Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROCUREMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Deep Lynx: Digital Engineering Integration Hub

The construction of megaprojects has consistently demonstrated challenges for project managers in regard to meeting cost, schedule, and performance requirements. Megaproject construction challenges are common place within megaprojects with many active projects in the United States failing to meet cost and schedule efforts by significant margins. Currently, engineering teams operate in siloed tools and disparate teams where connections across design, procurement, and construction systems are translated manually or over brittle point-to-point integrations. The manual nature of data exchange increases the risk of silent errors in the reactor design, with each silent error cascading across the design. These cascading errors lead to uncontrollable risk during construction, resulting in significant delays and cost overruns. Deep Lynx allows for an integrated platform during design and operations of mega projects.

Darrington, JohnW↗

VARS Framework

The Verification and Validation Assuring Reliability and Security (VARS) project team has developed the proof-of-concept VARS framework which will be implemented in the form of a software tool called Risk-Informed Verification and Validation Recommendation (RIVVR). The framework will provide Energy Delivery System (EDS) stakeholders with cybersecurity focused verification and validation (V&V) approach which includes list of potentially relevant vulnerabilities to test or address, pre-procurement guidance, and separate lists of relevant standards, tools, and techniques (ST2) to be considered by utilities and vendors

Pal, Seemita↗

An HPC benchmark survey and taxonomy for characterization

The field of High-Performance Computing (HPC) is defined by providing computing devices with highest performance for a variety of demanding scientific users. The tight co-design relationship between HPC providers and users propels the field forward, paired with technological improvements, achieving continuously higher performance and resource utilization. A key device for system architects, architecture researchers, and scientific users are benchmarks, allowing for well-defined assessment of hardware, software, and algorithms. Many benchmarks exist in the community, from individual niche benchmarks testing specific features, to large-scale benchmark suites for whole procurements. We survey the available HPC benchmarks, summarizing them in table form with key details and concise categorization, also through an interactive website. For categorization, we present a benchmark taxonomy for well-defined characterization of benchmarks.

Benchmarking↗

Design of Critical Experiments Targeting Epithermal Cross Sections of Tantalum

Sandia National Laboratories (SNL) and Oak Ridge National Laboratory (ORNL) are collaborating to develop a capability to test the epithermal/intermediate cross sections of tantalum (Ta) at the SNL critical experiments facility using the Seven Percent Critical Experiment (7uPCX) fuel. The Sandia Critical Experiments (SCX) Program provides a specialized facility for performing water moderated and reflected critical experiments with UO 2 fuel rod arrays. A history of safe reactor operations and flexibility in reactor core configuration has resulted in the completion of several benchmark critical experiment evaluations that are published in the International Criticality Safety Benchmark Evaluation Project (ICSBEP) Handbook. The critical experiments described here are scheduled to be performed at SCX in fiscal year 2023. Currently, fabrication details for the needed new equipment are being finalized for completion of the procurement process. The experiments will then be executed and documented for publication consideration by the ICSBEP.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Community Geothermal: Mechanical, Electrical, and Plumbing Design Report and Drawings - Wallingford, CT

Included here are the mechanical, electrical, and plumbing design report and drawings for the proposed community geothermal system at an affordable housing complex in Wallingford, Connecticut. The report and drawings were developed by LN Consulting, in partnership with the University of Connecticut, which completed the energy modeling that formed the basis of the design work. The drawings can be used as a basis for a Request for Proposals to procure entities to complete construction-ready design documents.

15 GEOTHERMAL ENERGY↗

Energy Storage Cost and Performance Database

In support of the U.S. Department of Energy’s Energy Storage Grand Challenge, Pacific Northwest National Laboratory is applying its rich history of battery research and development to provide the U.S. Department of Energy (DOE) and industry with a guide to current energy storage costs and performance metrics for various technologies. Cost and performance metrics for individual technologies track the following to provide an overall cost of ownership for each technology: cost to procure, install, and connect an energy storage system; associated operational and maintenance costs; and end-of-life costs. These metrics are intended to support DOE and industry stakeholders in making sound decisions about future R&D directions and priorities that move the United States closer to its goal of energy independence. The technologies currently being evaluated are lithium-ion [lithium iron phosphate (LFP) and nickel manganese cobalt (NMC)] batteries, vanadium redox flow batteries, lead-acid batteries, zinc-based batteries, hydrogen energy storage, pumped storage hydropower, gravitational energy storage, compressed air energy storage, and thermal energy storage.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Foliar element determination from field survey in association with the National Ecological Observatory Network Airborne Observation Platform survey, East River, Colorado 2018

