Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Administration and Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Data Management as a Cluster Middleware Centerpiece

Through earth and space modeling and the ongoing launches of satellites to gather data, NASA has become one of the largest producers of data in the world. These large data sets necessitated the creation of a Data Management System (DMS) to assist both the users and the administrators of the data. Halcyon Systems Inc. was contracted by the NASA Center for Computational Sciences (NCCS) to produce a Data Management System. The prototype of the DMS was produced by Halcyon Systems Inc. (Halcyon) for the Global Modeling and Assimilation Office (GMAO). The system, which was implemented and deployed within a relatively short period of time, has proven to be highly reliable and deployable. Following the prototype deployment, Halcyon was contacted by the NCCS to produce a production DMS version for their user community. The system is composed of several existing open source or government-sponsored components such as the San Diego Supercomputer Center s (SDSC) Storage Resource Broker (SRB), the Distributed Oceanographic Data System (DODS), and other components. Since Data Management is one of the foremost problems in cluster computing, the final package not only extends its capabilities as a Data Management System, but also to a cluster management system. This Cluster/Data Management System (CDMS) can be envisioned as the integration of existing packages.

Zero, Jose↗

NASA WorldWind: Open Source Visualization Technology for Earth Observation

NASA WorldWind: Open Source Visualization Technology for Earth Observation WorldWind, open source virtual globe technology for Java, iOS, Android and Web, is provided by NASA and is architected as API-centric modular componentry. This enable it to be continually optimized and feature-enriched in ways that allow applications based on this SDK (Software Development Kit) to benefit Earth Observation, especially Open Science, with minimal or no adjustment for the decade ahead. The next-generation National Airspace System (NAS) aviation management system for the U.S. Federal Aviation Administration, FAA, uses WorldWind, as do applications currently being developed by the European Space Agency, along with several other US and European government agencies and industry partners. This presentation will demonstrate several NASA open source use cases for WorldWind technology that include advances being made to optimize access to NetCDF and HDF data via WebWorldWind.NASA WorldWind: Multidimensional Geospatial Web Platform The ability to see spatial data in its native context is essential for that data to be appreciated whether by the scientific community, policy and decision-makers or the general public. Recently, the accessibility of spatial data has dramatically improved. Without the need to install an application, spatial data can now be experienced via any web browser, mobile devices included. For developers, by simply updating the app on your server, the latest version of your application is now immediately available to your entire usercommunity. Unlike other virtual globes such as Google Earth, NASA World Wind offers something very special, full control to customize the interface with any features or functionalities you might need. You decide how the data is accessed and experienced. This allows you to provide maximum value of the information to your user community. The web version of NASA WorldWind (WebWorldWind) has made it possible for a whole new suite of applications for managing and sharing spatial data. Apps built with this web version are ideal for immediate social media type activity and also facilitate delivery of sophisticated data exchange scenarios such as weather and climate research, disaster response, personal navigation, and industrial-strength tracking for transportation, supply chain, aviation and satellites. WebWorldWind is an application component, not an app in itself. It is written in JavaScript and provides the real world geographic context for spatial data and information visualization, using a rich set of shapes and graphic primitives. WebWorldWind also provides platform independence, while accommodating any number of data types. Web WorldWind runs on any platform via a browser, i.e., Internet Explorer, Firefox, Chrome and Safari. Features include, 3D virtual globe, 2D map with multiple projection choices (Mercator, Polar, UPS, Equirectangular), imagery and elevation import, extensible, data retrieval (via REST, WMS, WCS, WFS, Bing, User-Defined), decluttering, measurement, accurate line-ofsight, subsurface visualization, and more.

Open Source Mapping↗

Evaluation of a Dynamic Weather-Avoidance Rerouting Tool in Adjacent-Center Arrival Metering

Dynamic Reroutes for Arrivals in Weather (DRAW) is a NASA-developed decision-support tool for Traffic Management Coordinators (TMCs) at the Federal Aviation Administration's Air Route Traffic Control Centers ("Centers"). DRAW proposes weather-avoidance reroutes for en route arrival flights subject to metering restrictions when transitioning into a busy terminal airspace. The prior DRAW study demonstrated that TMCs' use of DRAW promotes earlier reroutes of arrivals, and reduces the number of routes conflicting with weather in the Center. The present paper focuses on how DRAW benefits metering delivery accuracy when schedule freeze horizon distance was altered. A human-in-the-loop simulation was conducted at NASA Ames Research Center in October-November 2018, where retired TMCs and controllers performed simulated metering operations for southeast arrivals through the Atlanta and Jacksonville Centers to the Hartsfield-Jackson Atlanta International Airport during convective weather periods. Results demonstrated that DRAW use reduced the frequency of manual adjustments of Scheduled Times of Arrival and lowered TMC workload. DRAW use also made the metering accuracy, the number of reroute amendments after the freeze horizon, and the en route sector controller workload more robust to the effect of different freeze horizon distance.

