Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROCUREMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Data Interconnection Exploration

This project involves innovating the way the Quality Assurance organization at the Jet Propulsion Laboratory (JPL) tracks the receiving inspection of JPL Critical Items (JCI) procured from suppliers. The Quality Assurance organization uses a Microsoft Access based front-end to enter items into an inspection queue. The current design has grown to be much more than was expected when the inspection queue system was created in 2007. The goal is to migrate to a web based solution that will allow the handling of more data, multiple input interfaces, and customizable display options. This has been achieved by implementing a divided tables scheme, the use of ColdFusion programming language, and the usage of Web 2.0 technologies such as AJAX and jQuery. These updates will allow for future expansion as well as the standardization of inspection queues for the Quality Assurance organization. When engineers and scientists order flight hardware, they cannot use it straight away. After a spacecraft or a satellite has been launched, it will be impossible to repair; therefore, the parts used must be inspected to make sure they are operating correctly and within the required specifications. The task of inspecting these JPL Critical Items (JCI) falls on the Quality Assurance organization. One of the tools the receiving inspection group uses is a database to maintain a queue of inspections that need to be done and of inspections that have been completed. The current Access interface has worked well but increased amounts of data, multiple input interfaces, and changes to how data is handled have made it necessary to seek a new way of organizing items for inspection. In addition, the different inspection groups have recently been merged and each has different ways of keeping track of inspection information. The ultimate goal is for the new group to have one shared inspection queue and website. To achieve this goal, I have been working with Ian Luczon of Procurement Quality Assurance and 3 Myers Hawkins, another intern, to not only create the new queue for receiving inspection but also a central web portal for the newly combined inspection group.

flight hardware↗

Viking GCMS Data Restoral and Perceiving Temperature on Other Worlds: Astrobiology Projects at NASA Ames

The primary task for the summer was to procure the GCMS data from the National Space Science Data Coordinated Archive (NSSDCA) and to assess the current state of the data set for possible reanalysis opportunities. After procurement of the Viking GCMS data set and analysis of its current state, the internship focus shifted to preparing a plan for restoral and archiving of the GCMS data set. A proposal was prepared and submitted to NASA Headquarters to restore and make available the 8000 mass chromatographs that are the basic data generated by the Viking GCMS instrument. The relevance of this restoral and the methodology we propose for restoral is presented. The secondary task for the summer is to develop a thermal model for the perceived temperature of a human standing on Mars, Titan, or Europa. Traditionally, an equation called "Fanger's comfort equation" is used to measure the perceived temperature by a human in a given reference environment. However, there are limitations to this model when applied to other planets. Therefore, the approach for this project has been to derive energy balance equations from first principles and then develop a methodology for correlating "comfort" to energy balance. Using the -20 C walk-in freezer in the Space Sciences building at NASA Ames, energy loss of a human subject is measured. Energy loss for a human being on Mars, Titan and Europa are calculated from first principles. These calculations are compared to the freezer measurements, e.g. for 1 minute on Titan, a human loses as much energy as x minutes in a -20 C freezer. This gives a numerical comparison between the environments. These energy calculations are used to consider the physiological comfort of a human based on the calculated energy losses.

FangeraEuro(TM)s comfort equation↗

A Tailored Concept of Operations for NASA LSP Integrated Operations

An integral part of the Systems Engineering process is the creation of a Concept of Operations (ConOps) for a given system, with the ConOps initially established early in the system design process and evolved as the system definition and design matures. As Integration Engineers in NASA's Launch Services Program (LSP) at Kennedy Space Center (KSC), our job is to manage the interface requirements for all the robotic space missions that come to our Program for a Launch Service. LSP procures and manages a launch service from one of our many commercial Launch Vehicle Contractors (LVCs) and these commercial companies are then responsible for developing the Interface Control Document (ICD), the verification of the requirements in that document, and all the services pertaining to integrating the spacecraft and launching it into orbit. However, one of the systems engineering tools that have not been employed within LSP to date is a Concept of Operations. The goal of this project is to research the format and content that goes into these various aerospace industry ConOps and tailor the format and content into template form, so the template may be used as an engineering tool for spacecraft integration with future LSP procured launch services.