The purpose of this dataset is to support research aimed at understanding the coupling between hydrologic and biogeochemical processes at watershed scale, particularly the relationship between aboveground vegetation characteristics and subsurface soil properties. These data are intended to inform and calibrate models of catchment-scale biogeochemical fluxes, including rock-derived nutrient cycling, and they were procured to address the following questions: (1) What is the distribution of vegetation characteristics across the study catchments? (2) Are foliar concentrations of rock-derived nutrients related to underlying lithology and soil availability, or are these signals masked by biotic nutrient cycling and retention processes?This data package contains foliar elemental data collected during the 2018 National Ecological Observatory Networks (NEON) Airborne Observation Platform (AOP) imaging spectroscopy and lidar surveys in Gunnison County, Colorado. Folair samples were collected across the East River, Washington Gulch, Slate River, and Coal Creek watersheds and contain a mixture of vegetation including meadow, shrub, and tree foliar samples. The samples were processed using aqua regia digestion and analyzed for elemental determination on inductively coupled plasma optical emission spectrometry (ICP-OES).The data package includes: (1) raw foliar elemental data files in CSV and PDF formats, (2) quality control certificates in PDF format, and (3) an aggregated CSV file containing all elemental measurements compiled across samples. No specialized software is required to access or use these files.

2018 National Ecological Observatory Network Campa↗

Optimized allocation method of the VSC-MTDC system for frequency regulation reserves considering the cost

In recent years, the interconnection of asynchronous power grids through the VSC-MTDC system has been proposed and extensively studied in light of the potential benefits of economical bulk power exchanges and frequency regulation reserves sharing. This paper proposed an optimized allocation method for sharing frequency regulation reserves among the interconnected power systems and the corresponding frequency regulation control of the VSC-MTDC system under emergency frequency deviation events. Firstly, the frequency regulation reserve classification is proposed. In the classification, the available frequency response capacity reserves of each interconnection are divided into commercial reserves and regular reserves. While the commercial reserves are procured through long-term contracts, the regular reserves are purchased based on market prices of frequency regulation services. Secondly, based on the proposed frequency regulation reserve classification, a novel frequency regulation control is then introduced for the VSC-MTDC system. This control method could minimize the costs of the disturbed power grid for the needed frequency response supports from the other power grids. Simulation verifications are performed on a modified IEEE 39 bus system and a highly reduced power system model representing the North American grids. The simulation verification indicates that the developed frequency regulation control significantly reduced ancillary service costs of the disturbed power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Status of PIP-II 650 MHz Prototype Dressed Cavity Qualification

Low-beta and high-beta sections of PIP-II linac will use nine low-beta cryomodules with four cavities each and four high-beta cryomodules with six cavities each. These cavities will be produced and qualified in collaboration between Fermilab and the international partner labs. Prior to their installation into prototype cryomodules, several dressed cavities, which include jacketed cavities, high power couplers, and tuners, will be qualified in STC horizontal test bed at Fermilab. After qualification of bare β = 0.9 cavities at Fermilab, several pre-production β = 0.92 and β = 0.61 cavities have been and are being fabricated and qualified. Procurements have also been started for high power couplers and tuners. In this contribution we present the current status of prototype dressed cavity qualification for PIP-II.

43 PARTICLE ACCELERATORS↗

Experience from the US contribution to HL-LHC: Nb3Sn focusing quadrupoles and SRF crab cavities

The Interaction Regions (IR) of many colliders benefit from the application of leading-edge technologies to ensure the highest possible luminosity delivered to the experiments. Leading-edge low-beta focusing magnets and crab cavities to handle individual bunches are critically important to increase the instantaneous and integrated luminosity in future Colliders.The High-Luminosity LHC Upgrade, HL-LHC, with Nb3Sn Magnets (called MQXF) and Superconducting Radio Frequency (SRF) crab cavities (of two types, called DQW and RFD) is a world-wide collaborative project under construction in this decade to utilize the solutions mentioned above as key ingredients to increase tenfold the integrated luminosity delivered to the CMS and ATLAS experiments in the next decade. The HL-LHC AUP is the US effort to contribute approximately 50% of the low-beta focusing magnets and crab cavities for the HL-LHC.In this contribution we present the valuable lessons learned by the US efforts in the procurement, construction, and testing phases of the Nb3Sn focusing magnets and SRF crab cavities. We will report on the experience gathered by HL-LHC AUP in the production of the first half of deliverables (magnets MQXFA03 to MQXFA13). We will also report on the test of the first cryoassemblies and the status of the cavities’ development, production and testing.Both the technical and project management lessons-learned will inform applications of these technologies to future colliders and projects.

