Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Thermal verification testing of commercial printed-circuit boards for spaceflight

A method is discussed developed to verify commercial printed-circuit boards for a shuttle orbital flight. The Space Acceleration Measurement System Project used this method first with great success. The test sequence is based on early fault detection, desire to test the final assembly, and integration with other verification testing. A component thermal screening test is performed first to force flaws in design, workmanship, parts, processes, and materials into observable failures. Then temperature definition tests are performed that consist of infrared scanning, thermal vacuum testing, and preliminary thermal operational testing. Only the engineering unit is used for temperature definition testing, but the preliminary thermal operational testing is performed on the flight unit after the temperature range has been defined. In the sequence of testing, vibration testing is performed next, but most vibration failures cannot be detected without subsequent temperature cycling. Finally, final assembly testing is performed to simulate the shuttle flight. An abbreviated thermal screening test is performed as a check after the vibration test, and then a complete thermal operational test is performed. The final assembly test finishes up with a burn-in of 100 hours of trouble-free operation. Verification is successful when all components and final assemblies have passed each test satisfactory. This method was very successful in verifying that commercial printed-circuit boards will survive in the shuttle environment.

Foster, William M., II↗

Expandable rubber plug seals openings for pressure testing

Plug assembly seals openings in piping systems, vessels, and chambers for low pressure leak testing. The assembly, which consists of a rubber sealing plug and the mechanism for expanding it into a pressure-tight configuration, adequately seals irregular diameters without damage to mating surfaces.

Source record↗

Accelerated thermal and mechanical testing of CSP assemblies

Chip Scale Packages (CSP) are now widely used for many electronic applications including portable and telecommunication products. A test vehicle (TV-1) with eleven package types and pitches was built and tested by the JPL MicrotypeBGA Consortium during 1997 to 1999. Lessons learned by the team were published as a guidelines document for industry use. The finer pitch CSP packages which recently became available were indluded in the next test vehicle of the JPL CSP Consortium.

Chip Scale Package CSP thermal cycle fatigue solde↗

Full-Scale Assembly 30 cm Drop Test

Can Spent Nuclear Fuel withstand the shocks and vibrations experienced during normal conditions of transport? This question was the motivation for the multi-modal transportation test (MMTT) (Summer 2017), 1/3-scale cask 30 cm drop test (December 2018), and full-scale assembly 30 cm drop tests (June 2019). The full-scale ENSA ENUN 32P cask with 3 surrogate 17x17 PWR assemblies was used in the MMTT. The 1/3-scale cask was a mockup of this cask. The 30 cm drop tests provided the accelerations on the 1/3-scale dummy assemblies. These data were used to design full-scale assembly drop tests with the goal to quantify the strain fuel rods experience inside a cask when dropped from a height of 30 cm. The drop tests were first done with the dummy and then with the surrogate assembly. This paper presents the preliminary results of the tests.

Transportation↗

Hydrostatic testing of porous assemblies

Pores of the material were plugged with dust particles suspended in water. The plugging material used was a standard test dust prepared as a slurry in distilled water. This technique provides a permanent high-integrity seal for porous material without affecting its physical properties, yet permitting pressure testing to verify structural adequacy.

Bigelow, W. L.↗

IOTA Pre-Bake Test Development

The poster presentation prepared for the IOTA (Integrable Optics Test Accelerator) Pre-Bake Test Development project consists of introducing the background of the project, the work completed, and the new test configurations available with the newly designed assembly. It explains the scale of the projects, both within the IOTA ring assembly and test assembly, and describes the purpose in baking or incrementing and holding exterior heat on the beampipe to reduce impurities in the vacuum. The originally designed test, Configuration One, uses RCA scans on the interior of the pipe, increments and holds heat for a set amount of time, and is scanned again to check for water evaporation. Configuration Two begins with the same test for Configuration One but has a second cross section of beampipe separated by a gate valve. After configuration one is complete, the gate valve opens, and after a period of cooling the other side is heated, molecular movement is scanned and observed.