Systems↗

Tailoring a ConOps for NASA LSP Integrated Operations

An integral part of the Systems Engineering process is the creation of a Concept of Operations (ConOps) for a given system, with the ConOps initially established early in the system design process and evolved as the system definition and design matures. As Integration Engineers in NASA's Launch Services Program (LSP) at Kennedy Space Center (KSC), our job is to manage the interface requirements for all the robotic space missions that come to our Program for a Launch Service. LSP procures and manages a launch service from one of our many commercial Launch Vehicle Contractors (LVCs) and these commercial companies are then responsible for developing the Interface Control Document (ICD), the verification of the requirements in that document, and all the services pertaining to integrating the spacecraft and launching it into orbit. However, one of the systems engineering tools that have not been employed within LSP to date is a Concept of Operations. The goal of this paper is to research the format and content that goes into these various aerospace industry ConOps and tailor the format and content into template form, so the template may be used as an engineering tool for spacecraft integration with future LSP procured launch services. This tailoring effort was performed as the authors final Masters Project in the Spring of 2016 for the Stevens Institute of Technology and modified for publication with INCOSE (Owens, 2016).

Knowledge↗

Development of the European Service Module Propulsion Subsystem for the Multi-Purpose Crew Vehicle

2013, NASA and the European Space Agency (ESA) entered into an international partnership to develop the European Service Module (ESM) for use on NASA's Multi-Purpose Crew Vehicle (MPCV), also known as Orion. The MPCV will be used as the principal spacecraft for future human space exploration missions beyond low earth orbit. The ESM Propulsion Subsystem (PSS) is a pressure-fed, bi-propellant propulsion system, being developed by Airbus Defense and Space under contract to ESA. For this effort, NASA is responsible for the traditional role of insight/oversight to ensure that the PSS delivered by Airbus meets all MPCV Program requirements. In addition, the NASA Propulsion team also has some unique responsibilities that are a result of the Implementing Agreement (IA) between NASA and ESA for development of the ESM. These responsibilities include: (1) providing the main engine and Thrust Vector Control (TVC) assembly for the PSS. This is being accomplished through the delta qualification and re-use the Space Shuttle Orbital Maneuvering System (OMS) engine and TVC assembly; (2) procurement and delivery of the Auxiliary engines (R-4Ds) for the PSS. These engines are being procured by NASA from Aerojet-Rocketdyne via Lockheed Martin, the prime contractor for the MPCV, per an Airbus-provided specification; and (3) conducting the integrated systems hot-fire test which will qualify the end-to-end PSS for flight on MPCV. This test is being conducted at the NASA White Sands Test Facility (WSTF) using an Airbus-provided test article known as the Propulsion Qualification Model (PQM).

Multi-Purpose Crew Vehicle↗

Artemis: An Overview of NASA’s Activities to Return Humans to the Moon

NASA is well underway in its plans to return humans to the Moon and build long-term infrastructure both in orbit and on the surface. Following the Artemis I and Artemis II flight tests, NASA will begin crewed landings and regular missions to the Moon. Artemis will return value to the American public and the global community, enable groundbreaking scientific discovery, and prepare NASA and its partners for exploration of the solar system. Work on the initial Human Landing System (HLS), procurement activities for future HLS, and work on the initial modules of the lunar-orbiting Gateway are underway. International partnerships are playing a critical role in the planning, development, and execution of these missions. As of December 2021, three international partners have entered agreements to contribute to the Gateway and 14 nations have signed the Artemis accords. A new spacesuit acquisition strategy will stimulate economic growth and meet the growing needs of NASA and emerging customers. Requirements development is underway for an unpressurized lunar surface rover and plans for a pressurized rover, foundation surface habitat, and the Artemis Base Camp are in work. This paper will provide an update on the HLS demonstration missions and the procurement status for HLS services; a comprehensive look at the Gateway’s components and related statuses; a summary of planned surface systems; and an outline of the strategies NASA will use to successfully implement these plans, preparing for humanity's next giant leap: Mars.

