WIRE SCANNER FOR HIGH INTENSITY BEAM PROFILE DIAGNOSITICS

A control and data acquisition system of a high speed wire scanner is developed for high intensity beam profile diagnostics. The control system of the wire scanner includes two IOCs, a Soft IOC and a VME IOC. The Soft IOC connects with an Aerotech Ensemble motor drive through EPCIS motor record and controls the movement of the wire scanner. An Electrical Input card samples the real-time position of the wire through an incremental encoder, and generates a pulse to synchronize a VME ADC data acquisition card, which digitizes and samples the beam-induced signal after pre-amplification. A VME Relay Output card is installed to control the Brake Solenoid and Actuator Solenoid. All the VME I/O cards are installed on one VME crate and controlled by the VME IOC. The system configuration and software of the wire scanner are under development.

Yan, J.↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: LMP Lessons Learned, Best Practices, and Frequently Asked Questions

This report captures lessons learned, best practices, and frequently asked questions with responses gleaned from the experiences of early adopters of the LMP RIPB process. Interviews were conducted in late 2019 with five non-LWR design organizations to gather their feedback on the application of the LMP RIPB process under real production conditions. The overall feedback from the reactor developers is that the LMP RIPB process can be successfully implemented with material benefits to the designer. As with any new processes, numerous challenges and questions were relayed by the designers. These challenges have been translated into lessons learned and best practices. Those two sections address both technical and organizational aspects of implementing the LMP RIPB process. Questions that were asked by multiple designers were turned into “frequently asked questions” and responses were provided by the LMP team.

42 ENGINEERING↗

Modeling Framework for Bulk Electric Grid Impacts from HEMP E1 and E3 Effects (Tasks 3.1 Final Report)

This report presents a framework to evaluate the impact of a high-altitude electromagnetic pulse (HEMP) event on a bulk electric power grid. This report limits itself to modeling the impact of EMP E1 and E3 components. The co-simulation of E1 and E3 is presented in detail, and the focus of the paper is on the framework rather than actual results. This approach is highly conservative as E1 and E3 are not maximized with the same event characteristics and may only slightly overlap. The actual results shown in this report are based on a synthetic grid with synthetic data and a limited exemplary EMP model. The framework presented can be leveraged and used to analyze the impact of other threat scenarios, both manmade and natural disasters. This report d escribes a Monte-Carlo based methodology to probabilistically quantify the transient response of the power grid to a HEMP event. The approach uses multiple fundamental steps to characterize the system response to HEMP events, focused on the E1 and E3 components of the event. 1) Obtain component failure data related to HEMP events testing of components and creating component failure models. Use the component failure model to create component failure conditional probability density function (PDF) that is a function of the HEMP induced terminal voltage. 2) Model HEMP scenarios and calculate the E1 coupled voltage profiles seen by all system components. Model the same HEMP scenarios and calculate the transformer reactive power consumption profiles due to E3. 3) Sample each component failure PDF to determine which grid components will fail, due to the E1 voltage spike, for each scenario. 4) Perform dynamic simulations that incorporate the predicted component failures from E1 and reactive power consumption at each transformer affected by E3. These simulations allow for secondary transients to affect the relays/protection remaining in service which can lead to cascading outages. 5) Identify the locations and amount of load lost for each scenario through grid dynamic simulation. This can be an indication of the immediate grid impacts from a HEMP event. In addition, perform more detailed analysis to determine critical nodes and system trends. 6) To help realize the longer-term impacts, a security constrained alternating current optimal power flow (ACOPF) is run to maximize critical load served. This report describes a modeling framework to assess the systemic grid impacts due to a HEMP event. This stochastic simulation framework generates a large amount of data for each Monte Carlo replication, including HEMP location and characteristics, relay and component failures, E3 GIC profiles, cascading dynamics including voltage and frequency over time, and final system state. This data can then be analyzed to identify trends, e.g., unique system behavior modes or critical components whose failure is more likely to cause serious systemic effects. The proposed analysis process is demonstrated on a representative system. In order to draw realistic conclusions of the impact of a HEMP event on the grid, a significant amount of work remains with respect to modeling the impact on various grid components.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hydrogen Compatible Materials Workshop