Seagrave, Kayla [DuPage Coll.]↗

Performance of the Center-Of-Curvature Optical Assembly During Cryogenic Testing of the James Webb Space Telescope

The James Webb Space Telescope (JWST) primary mirror (PM) is 6.6 meters in diameter and consists of 18 hexagonal segments, each 1.5 meters point-to-point. Each segment has a 6 degree-of-freedom hexapod actuation system and a radius-of-curvature (ROC) actuation system. The full telescope was tested at its cryogenic operating temperature at Johnson Space Center (JSC) in 2017. This testing included center-of-curvature measurements of the PM wavefront error using the Center-of-Curvature Optical Assembly (COCOA), along with the Absolute Distance Meter Assembly (ADMA). The COCOA included an interferometer, a reflective null, an interferometer-null calibration system, coarse and fine alignment systems, and two displacement measuring interferometer systems. A multiple-wavelength interferometer was used to enable alignment and phasing of the PM segments. By combining measurements at two laser wavelengths, synthetic wavelengths up to 15 millimeters could be achieved, allowing mirror segments with millimeter-level piston errors to be phased to the nanometer level. The ADMA was used to measure and set the spacing between the PM and the focus of the COCOA null (i.e., the PM center-of-curvature) for determination of the ROC. This paper describes the COCOA, the PM test setup, the testing performed, the test results, and the performance of the COCOA in aligning & phasing the PM segments and measuring the final PM wavefront error.

JWST↗

Performance of the Center-Of-Curvature Optical Assembly During Cryogenic Testing of the James Webb Space Telescope

Cryogenic testing of the James Webb Space Telescope (JWST) included center-of-curvature metrology of the 18-segment primary mirror (PM). The Center-of-Curvature Optical Assembly (COCOA) consisted of a multiple-wavelength interferometer, a reflective null, coarse and fine alignment systems, and two displacement measuring interferometer systems. The COCOA enabled alignment and phasing of the segments from millimeter-level errors down to the nanometer level. This paper describes the COCOA, the test setup, the testing performed, and the performance of the COCOA in aligning the PM segments and measuring the final PM wavefront error.

Hadaway, James↗

An upgraded cryogenic test stand for HL-LHC cryo-assemblies

The Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles has been upgraded to test cryo-assemblies for the high-luminosity LHC upgrade (HL-LHC). The test requirements of these new cryo-assemblies required additional capabilities of the test stand cryogenic system, including controlled cool-down and warm-up, helium recovery after a quench, and operation at higher pressures. Most of these upgrades were completed to support a zero-magnet test in late 2020, with the remainder of the upgrades completed to support the first pre-series cryo-assembly test in early 2022. An overview of the design and initial operating experience of the upgraded test stand cryogenic system and associated process controls system are presented in this paper.

Rabehl, Roger J.↗

Test Stand Functional Requirements for Testing MQXFA Magnets and Q1/Q3 Cryostat Assemblies (Rev.3)

This document specifies test stand requirements for testing the High Luminosity LHC (HL-LHC, or HiLumi LHC) MQXFA magnets and LQXFA/B cryostat assemblies. Total of 12 (3 pre-series, 7 series production and 2 re-work) of these cryostat assemblies are expected to be fabricated and delivered to CERN by the U.S. HL-LHC Accelerator Upgrade Project (US HL-LHC AUP) as part of the U.S. contributions to the LHC High Luminosity Upgrade. These cryostat assemblies are the quadrupole magnetic components of the HL-LHC Q1 (LQXFA) and Q3 (LQXFB) inner triplet optical elements in front of the interactions points 1 (ATLAS) and 5 (CMS). One LMQXFA cold mass is installed in each cryostat assembly and each cold mass consists of two MQXFA quadrupole magnets. MQXFA, LMQXFA and LQXFA/B functional requirements are specified in [1,2,3].MQXFA magnets will be tested at BNL Vertical Magnet Test Facility (VMTF) and 12 cryostat assembly tests planned at Fermilab’s Horizontal Magnet Test Facility (HMTF). This document specifies the test stand functional requirements for testing MQXFA magnets and LQXFA/B cryostat assemblies.

43 PARTICLE ACCELERATORS↗

GMI Spin Mechanism Assembly Design, Development, and Test Results

The GMI Spin Mechanism Assembly (SMA) is a precision bearing and power transfer drive assembly mechanism that supports and spins the Global Microwave Imager (GMI) instrument at a constant rate of 32 rpm continuously for the 3 year plus mission life. The GMI instrument will fly on the core Global Precipitation Measurement (GPM) spacecraft and will be used to make calibrated radiometric measurements at multiple microwave frequencies and polarizations. The GPM mission is an international effort managed by the National Aeronautics and Space Administration (NASA) to improve climate, weather, and hydro-meteorological predictions through more accurate and frequent precipitation measurements [1]. Ball Aerospace and Technologies Corporation (BATC) was selected by NASA Goddard Space Flight Center (GSFC) to design, build, and test the GMI instrument. The SMA design has to meet a challenging set of requirements and is based on BATC space mechanisms heritage and lessons learned design changes made to the WindSat BAPTA mechanism that is currently operating on orbit and has recently surpassed 8 years of Flight operation.

