Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Charger”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Improving the Freight Productivity of a Heavy-Duty, Battery Electric Truck by Intelligent Energy Management

This project aimed to enhance the range and reduce the operating costs of battery electric Class 8 trucks traveling over 250 miles daily. This was achieved through the development and implementation of an intelligent-Energy Management System (i-EMS) that leverages vehicle and operations data, physics-aware machine learning algorithms, and vehicle-to-cloud (V2C) connectivity. The project hypothesized that advanced machine learning algorithms and real-time data analytics could significantly improve the energy efficiency and range of these trucks. Key objectives included developing a physics-aware machine learning algorithm, implementing an i-EMS with V2C connectivity and physics-aware spatial data analytics (PSDA), and validating the system’s effectiveness with fleet partners HEB Companies and Murphy Logistics. Extensive data collection from vehicle operations, including vehicle characteristics, road conditions, and payload, was conducted. A machine learning algorithm was developed to predict energy consumption and enable proactive decision-making. The i-EMS was implemented on two Volvo VNR BEVs, with operators receiving charging and routing recommendations. Charging stations were installed at depot locations in Texas and Minnesota, with an additional on-route charger in Minnesota. Significant findings included a 14% range improvement for Murphy Logistics on a highway-driving eco-route and a 22% range improvement for HEB Companies on a city-driving eco-route. The i-EMS utilized rule-based methods and physics-based algorithms to predict and reduce energy consumption, with real-time monitoring and analysis through V2C connectivity enabling proactive decision-making. The project demonstrated the feasibility and economic viability of battery electric Class 8 trucks for long-haul operations, showcasing the potential of physics-aware machine learning in optimizing energy management. The successful implementation of the i-EMS in real-world scenarios validates its practical application and effectiveness, paving the way for the widespread adoption of battery electric vehicles in the freight transportation industry.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Electric Medium- and Heavy-Duty Vehicle Charging Infrastructure Attributes and Development

Although more established for light-duty vehicles (LDVs), advancements in electric vehicle (EV) charging technology are being made in the medium- and heavy-duty (MD/HD) sector. Progress is also being made with the electrification of MD/HD vehicles, including transit buses, school buses, MD trucks, and HD trucks. The diverse set of operational requirements and duty cycles for each vocation, as well as the range in the size of fleets, present unique charging and infrastructure requirements. This report focuses on charging requirements for MD/HD vehicles and synergies with LDV infrastructure. This analysis leans toward the qualitative rather than quantitative because relevant model inputs are in development and will not be established for a few years, as EV deployments are more mature in the LDV sectors than MD/HD. The report begins with an overview of MD/HD vehicle classes and types of charging, including depot and residential charging, among others (Section 2). Section 3 analyzes the home bases (overnight dwell locations) of existing MD/HD vehicles, with an emphasis on depot and residential home bases, and discusses implications for charging infrastructure. Section 4 discusses the key characteristics for determining if, when, and where MD/HD vehicles can leverage LDV charging infrastructure rather than requiring dedicated chargers. These considerations include electricity demand, connectors, physical space requirements, payment considerations, and impacts on the grid. Section 5 summarizes shared characteristics for MD/HD vehicles that are appropriate for near-term electrification and includes a summary of the outlook of the electric MD/HD vehicle market. The conclusion (Section 6) summarizes the report's findings and outlines areas for future research.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Vehicle Supply Equipment (EVSE) Study for Vernon County, Wisconsin [Slides]

Viroqua is a town in Wisconsin with a population of approximately 4,500. The Vernon County Energy district is a local nonprofit in Viroqua that provides energy education, individualized energy consulting and coaching to residents and businesses. They have a very good relationship with our county government and wish to support their efforts. The Vernon County government is currently working on a comprehensive plan and would like to include planning for electric vehicle (EV) charging infrastructure in the plan. They are seeking guidance on logical phases for implementation and identifying the best locations for Level 2 and Level 3 EV chargers. NREL provided technical input on strategic planning for electric vehicle (EV) adoption and electric vehicle supply equipment (EVSE) expansion in Vernon County through the Clean Energy to Communities (C2C) Expert Match technical assistance program. NREL provided strategic planning support for EV expansion planning in Vernon County and siting considerations for locating EVSE.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS↗

