Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Time Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Valuing Energy Efficiency and Distributed Energy Resources in the Built Environment: Preprint

Traditionally, analytical frameworks that underpin building energy policy have focused on the need to reduce annual energy consumption by assessing the cost and efficiency performance of energy-consuming technologies. Investments in distributed energy resources (DERs) such as photovoltaics have generally been evaluated independently, but also on a cost and performance basis. However, buildings are rapidly evolving to incorporate technologies that not just consume energy, but also generate, store, and control energy loads. Concurrently, the electric grid is becoming more dynamic and variable due to the increased proportion electricity production from variable renewable sources. To that end, building energy policy analytical frameworks should be updated to include the interactions between energy efficiency and DERs as well as potential value streams for the grid and building owner that technologies or packages of technologies might offer. As buildings with DERs and controllable loads are able to provide grid services or optimize operations based on electricity rates and grid conditions, the temporal and spatial nature of these technologies should also be incorporated into design decisions. To explore these questions further, the National Renewable Energy Laboratory will use a series of building and electric grid models to simulate the design and operation of a neighborhood of buildings under various electricity rates, grid conditions, and potential compensation scenarios. Scenarios of time-sensitive values for future grid services will also be constructed for use in the analysis. New metrics that can be used in building energy policies will also be explored to capture the responsiveness or flexibility of high efficiency buildings with DERs under various electric grid conditions and future scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Valuing Energy Efficiency and Distributed Energy Resources in the Built Environment

Traditionally, analytical frameworks that underpin building energy policy have focused on the need to reduce annual energy consumption by assessing the cost and efficiency performance of energy-consuming technologies. Investments in distributed energy resources (DERs) such as photovoltaics have generally been evaluated independently, but also on a cost and performance basis. However, buildings are rapidly evolving to incorporate technologies that not just consume energy, but also generate, store, and control energy loads. Concurrently, the electric grid is becoming more dynamic and variable due to the increased proportion electricity production from variable renewable sources. To that end, building energy policy analytical frameworks should be updated to include the interactions between energy efficiency and DERs as well as potential value streams for the grid and building owner that technologies or packages of technologies might offer. As buildings with DERs and controllable loads are able to provide grid services or optimize operations based on electricity rates and grid conditions, the temporal and spatial nature of these technologies should also be incorporated into design decisions. To explore these questions further, the National Renewable Energy Laboratory will use a series of building and electric grid models to simulate the design and operation of a neighborhood of buildings under various electricity rates, grid conditions, and potential compensation scenarios. Scenarios of time-sensitive values for future grid services will also be constructed for use in the analysis. New metrics that can be used in building energy policies will also be explored to capture the responsiveness or flexibility of high efficiency buildings with DERs under various electric grid conditions and future scenarios.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

VOLTTRON-Based System for Providing Ancillary Services with Residential Building Loads

Ancillary services entail controlled modulation of building equipment to maintain a stable balance of generation and load in the power system. Ancillary services include frequency regulation and contingency reserves, whose acting time ranges from several seconds to several minutes. Many pilot studies have been implemented to use industrial loads to provide ancillary services, and some have explored services from commercial building loads or electric vehicle charging loads. Residential loads, such as space conditioning and water heating, represent a largely untapped resource for providing ancillary services. The residential building sector accounts for a significant fraction of the total electricity use in the United States. Many loads in residential buildings are flexible and could potentially be curtailed or shifted at the request of the grid. However, there are many barriers that prevent residential loads being widely used for ancillary services. One of the major technical barriers is the lack of communication capabilities between end-use devices and the grid. End-use devices need to be able to receive the automatic generation control (AGC) signal from the grid operator and supply certain types of telemetry to verify response. With the advance of consumer electronics, communication-enabled, or 'connected,' residential equipment has emerged to overcome the communication barrier. However, these end-use devices have introduced a new interoperability challenge due to the existence of numerous standards and communication protocols among different end devices. In this paper, we present a VOLTTRON-based system that overcomes these technical challenges and provides ancillary services with residential loads. VOLTTRON is an open-source control and sensing platform for building energy management, facilitating interoperability solutions for end devices. We have developed drivers to communicate and control different types of end devices through standard-based interfaces, manufacturer-provided application programming interfaces, and proprietary communication interfaces. We document the ability to manage nine appliances, using four different standards or proprietary communication methods. A hardware-in-the-loop test was performed in a laboratory environment where the loads of a laboratory home and a large number of simulated homes are controlled by an aggregator. Upon receipt of an AGC signal, the VOLTTRON home energy management system (HEMS) of the laboratory home adjusts the end-device controls based on the comfort criteria set by the end users and sends telemetry to the aggregator to verify response. The aggregator then sends the AGC signal to other simulated homes in attempts to match the utility request as closely as possible. Frequency regulation is generally considered a higher value service than other ancillary services but it is also more challenging due to the constraint of short response time. A frequency regulation use case has been implemented with the regulation signals sent every 10 seconds. Experimental results indicate that the VOLTTRON-controlled residential loads are able to be controlled with sufficient fidelity to enable an aggregator to meet frequency regulation requirements. Future work is warranted, such as understanding the impact of this type of control on equipment life, and market requirements needed to open up residential loads to ancillary service aggregators.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Coordinated PEV Charging for Distribution System Management

