Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “distributed services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Market Brief: Customer-sited Distributed Energy Resources

This market brief summarizes key takeaways from interviews with vendors and service providers in one or more areas of the DER market: DER controls, battery storage, solar photovoltaic, thermal energy storage, combined heat and power, flexible building loads, and electric vehicle charging. Back-up generators used only in emergencies are not in the scope of this market brief.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Utah FORGE: Neubrex Well 16B(78)-32 Circulation Test Fiber Optics Monitoring Data and Reports - July, 2023

This dataset features Distributed Acoustic Sensing (DAS) and fiber optics monitoring data acquired by Neubrex Energy Services during the Utah FORGE Well 16B(78)-32 circulation test in July 2023. DAS and fiber optic monitoring data include absolute strain, strain change, strain change rate, distributed temperature sensing (DTS), and frequency band extraction (FBE). Data processing was completed between September and October 2023. The dataset includes the fiber optic sensing data collected during these operations, along with a data collection report, descriptions of the data, and instructions for reading the data files.

15 GEOTHERMAL ENERGY↗

A Machine Learning-Based Method to Estimate Transformer Primary-Side Voltages with Limited Customer-Side AMI Measurements

Distribution control applications such as volt/var optimization, network reconfiguration, and distribution automation require accurate knowledge of the distribution system state. The lack of sufficient sensors on the primary side of distribution networks often limits the accuracy of the control decisions by these applications. The deployment of advanced metering infrastructure (AMI) provides utilities an opportunity to translate the AMI data on the secondary onto the primary so that it can be used as pseudo-measurements to augment the limited existing measurements on the primary. This paper develops an approach for estimating service transformer primary-side voltages by using limited secondary-side AMI measurements. The estimated primary-side voltages can be used by utilities as pseudo-measurements for distribution control applications. The detailed secondary model topology, which is an essential input data for many existing algorithms, is not required for the proposed method. The performance of the proposed method is validated by using AMI measurements from the field and an actual distribution feeder model of San Diego Gas & Electric Company.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A Machine Learning-Based Method to Estimate Transformer Primary-Side Voltages with Limited Customer-Side AMI Measurements: Preprint

Distribution control applications such as volt/var optimization, network reconfiguration, and distribution automation require accurate knowledge of the distribution system state. The lack of sufficient sensors on the primary side of distribution networks often limits the accuracy of the control decisions by these applications. The deployment of advanced metering infrastructure (AMI) provides utilities an opportunity to translate the AMI data on the secondary onto the primary so that it can be used as pseudo-measurements to augment the limited existing measurements on the primary. This paper develops an approach for estimating service transformer primary-side voltages by using limited secondary-side AMI measurements. The estimated primary-side voltages can be used by utilities as pseudo-measurements for distribution control applications. The detailed secondary model topology, which is an essential input data for many existing algorithms, is not required for the proposed method. The performance of the proposed method is validated by using AMI measurements from the field and an actual distribution feeder model of San Diego Gas & Electric Company.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A National Roadmap for Grid-Interactive Efficient Buildings

The way electricity is generated and consumed in the US is quickly changing, including in terms of the rapid growth in variable power generation resources and the need for large-scale investments to replace aging infrastructure and modernize the grid. Buildings that coordinate electricity use with grid conditions are a flexible and cost-effective resource to address the evolving power system challenges. Outfitted with smart technologies, GEBs are energy-efficient buildings with smart technologies characterized by the active use of distributed energy resources to optimize energy use for grid services, occupant needs and preferences, and cost reductions in a continuous and integrated way. In doing so, GEBs can play a key role in promoting greater affordability, resilience, environmental performance, and reliability. The report finds that, over the next two decades, GEBs could deliver between $100 and $200 billion in savings to the US power system and cut CO 2 emissions by 80 million tons per year by 2030, or 6% of total power sector CO 2 emissions. The report also provides 14 recommendations for addressing the top barriers to overcome barriers to GEB adoption and deployment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Satellite Embedding-Based Population Imputation for Areas with Missing Building Footprint Data: A Computer Vision-Based Approach