This report serves as the proceedings of the Hydrogen Compatible Materials Workshop held virtually by Sandia National Laboratories on December 2-3, 2020. The purpose of the workshop was to assemble subject matter experts at Sandia and its national laboratory partners within the U.S. Department of Energy's (DOE) Hydrogen Materials Compatibility (H-Mat) Consortium with public and private stakeholders in the research, development and deployment of hydrogen technologies to discuss the topic of hydrogen compatible materials. This workshop was designed to build on past events and current research and development (R&D) efforts to develop a forward-looking vision that identifies gaps and challenges for the next decade. In particular, the workshop organizers sought to expand their understanding of hydrogen compatible materials needs for power, manufacturing and other industrial uses to enable deeper impact and widespread use of hydrogen while continuing to address open questions in hydrogen-powered transportation of concern to Original Equipment Manufacturers, hydrogen producers, materials & component suppliers and other private entities. The workshop was primarily organized as a series of panel-led discussions on the topics of hydrogen-enabled transportation, heating and power, and industrial uses. Each panel consisted of 2-3 subject matter experts who relayed their perspectives on a set of framing questions developed to facilitate discussion by the broader group of workshop participants. By the workshop's conclusion, the participants identified and prioritized a list of technical challenges for each panel topic where further R&D is warranted.

08 HYDROGEN↗

Enabling Realistic Communications Evaluations for ADMS

Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. As demand for the seamless integration of distributed energy resources (DERs) continues to increase, proper networking and communications systems are becoming important to support the DER infrastructure. This report summarizes validation of a private wireless LTE network in a laboratory environment. The purpose of this work is to 1) demonstrate the effectiveness of private wireless LTE communication for grid applications and 2) provide a means of evaluating latency and overall performance of wireless communication in grid applications. First, private wireless LTE communication was validated in a direct transfer trip relaying scenario as an example of one-way communications using grid equipment. This study provided a baseline understanding of the variation in latency for seven different kinds of wireless scenarios shown in Figure A below. As expected, weak (attenuated) wireless signal-based communication yielded the widest ranges in latency. When higher priority was set for the trip signal communication, this resulted in lower latency in communication timing. In the final phase of this project, the private wireless LTE network was validated using two-way communications in an advanced distribution management system (ADMS) testbed which was developed in the ESIF at NREL. The purpose of this was to study the impact of wireless communication on grid performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Icy Moon Project (Final Report)

For this Icy Moon project, we designed, procured, built, tested and used a compact ICI instrument. This instrument has several technical advances, including a compact form factor that uses fiber arrays to relay light to six APDs. This enables a single data acquisition to measure eleven unique baselines simultaneously. The DAQ is well-synchronized and provides a path forward to even more channels. The combination of a bright LED, a sinusoidal target and cylindrical optics enables high-SNR measurements based on a known formula: a 25-ms measurement should have an SNR of 188 on the baseline zero signal. This rapid measurement time should enable two-dimensional operation and obviate the impact of temperature drifts. However, the experiment did not detect a coherence signal on any baseline (see Section Single-shot measurement results).

47 OTHER INSTRUMENTATION↗

Protection of Distribution Circuits with High Penetration of Solar PV: Distance, Learning, and Estimation-Based Methods

The results of DOE Solar Energy Technologies Office project 34233 are presented. The newest version of IEEE Standard 1547 enables photovoltaic inverters to ride through voltage disturbances, improving bulk system reliability, at the expense of removing undervoltage trip as a fast method of de facto fault detection in high PV adoption scenarios. The project explored new methods of fault detection that don't rely on communication systems and could be available quickly, including distance-based schemes, focused directional relays, and two different data-driven schemes. The schemes were evaluated with fast-phasor simulation, electromagnetic transient simulation, and field data collection at partner utilities Chattanooga Electric Power Board and Dominion Energy Virginia. Accomplishments and possible paths forward are summarized.