43 PARTICLE ACCELERATORS↗

INFN LASA in-kind contribution to PIP-II

This paper reports the status and recent progress of INFN LASA’s in-kind contribution to the PIP-II project at Fermilab, with updates on key activities and major procurements. Production efforts for the 38 INFN LASA-designed, 5-cell cavities (β=0.61) for the LB650 section of the linac are underway and two pre-series prototypes are being realized as a first step to validate the manufacturing and treatment sequence. Concurrently, preliminary testing on existing prototypes is progressing to gain a deeper understanding of the surface preparation and qualification procedures, including cross-validation at different infrastructures. Series LB650 cavities will be industrially produced and surface-treated to achieve the stringent performance targets, qualified via vertical cold tests at DESY AMTF, and delivered installation-ready for string assembly.

Paparella, Rocco [INFN, Pisa; LASA, Segrate]↗

Status of the INFN LASA in-kind contribution to PIP-II project

The status of INFN LASA in-kind contribution to the PIP-II project at Fermilab is reported in this paper. The effort for the series production of the 38 INFN LASA designed, 5-cell cavities with beta 0.61 for the LB650 section of the linac commenced and the status of ongoing activities and major procurements is here conveyed. At the same time, preliminary tests on INFN LB650 cavity prototypes are progressing in order to optimize the complete preparation and qualification cycle. All cavities will be produced, and surface treated in industry to reach the unprecedented performances required, qualified through vertical cold test at state-of-the art infrastructures and delivered as installation ready at the string assembly site.

43 PARTICLE ACCELERATORS↗

Second Generation Fermilab Main Injector 8 GeV Beamline Collimation Preliminary Design

The current Fermilab Main Injector 8 GeV beamline transverse collimation system was installed in 2006. Since then, proton beam intensities and rates have increased significantly. With the promise of even greater beam intensities and a faster repetition rate when the PIP-II upgrade completes later this decade, the current collimation system will be insufficient. Over the past 18 months, multiple collimation designs have been investigated, some more traditional and others novel. A preliminary design review was conducted and a design chosen. Work is underway to finalize the chosen design, prototype some of its novel components and procure parts for installation Summer 2023.

43 PARTICLE ACCELERATORS↗

New Improved Horizontal Electropolishing System for SRF Cavities

The best performance of niobium SRF accelerating cavities is obtained with surfaces smoothed with electropolishing chemical finishing. Jefferson Lab has recently specified, procured, installed, and commissioned a new versatile production electropolishing (EP) tool. Experience with EP research and operations at JLab as well as vendor interactions and experience guided development of the system specification. Detailed design and fabrication was awarded by contract to Semiconductor Process Equipment Corporation (SPEC). The delivered system was integrated into the JLab chemroom infrastructure and commissioned in 2020. The new EP tool provides much improved heat exchange from the circulating H₂SO₄/HF electrolyte and also the cavity via variable temperature external cooling water flow, resulting in quite uniform cavity wall temperature control and thus improved removal uniformity. With the JLab infrastructure, stabilized process temperature as low as 5 C is available. We describe the system and illustrate operational modes in this contribution.

Reece, C. E.↗

Status of the LCLS-II-HE Project at Jefferson Lab

The Linac Coherent Light Source II High Energy (LCLS-II-HE) upgrade at the SLAC National Accelerator Laboratory is being constructed in partnership with the Thomas Jefferson National Accelerator Facility (JLab) and the Fermi National Accelerator Laboratory (FNAL). The cryomodule production scope consists of the design, procurement, construction, and acceptance testing of 24 eight-cavity, 1.3 GHz cryomodules, as well as R&D activities necessary to develop the required technology. To achieve this, JLab and FNAL are also contributing to SLAC’s effort to develop the cavity recipe and production processes necessary to meet the LCLS-II-HE goal of 20.8 MV/m and average Q₀ of 2.7·10¹⁰. This paper details the JLab scope, focusing on the project initiation phase, in particular technology development and prototyping, project development and planning, and implementation of lessons learned from LCLS-II.

