Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Computer Backup Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

GPM Mission's Best Practices: PERP

Similar to other missions, the Global Precipitation Measurement (GPM) Core Observatory's Command and Data Handling (C&DH) subsystem is critical for operations of the spacecraft. The onboard C&DH system comprises of two fully redundant boxes - a primary and a cold backup. Within each box, amongst other components, is a Single Board Computer (SBC) that hosts the flight software (FSW) system. In the event of an SBC reset, the Flight Operations Team (FOT) is poised with a lengthy task of restoring the SBC to nominal configuration. Due to the complexity of the C&DH system, this may take many days at a time to complete. The spacecraft's FSW applications are located in Electronically Erasable Programmable Read-Only Memory (EEPROM) and are copied into Random Access Memory (RAM) upon SBC initialization/reset. Each SBC has two banks of EEPROM, with each bank containing a copy of the FSW. Since launch, there have been many configuration changes to tables and applications that have been loaded into just RAM. Unfortunately, these changes are vulnerable to being wiped during a SBC initialization/reset, when the RAM is overwritten by the EEPROM. Although the EEPROM loads the default FSW configurations, the process to command non-default individual table and application changes is very cumbersome and time consuming. This consequentially increases the time until the spacecraft is back into nominal Mission Science Mode (MSM) drastically. The GPM Power-On Reset (POR) Expedited Recovery Process (PERP) Design introduces a method of consolidating commands into a single file load which the SBC can process independently of the ground - decreasing recovery time, the level of TDRS support reliance, and human error. This tested design can be implemented across many other missions that utilize a similar core Flight Executive (cFE) platform; hence providing an easy-to-follow, safe, and efficient process that can be applied across the board.

recovery↗

Local area network with fault-checking, priorities, and redundant backup

This invention is a redundant error detecting and correcting local area networked computer system having a plurality of nodes each including a network connector board within the node for connecting to an interfacing transceiver operably attached to a network cable. There is a first network cable disposed along a path to interconnect the nodes. The first network cable includes a plurality of first interfacing transceivers attached thereto. A second network cable is disposed in parallel with the first cable and, in like manner, includes a plurality of second interfacing transceivers attached thereto. There are a plurality of three position switches each having a signal input, three outputs for individual selective connection to the input, and a control input for receiving signals designating which of the outputs is to be connected to the signal input. Each of the switches includes means for designating a response address for responding to addressed signals appearing at the control input and each of the switches further has its signal input connected to a respective one of the input/output lines from the nodes. Also, one of the three outputs is connected to a repective one of the plurality of first interfacing transceivers. There is master switch control means having an output connected to the control inputs of the plurality of three position switches and an input for receiving directive signals for outputting addressed switch position signals to the three position switches as well as monitor and control computer means having a pair of network connector boards therein connected to respective ones of one of the first interfacing transceivers and one of the second interfacing transceivers and an output connected to the input of the master switch means for monitoring the status of the networked computer system by sending messages to the nodes and receiving and verifying messages therefrom and for sending control signals to the master switch to cause the master switch to cause respective ones of the nodes to use a desired one of the first and second cables for transmitting and receiving messages and for disconnecting desired ones of the nodes from both cables.

Morales, Sergio↗

Flight experience with a backup flight-control system for the HiMAT research vehicle

The NASA Dryden Flight Research Facility is conducting flight tests of two remotely piloted, subscale, advanced fighter configurations; the tests are part of the Highly Maneuverable Aircraft Technology (HiMAT) project. Closed-loop primary flight control is performed from a ground-based cockpit and digital computer in conjunction with an up/down telemetry link. A significant feature of these vehicles is an on-board, digitally active, backup control system designed to recover the vehicle in the event of a transfer from primary control. Automatic transfers occur upon certain critical ground or airborne system malfunctions. Control modes are provided that enable a ground or airborne controller to guide the vehicle to a safe landing. This paper describes the features, operational development, and flight evaluation of the HiMAT backup flight control system.