Woolaway, Scott↗

Design, construction and long life endurance testing of cathode assemblies for use in microwave high-power transmitting tubes

The ability of state of the art cathode types to produce current densities of 2A/sq cm, respectively, over a minimum designed life of 30,000 hours of continuous operation without failures was demonstrated. The performance of the state of the art cathode types was evaluated by endurance testing while operating under identical electrical geometrical, and vacuum conditions that realistically duplicate the operating conditions present in a transmitter tube. Although there has been considerable life testing done on high current density types of cathodes, these have beem primarily limited to diodes. A diode and high power microwave tube are grossly different devices. A comparison of these two devices is provided. A diode and high power microwave tube are quite different; one could therefore assume different internal environments, especially in the cathode region. Therefore, in order to establish life capabilities of the cathodes just mentioned, they should be tested in a vehicle which has an internal environment similar to that of a high power microwave tube.

Gorshe, R.↗

Surrogate Assembly 30 cm Drop Test

The 30 cm drop is the remaining NRC normal conditions of transport (NCT) regulatory requirement (10 CFR 71.71) for which there are no data on the actual surrogate fuel. While obtaining data on the actual fuel is not a direct requirement, it provides definitive information which aids in quantifying the risk of fuel breakage resulting from a cask drop from a height of 30 cm or less. The 30 cm drop test with the full-scale surrogate assembly conducted in May 2020 was the last step needed for quantifying the strains on the surrogate assembly rods under NCT. The full-scale surrogate assembly used in the 2020 30 cm drop test was built using a new 17x17 Pressurized Water Reactor (PWR) Westinghouse skeleton filled with the copper rods and 3 zircaloy rods from the full-scale surrogate assembly used in the Multi-Modal Transportation Test (MMTT). Felt pads were attached to the surrogate assembly bottom prior to the 30 cm drop to adequately represent the effects of the impact limiters and the cask. Note that felt "programming material" has been used extensively in past drop tests and is known to be a good material for programming a desired shock pulse. The felt pad configuration was determined during a previous series of tests reported in. The acceleration pulses observed on the surrogate assembly during the test were in good agreement with the expected pulses. This confirmed that during the 30 cm drop the surrogate assembly experienced the same conditions as it would if it was dropped in the cask with the impact limiters.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

U.S. HL-LHC Accelerator Upgrade Project: Q1/Q3 Cryostat Assembly and Horizontal Test (Final Design Report)

The Inner Triplet (IT) quadrupoles are the magnetic system for reaching low beta functions around the Interaction Point (IP). The triplet is made of three optical elements: Q1, Q2, and Q3. The upgrade of the Inner Triplets in the high luminosity insertions is the cornerstone of the LHC upgrade. The decision for HL-LHC heavily relies on the success of the advanced Nb 3 Sn technology that provides access to magnetic fields well beyond 9 T, allowing the maximization of the aperture of the IT quadrupoles. A 15-year-long study led by the DOE in the US under the auspices of the U.S. LARP program, and lately by other EU programs, has shown the feasibility of Nb 3 Sn accelerator magnets. The HL-LHC is expected to be the first application of accelerator-quality Nb 3 Sn magnet technology in an operating particle accelerator.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Cost effective dynamic design and test requirements for Shuttle payloads

The results of a study examining current spacecraft dynamic design and test requirements for the cost effective design and development of Shuttle payloads are presented. Dynamic environments, payload configurations, design/test requirements, test levels, assembly level of testing, simulation methods, prototype role, load limiting, test facilities, and flight measurements are discussed as they relate to the development of a cost effective design and test philosophy for Shuttle Spacelab payloads. It is concluded that changes to current design/test practices will minimize long range payload costs. However, changes to current practices need be quantitatively evaluated before an orderly progression to more cost effective methods can be achieved without undue risk of mission failures. Of major importance is optimization of test levels and plans for payloads and payload subsystems which will result in minimum project costs.

Stahle, C. V.↗