Air Traffic Management (ATM)↗

Wiretap

SAND2023-12116O Wiretap is an offensive security software package meant for penetration testers and red teams. Unlike a traditional VPN, Wiretap transparently proxies networking traffic without requiring administrator privileges. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Rindels, Raymond↗

Proceedings of the NASA Technical Interchange Meeting on Active Optical Systems for Supporting Science, Exploration, and Aeronautics Measurements Needs

Active optical (Laser/Lidar) measurement techniques are critical for the future National Aeronautics and Space Administration (NASA) Earth, Planetary Science, Exploration, and Aeronautics measurements. The latest science decadal surveys recommend a number of missions requiring active optical systems to meet the science measurement objectives and the aeronautics community continues to use Laser/Lidar technologies to meet the aeronautics measurement objectives. With these drivers, the NASA Agency Program Management Council (APMC), chaired by the NASA Associate Administrator, has tasked the NASA Sensors and Instrumentation (S&I) Capability Leadership Team (CLT) Leader to determine if the Agency has the necessary expertise and capabilities to execute successfully the active optical-based systems necessary to make the required measurements for Science, Exploration, and Aeronautics. This NASA Technical Interchange Meeting (TIM) was a forum to exchange perspectives on the current state of the discipline’s technologies and the direction NASA needs to take in the future to raise the Technical Readiness Level (TRL) of the measurement technologies to meet these measurement needs in the applications domains. The information developed at this TIM was used in formulating the Agency-level strategy and solutions for advancing high-risk Laser/Lidar technologies that are not currently being sufficiently planned, developed, or risk-reduced to meet NASA’s mission requirements. Given the crosscutting synergies in critical Active Optical measurements for NASA Science, Exploration, and Aeronautics, a strategic approach is needed to identify areas where NASA should “lead, leverage or collaborate” with existing national and international industries to meet its future needs. The TIM aimed at focusing NASA’s directions to attain the necessary TRLs to meet the Agency-level priority Active Optical measurements in Space and Aeronautics. The TIM presentations and strategic inputs were synthesized by the NASA Active Optical Tiger Team for presentation to the NASA APMC with a suggested strategy to address the Agency’s needs in a crosscutting, synergistic and cost-effective manner.

Singh, Upendra N↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, SLS is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress is on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance (ULA) in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the OSA and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center (MSFC) in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 t to LEO, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the EUS, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the proving ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations program is transforming Kennedy Space Center into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the Exploration Upper Stage, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the Proving Ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

A Satellite Data-Driven, Client-Server Decision Support Application for Agricultural Water Resources Management

Water cycle extremes such as droughts and floods present a challenge for water managers and for policy makers responsible for the administration of water supplies in agricultural regions. In addition to the inherent uncertainties associated with forecasting extreme weather events, water planners need to anticipate water demands and water user behavior in a typical circumstances. This requires the use decision support systems capable of simulating agricultural water demand with the latest available data. Unfortunately, managers from local and regional agencies often use different datasets of variable quality, which complicates coordinated action. In previous work we have demonstrated novel methodologies to use satellite-based observational technologies, in conjunction with hydro-economic models and state of the art data assimilation methods, to enable robust regional assessment and prediction of drought impacts on agricultural production, water resources, and land allocation. These methods create an opportunity for new, cost-effective analysis tools to support policy and decision-making over large spatial extents. The methods can be driven with information from existing satellite-derived operational products, such as the Satellite Irrigation Management Support system (SIMS) operational over California, the Cropland Data Layer (CDL), and using a modified light-use efficiency algorithm to retrieve crop yield from the synergistic use of MODIS and Landsat imagery. Here we present an integration of this modeling framework in a client-server architecture based on the Hydra platform. Assimilation and processing of resource intensive remote sensing data, as well as hydrologic and other ancillary information occur on the server side. This information is processed and summarized as attributes in water demand nodes that are part of a vector description of the water distribution network. With this architecture, our decision support system becomes a light weight 'app' that connects to the server to retrieve the latest information regarding water demands, land use, yields and hydrologic information required to run different management scenarios. Furthermore, this architecture ensures all agencies and teams involved in water management use the same, up-to-date information in their simulations.

Agricultural↗

America's shuttle returns to space

The Shuttle management structure, streamlined since the Challenger accident, is outlined. The associate administrators for space flight are identified and their responsibilities clearly spelled out. The NASA policy of assigning astronauts to management positions is described. A spaceflight safety panel is described. Non-managerial safety enhancement programs are outlined. These include: solid rocker booster changes, shuttle crew escape systems, and landing improvements.