Plug-in electric vehicles (PEVs) can help to reduce worldwide dependence on petroleum and carbon emissions. In the past a few years, PEVs have received considerable attention as an eco-friendly and cost-effective alternative to conventional gasoline vehicles. PEVs consume higher power from the grid during charging compared to conventional residential loads. Therefore, the emerging fleet of PEVs will introduce a considerable amount of additional load on power system. On the other hand, majority of PEVs are parked for more than 90% of the time, making them ideal for providing various services through Electric Vehicle Supply Equipment (EVSE), a.k.a. charging stations which are PEVs’ connection points to the power system. In this project, coordinated PEV charging are developed to provide distribution system services, considering PEV characteristics, realistic travel pattern, charging behaviors, and EVSE power rating and availability. The main efforts and contributions are summarized as follows. • Mobility models and EVSE charging capability/availability are indispensable for evaluating PEV charging coordination strategies and developing PEV charging control. Many existing studies utilize simplified mobility models assuming that the entire vehicle fleet returns home in the evening and is parked at home until the next morning. Some other PEV models better represent diversified home arrival and departure time, but cannot capture varying charging flexibility and capability at different locations, and therefore are not appropriate to study the impacts of public EVSE on PEV load and utilization. In this work, a mobility and charging flexibility model is proposed to better represent the temporal availability and varying charging capability from PEV onboard charger and EVSE. • Based on the mobility model, a generalized optimization method is proposed to evaluate different PEV charging coordination strategies. In existing literature, different algorithms and methods need to be designed to evaluate each charging strategy from both vehicle owners’ and system’s perspective. With the optimization method proposed in this work, different charging control strategies can be studied and compared by only updating objective functions. Moreover, optimization tricks are provided to convert the optimization problems to equivalent linear programming problems, which can be efficiently solved with existing solvers. • An innovative scheduling and control framework is proposed to enable smart PEV charging for grid services while meeting PEV owners’ travel needs. In the proposed framework, each set of EVSE is equipped with a controller that estimates charging power and energy flexibility based on vehicle characteristics, EVSE power rating, battery energy state, and upcoming trip information. With the simplified charging flexibility model received from each EVSE controller, the central coordinator determines the optimal power allocation for a look-ahead time window for the given grid services. The proposed charging control can help reduce the computational complexity and communication requirement compared with existing methods. It is also scalable to the expanding PEV fleet and robust to uncertainties in upcoming vehicle trips and future system condition. • The proposed charging strategy evaluation and smart charging control methods are applied to one of the prototypical feeders developed by the Pacific Northwest National Laboratory (PNNL) for case studies. Detailed trip information extracted from the National Household Travel Survey (NHTS) is used to represent travel and parking patterns. Different scenarios are simulated to evaluate the performance of the proposed methods and understand how PEV mobility and public EVSE availability affect PEV load and potential grid services.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Component Repair Times Obtained from MSPI Data

