Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Coal Power Generator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Update on the United States Advanced Ultra-Supercritical Program with Full Scale Component Fabrication to Develop Utility Scale Power Plants with 760°C Steam Temperature

Following the successful completion of a 15-year effort to develop and test materials that would allow coal-fired power plants to be operated at advanced ultra-supercritical (A-USC) steam conditions, a United States-based consortium is presently engaged in Phase 2 of a project which includes an advanced manufacturing effort to complete US-based supply chain development for full commercial scale (800-850 MWe) A-USC components made of nickel-based alloys, components operating at up to 760°C. The project, funded under U.S. Department of Energy Award No. DE-FE0025064, falls under the US DOE overall goal to Develop cost-effective, reliable technologies to improve the efficiency of new and existing coal-fired power plants. A-USC steam cycles have the potential to improve cycle efficiency, reduce fuel costs, and reduce greenhouse gas emissions. Current development and demonstration efforts are focused on enabling the construction of A-USC plants, operating with steam temperatures as high as 1400°F (760°C) and steam pressures up to 5000 psi (35 MPa), which can potentially increase cycle efficiencies to 47% HHV (higher heating value), or approximately 50% LHV (lower heating value), and reduce CO 2 emissions by roughly 25%, compared to today’s U.S. fleet. A-USC technology provides a lower-cost method to reduce CO 2 emissions, compared to CO 2 capture technologies, while retaining a viable coal option for owners of coal generation assets. Among the specific goals of Phase 2 of the ComTest Project are to: validate that components made from advanced nickel-based alloys can operate and perform under A-USC conditions accelerate the development of a U.S.-based supply chain for the full complement of A-USC components close the remaining gaps and reduce the risks for manufacturing components from advanced materials for commercial demonstration fabricate full-scale versions of selected key components made of nickel-based alloys validate a qualified U.S. supply chain, to provide greater cost certainty for components obtain American Society of Mechanical Engineers (ASME) code approval for new materials, components and processes Additional benefit: Manufacturing technology will be applicable to other advanced fossil energy high temperature cycles, and can support increased flexibility of existing power plants The ComTest project is managed by Energy Industries of Ohio, and technically directed by the Electric Power Research Institute, Inc., with General Electric designing the A-USC components. As stated earlier, the current phase of the effort is primarily funded by the U.S. Department of Energy, through the National Energy Technology Laboratory. This presentation outlines the motivation for the project, explains the project’s structure and schedule, and provides some of the technical details on the design of the ComTest components.

01 COAL, LIGNITE, AND PEAT↗

Remining and Restoring Abandoned US Mining Sites: The Case for Materials Needed for Zero-Carbon Transition

The electricity generation sector is responsible for 25% of the world’s greenhouse gas (GHG) emissions and thus has been the focus of efforts to transition to clean energy and sustainable development in many nations. In the past 20 years, renewable energy sources have been the fastest-growing energy source in the world, comprising almost 29% of the world’s electricity generation in 2020. Renewable energy sources are expected to comprise nearly 95% of the world’s power capacity growth through 2026, with a share of planned capacity expansion of up to 46% in 2026. The rapid development of renewable energy sources and technologies will require an enormous amount of raw materials to replace coal and gas plants and increase in the capacity to handle growing electricity demand because renewable energy sources have a low-power density and intermittent behavior. Accounting for the expected scale of rapidly deploying renewable energy sources that require rare earth elements (REEs), cement, and steel, the mining industry may face a supply problem for the materials critical for clean energy. And, as the exploration and development of new mining sites can be expensive and risky, the mining industry may require economic stimuli to grow supply. The increasing demand for renewable energy resources makes mining a threat to the environment unless proper regulations are established and calls for remining, cleanup, and circular economic development are made. Mining also contributes to environmental injustices related to the exploitation and pollution of lands near communities that are dependent on biodiversity in the area, while not always benefiting from technological advancements provided by the use of renewable energy and technologies. This study explored the opportunity of remining abandoned mining waste to extract metals and minerals essential for the production of renewable energy sources. The authors analyzed materials used in the production of these technologies, materials readily available in the United States, and which materials can be extracted locally in the United States from abandoned mine waste. The authors also studied environmental injustices that populations near mining sites experience and ways to mitigate these injustices, such as providing more control over extraction and cleanup activities, providing more job opportunities in those areas, and offsetting costs associated with cleanup and land restoration projects.