14 SOLAR ENERGY↗

Roadmap for Advancement of Low-Voltage Secondary Distribution Network Protection

Downtown low-voltage (LV) distribution networks are generally protected with network protectors that detect faults by restricting reverse power flow out of the network. This creates protection challenges for protecting the system as new smart grid technologies and distributed generation are installed. This report summarizes well-established methods for the control and protection of LV secondary network systems and spot networks, including operating features of network relays. Some current challenges and findings are presented from interviews with three utilities, PHI PEPCO, Oncor Energy Delivery, and Consolidated Edison Company of New York. Opportunities for technical exploration are presented with an assessment of the importance or value and the difficulty or cost. Finally, this leads to some recommendations for research to improve protection in secondary networks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power System Waveform Classification Using Time-Frequency and CNN

Many modern reclosers and circuit breakers have microprocessor relays that record waveforms of system events. In some cases, utilities may record a half-a-dozen event captures for every event. This is thousands of events per year. The industry needs faster, more automated, more conclusive, and easy-to-use systems that can process massive amounts of event recordings without extensive input/support from power system engineers. To address the need for a commercially viable solution that can classify waveform data, energies were directed to develop a universal neural network (NN) structure (deep learning algorithm) that works for a wide variety of system event types. The structure that showed the most promise was one that included the use of spectrograms. The technique has shown positive results in audio engineering, particularly with respect to speech recognition. A waveform signature could be treated as a spoken word like audio waveforms for specific things such as “YES” or “UP”. No two people produce the exact same waveform when speaking each of these words, but audio processing algorithms based on spectrograms and convolutional neural networks (CNN) can still distinguish the word regardless of the speaker. No two circuits produce the exact same waveform for a given event, but the NN can be trained to classify the event type regardless of the circuit or location on the circuit. A Power System Neural Network (PSNN) has been developed to use a CNN to classify events within waveform data for power systems. The waveform is converted to an array of values by way of spectrograms and interpreted as an image. This image is passed into the CNN. The test results on independent simulated test and validation datasets show greater than 99% accuracy. While the results thus far are based on simulated data, the performance of the PSNN is very promising and should work for a wide variety of power system conditions of interest. Ultimately, much of the custom code and tools used today and much of the manual effort expended today may be automated using this PSNN.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Protection and Restoration Solutions to Reliable and Resilient Integration of Grid-connected PV Installations and Distributed Energy Resources: Design, Testbed, Proof of Work and Impact Studies (Final Report)