Artemis↗

Commercial Low-Earth Orbit Destination (CLD) Concept of Operations

This concept of operations describes: - High-level Government goals, objectives, and needs for the CLD program, vehicle(s), and missions, - Strategies, policies, and processes for developing, certifying, maintaining, using, and retiring CLDs in the context of Government use, and - Government and CLD partner roles, responsibilities, and interactions during various phases of Government CLD operations. The intent of this document is to describe the overall high-level concept of how the end-to-end CLD service will be used to convey the nature and scope of services the Government intends to procure from the CLD partner. It will provide insight into NASA’s concepts for CLD operations rather than to provide mature, explicit, or complete requirements. It addresses how the concept of operations will be used to meet NASA expectations from an operational perspective to facilitate an understanding of the end-to-end CLD service needs, goals, and objectives (NGOs). Formal CLD requirements and standards are detailed in the NASA Commercial LEO Development Program’s (CLDP) various requirements, interface, process, and standards documents, as well as the contractual Statements of Work (SOW) and Data Requirement Deliverables (DRD). As such, the Concept of Operations can use terms such as “should” or “may” or “expects to” since it is not a contractual requirements document. It exists solely to convey the initial nature and type of services the Government intends to procure and is not, per se, a requirements document.

Operations↗

Process Development and Testing for Lunar Habitats

Non-metallic solutions for Lunar bases are appealing due to their light weight and ability to block many forms of radiation. Composite materials made from different combinations of these non-metallic materials enable effective mating of dissimilar materials for strong structures such as pressurized habitats. Inserting and manufacturing composite structural materials on the Moon presents several challenges, however: the oxygen levels inside pressurized habitats will be relatively high, radiation that is blocked causes damage and the lack of atmosphere results in a high-magnitude negative pressure environment. In the past two years, the Materials and Processes Lab (EM01) invested in two internal research and development (IRAD) proposals for testing and procurement of composite materials. One proposal endeavors to determine flammability and radiation damage of various composite materials with a focus on carbon fiber and ultra-high molecular weight polyethylene (UHWMPE). The other proposal enables procurement of chopped fiber spray equipment materials which will be used to develop a novel technique for chopped UHMWPE fiber layup, similar to the chopped fiberglass layups used for making large structures such a boat hulls and hot tubs.

Composite↗

The Human Research Program Grant Lifecycle & Data Integration Schedule: Infographic

The Human Research Program (HRP) Grant Lifecycle process can be described using information from several government authoritative sources with overlapping generalizations. It is the responsibility of the HRP Program Planning & Control (PP&C) Office and the Data Management Integration Office (DMIO)to interpret this information into a cohesive process that can be communicated to the human research organization. PP&C and DMIO have been exploring training opportunities to facilitate understanding through the form of infographics. This communication tool combines eye-catching visuals and text making complex information and data more digestible and shareable. The infographic poster tells a short story about a federally awarded grant and is intended to help both the new and experienced HRP workforce understand the timeline for a research procurement and where their specific tasks fall within the 4 phases of the grant lifecycle. The Pre-Award, Award, Post-Award, and Closeout phases are overlayed with business swimlanes so HRP stakeholders can see where they fit into the timeline rather than working in an isolated part. This includes the Chief Scientist Office (CSO), PP&C, the Data Management Integration Office (DMIO), the Principal Investigator (PI), the Element stakeholders, the LSDA Archivists, and the Research & Operations Integration (ROI) team along with the stakeholders in the Human Health and Performance Directorate. Additionally, the poster introduces (1) the HRP Data Integration Schedule identified in the HRP Data Management Plan HRP-48047, Table 8-2 and (2) a Smartsheet Solution to automate the grants tracking business process. Emphasis is given to the Data Integration Schedule which is the basis for the milestone tasks that are to be completed during the Post-Award phase in the grant lifecycle. The poster is also an opportunity to present the Smartsheet Solution, a software collaboration and work management tool used to assign tasks and track project progress. This PP&C FY24 effort will facilitate an end-to-end solution to track grants and provide insight to the health of HRP grant research procurements using metrics, reports, and dashboards.

