue management and cost allocation. Sample results are presented to illustrate how some queue modifications might play out both in distribution and transmission systems.

Distributed Energy Resources, Interconnection↗

Management of Risk and Uncertainty Through Optimized Co-Operation of Transmission Systems and Microgrids with Responsive Loads (Final Report)

The evolution of the power system to the reliable, efficient and sustainable system of the future will involve development of both demand- and supply-side technology and operations. Ambitious national and state-level goals around the decarbonization of electricity relies on the integration of very high levels of renewable resources, most of which are variable and intermittent. The use of demand response is an ideal approach to counterbalance the intermittency of renewable generation and brings the consumer into the spotlight. Until recently, very little research had been conducted on the co-optimization of these two systems due to computational limitations. However, advances in computational capabilities, and the judicious use of decomposition methods and innovative approximation methods for high-dimension dynamic programming made this goal a viable objective for this project, leading to a fundamental shift in the ability to integrate and fully utilize demand-side resources. To this end, the modeling framework developed introduces a novel co-optimization framework, to include the operations of both the transmission and distribution systems (or microgrids) in operational decision making. This framework was used to analyze renewable and distributed generation along with responsive demand and to compare the capability of co-optimized systems to perform with higher levels of variable renewables. Results show that the use of a bi-level optimization approach is an appropriate structure, capable of co-optimizing a transmission system with multiple distribution systems and microgrids. While increasing the number of connected systems provides increasing flexibility for renewables integration this can also the economic benefits to the low-voltage subsystems with each additional system connected. Comparison of a traditional single-level decision structure with the co-optimization approach illustrates a reduction in overall system cost under co-optimization, while specific cost allocations to transmission and distribution systems are changed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Management of Risk and Uncertainty Through Optimized Co-Operation of Transmission Systems and Microgrids With Responsive Loads (Final Report)

The evolution of the power system to the reliable, efficient and sustainable system of the future will involve development of both demand- and supply-side technology and operations. Ambitious national and state-level goals around the decarbonization of electricity relies on the integration of very high levels of renewable resources, most of which are variable and intermittent. The use of demand response is an ideal approach to counterbalance the intermittency of renewable generation and brings the consumer into the spotlight. Though individual consumers are interconnected at the low-voltage distribution system, these resources are typically modeled as variables at the transmission network level. Demand-side participation cannot be leveraged effectively without explicitly including the distribution system dynamics in the optimization-based wholesale market operations. This project grew from a vision for co-optimized interaction of distribution systems, or microgrids, with the high-voltage transmission system. In this framework, microgrids encompass consumers, distributed renewables and storage. The energy management system of the lower voltage system (distribution or microgrid) can also sell (buy) excess (necessary) energy from the transmission system. Until recently, very little research had been conducted on the co-optimization of these two systems due to computational limitations. However, advances in computational capabilities, and the judicious use of decomposition methods and innovative approximation methods for high-dimension dynamic programming made this goal a viable objective for this project, leading to a fundamental shift in the ability to integrate and fully utilize demand-side resources. To this end, the modeling framework developed introduces a novel co-optimization framework, to include the operations of both the transmission and distribution systems (or microgrids) in operational decision making. This framework was used to analyze renewable and distributed generation along with responsive demand and to compare the capability of co-optimized systems to perform with higher levels of variable renewables. An ideal microgrid is defined as an electric entity capable of operating in both interconnected (with the high-voltage grid) and islanded mode. As such, the microgrid should incorporate generating units (traditional units and intermittent) and if needed, exchange power with the high-voltage grid. The interplay between the microgrid and high-voltage grid motivated the development of the co-optimization approach to ensure efficient performance of the interconnected network. Results show that the use of a bi-level optimization approach is an appropriate structure, capable of co-optimizing a transmission system with multiple distribution systems and microgrids. While increasing the number of connected systems provides increasing flexibility for renewables integration this can also the economic benefits to the low-voltage subsystems with each additional system connected. Comparison of a traditional single-level decision structure with the co-optimization approach illustrates a reduction in overall system cost under co-optimization, while specific cost allocations to transmission and distribution systems are changed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Waiting in Queue: A Historical Evaluation of Interconnection Policy