PV Inverter Systems Enabled by Monolithically Integrated SiC based Four Quadrant Power Switch (4-QPS) [BiDFET]

The purpose of this project was to develop a new breed of Power Conversion Systems (PCS) for PV integration that is enabled by the newly developed 4-Quadrant Single Die SiC Power Semiconductor Switches (4-QPS) or also referred to as “Bidirectional FET (BIDFET)”. This work includes semiconductor die development, advanced packaging, converter design, development, and testing of 4-QPS enabled hardware prototypes at 1 kW (for single phase residential application) and 10 kW (for three phase commercial application). The BiDirectional Field-Effect Transistor (BiDFET) can enable circuit topologies requiring four-quadrant switches, that were earlier designed using discrete combinations of MOSFETs, IGBTs, GaN HEMTs, and PiN diodes. The monolithic nature of the BiDFET allows lower device count, smaller switch volume, lower inductance, and simpler packaging, and hence more reliable and commercially viable implementation in power electronics converters. The matrix converter topologies, now feasible using BiDFETs, can eliminate the bulky and unreliable dc link capacitors or inductors required for conventional voltage-source or current-source converters in ac–ac and ac–dc applications. The 1.2 kV BiDFET has the potential to disrupt all the applications utilizing 1.2 kV switches, including electric vehicle (EV) drivetrain, bidirectional EV chargers, industrial motor drives, solid-state transformers, datacenter power supplies, elevator drives, dc microgrids, energy storage grid integration, solid-state breakers, etc.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Standardized Protocol for Real-Time APIs as Required by Title 23 CFR 680.116(c)

Improving the ability of drivers to easily locate working and available chargers is key to improving the public charging experience. Electric vehicle charging providers who are recipients of federal funds through the National Electric Vehicle Infrastructure (NEVI) Formula Program, Charging and Fueling Infrastructure (CFI) Discretionary Grant Program, and other funding programs as identified under Title 23 of the U.S. Code must deploy and maintain an application programming interface (API) to access information about charging stations they operate.1 This includes information about individual charging ports, pricing, and availability in accordance with the Federal Highway Administration’s National Electric Vehicle Infrastructure Standards and Requirements, 23 CFR 680.116(c), herein referred to as the minimum standards (Federal Highway Administration 2023). Specifically outlined in the minimum standards, states and other designated recipients are required to ensure that charging station information including location, connector type, power level, real-time status, and real-time price to charge are available free of charge to third-party software developers through an API. These requirements are intended to enable effective communication with consumers about available charging stations and help consumers make informed decisions about trip planning, including when and where to charge. This document provides a standardized protocol for how to structure data, data update frequency, and practices for making the data required to be shared via API usable for improving public transparency and the customer experience. These are recommendations only and do not modify the Federal Highway Administration’s minimum standards in any way.

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Charging Analytics and Reporting Tool (EV-ChART): Data Format and Preparation Guidance (V.5.0)