Information concerning times to repair or restore equipment to service given a failure is valuable to probabilistic risk assessments (PRAs). Examples of such uses in modern PRAs include estimation of the probability of failing to restore a failed component within a specified time period (typically tied to recovering a mitigating system before core damage occurs at nuclear power plants) and the determination of mission times for support system initiating event (SSIE) fault tree models. Information on equipment repair or restoration times applicable to PRA modeling is limited and dated for U.S. commercial nuclear power plants. However, the Mitigating Systems Performance Index (MSPI) program covering all U.S. commercial nuclear power plants provides up-to-date information on restoration times for a limited set of component types. This paper describes the MSPI program data available and analyzes the data to obtain median and mean component restoration times as well as non-restoration cumulative probability curves. The MSPI program provides guidance for monitoring both planned and unplanned outages of trains of selected mitigating systems deemed important to safety. For systems included within the MSPI program, plants monitor both train UA and component unreliability (UR) against baseline values. If the combined system UA and UR increases sufficiently above established baseline results (converted to an estimated change in core damage frequency or CDF), a “white” (or worse) indicator is generated for that system. That in turn results in increased oversight by the US Nuclear Regulatory Commission (NRC) and can impact a plant’s insurance rating. Therefore, there is pressure to return MSPI program components to service as soon as possible after a failure occurs. Three sets of unplanned outages might be used to determine the component repair durations desired in this article: all unplanned outages for the train type that includes the component of interest, only unplanned outages associated with failures of the component of interest, and only unplanned outages associated with PRA failures of the component of interest. The paper will describe how component repair times can be generated from each set and which approach is most applicable. Repair time information will be summarized for MSPI pumps and diesel generators using data over 2003 – 2007. Also, trend information over 2003 – 2012 will be presented to indicate whether the 2003 – 2007 repair time information is still considered applicable. For certain types of pumps, mean repair times are significantly higher than the typically assumed 24 h duration.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Dissolved Oxygen and Temperature Data from the Hyporheic Zone of the East River Watershed July 2017 to October 2018

Dissolved oxygen (DO) is critical for aquatic ecosystems. Our focus is on the long-term DO dynamics in hyporheic zone of rivers, which are a function of both transport (hydrologic exchange between river and hyporheic zone) and uptake by biogeochemical reactions or respiration. The study site is the alpine East River watershed in Colorado, USA, meander A downstream from the pump house. Opti O2 probes were deployed in the water column and directly within the river-bed at 10, 20, and 35 cm depth (38°55'23.38"N, 106°57'4.21"W, 9046.88m) to monitor DO and temperature. A continuous data stream from July 24, 2017 to Oct 24, 2018 was autonomously telemetered to the cloud. This 14-month DO and temperature time series were obtained without any servicing for maintenance or data downloads; additionally the ability to remotely verify probe performance during field deployment was essential to confirm data validity during winter freeze-in and hydrological/weather events, such as spring melt and summer monsoons. We investigate the variations in dissolved oxygen dynamics of this snow-pack dominated watershed during a comparatively low flow water year (2018) and a relatively normal water year (2017), enabled by distinctive, in-situ, high frequency (∆t = 5min) sensors that provided a continuous time-series from the undisturbed study site over multiple seasons.

