Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Computer Backup Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

System Administrator for LCS Development Sets

The Spaceport Command and Control System Project is creating a Checkout and Control System that will eventually launch the next generation of vehicles from Kennedy Space Center. KSC has a large set of Development and Operational equipment already deployed in several facilities, including the Launch Control Center, which requires support. The position of System Administrator will complete tasks across multiple platforms (Linux/Windows), many of them virtual. The Hardware Branch of the Control and Data Systems Division at the Kennedy Space Center uses system administrators for a variety of tasks. The position of system administrator comes with many responsibilities which include maintaining computer systems, repair or set up hardware, install software, create backups and recover drive images are a sample of jobs which one must complete. Other duties may include working with clients in person or over the phone and resolving their computer system needs. Training is a major part of learning how an organization functions and operates. Taking that into consideration, NASA is no exception. Training on how to better protect the NASA computer infrastructure will be a topic to learn, followed by NASA work polices. Attending meetings and discussing progress will be expected. A system administrator will have an account with root access. Root access gives a user full access to a computer system and or network. System admins can remove critical system files and recover files using a tape backup. Problem solving will be an important skill to develop in order to complete the many tasks.

Virtualizing in Linux↗

A Heuristic Approach to Correlating ERAM Flight Data from Twenty Centers

Among its many other functions, the Federal Aviation Administration’s En Route Automation Modernization (ERAM) provides external systems with real-time air traffic data for flights in enroute airspace in the National Airspace System. It replaced the En Route Host computer and backup system used at 20 FAA Air Route Traffic Control Centers (Centers) nationwide. Among the new features of ERAM, its output data stream of flight plan and track data includes a unique identifier for a flight originating in any one of the 20 ERAM Centers. The unique identifier, called the Global Unique Flight Identifier (GUFI), is persistent across all the Centers that track the flight. However, certain factors make it difficult to correlate data using the GUFI. First, the value of the GUFI is only unique within a time window of seven days. Second, the GUFI is attached only to flight-plan related data messages. Finally, track positions reported by ERAM do not reference the GUFI. In order to correlate historical as well as real time flight-plan and position related ERAM data, an efficient, heuristic approach was developed, and a prototype was developed. The approach showed that the processing speed, through parallel processing, is sufficient to correlate ERAM data in real-time. As described in this paper, when there are multiple track positions reported from multiple Centers within a few seconds, each position is assigned with a weighted score to indicate the quality of the position relative to its last know position. The weighted score can be used to eliminate potentially duplicate track positions. The approach is database-agnostic, and can be implemented in a Big Data system such as an Apache Hadoop system, as well as in traditional database systems.

Correlating ERAM Flight Data↗

Simulation of PCM Data

Program for communications and control computer simulates pulse-codemodulated data. Software for simulation pulse-code-modulated (PCM) data from Space Shuttle during launch preparations developed for use with checkout, control, and monitor subsystem (CCMS). Facilitates testing of CCMS with data expected from main engines, external fuel tanks, operational instrumentation, general-purpose computer, backup flight system, and payload. Simulator program executes in standard CCMS hardware, requiring no new hardware.

Bernstrom, G. G.↗

Data processing for water monitoring system

Water monitoring data acquisition system is structured about central computer that controls sampling and sensor operation, and analyzes and displays data in real time. Unit is essentially separated into two systems: computer system, and hard wire backup system which may function separately or with computer.

Monford, L.↗

Mechanical Backup For Fly-By-Wire Control System

Mechanical device eliminates need for redundant fly-by-wire subsystems. Main components are two linkages. One connected to control column in conventional, reversible control system. Other slides inside first linkage and connected to pilot's control wheel. In addition to aircraft applications, design used in control systems in which computer control desirable but safety backup systems required; for example, in boat rudders, engine controls in boats and automobiles, and controls in construction equipment.

Stewart, Eric C.↗

Design and development experience with a digital fly-by-wire control system in an F-8C airplane

To assess the feasibility of a digital fly-by-wire system, the mechanical flight control system of an F-8C airplane was replaced with a digital system and an analog backup system. The Apollo computer was used as the heart of the primary system. This paper discusses the experience gained during the design and development of the system and relates it to active control systems that are anticipated for future civil transport applications.

Deets, D. A.↗

Design and development experience with a digital fly-by-wire control system in an F-8C airplane

To assess the feasibility of a digital fly by wire system, the mechanical flight control system of an F-8C airplane was replaced with a digital primary system and an analog backup system. The Apollo computer was used as the heart of the primary system. This paper discusses the experience gained during the design and development of the system and relates it to active control systems that are anticipated for future civil transport applications.