42 ENGINEERING↗

Nonlinear multiobjective and dynamic real-time predictive optimization for optimal operation of baseload power plants under variable renewable energy

Considering the increase of disruptive variable renewable energy penetration into the power grid, this article focuses on the investigation of a multiobjective and dynamic real-time optimization framework to address the cycling of large-scale power plants under renewable penetration. In this framework, a parallelized particle swarm optimization step is first performed to generate feasible initial points. Then, a multiobjective and dynamic real-time optimization formulation generates optimal trajectories. Further, the benefit of predictive capability is investigated for the dynamic component, which introduces the novel nonlinear multiobjective and dynamic real-time predictive optimization approach. Two multiobjective formulations to obtain Pareto front optimal in real time are explored: the modified Tchebycheff-based weighted metric and ϵ-constraint methods. Economic and environmental objectives are considered in this study. A novel topical discussion on the intersection of dynamic real-time optimization with model predictive control is also presented. The developed framework is successfully applied to a baseload coal-fired power plant with postcombustion CO 2 capture. Results indicate that the approach can be deployed for a large-scale system if automatic differentiation, model reduction, and parallelization are adopted to improve computational tractability, with computational improvement up to 120-folds after performing these steps. Finally, market and carbon policies showed an impact on the optimal compromise between the objectives with an additional 63 ton of CO 2 captured under favorable market conditions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Prairie State Generating Company Site: Storage Field Development Plan

This Storage Field Development plan presents the Storage Complex characterization results, construction, monitoring, operational plans, and costs associated with the proposed Prairie State Energy Campus - Carbon Capture and Storage (PSEC-CCS) project in Washington County, Illinois, near Marissa. The proposed storage complex, known as the St. Peter-Everton Storage Complex, comprises the St. Peter Sandstone and Everton sandstone reservoirs, with the Maquoketa Shale serving as the primary confining unit and the Knox Group as lower confining unit. The lowermost Underground Source of Drinking Water (USDW) identified for the site is the Pennsylvanian section.

01 COAL, LIGNITE, AND PEAT↗

Chapter 9: Impact of Variable Renewable Energy Sources on Bulk Power System Planning and Operations

Wind and solar photovoltaics (PV) have experienced remarkable growth in recent years, with many consequent benefits within and outside of power systems. At the same time, wind and solar PV have unique characteristics relative to the historically dominant dispatchable technologies like coal, gas, and nuclear power plants that have required and will continue to require changes in power system planning and operations. This chapter discusses planning and operational challenges of integrating wind and solar PV into bulk power systems. We first present the key characteristics of wind and solar PV that differentiate it from conventional technologies, such as variable and uncertain electricity generation, asynchronous interconnection to the power system, and near-zero marginal costs. We then link these characteristics to power system planning and operational challenges at low through high wind and solar penetrations. Finally, we discuss near- and long-term solutions to those challenges, such as diversifying the generation mix and wind and solar fleets, improving system flexibility, diversifying ancillary service products, and integrating generation and transmission planning.

bulk power system↗

Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100): Six-Month Progress Update [Slides]

Puerto Rico has committed to meeting its electricity needs with 100% renewable energy by 2050, along with realizing interim goals of 40% by 2025, 60% by 2040, the phase-out of coal-fired generation by 2028, and a 30% improvement in energy efficiency by 2040, as established in Puerto Rico Energy Public Policy Act (Act 17). Since hurricanes Irma and Maria in September 2017, DOE and its national laboratories have provided Puerto Rico energy system stakeholders with tools, training, and modeling support to enable planning and operation of the electric power grid with more resilience against further disruptions. On February 2, 2022, DOE, FEMA, and six national laboratories launched the two-year Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) to conduct comprehensive analysis of stakeholder-driven pathways to Puerto Rico's energy future. The robust and objective energy analysis entails five activities, with an emphasis on power system reliability, resilience, and generation planning. This presentation provides a six-month progress update on the study, including presentation of four initial scenario frameworks defined with extensive stakeholder input.

14 SOLAR ENERGY↗

Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) (Six-Month Progress Update) [Slides]

Puerto Rico has committed to meeting its electricity needs with 100% renewable energy by 2050, along with realizing interim goals of 40% by 2025, 60% by 2040, the phase-out of coal-fired generation by 2028, and a 30% improvement in energy efficiency by 2040, as established in Puerto Rico Energy Public Policy Act (Act 17). Since hurricanes Irma and Maria in September 2017, DOE and its national laboratories have provided Puerto Rico energy system stakeholders with tools, training, and modeling support to enable planning and operation of the electric power grid with more resilience against further disruptions. On February 2, 2022, DOE, FEMA, and six national laboratories launched the two-year Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) to conduct comprehensive analysis of stakeholder-driven pathways to Puerto Rico's energy future. The robust and objective energy analysis entails five activities, with an emphasis on power system reliability, resilience, and generation planning. This presentation was delivered in a public webinar on July 21, 2022, providing a high level summary of the progress in the first six months of the study, including presentation of four initial scenario definitions based on extensive stakeholder input.