54 ENVIRONMENTAL SCIENCES↗

Rapidly Viable Sustained Grid

Rapid recovery of power flow, possibly after a blackout, is a crucial need arising in scenarios that are increasingly becoming more frequent; here, solutions for rapid viability of power while the grid is being restored are urgently needed to keep critical infrastructure (CI) online. Increasingly, after the initial recovery phase, sustenance of reliable power requires assistive services to the grid for long periods of time. Even though the need is urgent, there is only sparse effort present toward a comprehensive framework/strategy for making power rapidly viable with an emphasis on sustained grid ancillary services; which is the focus of this proposal. The proposed concept envisions four phases. In the first phase, when a large portion of power is disrupted (see Figure 1(a)), emphasis is on bringing CI online with the objective of maximizing the time horizon of power viability using resources available at the CI. In the second phase (Figure 1(b)), neighborhood resources are tightly coordinated that forms the CI’s central-core (CC) to provide guaranteed viability of CI over a longer horizon. In the third phase, self-organizing power networks are expanded in a distributed layer supporting the central-core (Figure 1(c)). In the fourth phase, separate CI-networks coalesce and are controlled in a coordinated fashion to provide grid ancillary services (AS), such as primary frequency control and enhancing grid resiliency. With time, system efficiencies and penetration of renewables increase, while the time-horizon of guaranteed sustenance of CI is maximized. Under proposed work, the concept will be instantiated with a focus on medical centers as CI. Comprehensive power hardware in the loop strategies and emulated field tests will guide and validate devised solutions. A strong T2M effort to commercialize resulting technology is outlined. The proposed technology will be transformative for the grid. It will fundamentally change the way large contingencies are managed where power systems and critical infrastructure transition from being fragile to being robust using intelligent, self-organizing control for coordinating resources, enhanced resiliency and use of sustainable energy sources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Emigration of Natural and Hatchery Naco x (Chinook salmon; Oncorhynchus tshawytscha) and Heeyey (Steelhead; Oncorhynchus mykiss) Smolts from the Imnaha River, Oregon from 5 October 2006 to 21 June 2007, Annual Report 2007.

This report summarizes the Nez Perce Tribe (NPT) Department of Fisheries Resources Management (DFRM) results for the Lower Snake River Compensation Plan (LSRCP) Hatchery Evaluation studies and the Imnaha River Smolt Monitoring Program (SMP) for the 2007 smolt migration from the Imnaha River, Oregon. These studies are closely coordinated and provide information about juvenile natural and hatchery spring/summer Naco x (Chinook Salmon; Oncorhynchus tshawytscha) and Heeyey (steelhead; O. mykiss) biological characteristics, emigrant timing, survival, arrival timing and travel time to the Snake River dams and McNary Dam (MCD) on the Columbia River. These studies provide information on listed Naco x (Chinook salmon) and Heeyey (steelhead) for the Federal Columbia River Power System (FCRPS) Biological Opinion (NMFS 2000). The Lower Snake River Compensation Plan program's goal is to maintain a hatchery production program of 490,000 Naco x (Chinook salmon) and 330,000 Heeyey (steelhead) for annual release in the Imnaha River (Carmichael et al. 1998, Whitesel et al. 1998). These hatchery releases occur to compensate for fish losses due to the construction and operation of the four lower Snake River hydroelectric facilities. One of the aspects of the LSRCP hatchery evaluation studies in the Imnaha River is to determine natural and hatchery Naco x (Chinook salmon) and Heeyey (steelhead) smolt performance, emigration characteristics and survival (Kucera and Blenden 1998). A long term monitoring effort was established to document smolt emigrant timing and post release survival within the Imnaha River, estimate smolt survival downstream to McNary Dam, compare natural and hatchery smolt performance, and collect smolt-to-adult return information. This project collects information for, and is part of, a larger effort entitled Smolt Monitoring by Federal and Non-Federal Agencies (BPA Project No. 198712700). This larger project provides data on movement of smolts out of major drainages and past dams on the Snake River and Columbia River. In season indices of migration strength and migration timing are provided for the run-at large at key monitoring sites. Marked smolts are utilized to measure travel time and estimate survival through key index reaches. Fish quality and descaling measures are recorded at each monitoring site and provide indicators of the health of the run. Co-managers in the Imnaha River subbasin (Ecovista 2004) have identified the need to collect information on life history, migration patterns, juvenile emigrant abundance, reach specific smolt survivals, and Smolt-to-Adult Return rates (SAR's) for both Heeyey (steelhead) and Naco x (Chinook salmon) smolts. The current study provides information related to the majority of the high priority data needs. Current funding does not allow for determination of a total (annual) juvenile emigrant abundance and lack of adult passive integrated transponder (PIT) tag detectors at the mouth of the Imnaha River results in the inability to calculate tributary specific SAR's. Information is shared with the Fish Passage Center (FPC) on a real time basis during the spring emigration period. The Bonneville Power Administration (BPA) and the United States Fish and Wildlife Service (USFWS) contracted the NPT to monitor emigration timing and tag up to 19,000 emigrating natural and hatchery Naco x (Chinook salmon) and Heeyey (steelhead) smolts from the Imnaha River with passive integrated transponder (PIT) tags. The completion of trapping in the spring of 2007 marked the 16th year of emigration studies on the Imnaha River, and the 14th year of participating in the FPC smolt monitoring program. Monitoring and evaluation objectives were to: (1) Evaluate effects of flow, temperature and other environmental factors on juvenile migration timing. (2) Determine emigration timing, travel time, and in-river survival of PIT tagged hatchery Naco x (Chinook salmon) smolts released at the Imnaha River acclimation facility to the Imnaha River juvenile migration trap. (3) Monitor the daily catch and biological characteristics of juvenile Naco x (Chinook salmon) and Heeyey (steelhead) smolts collected at the Imnaha River screw trap. (4) Determine spring emigration timing of Naco x (Chinook salmon) and Heeyey (steelhead) smolts collected at the Imnaha River juvenile migration trap. (5) Compare emigration characteristics and survival rates of natural fall and spring tagged juvenile Naco x (Chinook salmon). (6) Determine arrival timing, travel time and estimated survival of PIT tagged natural and hatchery Naco x (Chinook salmon) and natural and hatchery Heeyey (steelhead) smolts from the Imnaha River to Snake and Columbia River dams.