High-resolution population modeling is important for supporting effective decision-making across diverse sectors. LandScan Mosaic generates population estimates at the level of individual buildings and aggregates them to 3 arc-second grids, and this approach performs well in regions where building footprint data are comprehensive and reliable. However, large portions of the globe still suffer from incomplete, sparse, or entirely missing building stock datasets, creating a structural limitation for strictly building-based population models. To address this research gap, this study proposes a computer vision-based framework that employs Google Earth Engine satellite embeddings and UNet, which allows us to directly impute grid-level population estimates in building-data-deficient areas. Applied to Taiwan as a case study, the framework achieved strong predictive performance with R$^{2}$ of 0.89, RMSE of 18.70, and MAE of 8.41, outperforming traditional machine learning approaches. Notably, the proposed framework effectively addressed building false-positive errors inherent in Global Human Settlement Layer (GHSL) data, correctly identifying uninhabited areas that were erroneously classified as populated. The framework also offers significant advantages for global population mapping, particularly in terms of scalability and temporal consistency, thereby extending the coverage and accuracy of high-resolution population products in data-scarce regions worldwide. Urban planners, decision makers, and related stakeholders can obtain granular population distributions to support more accurate and targeted infrastructure investment, service delivery, resource allocation, and risk assessment decisions.

97 MATHEMATICS AND COMPUTING↗

Model-Free Building Temperature Control and Power Allocation Under Measurement Time Delays

Taking a step towards a greener planet has created an increased need for a higher integration of renewable energy resources into the electric grid. Nonetheless, the intermittency and uncertainty associated with renewable generation have slowed down this integration. Demand response (DR) has been recently adopted to address this challenge by utilizing demand side flexibility and enabling the participation of many grid-interactive efficient buildings (GEBs). However, existing DR methods require significant modeling and/or training efforts and are computationally expensive. To address the aforementioned issues, we propose a model-free control (MFC)-based strategy that is robust to the time delays in the temperature measurements of the thermostatically controlled loads (TCLs). It assigns to each GEB a local controller to maintain the TCLs’ temperatures within desired comfort levels, while the load aggregator (LA) allocates the assigned reference power provided by the distribution system operator (DSO) to support a specific grid service, such as demand peak reduction, load shifting, balancing supply and demand, and consuming the solar photovoltaic power locally. We investigate the effects of such loss of information on the local control action as well as on meeting the power allocation constraint. We conclude that, for an appropriate choice of design parameters, the proposed MFC controller is satisfactorily robust to measurement time delays.

Telsang, Bhagyashri↗

Lessons Learned for Responsible Use of Cloud in the Cirrus Project, Following the CrowdStrike Outage Event

A disruption in CrowdStrike’s Falcon cybersecurity platform on July 19th, 2024, caused worldwide chaos. This event highlights the imperative need for cloud security measures for networks that are critically reliant on cloud technology. This incident negatively impacted air travel, government networks, and critical infrastructure sectors such as hospitals and financial institutions. While no electric utilities had a physical impact, and few had an IT impact, there were issues created by loss of cloud services, and other interrelated industries. For utilities and energy distribution organizations, understanding and mitigating these risks is essential. The Cirrus tool offers a strategic solution engineered to weave cloud integration seamlessly into the fabric of operational management, thereby enhancing resilience and streamlining efficiency in the face of digital challenges.

25 ENERGY STORAGE↗

Digital twin advanced distribution management systems (ADMS) and methods

Advanced Distribution Management Systems not generally optimize over the entire feeder because there are few high-fidelity distribution circuit models and real-time distribution-connected sensors are rare. The limited observability at the distribution level makes it difficult to globally optimize distribution operations and issue control setpoints to power systems equipment or Distributed Energy Resources (DER) to perform grid-support services. For example, setpoints can be issued to DER based on results from an optimization module that incorporates a static or time-series feeder simulation. Feeder simulation initial conditions are populated with photovoltaic (PV) and load forecasts, state estimation results, and/or digital twin measurements or state output. The real-time (RT) digital twin runs a model of the feeder to generate state estimation pseudo-measurements since there are limited live feeder measurements.

Johnson, Jay Tillay↗

Technical Assistance for Mount Desert Island, Maine

Mount Desert Island, Maine, worked with researchers in the Energy Technology Innovation Partnership Project (ETIPP) to evaluate microgrid siting and sizing to assess how this technology could measurably improve critical service reliability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Controllers for Distributed Grid Support for Power Systems using Hybrid DER plants with Electrolyzers [SWR-20-06]

This software presents the design and control for a hybrid DER site with integrated dispatchable electrolyzers. It is a comprehensive solution for regulating the dispatch of electrolyzer demand to support the grid using the respective control functions. Multiple control functions (ramp control, frequency support control, dispatch prioritization) are developed to integrate the proposed site for multiple services around load, voltage and frequency control. This allows the site owners to participate in both distribution and bulk system energy markets for grid ancillary services.

