Abstract
The construction of megaprojects has consistently demonstrated challenges for project managers in regard to meeting cost, schedule, and performance requirements. Megaproject construction challenges are common place within megaprojects with many active projects in the United States failing to meet cost and schedule efforts by significant margins. Currently, engineering teams operate in siloed tools and disparate teams where connections across design, procurement, and construction systems are translated manually or over brittle point-to-point integrations. The manual nature of data exchange increases the risk of silent errors in the reactor design, with each silent error cascading across the design. These cascading errors lead to uncontrollable risk during construction, resulting in significant delays and cost overruns. Deep Lynx allows for an integrated platform during design and operations of mega projects.
Keep this discovery
Explore connections, maps & timelines
Darrington, JohnW, Browning, JerenM, Ritter, ChristopherS. 2020-07-02. Deep Lynx: Digital Engineering Integration Hub. https://doi.org/10.11578/dc.20200929.1
Cite the original work for its findings. Save a collection to share your selection of sources.