13 HYDRO ENERGY↗

INCONEL 690 CORROSION IN WTP (WASTE TREATMENT PLANT) HLW (HIGH LEVEL WASTE) GLASS MELTS RICH IN ALUMINUM & BISMUTH & CHROMIUM OR ALUMINUM/SODIUM

Metal corrosion tests were conducted with four high waste loading non-Fe-limited HLW glass compositions. The results at 1150 C (the WTP nominal melter operating temperature) show corrosion performance for all four glasses that is comparable to that of other typical borosilicate waste glasses, including HLW glass compositions that have been developed for iron-limited WTP streams. Of the four glasses tested, the Bi-limited composition shows the greatest extent of corrosion, which may be related to its higher phosphorus content. Tests at higher suggest that a moderate elevation of the melter operating temperature (up to 1200 C) should not result in any significant increase in Inconel corrosion. However, corrosion rates did increase significantly at yet higher temperatures (1230 C). Very little difference was observed with and without the presence of an electric current density of 6 A/inch{sup 2}, which is the typical upper design limit for Inconel electrodes. The data show a roughly linear relationship between the thickness of the oxide scale on the coupon and the Cr-depletion depth, which is consistent with the chromium depletion providing the material source for scale growth. Analysis of the time dependence of the Cr depletion profiles measured at 1200 C suggests that diffusion of Cr in the Ni-based Inconel alloy controls the depletion depth of Cr inside the alloy. The diffusion coefficient derived from the experimental data agrees within one order of magnitude with the published diffusion coefficient data for Cr in Ni matrices; the difference is likely due to the contribution from faster grain boundary diffusion in the tested Inconel alloy. A simple diffusion model based on these data predicts that Inconel 690 alloy will suffer Cr depletion damage to a depth of about 1 cm over a five year service life at 1200 C in these glasses.

36 MATERIALS SCIENCE↗

Long-term stability of the Leksell Gamma Knife{sup ®} Perfexion™ patient positioning system (PPS)

