Engineering Papers⌕ Search

DOE OSTI · 1908071

Second Target Station High-Fidelity Target Activation Comparison

Abstract

The development of the Second Target Station (STS) target system at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) is well underway. The target system at STS consists of a rotating target disk that contains 21 segments of tungsten clad in tantalum clad in steel. A key aspect of the design of the target system is to account for the delayed heating and material damage caused by the delayed dose from decaying radionuclides. These radionuclides are a product of either spallation reactions or transmutation of the nuclei in the target system. These radionuclides build up in the target system components over the lifetime of the facility, and the radiation that is emitted can deposit energy in the components causing significant component heating and material damage. Monte Carlo N-Particle (MCNP) Version 6.2 transports the various particle species and calculates the spallation products and neutron fluxes throughout the target system. These spallation products and neutron fluxes along with the material definition of each component are relayed to the CINDER2008 transmutation code to calculate the radionuclide inventories and the corresponding decay gamma emission spectra. MCNP6.2 coupled with CINDER2008 is the computational method-of-choice for the analysis discussed in the following sections of this report. The analysis focuses on validating major assumptions in calculating the radionuclide inventory in the STS target system: all of the target segments are fresh, unirradiated material when the protons are incident on the segment, the average of the 21 segments of the target is sufficient to represent a single segment, and that averaging the proton pulse structure over time does not significantly affect the radionuclide inventory. The position-averaged, high-fidelity, and single-tally computational methods are used to validate the assumptions and provide a point of comparison to evaluate how the assumptions impact the radionuclide inventories. A more detailed explanation of the three computational methods is provided in Section 2. The position-averaged and single-tally methods are less computationally expensive when compared with the high-fidelity method where 54,000 individual calculations are needed to calculate 1 hr of STS operation. Section 3 details the comparison of the three methods to show that the assumptions made in the position-averaged method do not significantly impact the radionuclide inventory after 1 hr of operation. The discussions and results in this report are for 1 hr of operation. Due to the computational cost associated with calculating the transmutation and activation using the high-fidelity method, only 1 hr of operation has been calculated. The discrepancies observed after 1 hr of operation are not extrapolated out to longer operational times, and this report does not address how the discrepancies between the computational methods may manifest for longer operational periods.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

McClanahan, Tucker, Remec, Igor. 2022-11-01. Second Target Station High-Fidelity Target Activation Comparison. https://doi.org/10.2172/1908071

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Design and Integration of High Precision Superconducting Magnet Power Supply Systems

This paper reviews the design and integration approach being taken to power more than 400 superconducting magnets in Electron Ion Collider (EIC) by power supplies ranging from 20V to 400V and 100A to 18kA. A major challenge is to integrate existing legacy power supplies with new high current systems and maximize performance and reduce costs. Successful implementation requires coordinated integration of power convertors, current regulation, quench protection, energy extraction, machine protection, controls and existing accelerator infrastructure.

43 PARTICLE ACCELERATORS↗

Searching for the Most Harmful Field Errors in the HSR IR Superconducting Magnets

In this project, we improve beam stability for the Electron-Ion Collider. Magnetic field errors can reduce beam stability, making it essential to identify the field errors that have the greatest impact on accelerator performance. However, this is particularly challenging because beam stability depends on the complex interactions of many magnetic field errors, resulting in a high-dimensional and nonlinear optimization problem. We determine which field errors are the most influential for the large physical aperture superconducting magnet B2PF, a critical magnet in the Interaction Region (IR) in the Hadron Storage Ring (HSR). We complete and analyze nearly 30,000 simulations on the Brookhaven National Laboratory Linux Cluster by varying 18 nonlinear magnetic field errors. We evaluate beam stability using the dynamic aperture and the tune diffusion. We identify the field errors that most strongly influence beam stability and establish quantitative field error tolerances that improve accelerator performance.

43 PARTICLE ACCELERATORS↗