Deets, D. A.↗

Large File System Backup: NERSC Global File System Experience

NERSC's Global File system (NGF), accessible from all compute systems at NERSC, holds files and data from many scientific projects. A full backup of this file system to our High Performance Storage System (HPSS) is performed periodically. Disk storage usage by projects at NERSC has grown seven fold over a two year period, from ~;;20TB in June 2006 to ~;;140 TB in June 2008. The latest full backup took about 13 days and more than 200 T10k tape cartridges (.5 TB capacity). Petabyte file systems are becoming a reality in the next few years and the existing utilities are already strained in handling backup tasks.

97 MATHEMATICS AND COMPUTING↗

Flight control systems development of highly maneuverable aircraft technology /HiMAT/ vehicle

The highly maneuverable aircraft technology (HiMAT) program was conceived to demonstrate advanced technology concepts through scaled-aircraft flight tests using a remotely piloted technique. Closed-loop primary flight control is performed from a ground-based cockpit, utilizing a digital computer and up/down telemetry links. A backup flight control system for emergency operation resides in an onboard computer. The onboard systems are designed to provide fail-operational capabilities and utilize two microcomputers, dual uplink receiver/decoders, and redundant hydraulic actuation and power systems. This paper discusses the design and validation of the primary and backup digital flight control systems as well as the unique pilot and specialized systems interfaces.

Petersen, K. L.↗

Handling Qualities of a Capsule Spacecraft During Atmospheric Entry

A piloted simulation was conducted to study handling qualities for capsule spacecraft entering the Earth s atmosphere. Eight evaluation pilots, including six pilot astronauts, provided Cooper-Harper ratings, workload ratings, and qualitative comments. The simulation began after descending through the atmospheric entry interface point and continued until the drogue parachutes deployed. There were two categories of piloting tasks, both of which required bank angle control. In one task category, the pilot followed a closed-loop bank angle command computed by the backup guidance system to manage g-loads during entry. In the other task category, the pilot used intuitive rules to determine the desired bank angle independently, based on an open-loop schedule of vertical speed, Mach, and total energy specified at several range-to-target gates along the entry trajectory. Pilots were able to accurately track the bank angle guidance commands and steered the capsule toward the recovery site with essentially the same range error as the benchmark autopilot trajectory albeit with substantially higher propellant usage, and the handling qualities for this task were satisfactory. Another key result was that the complex piloting task of atmospheric entry could be performed satisfactorily, even in the presence of large dispersions, by controlling bank angle to follow a simple open-loop schedule.

Bilimoria, Karl D.↗

Flight test of a resident backup software system

A new fault-tolerant system software concept employing the primary digital computers as host for the backup software portion has been implemented and flight tested in the F-8 digital fly-by-wire airplane. The system was implemented in such a way that essentially no transients occurred in transferring from primary to backup software. This was accomplished without a significant increase in the complexity of the backup software. The primary digital system was frame synchronized, which provided several advantages in implementing the resident backup software system. Since the time of the flight tests, two other flight vehicle programs have made a commitment to incorporate resident backup software similar in nature to the system described in this paper.

Deets, D. A.↗

Flight test of a resident backup software system

A new fault-tolerant system software concept employing the primary digital computers as host for the backup software portion has been implemented and flight tested in the F-8 digital fly-by-wire airplane. The system was implemented in such a way that essentially no transients occurred in transferring from primary to backup software. This was accomplished without a significant increase in the complexity of the backup software. The primary digital system was frame synchronized, which provided several advantages in implementing the resident backup software system. Since the time of the flight tests, two other flight vehicle programs have made a commitment to incorporate resident backup software similar in nature to the system described here.

Deets, Dwain A.↗

HiMAT onboard flight computer system architecture and qualification

Two highly maneuverable aircraft technology (HiMAT) remotely piloted research vehicles (RPRV's) are being flight tested at NASA Dryden Flight Research Center, Edwards, California, to demonstrate and evaluate a number of technological advances applicable to future fighter aircraft. Closed-loop primary flight control is performed from a ground-based cockpit utilizing a digital computer and up/down telemetry links. A backup flight control system for emergency operation resides in one of two onboard computers. Other functions of the onboard computer system are uplink processing, downlink processing, engine control, failure detection, and redundancy management. This paper describes the architecture, functions, and flight qualification of the HiMAT onboard flight computer systems.