Purpose: To assess the long-term mechanical stability and accuracy of the patient positioning system (PPS) of the Leksell Gamma Knife{sup ®} Perfexion™ (LGK PFX). Methods: The mechanical stability of the PPS of the LGK PFX was evaluated using measurements obtained between September 2007 and June 2011. Three methods were employed to measure the deviation of the coincidence of the radiological focus point (RFP) and the PPS calibration center point (CCP). In the first method, the onsite diode test tool with single diode detector was used together with the 4 mm collimator on a daily basis. In the second method, a service diode test tool with three diode detectors was used biannually at the time of the routine preventive maintenance. The test performed with the service diode test tool measured the deviations for all three collimators 4, 8, and 16 mm and also for three different positions of the PPS. The third method employed the conventional film pin-prick method. This test was performed annually for the 4 mm collimator at the time of the routine annual QA. To estimate the effect of the patient weight on the performance of the PPS, the focus precision tests were also conducted with varying weights on the PPS using a set of lead bricks. Results: The average deviations measured from the 641 daily focus precision tests were 0.1 ± 0.1, 0.0 ± 0.0, and 0.0 ± 0.0 mm, respectively, for the 4 mm collimator in the X (left/right of the patient), Y (anterior/posterior of the patient), and Z (superior/inferior of the patient) directions. The average of the total radial deviations as measured during ten semiannual measurements with the service diode test tool were 0.070 ± 0.029, 0.060 ± 0.022, and 0.103 ± 0.028 mm, respectively for the central, long, and short diodes for the 4 mm collimator. Similarly, the average total radial deviations measured during the semiannual measurements for the 4, 8, and 16 mm collimators and using the central diode were 0.070 ± 0.029, 0.097 ± 0.025, 0.159 ± 0.028 mm, respectively. The average values of the deviations as obtained from the five annual film pin-prick tests for the 4 mm collimator were 0.10 ± 0.06, 0.06 ± 0.09, and 0.03 ± 0.03 mm for the X, Y, Z stereotactic directions, respectively. Only a minor change was observed in the total radial deviations of the PPS as a function of the simulated patient weight up to 202 kg on the PPS. Conclusions: Excellent long-term mechanical stability and high accuracy was observed for the PPS of the LGK PFX. No PPS recalibration or any adjustment in the PPS was needed during the monitored period of time. Similarly, the weight on the PPS did not cause any significant disturbance in the performance of the PPS for up to 202 kg simulated patient weight.

61 RADIATION PROTECTION AND DOSIMETRY↗

Toward Real Time Data Analysis for Smart Grids

This paper describes the architecture and design of a novel system for supporting large-scale real-time data analysis for future power grid systems. The widespread deployment of renewable generation, smart grid controls, energy storage, plug-in hybrids, and new conducting materials will require fundamental changes in the operational concepts and principal components of the grid. As a result, the whole system becomes highly dynamic and requires constant adjusting based on real time data. Even though millions of sensors such as phase measurement units (PMU) and smart meters are being widely deployed, a data layer that can analyze this amount of data in real time is needed. Unlike the data fabric in other cloud services, the data layer for smart grids has some unique design requirements. First, this layer must provide real time guarantees. Second, this layer must be scalable to allow a large number of applications to access the data from millions of sensors in real time. Third, reliability is critical and this layer must be able to continue to provide service in face of failures. Fourth, this layer must be secure. We address these challenges though a scalable system architecture that integrates the I/O and data processing capability in a devise set of devices. Data process operations can be placed anywhere from sensors, data storage devices, to control centers. We further employ compression to improve performance. We design a lightweight compression customized for power grid data. Our system can reduce end-to-end response time by reduce I/O overhead through compression and overlap compression operations with I/O. The initial prototype of our system was demonstrated with several use cases from PNNL’s FPGI and show that our system can provide real time guarantees to a diverse set of applications.

Data Analytics, Power Grid, Big Data↗

A SOAP Web Service for accessing MODIS land product subsets

Remote sensing data from satellites have provided valuable information on the state of the earth for several decades. Since March 2000, the Moderate Resolution Imaging Spectroradiometer (MODIS) sensor on board NASA s Terra and Aqua satellites have been providing estimates of several land parameters useful in understanding earth system processes at global, continental, and regional scales. However, the HDF-EOS file format, specialized software needed to process the HDF-EOS files, data volume, and the high spatial and temporal resolution of MODIS data make it difficult for users wanting to extract small but valuable amounts of information from the MODIS record. To overcome this usability issue, the NASA-funded Distributed Active Archive Center (DAAC) for Biogeochemical Dynamics at Oak Ridge National Laboratory (ORNL) developed a Web service that provides subsets of MODIS land products using Simple Object Access Protocol (SOAP). The ORNL DAAC MODIS subsetting Web service is a unique way of serving satellite data that exploits a fairly established and popular Internet protocol to allow users access to massive amounts of remote sensing data. The Web service provides MODIS land product subsets up to 201 x 201 km in a non-proprietary comma delimited text file format. Users can programmatically query the Web service to extract MODIS land parameters for real time data integration into models, decision support tools or connect to workflow software. Information regarding the MODIS SOAP subsetting Web service is available on the World Wide Web (WWW) at http://daac.ornl.gov/modiswebservice.