To gain a better understanding of the complex transients in a utility grid with a large number of solar PV installations coupled by PWM inverters during the protection and restoration period of the power grid, in this project a kW-level experimental system with dominating inverter-based resources and a hardware-in-loop simulation system with transmission and distribution models, as well as several SEL protective relays have been built and used. The major research findings of the project are summarized below in two perspectives: Experimental research: A self-organized ultra-high frequency solitary waveform is discovered and demonstrated in the hardware experimental system. Despite the familiarities, such a solitary waveform is distinct from any harmonics, transient, or resonance waves in that, it is 1) non-dispersive over time and space, 2) not associated with any active source or the linear superposition of sources, 3) half-cycle asymmetric, 4) not responding to filters or change of system characteristic resonance frequency, 5) ubiquitous as it occurs simultaneously everywhere in the system from DC supply, power lines, and the utility grid, and 6) explosive through tripping the protection or damaging susceptible devices or circuits. Analytical study: The nature of such a new waveform and an analytical explanation of its formation are studied based on related physics and non-linear science principles, with the following highlights: 1) such a new waveform follows the solutions to the Non-linear Schrödinger equation, so the classic linear perturbation theory is unable to explain or predict such a unique waveform as confirmed with the research team of RTDS; 2) the critical condition of occurrence of such a waveform is derived, which indicates that the breakings of solitary wave is a system synchronous issue between the utility grid in the 60Hz phasor domain and duty-ratio modulation of DC sources in the inverter switching frequency domain; 3) such a waveform carries energy mass so it could be detrimental; 4) such a waveform is deceiving as it is not readily detectable in the energy propagation direction by the primary protection equipment, while it is detrimental in the perpendicular direction of energy propagation, i.e. voltage direction. Thus, it has more likely challenges to the second primary equipment and devices, particularly at the weakest link and point such as aging insulation and inappropriate setting of susceptible devices. Therefore, such a waveform can be easily ignored in the aftermath investigation. The intellectual merits: The experimental discovery reveals certain unfamiliar transient phenomena that could challenge the integration of large-scale grid-connected solar PV installation during the group ride-through period of solar PV installations, commissioning of large-solar farms, or dramatic change of solar radiation conditions. Particularly, the research findings suggest that the occurrence of the unfamiliar transient phenomena is uniquely associated with the inverter-based solar PV installation, which is less likely to happen for rotary energy systems. The physics and non-linear science-based research work laid down an analytical path to the challenging transient stability problems including those that have been observed currently and future calls. Both experimental and analytical research results explain the limitation of many current research effects including some DoE research undertakings as well as possible solutions. The broader impacts: The research outcome of the project advances the understanding of the possible transient problems for the integration of inverter-based solar PV installation. It also highlights the theoretical and technical barriers for applying the conventional theory and technology to design and implement countermeasures against their adverse impacts of the large-scale solar PV installation and operation on grid reliability and security. More broadly, the research outcomes have shed some light on the open, fundamental challenges in the integration of large-scale solar photovoltaic energy into current and next-generation power grids across the country, and worldwide. The advanced physics and non-linear science-based analysis open up a path to harmonization of the renewables for societal energy needs via building a resilient and sustainable electric power infrastructure.

14 SOLAR ENERGY↗

Oak Ridge National Laboratory Pilot Demonstration of an Attestation and Anomaly Detection Framework using Distributed Ledger Technology for Power Grid Infrastructure

This report summarizes the design and pilot demonstration of a framework called Grid Guard that was created to provide increased data and device trustworthiness to electric grid devices by leveraging distributed ledger technology (DLT), specifically blockchain. Grid Guard contains a combination of core cryptographic methods such as the secure hash algorithm (SHA), and asymmetric cryptography, private permissioned blockchain, baselining configuration data, consensus algorithm (Raft) and the Hyperledger Fabric (HLF) framework. The system implements a low energy, fast, and robust enhancement to system trustworthiness within and across electric grid systems such as substations, control centers and metering infrastructures. Blockchain is a distributed database structured that provides a practically unalterable (immutable) timeline of stored transactions. By relying on hashing and the Raft consensus algorithm, if an entity tries to illegitimately alter a record at one instance of the database the other ledger nodes are not altered. They work to cross-reference each other and easily locate any incorrectly added data and remove it. The bulk raw data is stored in an off-chain storage (outside of the blockchain ledger) and a hash of this baseline data is stored in the Blockchain ledger via hashing windows of time-series and configuration data, after aggregation and filtering. The bulk off-chain data repository is then considered to be trust-anchored using the hashes stored in the blockchain. To secure the electric grid testbed devices and data, device configuration baselines were compared to those baselines that had been previously stored in the ledger. Statistical baselines for device configurations, network communication patterns, and high-speed sensor data are calculated and then stored off-chain and hashes stored in the ledger. Measurements such as three-phase voltage and current, frequency, breaker status, protection scheme settings, network configuration settings (and other device configuration artifacts) and network traffic features (packet interarrival times) are compared every minute or other selected time windows. During phase 1 of the Grid Guard DLT project different DLT technologies were studies, and an assessment was performed on DLT technology vulnerabilities, uses, and key characteristics. DLT consensus protocols were studies (e.g., RAFT, named after Reliable, Replicated, Redundant, And Fault-Tolerant). Also, cryptography, public, private and permissioned or permissionless systems were assessed. Grid Guard implements a permissioned private DLT. Consensus algorithm selection and choice of DLT implementation depended heavily on the use-case. For this use-case, parameters were selected to measure performance and existing tools for assessment. Benchmarking was performed theoretically and practically. During phase 2 hashed transactions/blocks were inserted into the ledger every second. During phase 2 of the Grid Guard DLT project, a prototype framework was developed and demonstrated for attestation of critical substation devices and data using precision timing systems that use PTP and IRIG-B protocols) on a testbed of operational devices that emulated a distribution substation, control center, and power metering infrastructure using real Operational Technology (OT). The testbed includes OT devices such as protective relays, human machine interfaces (HMI), and power meters. To determine when to collect and compare system and network baselines, an initial examination of an anomaly detection capability to identify malicious manipulation of data streams was conducted. The resulting anomaly detection was demonstrated in a set of experiments and leveraged to trigger device artifact attestation checks. Attestation checks occur against device configuration baselines when compared with the immutable blockchain-stored baselines, which provided a cryptographically supported means by which to store baselines. The electrical substation-grid testbed was created to test the Grid Guard framework. The testbed emulates the operations of a portion of a power grid and SCADA systems as closely as possible. The testbed integrates real protocols, mainly IEC 61850 standard protocols, such as the Sampled Value (SV) and the GOOSE protocols. The testbed also supports DNP3 and other layer 2 and layer 3 protocols such as Telnet, SSH, SFTP/FTP and other proprietary protocols needed to connect to industrial control system equipment. The testbed emulates real power conditions using the OpalRT hardware-in-the-loop (HIL) device which can create fault situations that cannot be easily tested on real systems. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that electrical utilities commonly use.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design, Deployment, and Characterization of the World’s First Flexible Large Power Transformer