Moorehead, Robert W.↗

Three Insights About Change

Managers need to develop credibility, and need to base it upon new managerial accomplishments rather than previous ones. New and exciting jobs in management are challenging, but can lead to personal growth. Personnel who are afraid of potential negative consequences resulting from administrative changes are a hindrance to projects. An approval-seeking management style almost always fails.

Little, Terry↗

Correlating real-world incidents with vessel traffic off the coast of Hawaii, 2017–2020

Abstract Objectives Because of the high-risk nature of emergencies and illegal activities at sea, it is critical that algorithms designed to detect anomalies from maritime traffic data be robust. However, there exist no publicly available maritime traffic data sets with real-world expert-labeled anomalies. As a result, most anomaly detection algorithms for maritime traffic are validated without ground truth. Data description We introduce the HawaiiCoast_GT data set, the first ever publicly available automatic identification system (AIS) data set with a large corresponding set of true anomalous incidents. This data set—cleaned and curated from raw Bureau of Ocean Energy Management (BOEM) and National Oceanic and Atmospheric Administration (NOAA) automatic identification system (AIS) data—covers Hawaii’s coastal waters for four years (2017–2020) and contains 88,749,176 AIS points for a total of 2622 unique vessels. This includes 208 labeled tracks corresponding to 154 rigorously documented real-world incidents.

99 GENERAL AND MISCELLANEOUS↗

SolSmart Technical Assistance Provider (Final Technical Report)

The SolSmart program was established in late 2015 to “establish a prominent national recognition and technical assistance program for local governments that will signal to installers and the public that a community is receptive to solar businesses and has established a supportive solar market environment. This, in turn, will reduce market barriers and lower soft costs, thus contributing to SunShot goals. The program will also assist communities who are just beginning to improve their solar markets.” By March 31, 2022 (the grant end date), the SolSmart Team designated 460 communities, more than 50% more than the initial program objective of 300 communities. The designated communities represent 42 states, the District of Columbia, the U.S. Virgin Islands, and Puerto Rico. The SolSmart team developed and revised criteria representing best practices for local governments; recruited, trained, evaluated, and mentored communities to incorporate these best practices; and disseminated resources about solar and solar-related technologies as well as the newest best practices on a regular basis. 98% of local government officials who participated in the program said that SolSmart increased their knowledge of solar energy. The SolSmart program had both real and perceived tangible impacts on barriers to solar adoption in designated communities. Significantly, the time to permit a solar installation decreased by 7.5 days on average. This reduced the soft costs for both the solar installer (and therefore the customer) and the local government. The result is that solar installations in SolSmart communities increased by 17% per month compared with similar non-SolSmart communities. Larger and wealthier communities were more likely to pursue SolSmart designation and earn more points within SolSmart. As a result, IREC/TSF developed strategies to reach underserved communities and created new resources to help them more easily achieve designation, as described below. In the last year of the Award, 44% of designated communities were underserved, compared with 31% in the earlier years of the program. DOE issued two awards for SolSmart: the SolSmart Technical Assistance Provider (TAP), led by The Solar Foundation (TSF) which has since merged with the Interstate Renewable Energy Council (IREC), and the Designation Program Administrator (DPA), led by the International City/County Management Association (ICMA). IREC was lead for the TAP project and, until the time of TSF/IREC merger, was a subrecipient on the DPA project. These two projects were interdependent; one could not exist without the other. While this report will focus on the work performed by the TAP, it will be impossible to speak of this without talking about the successes, impacts, and benefits of the overall SolSmart program.

14 SOLAR ENERGY↗

U.S. Offshore Wind Energy Noise Reduction Associated with Installation of Fixed-Bottom Foundations: Workshop Report