99 GENERAL AND MISCELLANEOUS↗

Southern company energy storage study :

This study evaluates the business case for additional bulk electric energy storage in the Southern Company service territory for the year 2020. The model was used to examine how system operations are likely to change as additional storage is added. The storage resources were allowed to provide energy time shift, regulation reserve, and spinning reserve services. Several storage facilities, including pumped hydroelectric systems, flywheels, and bulk-scale batteries, were considered. These scenarios were tested against a range of sensitivities: three different natural gas price assumptions, a 15% decrease in coal-fired generation capacity, and a high renewable penetration (10% of total generation from wind energy). Only in the elevated natural gas price sensitivities did some of the additional bulk-scale storage projects appear justifiable on the basis of projected production cost savings. Enabling existing peak shaving hydroelectric plants to provide regulation and spinning reserve, however, is likely to provide savings that justify the project cost even at anticipated natural gas price levels. Transmission and distribution applications of storage were not examined in this study. Allowing new storage facilities to serve both bulk grid and transmission/distribution-level needs may provide for increased benefit streams, and thus make a stronger business case for additional storage.

Ellison, James↗

Commercialization of Distribution System Load Modeling Tool for Improved DER Interconnection Studies

Residential and commercial buildings have huge potential to contribute value to improve grid resilience by participating grid services. To reveal the significant value, it is critical to estimate the grid service capability from these buildings. Unlike the large-scale distributed energy resources such as wind and solar farms, those buildings need to participate grid services in aggregation, not by individual. Therefore, it is important to appropriately group buildings for aggregation. The load profiles in the same group will have similar characteristics at the same time step, so grid operators can send the grid service signal to the customer group with a higher chance to respond at that time step. In this paper, we develop a load profile clustering method to classify the building-level load profiles for grid service capability estimation. In our two-step clustering approach, we first calculate the total load consumption for each building, clustering the load profiles based on energy consumption level. Then, we further cluster the load profiles in each energy cluster based on the load shape. The parameter selection for each clustering step is discussed. The proposed method is applied on actual building-level load profiles, and the results have proved the effectiveness of this method.

14 SOLAR ENERGY↗

How Many Trip Requests Could We Support? An Activity-Travel Based Vehicle Scheduling Approach

In a world of ever-changing travel behavior and ever-increasing modal options, is vital to have integrated models that could capture the interactions between supply and demand layers of travel. Addressing this need, we propose three different versions of network representation and mathematical models for the activity-based vehicle routing problem to connect activity-travel graphs of passengers (demand layer) to spatio-temporal networks of vehicles (supply layer). Versions I and II are arc-based, while version III is path-based. In version I, we introduce the concept of activity-travel graphs for passengers. For vehicles, we construct space–time networks and add a new dimension, called “under-service state”, to track the execution status of trip requests at any location and time. In version II, we reduce the complexity of the network structure by eliminating the state dimension and some other modifications in the structure of the passengers’ and vehicles’ network. Although both versions can capture various behavioral constraints of the activity-based vehicle routing problem (e.g., mandatory and optimal activities, duration of activities, chain of activities, preferred starting and ending times of activities), due to the high level of complexity of the network structure, both versions can only solve small-sized problems. To tackle the computational complexity, we propose a path-based network representation in version III, and to make a balance between the disutility of passengers and vehicles, we present a tolled user equilibrium problem. Mathematical models are coded in C and GAMS and implemented on real-world Phoenix regional transportation network with more than 39 million trip requests, which demonstrate the effectiveness of the proposed solution for the original and restricted master problems.