GE Research and its partner Prolec GE have designed, built and deployed in the field the world’s first flexible power transformer. The flexible power transformer is a transmission class 3-phase autotransformer configurable in impedance and in voltage which allows it to serve as a universal spare for multiple units in a given fleet. However, the key innovation in this new concept is the online adjustable leakage impedance which allows the transformer to change its impedance without interrupting the transmission line operation. The flexible power transformer can be designed with up to three low voltage transmission class ratings and up to 12 impedance values changeable both online and offline. This report provides an overview of the design, manufacturing, testing, and commissioning of the 165kV, 60MVA prototype built including the results of the field performance validation tests. The prototype was specified in collaboration with Cooperative Energy, the utility host. It was designed and tested in the factory according to IEEE standard C57.12.00 and followed all protocols for transportation, installation, and commissioning of a power transformer. In addition to the prototype, a flexible protection system capable of automatically adjusting its settings upon the transformer impedance was also developed and deployed in the for testing and validation. On September 3, 2021 the prototype was energized in Cooperative Energy’s substation in Columbia, Mississippi to become the world’s first flexible power transformer in operation. Its performances and impact on the grid operation were demonstrated through different field tests. Results obtained confirm that the impedance of the flexible transformer can be varied under load through its full range, from 4.3% to 9.3%, without adverse impacts on the line operation, the protection system, the transformer stability and health condition. Results also proved that the flexible transformer is very effective in controlling power transfer through the line or load sharing between units operating in parallel. Indeed, it was proven that higher impedances decrease the thruput power of the transformer while lower impedances increase it. Up to 26MW was controllable on a line loading of 45MVA. It was also possible to demonstrate that the variation of the transformer impedance has no effect on the circulating current between units in parallel, except a minor transient during the impedance change. It was also proven that the flexible protection relay can update its protection settings automatically when the impedance change was detected. The prototype has operated continuously for more than 12 months now with a peak load exceeding 50MVA corresponding to >80% of its ONAN power rating. No alarm, trip or sign of failure has been reported by the utility. In addition to the development and deployment of the flexible transformer prototype, investigations were carried out on new nanodielectric fluids to replace the mineral oil used in power transformers with the goal of reducing their footprint and weight. The key parameters that were targeted for improvement included the breakdown voltage to reduce clearances between windings and tank hence the footprint; viscosity and thermal conductivity to increase the cooling efficiency and therefore to reduce the winding material. Several nanodielectric mixtures with mineral oil including with alumina (Al2O3), titania (TiO2) and Borum Nitrate (BN) with different surfactants have been analyzed and tested. Unfortunately, despite encouraging results no nanofluid candidate has been found viable to replace mineral oil. With the formulations tested, breakdown voltages are generally similar to mineral oil at lower particle contents and worse at higher particle contents. Viscosity appreciably increased at particles concertation over 2 wt% and thermal conductivity increased slightly at 5wt% and appears to be 10-15% higher at 10 wt% particle content. It is recommended to continue investigations to find solutions that can help increase the power density of future flexible power transformers. Flexible power transformers can significantly help the future power grid by providing more flexibility and resiliency. Indeed, by providing voltage and impedance flexibility, flexible power transformers reduce the need for multiple spares, hence inventory costs for utilities. With their online controllable impedance, they can provide support to the grid and help manage short-circuit currents, power flow, line congestion, and grid stability which will become more important with higher penetrations of intermittent renewable resources. During the field validation tests, it was demonstrated that up to 26MW was controllable on a line loading of 45MVA when the transformer impedance was varied from its minimum to its maximum range. Also, with the impedance range, the short-circuit currents could be reduced by up to 38% at the load side of the transformer. With its controllable impedance, flexible transformers can be used in future strategies of grid resilience to help better prepare the grid to face forecasted severe events including storms, heat waves and contingencies. The flexible power transformers can also find role in other applications including high voltage transmission cables such as offshore wind farms where solutions for energizing the cables and managing the reactive power are of critical importance. The designed flexible power transformer is now fully validated and ready for commercialization. Further analysis on the benefits of flexible power transformers for grid stability and short-circuit management including current limiting capability, reclosure and line restoration, control of inrush current, sizing of flexible AC components (FACTS) would help its rapid adoption by the industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of Loss-of-Offsite-Power Events: Update