14 SOLAR ENERGY↗

Sorbent Based Post-Combustion CO 2 Slipstream Testing

TDA Research, Inc. has developed a low-cost sorbent (alkalized alumina) based technology for post-combustion CO 2 capture. The sorbent runs in an isothermal process for adsorption and regeneration. Neither temperature swing nor pressure swing is needed. TDA designed a system which operated 10 fixed beds to simulate a moving bed process. The flow pattern was optimized to minimize the steam usage for regeneration. An excellent sorbent (Batch 1) was also developed with collaboration with our partner. The sorbent degraded after long term operation. We developed a reprocessing procedure, which can be conducted in situ, to restore the sorbent capture capacity as the fresh sorbent after running for about 1250 hours. The reprocessing extended the sorbent longevity significantly. TDA designed a pilot unit (40’ x 32’ x 11.5’), processing flue gas equivalent to 0.5 MW of power generation. It had 10 beds and each bed could hold 1.75 m 3 of sorbent. We worked with Springs Fabrication, Inc. to complete the construction of the pilot unit. It was then shipped and installed at NCCC. The pilot unit was kept running in 24-hour mode when the flue gas and steam were available. It could run automatically without operator on site. Parametric and long-term (2 months) tests were carried out successfully. The results showed that TDA’s process can achieve 90% capture and 95% CO 2 purity for both coal and NG flue gases. For coal flue gas, the system reached performance target when processing up to 0.62 MW flue gas, 24% higher than the design capacity. Thus, capital cost could be saved on the reactors and sorbent. The strip air flow was designed to be 0.25 of that of the flue gas. The test data showed the strip/flue ratio can be reduced to as little as 0.18, which saves the power consumption for the strip air blower. The pressure drop was found to be lower than what the empirical equation calculated. The sorbent still had 91.7% of original capacity after 3-month test. With the data from the pilot test, we updated the TEA. For a 550-MW e supercritical coal fired power plant with CO 2 capture, the capture cost for TDA’s process is $34.9/tonne CO 2 captured, which meets DOE’s goal of $40/tonne and is 17.1% less than the DOE baseline Case 12. Therefore, TDA’s process has a good potential for commercialization.

01 COAL, LIGNITE, AND PEAT↗

Integration of 5G and Time Sensitive Networks in Fossil Energy Generation Systems: A Case Study

Precise timing and data transmission within stringent time constraints are critical for numerous applications, such as robotics, virtual and augmented reality, industrial automation, energy and medical business, and various other sectors. Time-sensitive networks (TSN) and fifth-generation wireless communications (5G) are crucial for industrial communications, enabling convergent communication for various services using a common network core. Applications that are time-sensitive and require deterministic communications with low latency fall into this category, such as generation plant systems. This paper presents a simulated model of 5G-TSN for a fossil power plant based on the wired network parameters implemented in situ. Metrics analysis, comparison and future work are presented. © 2024 IEEE.

01 COAL, LIGNITE, AND PEAT↗

Optimal CO2 Transport and Storage Cost Screening: Application Example

Poster on “Optimal CO2 Transport and Storage Cost Screening: Application Example” for the CCUS 2025 conference held in Houston, Texas March 3-5, 2025. A major challenge to commercial scale CCS deployment from the perspective of coal and natural gas-fired power plants is understanding cost-optimal CO2 transport and viable geologic storage options. This study demonstrates unique workflows, using NETL-developed, publicly-available models and tools, to efficiently estimate optimal CO2 transport and storage (T&S) costs for each of the CO2 sources in NETL’s Carbon Capture Retrofit Databases (CCRD) for Electricity Generating Units. The results demonstrate the impact of cost-drivers on optimal T&S, and trends in optimal T&S data, based on real point sources that could be retrofitted with CO2 source technologies.

application example↗

W.A. Parish Post-Combustion CO 2 Capture and Sequestration Demonstration Project (Final Technical Report)