Myers, A. F.↗

Achieving reliability - The evolution of redundancy in American manned spacecraft computers

The Shuttle is the first launch system deployed by NASA with full redundancy in the on-board computer systems. Fault-tolerance, i.e., restoring to a backup with less capabilities, was the method selected for Apollo. The Gemini capsule was the first to carry a computer, which also served as backup for Titan launch vehicle guidance. Failure of the Gemini computer resulted in manual control of the spacecraft. The Apollo system served vehicle flight control and navigation functions. The redundant computer on Skylab provided attitude control only in support of solar telescope pointing. The STS digital, fly-by-wire avionics system requires 100 percent reliability. The Orbiter carries five general purpose computers, four being fully-redundant and the fifth being soley an ascent-descent tool. The computers are synchronized at input and output points at a rate of about six times a second. The system is projected to cause a loss of an Orbiter only four times in a billion flights.

Tomayko, J. E.↗

Cle Elum and Supplementation Research Facility : Monthly Progress Report October 2008.

FISH PRODUCTION: On October 7th the 2008 spawning season was completed. 823 adults were transferred to the facility for the 2008 season. The overall adult mortality was 6.9% (1.3% pre-spawning mortality and 5.6% encountered after sorting). Wild/natural salmon collected included 278 females, 173 males, and 29 jacks for a total 480 fish for the 2008 brood. Supplemented brood stock collected included 149 adults (85 females, 35 males and 29 jacks). Hatchery control brood collected for research included 194 adults (91 females, 68 males and 35 jacks). Eggs will be inventoried in November with an actual summary of eggs numbers to be submitted for the November report. The estimated egg takes (production) for the 2008 season was 1,375,146 eggs with 1,006,063 comprising of W x W crosses and 250,755 eggs of H x H crosses with 118,328 supplement crosses. Total fish on hand for the 2007 brood is 768,751 with an average fish per pound of 30.6 f/lb. FISH CULTURE: The marking and pit-tagging operation started on October 13th. The pit-tagging portion was completed on October 23rd. A total 40,000 juveniles were pit-tagged (2,000 from each of the production ponds and 4,000 each for the hatchery juvenile ponds 9 & 10). Cle Elum staff began shocking, sorting, counting and splitting eggs in incubation. Shocking eggs will separate live eggs from dead eggs. Eggs are treated with formalin three times a week to control fungus. The focus for the culturists during the month of October entail completing the final spawn (egg take) on the 7th, pond cleaning, keeping the marking trailers supplied with fish and end of month sampling. The adult holding ponds were power washed and winterized for the shut down period. Facility crew members Greg Strom and Mike Whitefoot assisted Joe Blodgett and his crew with fish brood collection on the 22nd of October. Fall Chinook and Coho salmon were seined up and put in tanker trucks from Chandler canal and transported to holding ponds for later spawning. Charlie, Simon and Vernon assisted with sorting and spawning Summer Chinook at the Wells hatchery for the Summer Chinook reintroduction program on the lower Yakima River. WATER PRODUCTION: The current combined well and river water supply to the complex is 12,909 gallons/min. Four river pumps (12,400gpm) and one well pump No.2 (509gpm) are supplying water to the facility main head box and the egg incubation building. ACCLIMATION SITES: Easton had much activity in October, the electrical power panel that's switches commercial power operation to generator power (transfer switch) malfunctioned. Charlie called Wallace Electric as well as ASCO Services to trouble shoot the problem which has yet to be determined. Heaters have been turned on in all service buildings at the acclimation sites. Pacific States Marine Fisheries Commission traveled to Easton to install a pole to mount a satellite and a new ups backup system with new monitors and computers for pit tag data recording and transmitting. Brown and Jackson pumped out the septic tanks at Easton and Clark Flat. AMB Tools performed maintenance on the compressors at the acclimation sites as well as Cle Elum (5 total). VEHICLE MAINTENANCE: Day Wireless performed maintenance on all handheld and vehicle radios. Day Wireless repaired radio communications (static noise) on the 6th also. All vehicles mileages and conditions are reported monthly to Toppenish. Cle Elum staff continues to clean and maintain all facility vehicles weekly. MAINTENANCE BUILDING MAINTENANCE: Kevin of Raincountry was called in response to repairs needed to the water chiller system. Cle Elum staff winterized all irrigation as well as shop grounds. Brown and Jackson pumped out the septic tank at the hatchery on the 22nd. HATCHERY BUILDING MAINTENANCE: The incubation room has been set up for transfer of eggs from isolation buckets to vertical stacks, temperature units are recorded daily. RESENTDENTIAL HOUSING: Residents irrigation has been winterized and fall fertilizer was applied to all grass on facility. Four Seasons performed maintenance on all heating systems and replaced a thermostat on resident house No.391. Alden Plumbing replaced a water faucet in a sink at resident house No.1001. Shaw's Furniture & Appliance replaced three faulty microwaves in residents No.391, 411 and 871. RIVER PUMP STATION MAINTENANCE: All river pumps are in operation and supply river water to the main facility. Approximately 12,400 gallons per minute are being pumped to eighteen raceways. Weekly cleaning and upkeep is performed by Cle Elum staff. WELL FIELD MAINTENANCE: Weekly test holes are measured, recorded and sent to CH2MHILL. Pump No.1 is in operation and the flow meter is recorded weekly. On the 3rd well pumps 5 and 6 were shut down and winterized for the season. Well pump No.2 had fence damage repaired on the 16th. SAFETY AND TRAINING: A safety meeting was held on the 21st. On the 15th ABC Fire Prevention did maintenance on all fire extinguishers.