J Peace↗

ESPC ESA Training Series: Site-Specific/Stand-Alone Contract Vehicle

This webinar provides instructions and resources for financing distributed energy projects (e.g., on–site renewable energy, storage, and combined heat and power) using an energy savings performance contract (ESPC) energy sales agreement (ESA) through the site–specific/stand–alone contract vehicle. The site–specific/stand–alone contract vehicle is a procurement process using a request for proposal (RFP). Topics covered during the webinar include forming a strong project team, validating the feasibility of the distributed energy project at a site, acquisition planning, RFP development, procurement, proposal evaluation and contract award, and the construction and performance period. This webinar also provides an overview of the resources available in the ESPC ESA Toolkit, such as checklists and templates.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Fabrication experience of the pre-production PIP-II SSR2 cavities at Fermilab

The Proton Improvement Plan-II (PIP-II, [1]) linac will include 35 Single Spoke Resonators type 2 (SSR2). A total of eight pre-production SSR2 jacketed cavities will be procured and five installed in the first pre-production cryomodule. The mechanical design of the jacketed cavity has been finalized and it will be presented in this paper along with fabrication and processing experience. The importance of interfaces, quality controls and procurement aspects in the design phase will be remarked as well as lessons learned during the fabrication process. Furthermore, development studies will be presented together with other design validation tests.

43 PARTICLE ACCELERATORS↗

Techno-Economic Analysis

This National Energy Technology Laboratory presentation was given at the Carbon Conversion Procurement Grant Program Regional Workshops. The workshops are organized collaboratively by the DOE Office of Fossil Energy and Carbon Management and the United States Energy Association. There are a series of four workshops scheduled: 1) August 30, 2022 in Knoxville, TN (University of Tennessee) 2) September 13, 2022 in Emeryville, CA (Lawrence Berkeley National Laboratory 3) September 27, 2022 in New York, NY (Orrick, Herrington, & Sutcliffe LLP) 4) October 18, 2022 in Minneapolis, MN (TBD) The intent of the workshop is to provide potential applicants with background on the Procurement Grants program and the types of information requested. The specific purpose of this presentation is to give a high-level overview of techno-economic analysis to an audience that has little to no experience conducting them. The intent is to help the audience understand why techno-economic analysis is requested in the application process and to educate on its utility.

Hackett, Gregory↗

Advancing Federal Infrastructure Through Innovation: Selecting Electric Vehicle Charging Infrastructure Wisely

The Biden Administration's issuance of Executive Orders directly addressing and accelerating Federal fleet electrification places an onus on both fleet and facility managers. This panel will help fleet and facility personnel understand how to select EVSE infrastructure in terms of implementation, energy management, and costs of procurement, installation/deployment, and electricity. The panel will cover technology aspects to include managed EVSE, bi-directional charging, implications on local electrical systems and storage needs in certain cases to buffer power demand. Discussion will include various considerations relevant to ensuring adequate EVSE, balancing infrastructure needs, and upgrades with fleet needs. The panelists will discuss how to provide sufficient infrastructure support, including which stakeholders to involve, procurement impediments, easement locations, and requirements that arise during the design and implementation process.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

An Initial Evaluation of the Elevated-Temperature Cyclic Properties of Optimized 316H Stainless Steel Fabricated by Powder Metallurgy Hot Isostatic Pressing