Kempel, R. W.↗

Implementation of a Campuswide Distributed Mass Storage Service: the Dream Versus Reality

In 1990, a technical team at NASA Lewis Research Center, Cleveland, Ohio, began defining a Mass Storage Service to pro- wide long-term archival storage, short-term storage for very large files, distributed Network File System access, and backup services for critical data dw resides on workstations and personal computers. Because of software availability and budgets, the total service was phased in over dm years. During the process of building the service from the commercial technologies available, our Mass Storage Team refined the original vision and learned from the problems and mistakes that occurred. We also enhanced some technologies to better meet the needs of users and system administrators. This report describes our team's journey from dream to reality, outlines some of the problem areas that still exist, and suggests some solutions.

Prahst, Stephen↗

The Unparalleled Systems Engineering of MSL's Backup Entry, Descent, and Landing System: Second Chance

Second Chance (SECC) was a bare bones version of Mars Science Laboratory's (MSL) Entry Descent & Landing (EDL) flight software that ran on Curiosity's backup computer, which could have taken over swiftly in the event of a reset of Curiosity's prime computer, in order to land her safely on Mars. Without SECC, a reset of Curiosity's prime computer would have lead to catastrophic mission failure. Even though a reset of the prime computer never occurred, SECC had the important responsibility as EDL's guardian angel, and this responsibility would not have seen such success without unparalleled systems engineering. This paper will focus on the systems engineering behind SECC: Covering a brief overview of SECC's design, the intense schedule to use SECC as a backup system, the verification and validation of the system's "Do No Harm" mandate, the system's overall functional performance, and finally, its use on the fateful day of August 5th, 2012.

fault protection↗

The unparalleled systems engineering of MSL’s backup entry, descent, and landing system : second chance

Second Chance (SECC) was a bare bones version of Mars Science Laboratory’s (MSL) Entry Descent & Landing (EDL) flight software that ran on Curiosity’s backup computer, which could have taken over swiftly in the event of a reset of Curiosity’s prime computer, in order to land her safely on Mars. Without SECC, a reset of Curiosity’s prime computer would have lead to catastrophic mission failure. Even though a reset of the prime computer never occurred, SECC had the important responsibility as EDL’s guardian angel, and this responsibility would not have seen such success without unparalleled systems engineering. This paper will focus on the systems engineering behind SECC: Covering a brief overview of SECC’s design, the intense schedule to use SECC as a backup system, the verification and validation of the system’s “Do No Harm” mandate, the system’s overall functional performance, and finally, its use on the fateful day of August 5th, 2012.

Reeves, Glenn↗

Backup flight control system functional evaluator software manual

The software for the Backup Flight Control System Functional Evaluator (BFCSFE) on a Data General Corporation Nova 1200 computer consists of three programs: the ground support program, the operational flight program (OFP), and the ground pulse code modulation (PCM) program. The Nova OFP software is structurally as close as possible to the AP101 code; therefore, this document highlights and describes only those areas of the Nova OFP that are significantly different from the AP101. Since the Ground Support Program was developed to meet BFCSFE requirements and differs considerably from the AP101 code, it is described in detail.

Helmke, C. A.↗

Examples of mesoscale structures and short-term wind variations detected by VHF Doppler radar

The first of three wind profilers planned for operation in central and western Pennsylvania began full-time, high-quality operation during July 1985. It is located about 20 km south-southeast of University Park and operates at 50 MHz. Another 50-MHz radar and a 400-MHz radar are to be installed over the next few months, to complete a mesoscale triangle with sides of 120 to 160 km. During the period since early July, a number of weather systems have passed over the wind profiler. Those accompanied by thunderstorms caused data losses either because the Department computer system lost power or because power went out at the profiler site. A backup power supply and an automatic re-start program will be added to the profiler system to minimize such future losses. Data have normally been averaged over a one-hour period, although there have been some investigations of shorter-period averaging. In each case, preliminary examinations reveal that the profiler winds are indicative of meteorological phenomena. The only occasions of bad or missing data are obtained when airplane noise is occasionally experienced and when the returned power is nearly at the noise level, at the upper few gates, where a consensus wind cannot be determined. Jets streams, clouds, and diurnal variations of winds are discussed.