Loss-of-offsite power (LOOP) can have a negative impact on a nuclear power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study were based on the operating experience during calendar years 1987–2020, while the most recent 15-year data (i.e., from 2006–2020) were used for most analyses in this report. LOOP events during critical operation that did not result in a reactor trip are not included. Frequencies and durations were determined for four LOOP event categories: plant-centered, switchyard-centered, grid-related, and weather related. Highly significant decreasing trends in the LOOP occurrence rates were identified for All-LOOPs during critical operation (p-value = 0.001) and switchyard-centered LOOPs during critical operation (p-value = 0.002) for the most recent 10-year period (2011–2020). Adverse trends in LOOP durations continue for switchyard-centered LOOPs (p-value = 0.005), All-LOOPs (p-value = 0.019), as well as All-LOOPs during shutdown operation (p-value = 0.003). Statistical tests show the LOOP counts are not uniformly distributed across the 12 months, and variation among the months exists for plant-centered LOOPs (p-value = 0.028), grid-related LOOPs (p-value = 0.021), All-LOOPs (p-value = 0.003), and All-LOOPs during critical operation (p-value = 0.008). The engineering analysis of LOOP data showed for the period of 2006–2020, the equipment failure events were dominated by failures of circuits and relay; human errors have been less frequent and occurred primarily in maintenance; and weather events were dominated by tornadoes and lightning.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of Loss-of-Offsite-Power Events: 2021 Update