33 ADVANCED PROPULSION SYSTEMS↗

Energy Infrastructure Dependency Curves Simulation Tool User’s Guide

Foundational studies of infrastructure interdependencies have attempted to make sense of the complex relationships among critical infrastructure. Beyond understanding the complexity of these interconnections, owner/operators and decision makers have a continuing need for a situational awareness capability tool to move beyond a conceptual understanding toward a more quantified, visual analytic method to enable more detailed real-world analysis and prioritization.The purpose and development of the Energy Infrastructure Dependency Curves Simulation Tool is to provide a means to display and analyze the complexities of infrastructure dependencies, in a way that is dynamic and can be easily manipulated. The tool focuses on the connections between two infrastructure assets, a natural gas-processing plant that relies on electric power, and an electric power-generating plant that depends on natural gas to produce electricity. The tool allows the user to enter information characterizing each asset and the dependence relationships, including details about core operations, backup function, shutdown, and resumption of service. Output is provided as a visualization of the performance of each asset over time, displaying impact, stages of operation, and resumption to full service. Input can be modified to enable the user to see how different scenarios or decisions would change the outcome. The intent of the tool is to provide the user with the ability to make informed decisions regarding operation of individual asset.This report presents an overview of the concepts used for developing the Energy Infrastructure Dependency Curves Simulation Tool and a detailed user guide that provides instructions on how to use the tool. Finally, three example scenarios are presented to illustrate dependency curve outputs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Use of Shared Automated Vehicles for First-Mile Last-Mile Service: Micro-Simulation of Rail-Transit Connections in Austin, Texas

Shared fleets of fully automated vehicles (SAVs) coupled with real-time ride-sharing to and from transit stations are of interest to cities and nations in delivering more sustainable transportation systems. By providing first-mile last-mile (FMLM) connections to key transit stations, SAVs can replace walk-to-transit, drive-to-transit, and drive-only trips. Using the SUMO (Simulation of Urban MObility) toolkit, this paper examines mode splits, wait times, and other system features by micro-simulating two fleets of SAVs providing an FMLM ride-sharing service to 10% of central Austin’s trip-makers near five light-rail transit stations. These trips either start or end within two geofenced areas (called automated mobility districts [AMDs]), and travel time and wait time feedbacks affect mode choices. With rail service headways of 15?min, and 15 SAVs serving FMLM connections to and from each AMD, simulations predict that 3.7% of the person-trip-making will shift from driving alone to transit use in a 3?mi?×?6?mi central Austin area. During a 3-h morning peak, 30 SAVs serve about 10 person-trips each (to or from the stations), with 3.4?min average wait time for SAVs, and an average vehicle occupancy of 0.74 persons (per SAV mile-traveled), as a result of empty SAV driving between riders. Sensitivity analysis of transit headways (from 5 to 20?min) and fleet sizes (from 5 to 20 vehicles in each AMD) shows an increase in FMLM mode share with more frequent transit service and larger fleet size, but total travel time served as the biggest determinant in trip-makers’ mode share.

47 OTHER INSTRUMENTATION↗

Occupancy-Driven Stochastic Decision Framework for Ranking Commercial Building Loads

For effective integration of building operations into the evolving demand response programs of the power grid, real-time decisions concerning the use of building appliances for grid services must excel on multiple criteria, ranging from the added value to occupants' comfort to the quality of the grid services. In this paper, we present a data-driven stochastic decision-support framework to dynamically rank load control alternatives in a commercial building, addressing the needs of multiple decision criteria (e.g. occupant comfort, grid service quality) under uncertainties in occupancy patterns. We adopt a stochastic multi-criteria decision algorithm recently applied to prioritize residential on/off loads, and extend it to i) consider complex load control decisions (e.g. dimming of lights, changing zone temperature set-points) in a commercial building; and ii) systematically integrate zonal occupancy patterns to better identify short-term (and time-varying) opportunities for grid service participation. We evaluate the performance of the proposed framework for curtailment of air-conditioning, lighting, and plug-loads in a multi-zone commercial office building for a range of design choices. With the help of a prototype system that integrates an interactive \textit{Data Analytics and Visualization} frontend we demonstrate a way for the building operators to monitor and change in real-time the available flexibility in energy consumption and to develop trust in the decision recommendations by interpreting the rationale behind the ranking.

Jain, Milan↗