The Joint Office of Energy and Transportation maintains the Electric Vehicle Charging Analytics and Reporting Tool (EV-ChART), which provides a centralized hub for submitting electric vehicle (EV) charging infrastructure data directed by the Federal Highway Administration (23 CFR 680.112(a)-(c)). EV-ChART provides a streamlined data submission process and an integrated set of analytic tools, connects to other data sources, and empowers data sharing and access across stakeholders, including the public. Any data shared publicly will be aggregated and anonymized to stay in accordance with 23 CFR 680. This EV-ChART Data Format and Preparation Guidance provides a comprehensive overview of the data reporting requirements as authorized under 23 CFR 680.112(a)-(c)). The guidance is intended to be used alongside the EV-ChART Data Input Template, which defines the tabular data structure that these data submissions must follow. Per 23 CFR 680.112(a)-(c), the annual and quarterly data submissions are required of all National Electric Vehicle Infrastructure (NEVI) Formula Program projects, as well as projects for the construction of publicly accessible EV chargers that are funded with funds made available under Title 23, United States Code, including any EV charging infrastructure project funded with federal funds that is treated as a project on a federal-aid highway. One-time data submissions are required of both the NEVI Formula Program projects and grants awarded under 23 U.S.C. 151(f) for projects that are for EV charging stations located along and designed to serve the users of designated Alternative Fuel Corridors (AFCs). Other information and data required in 23 CFR 680, such as 23 CFR 680.112(d), 23 CFR 680.116(c), and 23 CFR 680.106(a), are not discussed in this guidance.

33 ADVANCED PROPULSION SYSTEMS↗

Federal Workplace Charging Program Guide

The 2015 Fixing America's Surface Transportation (FAST) Act authorizes the installation, operation, and maintenance of electric vehicle supply equipment (EVSE) for the purpose of recharging employees' privately owned vehicles (POVs) under the custody or control of the General Services Administration (GSA) or a Federal agency. It requires the collection of fees to recover the costs of installing, operating, and maintaining this equipment and imposes reporting requirements. This program guide reviews those requirements, excerpts the relevant language in Appendix A, and describes when and how fees may be required to cover costs of electricity, network costs, EVSE units, and installations in various scenarios. This program guide is designed to support Federal agencies developing and refining workplace charging programs for employee POVs. While it provides guidance and best practices, it does not replace agencywide policies or agency-specific legal counsel. It contains a roadmap for agency workplace charging programs and defines roles and responsibilities. This guide explains how to determine the number of POVs likely to charge at a given site and contains a sample employee survey in Appendix B. It reviews EVSE planning, including unit selection and acquisition, charger location(s), accounting for available power capacity, using existing infrastructure, and funding an incentive program. It also discusses the costs associated with EVSE acquisition, installation, and network management. These costs inform the subsequently provided information, which describes how to amortize costs to determine appropriate fees for each charging session. The final two sections of this guide address aspects of ongoing program management that the facility coordinator should consider and the reporting requirements associated with the FAST Act. The insights in this guide are applicable to all agency-owned and GSA-leased buildings or facilities offering the use of EVSE or a 120-volt receptacle for the purpose of recharging an employee's POV. However, the FAST Act requirements typically do not apply to any building or facility operated and maintained by a third-party vendor offering the use of EVSE as part of a commercial building lease unless the agency is managing the station and/or energy on behalf of the building and collecting POV fees.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Theoretical Modeling of Reactor Relevant Conditions for Plasma Jet Driven Magneto-Inertial Fusion

The Charger Advanced Power and Propulsion Laboratory (CAPP), a laboratory within the Propulsion Research Center (PRC) at the University of Alabama in Huntsville (UAH) is working with Los Alamos National Laboratory (LANL). to develop models and inform on promising paths for high gain magneto-inertial fusion (MIF) conditions. This report provides a framework for identifying promising conditions for achieving ignition in plasma-jet-driven magneto-inertial fusion (PJMIF)[1]. As proposed, for the first part of the contract, UAH proposes to develop a gain over unity set of stagnation conditions to provide a state of plasma conditions to achieve to set long terms goals for the PJMIF program. Specifically, UAH will model PJMIF stagnation conditions to include radiation, heat transfer, two temperature energy equations, fusion reactivity and nonlocal fusion product deposition, but no hydrodynamics for these purposes. These calculations will use a stationary plasma model to reduce simulation complexity—focusing on a DT target at 10 keV. Subsequent work will include a DD plasma layer acting as an afterburner. UAH will assume an initial magnetic field without any consideration of the topology, just assume a field strength, most likely scaled with consideration of the local hall parameter. This effort will inform the team on the tradeoff between mass, peak target field, etc and the achievable gain.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

eMosaic: Electrification Mosaic Platform for Grid Informed Smart Charging Management (Final Scientific/Technical Report)