Loss-of-offsite power (LOOP) can have a negative impact on a nuclear power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study were based on the operating experience during calendar years 1987–2021, while the most recent 15-year data (i.e., from 2007–2021) were used for most analyses in this report. LOOP events during critical operation that did not result in a reactor trip are not included. Frequencies and durations were determined for four LOOP event categories: plant-centered, switchyard-centered, grid-related, and weather-related. These categories (and the All-LOOPs group which contains all LOOPs without regarding of the four categories) could be further grouped by whether a LOOP event occurred during critical operation, during shutdown operation, or during all operations. The following decreasing trends in the LOOP occurrence rates were identified for the most recent 10-year period (2012–2021): All-LOOPs during critical operation, switchyard-centered LOOPs during critical operation, and grid-related LOOPs during critical operation. Adverse trends in LOOP durations continue for switchyard-centered LOOPs during all operations, All-LOOPs during all operations, and All-LOOPs during shutdown operation for the 1997–2021 period. Statistical tests show the LOOP counts for the period of 2007–2021 are not uniformly distributed across the 12 months, and variation among the months exists for grid-related LOOPs during all operations, All-LOOPs during all operations, and All-LOOPs during critical operation. The engineering analysis of LOOP data showed for the period of 2007–2021, the equipment failure events were dominated by failures of relay and other; human errors have been less frequent and occurred primarily in maintenance and switching; and weather were dominated by tornadoes then by lightning and hurricane. Weather was the cause for 45% of LOOPs for the last fifteen years (2007– 2021) but only for 20% of LOOPs for the previous 20 years (1987–2006) .

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Outdoor Test Bed Performance of a Power Line Sensor Using a Real-Time Event Simulator

This report summarizes the design and application of an outdoor power line sensor testbed (OPLST) with a real-time simulator and power meter to compare a potential transformer (PT) and current transformer (CT) versus an advanced line-post sensor. The OPLST was created to validate advanced medium-voltage (20/34.5 kV) outdoor power line sensors used in electrical distribution systems. Electrical utilities have installed metering and relay-protection transformers like PTs and CTs for several decades. The PTs/CTs are iron core measurement transformers based on the electromagnetic induction principle and provide reliable data in normal grid operation. However, new outdoor power line sensors (OPLS) using other technologies like voltage divider, Rogowski coil and optical principles have become available and may have favorable performance and costs compared to PTs/CTs. Therefore, the importance of testing these technologies with the PT/CT, to compare the measured phase voltage/current at different power grid scenarios is crucial to understand the performance of these new OPLS. For this study a G&W Electric Model CVS-36-O power line sensor was chosen as the OPLS to test with voltage/current signals. An OPAL-RT Technologies Model OP4510 real-time simulator and Schweitzer Engineering Laboratories Model SEL-735 power meter were installed with the 20/34.5 kV OPLST to compare the measured transient events collected from an advanced OPLS and the PT/CT. This system is installed at the Distributed Energy Communications and Control (DECC) lab, Oak Ridge National Laboratory (ORNL). The simulator generated different power grid scenarios (electrical faults, capacitor bank operation, service restoration, etc.), and its analog-output signals were connected to the voltage/current amplifiers that feed the 20/34.5 kV aerial cable loop through the PT/CT devices. Additional PT/CT devices were also wired with the medium voltage aerial cable loop to measure the phase current/voltage signals and server as references. After each test, common format for transient data exchange (COMTRADE) files were collected from the SEL-735 power meter and used to compare the performance of the OPLS with the PT/CT. The behavior of analog signals, harmonic components, total harmonic distortion and crest factors were assessed and found favorable for the G&W sensor as compared to the reference PT/CT.