Wilson, K. M.↗

National Mandates Won’t Save Us!: How to Design Energy Efficiency Policies that Address Institutional Barriers to Change

There are many national policies aimed at driving an increase in energy efficiency (EE) implementation. But how effective are they? Over the past 20 years, the U.S. government has established five legal authorities mandating federal agencies to prioritize energy-efficient products when purchasing. As the largest single buyer of energy-consuming products, energy-efficient purchasing across the federal sector would result in huge energy savings and emissions reductions. Despite this, our research has found that only ~55% of federal purchases currently meet existing requirements. If national mandates are not enough to ensure that federal agencies are buying efficient products, what is? To answer this question, we surveyed 161 procurement and sustainability staff from 26 different federal agencies. Findings revealed that several institutional factors (i.e., the roles, rules, and tools within an organization) play a key role in determining how likely federal buyers are to prioritize EE. Ensuring that federal agencies comply with existing EE requirements is foundational to achieving a clean energy future. This will require more than national mandates, but also the design of policies that successfully identify and address the institutional factors that must be changed in order to increase EE implementation. This paper presents an overview of the data collection and analysis methods for our study, as well as key survey findings and the insights they offer for overcoming institutional barriers to compliance with existing EE requirements. We conclude by discussing how these strategies can be broadly applied to improve the design of EE policies in the U.S. and beyond.

Morabito, Molly↗

The Policy Mullet: Good Intentions in the Front, Bad Policy in the Back

To achieve important policy goals like decarbonization, energy efficiency, and social justice, it is important to translate high-level policy into operational practice. Establishing sustainable purchasing goals has been one important part of this translation. However, not all sustainable purchasing policies are equally effective for organizations. In this study, we analyze sustainable purchasing policies collected from 30 public-sector organizations. We discuss a theoretical framework of optimal policy language and use that framework to evaluate the policies we collected. We believe that an ideal sustainable purchasing policy can increase the likelihood of implementation success by providing more product-specific guidance, giving authority to procurement staff, setting performance targets, and requiring reporting to account for progress. In our review of public sector sustainable purchasing policies, we found that policy language is less than ideal when measured against the framework. Based on our findings, we highlight the best practice language organizations can use in their sustainable purchasing policies to meet sustainability goals. While there is more work needed to inform best practices with sustainable purchasing policies, we recommend that organizations utilize existing frameworks when developing a sustainable purchasing policy to encourage better implementation.

99 GENERAL AND MISCELLANEOUS↗

Semantic Interoperability to Enable Smart, Grid-Interactive Efficient Buildings

Achieving a widespread transition to grid-interactive, efficient buildings (GEBs) depends critically on there being sufficient interoperability among connected building systems. While many critical elements already exist at the technical interoperability level (TCP/IP, BACnet, etc.), a lack of interoperability in the semantic level hinders streamlined integration of interdependent applications. Semantics refers to expressing information about “things” in a way that can be consistently understood by applications. Key components of formalized semantics include identifying what a “thing” is (its “type”), defining general information about that “thing” (its characteristics or properties), and defining the appropriate relationships of that “thing” to other “things” (its function or role in a larger system). Although this might seem initially trivial, the success of smart building applications is highly dependent on maintaining consistent self-descriptive notions of the “things”. Without semantic interoperability, it is technically difficult, labor-intensive, and cost-prohibitive to enable three key objectives of GEBs: optimizing performance, automatically identifying and diagnosing faults, and delivering grid services. Industry, academia, and standards bodies have invested effort in developing information models to facilitate semantic interoperability, however, they have not been widely adopted across the U.S. commercial building portfolio. This paper will present a pathway to drive semantic interoperability through a three-pronged approach to be led by the DOE Building Technologies Office in partnership with NIST and multiple national laboratories comprising: 1) industry engagement and coordination across existing efforts; 2) a semantic interoperability standard that empowers building owners to identify and require interoperable attributes when procuring equipment and applications; 3) tools to assist in implementation and a test framework to verify compliance of products with semantic interoperability specifications. This approach is designed to accelerate the timeline for adoption of semantic interoperability specifications. The intent is to reduce soft costs associated with implementing advanced controls, fault detection and diagnostics, and other smart building technologies and use cases as a necessary step in achieving an energy efficient smart grid future.

Bergmann, Harry↗