Jain, Rishabh↗

Resource distribution under spatiotemporal uncertainty of disease spread: Stochastic versus robust approaches

We consider the problem of optimizing locations of distribution centers (DCs) and plans for distributing resources such as test kits and vaccines, under spatiotemporal uncertainties of disease spread and demand for the resources. We aim to balance the operational cost (including costs of deploying facilities, shipping, and storage) and quality of service (reflected by demand coverage), while ensuring equity and fairness of resource distribution across multiple populations. We compare a sample-based stochastic programming (SP) approach with a distributionally robust optimization (DRO) approach using a moment-based ambiguity set. Numerical studies are conducted on instances of distributing COVID-19 vaccines in the United States and test kits, to compare SP and DRO models with a deterministic formulation using estimated demand and with the current resource distribution plans implemented in the US. We demonstrate the results over distinct phases of the pandemic to estimate the cost and speed of resource distribution depending on scale and coverage, and show the “demand-driven” properties of the SP and DRO solutions. Furthermore, our results further indicate that if the worst-case unmet demand is prioritized, then the DRO approach is preferred despite of its higher overall cost. Nevertheless, the SP approach can provide an intermediate plan under budgetary restrictions without significant compromises in demand coverage.

97 MATHEMATICS AND COMPUTING↗

Power system restoration incorporating diverse distributed energy resources

An example system includes an aggregator configured to receive a service collaboration request and iteratively determine, based on minimum and maximum power values for DERs under its management, an optimized operation schedule. The aggregator may also be configured to iteratively determine, based on the optimized operation schedule, an estimated flexibility range for devices under its management and output an indication thereof. The system may also include a power management unit (PMU) configured to iteratively receive the indication and determine, based on a network model that includes the estimated flexibility range, a reconfiguration plan and an overall optimized operation schedule for the network. The PMU may also be configured to iteratively cause reconfiguration of the network based on the plan. The PMU and aggregator may also be configured to iteratively, at a fast timescale, cause energy resources under their management to modify operation based on the overall optimized operation schedule.

Ding, Fei↗

Housing Energy Connection Project (Final Technical Report)

This project expanded existing medium-voltage distribution to 33 households, a daycare, a mechanical shop, irrigation pumps, and a sewer lift station, all of which previously received electric service from the local electric utility. As part of the project, automatic meter reading (AMR) and advanced metering infrastructure (AMI) was installed to allow the Tribe to set up its own electric metering like a utility. The primary objective of this project was to expand the Tribe-owned electrical distribution to provide highly reliable electrical service to these existing loads. The objective was successfully met after project completion. The project reduced high costs for electric energy previously supplied by the utility, by supplanting utility-supplied electric power with Tribe-generated electric power. The project gave the Tribe greater independence from traditional power sources and provided jobs for the community.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Large Load Integration - Task List and Overview

Large Load Integration Tasks: Task 1 – Workshops Support stakeholder engagement across industry to promote collaboration and identify solutions to challenges that will guide other work Task 2 – Ancillary Services Characterize different types of large loads to assess under what conditions they may be utilized to provide grid stability services Task 3 – Communications Explore the cybersecurity and communications infrastructure required to enable large loads to interface with grid operations to provide ancillary services Task 4 – Nuclear Integration Explore risks and methods for supporting large load energy needs with SMRs and incorporating them into the wider power system Task 5 – Decision Support and TA Provide support to stakeholders through the creation of planning tools and direct technical assistance.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Synthetic Ancillary Service Generator (SynAS) v1

The balance of demand and supply in the electric power grid is a crucial element to grid reliability. While balancing is typically provided by conventional power plants, with spinning generators, distributed energy resources (DER) and especially electric vehicles (EVs) pose a great potential to provide such service. This project conducted a field demonstration at the Los Angeles Air Force Base (LA-AFB) where a fleet of mixed-use bi-directional EVs were actively participating in the California Independent System Operator (CAISO) market for frequency regulation. While participation in regulation markets is promising, a major drawback in designing control systems and assessing potential revenue is the lack of example frequency regulation signals. This project introduces an open-source dataset for 143 days of four-second regulation data, and the SynAS Python module to synthetically generate frequency regulation signals of arbitrary length.

Black, DouglasR↗