Forbes, G. S.↗

The use of underwater dynamometry to evaluate two space suits

Four Astronauts were instrumented and donned one of three extravehicular activity (EVA) suits: the currently in use shuttle suit (STS), the Mark III (MK3), and the AX5. The STS was used as the comparison suit because of approved status. Each subject performed ten different exercises in each suit in three different manners (static, dynamic and fatigue) in two different environments, WETF and KC-135 (KC-135 not completed as of this report). Data were recorded from a flight qualified underwater dynamometer (Cybex power head) with a TEAC multichannel recorder/tape and downloaded into the VAX computer system for analysis. Also direct hard copy strip chart recordings were made for backup comparisons. Data were analyzed using the ANOVA procedure and results were graphed and reported without interpretation to the NASA/JSC ABL manager.

Squires, W. G.↗

An innovative design for autonomous backup attitude control of the Gamma Ray Observatory

The Gamma Ray Observatory is a NASA funded three-axis stabilized spacecraft which will carry four scientific instruments to observe gamma ray phenomena. The requirement to protect the scientific mission from system failures led to the attitude control and determination system design described in this paper. The design employs nine control modes with error detection, hardware substitution, and autonomous mode switching. The system architecture evolved to eliminate cross-dependence between the primary on-board computer (OBC) and the backup control processor electronics. Cross strapping of sensors and actuators and separation of the input/output electronics ensure that a reliable set of sensors and actuators will be available for backup mode operation. The OBC software includes failure detection, hardware reconfiguration, and mode switching logic which provide the ability to autonomously transfer, upon anomaly, to a reliable backup mode. Verification of this mode transition design is done in four test programs: at the unit level, by analytical simulation, by a hybrid breadboard electronics-simulation setup, and by a flight hardware-simulation test.

Tai, F.↗

Planning Space Shuttle's maiden voyage

NASA's first Space Shuttle, Columbia, whose technological advances include a space laboratory, navigational and communication satellites, and planetary explorers, is examined, and the first few flights, scheduled for 1980, are described. The Shuttle employs an all-digital, all-electronic, computer-operated avionics system. The onboard data processing and software subsystem, encompassing five computers (four online and one backup), a data-bus network, bus terminals, and software, is analyzed in detail. Attention is given to the basic structure of the Orbiter (37.19 m in length and 23.77 m wingspan), its main engines, and the payload and cargo capacities (29,500 kg). A two-step program that could increase the power and duration of spaceflights is presented. The first step is the creation of a power extension package, using solar arrays, generating electricity to extend the basic five-day flight to 20 days, while the second step uses the same design to create a 25-kW power model capable of providing energy for a 50-day flight. Plans for construction of a manned space construction base and a larger power platform of 250 kW are also presented.

Malkin, M. S.↗

Computer memory power control for the Galileo spacecraft

The developmental history, major design drives, and final topology of the computer memory power system on the Galileo spacecraft are described. A unique method of generating memory backup power directly from the fault current drawn during a spacecraft power overload or fault condition allows this system to provide continuous memory power. This concept provides a unique solution to the problem of volatile memory loss without the use of a battery of other large energy storage elements usually associated with uninterrupted power supply designs.

Detwiler, R. C.↗

Fault-Tolerant Software For Flight Control

Report discusses design and testing of redundant control system for F-8 digital fly-by-wire airplane. Outstanding feature of system is fault-tolerant software (REBUS) residing in primary digital computers. Transition to operation on backup software smooth.