Powder metallurgy hot isostatic pressing (PM-HIP) is a mature advanced manufacturing technology, which can consolidate metallic powder under high temperature and pressure to generate near-net shape components. This process can lower production costs and reduce component lead times for nuclear reactor construction and can be readily deployed in the near term for microreactor components because of their smaller size. The purpose of this work is to continue the evaluation of elevated-temperature cyclic material properties for PM-HIP 316H stainless steel. Prior scoping results have shown that the commercially procured PM-HIP stainless-steel materials have reduced creep-fatigue performance compared to wrought 316 stainless steels. To better understand how PM-HIP processed material properties compare to traditional manufacturing methods, additional billets of PM-HIP 316H stainless steel were procured and tested. This testing is necessary to understand how elevated-temperature properties are influenced by the PM-HIP process and what data are needed for incorporating PM HIP 316H into the American Society of Mechanical Engineers Boiler Pressure Vessel Code, Section III, Division 5 for high temperature reactor construction. Specifically, an additional PM-HIP 316H stainless steel billet with lower oxygen and nitrogen concentrations was fabricated by the Nuclear Advanced Manufacturing Research Centre of the United Kingdom and tested to understand if elevated-temperature cyclic properties can be improved. The creep-fatigue resistance of the material from this new billet did not show appreciable improvement compared to prior testing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Rescue of Unique Liquid IP-2 Portable Tanks at Savannah River Site – 25078

Westinghouse Savannah River Company, the SRS Management and Operations Contractor at the time, procured six large IP-2 portable tanks capable of transporting liquids in 2003 to support the layup of the F Canyon at SRS. F Canyon was one of two full-scale hardened radiochemical separations facilities built at SRS in the 1950s as part of the initial construction of the Site. F Canyon and H Canyon provided actinide separations capabilities for SRS through the end of the Cold War. Following the end of the Cold War era, the decision was eventually made that only one of these radiochemical separations facilities at SRS would still be needed moving forward. As H Canyon was considered better suited for ongoing SRS missions, F Canyon was placed into a layup state in the first decade of the 21st Century, with F Area deactivation completing in 2006. This process resulted in the creation of excess, radioactively contaminated solutions, which required disposition. These solutions included contaminated organic solutions as well as DU-bearing aqueous solutions. The six portable tanks were procured to support the transportation of these solutions.

Fee, Nathaniel C. [Savannah River Nuclear Solution↗

BESS Digital Assurance, Supply Chain Risk Management, and Emerging Regulation Session Two

The TADA BESS Supply Chain Workshops are designed to equip participants with the knowledge and tools necessary to address the evolving challenges at the intersection of battery energy storage systems (BESS), cybersecurity, and supply chain vulnerabilities. The workshops emphasize the application of Cyber-Informed Engineering (CIE) principles using INL’s procurement guide and the CIE-BAT tool. Attendees will develop risk-based security strategies and actionable compliance roadmaps tailored to their BESS projects. Additionally, the program fosters a collaborative network of practitioners and provides guidance on navigating emerging regulatory requirements, including FEOC rules under the OBBB framework, to assess and enhance organizational readiness. A comprehensive exploration of BESS cybersecurity supply chain risks, systematic vendor risk assessment through the BESS Procurement Guide, and practical application of the INL SCRM Chatbot for enhanced supply chain resilience. This is Session 2 of 3. (Full Version)

25 - ENERGY STORAGE↗

SPC-2918 Rev 0 MARVEL Test Loop Flowmeters

This specification contains the requirements for the design, manufacture, testing, and delivery of magnetic flowmeters to be installed on the MARVEL Primary Coolant Apparatus Test (PCAT) system. The PCAT system is a heated test loop which will be used to simulate the coolant system of a proposed sodium or NaK cooled microreactor. The system has four identical cooling loops. Installation of flowmeters on all four loops is anticipated at this time, however, the number of flowmeters may be reduced by the Project. Note that the number of flowmeters described herein is not a commitment to a particular number of procured units. The number of flowmeter units procured shall be identified on the purchase order. The MARVEL reactor is still under design, so the PCAT flowmeter design may not be directly transferrable to the reactor. It is intended that the design and development effort for the PCAT flowmeters be leveraged to the extent practical for the reactor flowmeter design.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