Both states and Independent System Operators (ISO)/Regional Transmission Organizations (RTO) have struggled with long wait times in interconnection queues. As a result, numerous reforms have been proposed to expedite the connection of new resources to the grid. This paper conducts a quantitative analysis of two of these policies: one providing detail hosting capacity information in Massachusetts, the other experimenting with cost allocation in New York. We find that both policies led to a statistically significant decrease in the times projects spend pending in interconnection queues, with New York seeing a small drop in days pending, and Massachusetts seeing a much larger one. We also include an analysis of how energy storage is impacts queue time in these states. These results can help inform regulators who are weighing reforms to interconnection policies, with the goal of reducing wait times.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evolving Competitive Markets in SAPP: Leveraging Competitive Wholesale Electricity Markets to Drive Renewable Generation Capacity in the Southern African Power Pool (SAPP)

The SADC region has significant natural resource potential to increase renewable energy generation, improve electricity reliability, and support economic development. This research finds an apparent lack of confidence from electricity infrastructure investors in SAPP wholesale electricity markets, which increases risk perception and lowers the likelihood of capital deployment. With respect to free market fundamentals, competitive market obstacles and renewable energy development obstacles are characterized. Stakeholders identified the top obstacles to well-functioning competitive markets as insufficient transmission infrastructure for interconnection and regional movement of electricity, dominance of national single-buyer markets, and lack of or weak nation-state regulatory frameworks. Stakeholders prioritized the top three obstacles for renewable energy development as a lack of viable commercial arrangements for variable renewable energy (VRE) balancing, lack of functional and consistent nation-level regulations, and higher project costs related to reliance on imported equipment. With respect to potential solution options, stakeholders prioritized the development of new cost allocation and finance methods to facilitate new transmission expansion, training to educate new or potential new market entrants on SAPP processes, as well as modeling and analysis of regional SAPP participation benefits disaggregated to the nation-state level. From these perspectives, this research identified strategy options for consideration including transitioning SAPP to a regional transmission operator (RTO) for operation and planning of cross-border transmission facilities and market administration, shifting operations of SAPP member transmission systems to Independent System Operators (ISOs), establishing a regional regulatory authority and enhancing market data transparency. Implementing these reforms is expected to be challenging, but not insurmountable, given the domestic political, legal, and jurisdictional complexities of the SADC region.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Distributed Energy Resource Interconnection Roadmap

Adopting strategic reforms to DER interconnection can help reduce interconnection delays, fairly allocate costs, improve transparency and equity, and support efficient and strategic investment in distribution and sub-transmission grids that can accommodate a rapidly evolving energy landscape. The Interconnection Innovation e-Xchange envisions this roadmap and its transmission system companion volume as collaborative resources to facilitate continued stakeholder discussions, problem-solving, and innovation as the U.S. works together to enable simpler, faster, and fairer interconnection of clean energy resources all while enhancing the reliability, resiliency, and security of our electric grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Bridging the Gap for Powering Data Centers

The rapid expansion of data centers, primarily driven by artificial intelligence, is outpacing the adaptability of the U.S. electric grid. This report, developed by Idaho National Laboratory (INL) , presents a gap analysis of some of the infrastructure challenges associated with large-scale data center deployment. Drawing from a national workshop hosted by INL in October of 2025, the report synthesizes stakeholder insights, survey data, and technical discussions to identify critical barriers and research needs. Key findings highlight the growing preference for behind-the-meter generation, the perceived inadequacy of legacy interconnection processes, and the urgent need for improved coordination between utilities, regulators, and data center developers. Environmental concerns such as water use and noise pollution, as well as economic constraints like equipment lead times and cost allocation, are also explored. The report outlines national lab capabilities in modeling, simulation, and technical assistance, and proposes targeted R&D priorities to support resilient, scalable, and efficient integration of data centers into the grid.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