As offshore wind energy development grows in the United States, solutions are needed to reduce the underwater noise and substrate vibration generated during fixed-bottom turbine installation to help protect marine life. Monopiles are currently the main turbine foundation type installed globally and impact pile driving, the primary installation method, can be a major source of noise and vibration generation during wind farm construction. Opportunities exist to reduce the amount of noise and vibration produced during future offshore wind farm development. The use of alternative foundation types and installation methods, as well as innovative noise abatement technologies, would help reduce the potential detrimental effects on sensitive marine species. To explore these opportunities, the Department of Energy’s Wind Energy Technologies Office, in collaboration with the Bureau of Ocean Energy Management and the National Oceanic and Atmospheric Administration, funded the National Renewable Energy Laboratory and the Pacific Northwest National Laboratory to organize, host, and facilitate a virtual workshop in December 2022. The goal of the workshop was to gather input from the offshore wind energy community on noise reduction strategies for the installation of fixed-bottom offshore wind turbines in U.S. waters across multiple regions, including the U.S. Atlantic Coast, Gulf of Mexico, and Great Lakes to inform recommendations on future research. The joint lab team convened industry representatives, subject matter experts, and regulators to discuss potential pathways to reduce noise and vibration associated with fixed-bottom turbine installation, including the practicality of using alternative foundations and installation methods, the effectiveness of noise abatement technologies, as well as research and monitoring needs. In preparation for the workshop, the team invited experts to be part of a steering committee and worked with its members to help focus activities to meet the workshop goals. Additional pre-workshop activities included developing the invitee list and workshop agenda, reviewing existing Construction and Operations Plans (COP) for proposed offshore wind projects, distributing a brief questionnaire to industry representatives, and drafting the workshop discussion questions and Mural boards. In total, 128 workshop participants provided over 600 comments in response to the 17 group discussion questions used over two workshop sessions. Overarching recommendations highlighted across themes included future investments to provide data sharing, consistency, transparency, and opportunities for sharing best available science, knowledge, and expertise. The joint lab team synthesized the comments and identified four key research and development themes that could help advance the successful implementation of noise and vibration reduction strategies (see report). This report provides an overview of the workshop goals and scope, reviews the pre-workshop activities, presents brief summaries of participant feedback, and concludes with detailed research themes and recommendations for future investments. Appendix A includes the group discussion questions, Appendix B includes the results of the COP review, and Appendix C includes the results of the industry questionnaire. Overall, there was a high level of interest and engagement in the workshop. The sessions provided an opportunity for significant exchange of information between workshop participants from across sectors. Participants identified a variety of opportunities for next steps towards the noise reduction of offshore wind turbine installation in U.S. waters, including recommendations for future investments to provide certainty in the use of new technologies associated with alternative foundation types, noise abatement systems, and efficacy monitoring.

17 WIND ENERGY↗

The 1991 EOS reference handbook

The following topics are covered: (1) The Global Change Research Program; (2) The Earth Observing System (EOS) goal and objectives; (3) primary EOS mission requirements; (4) EOS science; (5) EOS Data and Information System (EOSDIS) architecture; (6) data policy; (7) international cooperation; (8) plans and status; (9) the role of the National Oceanic and Atmospheric Administration; (10) The Global Fellowship Program; (11) management of EOS; (12) mission elements; (13) EOS instruments; (14) interdisciplinary science investigations; (15) points of contact; and (16) acronyms and abbreviations.

Dokken, David↗

NASA Pocket Statistics

Pocket Statistics is published for the use of NASA managers and their staff. Included herein is Administrative and Organizational information, summaries of Space Flight Activity including the NASA Major Launch Record, and NASA Procurement, Financial, and Manpower data. The NASA Major Launch Record includes all launches of Scout class and larger vehicles. Vehicle and spacecraft development flights are also included in the Major Launch Record. Shuttle missions are counted as one launch and one payload, where free flying payloads are not involved. Satellites deployed from the cargo bay of the Shuttle and placed in a separate orbit or trajectory are counted as an additional payload.

Source record↗

NASA Pocket Statistics

Pocket Statistics is published for the use of NASA managers and their staff. Included herein is Administrative and Organizational information, summaries of Space Flight Activity including the NASA Major Launch Record, and NASA Procurement, Financial, and Manpower data. The NASA Major Launch Record includes all launches of Scout class and larger vehicles. Vehicle and spacecraft development flights are also included in the Major Launch Record. Shuttle missions are counted as one launch and one payload, where free flying payloads are not involved. Satellites deployed from the cargo bay of the Shuttle and placed in a separate orbit or trajectory are counted as an additional payload.

Source record↗

Loran-C time management

As of 1 Oct. 1993, the US Coast Guard (USCG) supports and operates fifteen Loran-C chains. With the introduction of the Global Positioning Systems (GPS) and the termination of the Department of Defense (DOD) overseas need for Loran-C, the USCG will cease operating the three remaining overseas chains by 31 Dec. 1994. Following this date, the USCG Loran-C system will consist of twelve chains. Since 1971, management of time synchronization of the Loran-C system has been conducted under a Memorandum of Agreement between the US Naval Observatory (USNO) and the USCG. The requirement to maintain synchronization with Coordinated Universal Time (UTC) was initially specified as +/- 25 microseconds. This tolerance was rapidly lowered to +/- 2.5 microseconds in 1974. To manage this synchronization requirement, the USCG incorporated administrative practices which kept the USNO appraised of all aspects of the master timing path. This included procedures for responding to timing path failures, timing adjustments, and time steps. Conducting these aspects of time synchronization depended on message traffic between the various master stations and the USNO. To determine clock adjustment the USCG relied upon the USNO's Series 4 and 100 updates so that the characteristics of the master clock could be plotted and controls appropriately applied. In 1987, Public Law 100-223, under the Airport and Airway Improvement Act Amendment, reduced the synchronization tolerance to approximately 100 nanoseconds for chains serving the National Airspace System (NAS). This action caused changes in the previous administrative procedures and techniques. The actions taken by the USCG to meet the requirements of this law are presented.

Justice, Charles↗