13 HYDRO ENERGY↗

Independent Orbiter Assessment (IOA): Analysis of the backup flight system

The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA approach features a top-down analysis of the hardware to determine failure modes, criticality, and potential critical items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. This report documents the analysis results corresponding to the Orbiter Backup Flight System (BFS) hardware. The BFS hardware consists of one General Purpose Computer (GPC) loaded with backup flight software and the components used to engage/disengage that unique GPC. Specifically, the BFS hardware includes the following: DDU (Display Driver Unit), BFC (Backup Flight Controller), GPC (General Purpose Computer), switches (engage, disengage, GPC, CRT), and circuit protectors (fuses, circuit breakers). The IOA analysis process utilized available BFS hardware drawings and schematics for defining hardware assemblies, components, and hardware items. Each level of hardware was evaluated and analyzed for possible failure modes and effects. Criticality was assigned based upon the severity of the effect for each failure mode. Of the failure modes analyzed, 19 could potentially result in a loss of life and/or loss of vehicle.

Prust, E. E.↗

Sequencing design for BFS engagement

The Space Shuttle's avionics system is controlled by five onboard computers, four of which are loaded with the Primary Avionics Software System (PASS), and one of which is loaded with the Backup Flight System (BFS). The Shuttle is nominally controlled by the PASS computers. However, in the event of a PASS generic software failure, the BFS is engaged and assumes control of the Shuttle. The BFS Sequencing System problems presented by the engage requirement and the solutions chosen by the developers are discussed. These solutions constitute a technique which can be applied to the design of any real-time backup system.

Jurica, K. E.↗

An Adaptable Power System with Software Control Algorithm

A low cost, flexible and modular spacecraft power system design was developed in response to a call for an architecture that could accommodate multiple missions in the small to medium load range. Three upcoming satellites will use this design, with one launch date in 1999 and two in the year 2000. The design consists of modular hardware that can be scaled up or down, without additional cost, to suit missions in the 200 to 600 Watt orbital average load range. The design will be applied to satellite orbits that are circular, polar elliptical and a libration point orbit. Mission unique adaptations are accomplished in software and firmware. In designing this advanced, adaptable power system, the major goals were reduction in weight volume and cost. This power system design represents reductions in weight of 78 percent, volume of 86 percent and cost of 65 percent from previous comparable systems. The efforts to miniaturize the electronics without sacrificing performance has created streamlined power electronics with control functions residing in the system microprocessor. The power system design can handle any battery size up to 50 Amp-hour and any battery technology. The three current implementations will use both nickel cadmium and nickel hydrogen batteries ranging in size from 21 to 50 Amp-hours. Multiple batteries can be used by adding another battery module. Any solar cell technology can be used and various array layouts can be incorporated with no change in Power System Electronics (PSE) hardware. Other features of the design are the standardized interfaces between cards and subsystems and immunity to radiation effects up to 30 krad Total Ionizing Dose (TID) and 35 Mev/cm(exp 2)-kg for Single Event Effects (SEE). The control algorithm for the power system resides in a radiation-hardened microprocessor. A table driven software design allows for flexibility in mission specific requirements. By storing critical power system constants in memory, modifying the system code for other programs is simple. These constants can be altered also by ground command, or in response to an anomolous event. All critical power system functions have backup hardware functions to prevent a software or computer glitch from propagating. A number of battery charge control schemes can be implemented by selecting the proper control terms in the code. The architecture allows the design engineer to tune the system response to various system components and anticipated load profiles without costly alterations. A design trade was made with the size, weight and power dissipation of the electronics versus the performance of the power bus to load variations. Linear, fine control is maintained with a streamlined electronics design. This paper describes the hardware design as well as the software control algorithm. The challenges of closing the system control loop digitally is discussed. Control loop margin and power system performance is presented. Lab measurements are shown and compared to the system response of a hardware model running actual flight software.

Castell, Karen↗