ABB (Prime Contractor), in collaboration with its partners at the Utah State University (USU), Idaho National Laboratory, Rocky Mountain Power (RMP), and Electric Power Engineers (EPE), have performed research, development, and wide scale demonstration of a scalable and resilient Electrification Mosaic (eMosaic) platform for Smart Charge Management (SCM) for Electric Vehicle Infrastructure. Work was completed under DE EE0009194, titled “eMosaic Electrification Mosaic Platform for Grid Informed Smart Charging Management”, funded by the US Department of Energy. The project members developed algorithms that provide localized and bulk grid services and that reduce and stabilize costs all the way down the supply chain to the PEV owner through SCM. This platform aggregates telemetry from multiple data sources as pieces of the larger picture including personal, private fleet or transportation EVs, fast chargers and other supply equipment, weather service information, and geographically distributed charging sites such as public lots, garage and retail, and private or shared usage depots. ABB and the project team designed, tested, and improved a charging management system at local/edge and cloud levels. The ultimate objective of the project was to convincingly demonstrate that the developed secure eMosaic plat-form can be readily and favorably adopted by diverse utilities and site owners at scale. This was achieved through a demonstration plan with field deployment at several physical sites across 4 states and additional scalable simulation from high fidelity charging models.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Steel Creek, Pen Branch, and D-Area Watershed Stream Gauging Stations

A network of stream gauging systems were installed in the Steel Creek, Pen Branch, D-Area Discharge Canal, and the D006 Stream in support of the groundwater modeling efforts for the P-Area Groundwater Operable Unit (OU); Chemical, Metals, and Pesticides (CMP) Pits OU; and the D-Area Watershed, respectively. Each location is monitored by a MACE Floseries3 FloPro data logger and a MACE doppler ultrasonic area/velocity sensor. Each stream gauging system is powered by an internal 12-volt battery supplied by a solar panel with a trickle charger. Information collected by each data logger is logged internally and telecommunicated via a cellular network to an online server for real time analysis and monitoring. The MACE doppler ultrasonic area/velocity sensor can measure stream depth and velocities to give output values of flow rates, total flow, net flow, and volumes. The water depth is measured by a ceramic pressure transducer located on the top of the sensor. The velocity is measured by a continuous wave doppler sensor to give an average velocity across the whole stream profile. This report discusses the equipment and methods used to install continuous stream gauging stations and provides a summary of data collected through FY2025.

54 ENVIRONMENTAL SCIENCES↗

EVI-LOCATE User Manual

One of the longest stages in the deployment of electric vehicle supply equipment (EVSE) is the initial planning of the infrastructure itself. Engineers and fleet experts from the National Renewable Energy Laboratory (NREL) have supported dozens of charging infrastructure site plans over the past couple decades, including the generation of site schematics, determinations of electric capacity, and estimates for likely costs. As the market for electric vehicles (EVs) has matured, this approach should no longer require a time and personnel intensive process. In order to shorten the time taken to develop site plans and cost estimates, NREL developed a tool that fleet managers, facility managers, electricians, EVSE installers, and members of the public can use to develop initial schematics and ballpark pricing for charging station installations. The Electric Vehicle Infrastructure - Locally Optimized Charger Assessment Tool and Estimator (EVI-LOCATE) provides a structured and consistent way for users to enter information about their planned EVSE project in a relatively simple web-based format. EVI-LOCATE then calculates electrical equipment capacity, wiring runs, and project costs. It produces a site diagram optimized around surface characteristics with differential trenching costs for softscape such as grass compared to hardscape such as asphalt that can be adjusted by users in the tool. It also stores the resulting site plans and costs in a dashboard for access at a later date, including plan revisions if necessary. This document guides users through the EVI-LOCATE screens and associated questions. It contains tip text boxes throughout on how best to interface with the tool and find additional information or context. The appendices contain the assumptions and calculations underpinning the tool. Much of the information for EVI-LOCATE was gathered through industry engagements with EVSE installers, invoices from completed EVSE installations, Gordian's RS Means construction data, and the General Services Administration blanket purchase agreement for EVSE. For a visual tutorial of the tool, users can watch EVI-LOCATE Step-by-Step Video. The tool itself is available at https://evi-locate.nrel.gov.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Making Wireless Power Matter (CRADA Final Report)