24 POWER TRANSMISSION AND DISTRIBUTION↗

INL Site ARG-US Implementation – FY22 Activities and FY23 Plans

The Packaging Certification and Life Cycle Management program at Argonne National Laboratory (ANL) developed a suite of monitoring systems collectively referred to here as ARG-US. ARG-US provides necessary data for nuclear facility and system operation and maintenance, and has been previously demonstrated in hot cells, radioactive material (RAM) storage areas, and RAM shipment trucks. It has also been installed directly on RAM storage and shipment containers. ARG-US offers some unique advantages over other commercially available systems by using wireless data connections, battery power supplies, and customizable monitoring methods. Idaho National Laboratory (INL) has been tasked with investigating applications for ARG-US at INL site facilities, which are operated by several different contractors. The initial investigation scope centered on CPP-603 Irradiated Fuel Storage Facility in relation to the upcoming Department of Energy (DOE) Spent Nuclear Fuel (SNF) Packaging Demonstration. The investigation has been led by the Used Fuel Management Department in INL’s Nuclear Science and Technology (NS&T) directorate. This investigation is expected to recommend INL site processes or facilities in which to implement ARG-US systems. INL has engaged local site technical and oversight representatives, security, nuclear safeguards, and program management personnel to identify good candidates for ARG-US test implementations. INL has identified the following high-level goals for any INL site implementation of ARG-US: provide unique testing environments, prompt development of new monitoring methods/techniques for the ARG-US suite, and acquire useful monitoring for the user facility. As a result, INL suggests three program areas for further investigation: CPP-603 Fuel Handling Cave (FHC), legacy mixed waste storage systems at Idaho Nuclear Technology & Engineering Center (INTEC) known as the “Tank Farm,” and periodic and emergency environmental monitoring. This progress report relates activities undertaken in this investigation, describes the preliminary areas of interest for limited scope ARG-US testing or implementation, and relays expected actions for completing the task scope. This report offers an opportunity to the program sponsor, technical leads at ANL, and INL site representatives to give feedback on the initial assessment and make recommendations on the forthcoming activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Second Target Station High-Fidelity Target Activation Comparison

The development of the Second Target Station (STS) target system at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) is well underway. The target system at STS consists of a rotating target disk that contains 21 segments of tungsten clad in tantalum clad in steel. A key aspect of the design of the target system is to account for the delayed heating and material damage caused by the delayed dose from decaying radionuclides. These radionuclides are a product of either spallation reactions or transmutation of the nuclei in the target system. These radionuclides build up in the target system components over the lifetime of the facility, and the radiation that is emitted can deposit energy in the components causing significant component heating and material damage. Monte Carlo N-Particle (MCNP) Version 6.2 transports the various particle species and calculates the spallation products and neutron fluxes throughout the target system. These spallation products and neutron fluxes along with the material definition of each component are relayed to the CINDER2008 transmutation code to calculate the radionuclide inventories and the corresponding decay gamma emission spectra. MCNP6.2 coupled with CINDER2008 is the computational method-of-choice for the analysis discussed in the following sections of this report. The analysis focuses on validating major assumptions in calculating the radionuclide inventory in the STS target system: all of the target segments are fresh, unirradiated material when the protons are incident on the segment, the average of the 21 segments of the target is sufficient to represent a single segment, and that averaging the proton pulse structure over time does not significantly affect the radionuclide inventory. The position-averaged, high-fidelity, and single-tally computational methods are used to validate the assumptions and provide a point of comparison to evaluate how the assumptions impact the radionuclide inventories. A more detailed explanation of the three computational methods is provided in Section 2. The position-averaged and single-tally methods are less computationally expensive when compared with the high-fidelity method where 54,000 individual calculations are needed to calculate 1 hr of STS operation. Section 3 details the comparison of the three methods to show that the assumptions made in the position-averaged method do not significantly impact the radionuclide inventory after 1 hr of operation. The discussions and results in this report are for 1 hr of operation. Due to the computational cost associated with calculating the transmutation and activation using the high-fidelity method, only 1 hr of operation has been calculated. The discrepancies observed after 1 hr of operation are not extrapolated out to longer operational times, and this report does not address how the discrepancies between the computational methods may manifest for longer operational periods.

43 PARTICLE ACCELERATORS↗

Flash Neutron Imaging [Poster]

The NNSS has extensive historical experience with high-fidelity flash neutron imaging which may be applicable to the needs of NA-22. In recent neutron imaging tests, a dense plasma focus (DPF) discharges a capacitor bank across a hydrogen-filled diode to create a flash of fusion neutrons emitted from a point, which can be used for active interrogation. Object inspection may include both radiography transmission imaging as well as emission imaging of the subject via an aperture. A scintillator screen (coupled to a low-Z converter when necessary) converts deposited energy to visible light, which is relayed through optics to an ultra-sensitive visible imager contained in a light-tight box. Flash photon imaging, utilizing bremsstrahlung emission instead of fusion neutrons, is also available and is more mature.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