Deets, Dwain A.↗

Galileo spacecraft power management and distribution system

The Galileo PMAD (power management and distribution system) is described, and the design drivers that established the final as-built hardware are discussed. The spacecraft is powered by two general-purpose heat-source-radioisotope thermoelectric generators. Power bus regulation is provided by a shunt regulator. Galileo PMAD distributes a 570-W beginning of mission (BOM) power source to a user complement of some 137 load elements. Extensive use of pyrotechnics requires two pyro switching subassemblies. They initiate 148 squibs which operate the 47 pyro devices on the spacecraft. Detection and correction of faults in the Galileo PMAD is an autonomous feature dictated by requirements for long life and reliability in the absence of ground-based support. Volatile computer memories in the spacecraft command and data system and attitude control system require a continuous source of backup power during all anticipated power bus fault scenarios. Power for the Jupiter Probe is conditioned, isolated, and controlled by a Probe interface subassembly. Flight performance of the spacecraft and the PMAD has been successful to date, with no major anomalies.

Detwiler, R. C.↗

Backup control system (BUCS)

A backup software program is installed in an isolated portion in the memory of at least one of redundant computers. The backup program performs basically the same functions as the prime program but is dissimilarly programmed to prevent a common software error. Switchover to the backup program occurs either automatically in response to monitors, or manually by the operator (i.e. pilot) when he detects an anomaly.

Murphy, Richard D.↗

Data Definition Management for Orion Backup Flight Software

The NASA developed Core Flight System (cFS) is a reusable software architecture that has been used on multiple spaceflight missions. Missions using cFS can reuse code from other missions, as well as leverage deployment to similar computer architectures. The Orion Backup Flight Software (BFS) team selected cFS as the architecture to be used on the program, and this presentation will describe some design choices we made, and the consequences of those decisions.

CFS↗

Demonstration of Data Center Energy Use Prediction Software

This report documents a demonstration of a software modeling tool from Romonet that was used to predict energy use and forecast energy use improvements in an operating data center. The demonstration was conducted in a conventional data center with a 15,500 square foot raised floor and an IT equipment load of 332 kilowatts. It was cooled using traditional computer room air handlers and a compressor-based chilled water system. The data center also utilized an uninterruptible power supply system for power conditioning and backup. Electrical energy monitoring was available at a number of locations within the data center. The software modeling tool predicted the energy use of the data center's cooling and electrical power distribution systems, as well as electrical energy use and heat removal for the site. The actual energy used by the computer equipment was recorded from power distribution devices located at each computer equipment row. The model simulated the total energy use in the data center and supporting infrastructure and predicted energy use at energy-consuming points throughout the power distribution system. The initial predicted power levels were compared to actual meter readings and were found to be within approximately 10 percent at a particular measurement point, resulting in a site overall variance of 4.7 percent. Some variances were investigated, and more accurate information was entered into the model. In this case the overall variance was reduced to approximately 1.2 percent. The model was then used to predict energy use for various modification opportunities to the data center in successive iterations. These included increasing the IT equipment load, adding computer room air handler fan speed controls, and adding a water-side economizer. The demonstration showed that the software can be used to simulate data center energy use and create a model that is useful for investigating energy efficiency design changes.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Commonality Study of the Pressure-Volume-Temperature Based Propellant Gaging Software Modules for the Auxiliary Power Unit, Reaction Control System, and Orbital Maneuvering System

Computer storage requirements can be reduced if areas of commonality exist in two or more programs placed in the same computer and identical code can be used by more than one program. The pressure-volume-temperature (P-V-T) relationship for the propellant tank pressurant agent is utilized as the basis for either a primary of a backup propellant gaging program for the auxiliary power unit (APU), the reaction control system (RCS), and the orbital maneuvering system (OMS). These three propellant gaging programs were investigated. It was revealed that a very limited degree of software commonality exits among them. An examination of this common software indicated that only the computation of the helium compressibility factor in an external function subprogram accessible to both the RCS and OMS propellant gaging programs appears to offer a savings in computer storage requirements.

Duhon, D. D.↗