The Resonant Link project team investigated the integration of their novel, self-resonant magnetic structure for electromagnetic coils into inductive wireless power transfer systems. Relative to conventional wireless power coils, their multi-layer self-resonant structure (the “MSRS”) reduces losses by up to 6x and lowers to BOM cost by up to 10x. These power-dense, cost-effective coils are a promising path towards the first value-add wireless power systems in a variety of applications, from phones to medical devices to kitchen appliances to mobile robots to electric vehicles. The researchers explored development of the power electronics for wireless power transfer systems using the multi-layer self-resonant structure (MSRS) concept that efficiently transmits power over air gaps for in-home applications, including through-wall power transfer, appliances built around the Ki and Qi standards, and other potential use cases This project specifically focused on the power electronics design, development, and testing for these applications. Resonant Link’s proprietary wireless power technology holds the promise of matching the performance of wired chargers in size and efficiency, especially when operated from a DC distribution grid.

42 ENGINEERING↗

Customer-Focused Key Performance Indicators for Electric Vehicle Charging

To systematically improve the public charging experience, EV charging industry stakeholders need to define and measure it precisely. Many stakeholders currently measure aspects of the charging experience, but they typically employ metrics that are either operational in nature, such as charger uptime and mean time between failures, or composite customer satisfaction indices. To improve the customer experience most effectively, the industry needs metrics that define the charging experience from the perspective of the customer, not business operations. Furthermore, industry practitioners need granular metrics to know what specific aspects of the charging experience need improvement. This report defines such customer-focused metrics, called key performance indicators (KPIs).

33 - ADVANCED PROPULSION SYSTEMS↗

SuperLab 2.0 Showcase: Connecting Five Labs to Tackle Grid Complexity and Unlock Unique Grid Asset Potential

SuperLab 2.0 (a five-lab demonstration) is a collaborative, national-scale experiment showcasing the coordination of geographically distributed energy assets in real time. The demonstration integrates 25 physical and digital assets, spanning wind, photovoltaics, batteries, electrolyzers, DC fast chargers, microgrid controllers, building automation systems, small modular reactors, control centers, and gas turbines, across five U.S. Department of Energy (DOE) national laboratories: National Laboratory of the Rockies (NLR), Idaho National Laboratory, National Energy Technology Laboratory, Lawrence Berkeley National Laboratory, and Sandia National Laboratories. These assets are unified using Energy Sciences Network (ESnet), a low-latency, high-performance DOE network, and are controlled via a centralized energy controller hosted at NLR's Advanced Research on Integrated Energy Systems facility. The demonstration validates the ability to stress-test hybrid energy systems under dynamic scenarios to de-risk advanced control strategies for greater resilience and flexibility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Review of the Customer Experience at Public Charging Stations and its Effects on Electric Vehicle Purchase and Use

The electric vehicle (EV) market in the U.S. has grown rapidly. However, poor public charging reliability could challenge achieving widespread adoption. We reviewed peer-reviewed articles and market research reports to understand how the public charging experience affects the willingness to purchase EVs among first-time buyers and current owners. Ample literature identifies the measures of the public charging experiences, characterizes the current public charging experience, and identifies the effect of infrastructure availability on EV purchase decisions. However, there is no causal evidence linking the customer experience at public chargers to purchase decisions or intentions for current EV owners or prospective buyers.

33 ADVANCED PROPULSION SYSTEMS↗