The Petra Nova Project (Project) is a commercial scale post-combustion carbon capture project developed by a joint venture between NRG Energy, Inc. (NRG) and JX Nippon Oil Exploration (EOR) Limited (JX). The Project is designed to separate and capture carbon dioxide (CO2) from an existing coal-fired unit’s flue gas slipstream at NRG’s W.A. Parish Electric Generating Station (WAP) located southwest of Houston, Texas. The captured CO2 is dried, compressed, and transported via an 81-mile pipeline to the West Ranch oilfield (West Ranch) in Jackson County, Texas, where it is injected to boost oil production. The Project, which is partially funded by a grant (Grant) from the United States (U.S.) Department of Energy (DOE) under the Clean Coal Power Initiative (CCPI) Round 3, uses the Kansai Mitsubishi Carbon Dioxide Recovery advanced amine-based CO 2 absorption technology (KM-CDR Process®), which was jointly developed by Mitsubishi Heavy Industries, Ltd. (MHI) and the Kansai Electric Power Co. Inc., to treat and capture at least ninety percent (90%) of the CO 2 from a 240-megawatt equivalent (MWe) flue gas slipstream off of Unit 8 at WAP. When operating at full capacity, the Project captures approximately 5,200 short tons of CO 2 per day, which would otherwise be emitted into the atmosphere, representing the largest commercial scale deployment of post-combustion CO2 capture technology at a coal power plant to date. Under the Grant, the Project was managed in 3 phases: (1) Phase 1: Project Definition / Front End Engineering Design (FEED) (2) Phase 2: Detailed Engineering, Procurement & Construction (3) Phase 3: Demonstration and Monitoring. On December 29, 2016, commercial operation of the Project was achieved, ending Phase 2 and starting Phase 3, a 3-year demonstration period running from January 1, 2017 through December 31, 2019. The key objectives of Phase 3 were to (a) demonstrate the specific advanced technologies constructed during Phase 2 and (b) monitor the injected CO 2 at West Ranch to demonstrate technologies and protocols for monitoring, verification, and accounting (MVA). As of the end of Phase 3, Petra Nova captured 3,904,978 short tons of CO 2 (3,542,537 metric tons) that was transported to West Ranch. To support the DOE obligation to monitor, verify, and account for the sequestered CO 2 at West Ranch, Petra Nova contracted with the Bureau of Economic Geology (in the Jackson School of Geosciences at The University of Texas at Austin) to (a) design a monitoring program, (b) draft an MVA Plan for DOE review and approval, and (c) working with Petra Nova and the operator of West Ranch to manage and report on the MVA activity. This report discussed the technical aspects of the project during each of the 3 phases of the project as identified above.

01 COAL, LIGNITE, AND PEAT↗

Climate Influences on Capacity Expansion Planning with Application to the Western U.S

Electric power system planners utilize a variety of planning tools to inform decisions concerning generation and transmission additions to the electric grid, the need for operational changes, and to evaluate potential stressors on the system. Numerous factors contribute to the planning process including projected fuel and technology costs, policy and load profiles. There is also a growing recognition of the interdependency of the electric grid with other natural and engineered systems. Here we explore how future climate change and hydropower operability might influence decisions related to electricity capacity expansion planning and operations. To do so we assemble a multi-model framework. Specifically, water resource modeling is used to simulate climate impacts on future water supply for thermoelectric and hydropower generation. Separately, temperature impacts on electricity load are evaluated. Together, these climate factors spatially constrain a capacity expansion model that projects generation and transmission additions to the grid. The projected new capacity-builds are then evaluated on their operations, reliability, and cost under average and extreme climate conditions using production cost modeling. This coupled framework is demonstrated on the electric grid in the Western U.S., supporting capacity expansion planning by WECC, the North American Electric Reliability Corporation (NERC) regional entity responsible for reliability assurance of the Western Interconnection. This region was selected in part because the West is unique in that it has high potential for renewable penetrations and is experiencing large retirements/displacements of baseload resources, primarily coal, leading to possible operational challenges in terms of changing resource mix and the need for resource flexibility. Toward this challenge, planning scenarios encompass a range of alternative energy, climate and drought futures. In this context we explore answers to two strategic questions: 1) How does changing climate influence electricity expansion planning (generation and transmission) and future operations, including type and capacity of new builds, system reliability, cost and environmental impacts? 2) How does the representation of hydropower in the modeling framework influence the evaluation of bulk power system operations? Results indicate that climate has a measurable influence on recommendations concerning the capacity, type and location of new generation and transmission additions, with up to 17 GW additional capacity needed by 2038 to meet peak loads (~6.6% increase over capacity-builds based on historical climate). The extent of additional infrastructure needs is strongly influenced by future water availability for hydropower and the potential deployment of demand response technologies. Systems designed for future climate conditions were found to maintain high system reliability under a range of electricity and water availability scenarios (including significant drought), with minimal system curtailments. Additional capacity needs due to higher load tend to increase cumulative 20-year investment and operating costs by $\$$5-$\$$17 billion and generation costs increase by 9 to 19%. Finally, changing the representation of hydropower flexibility has a relatively small influence on capacity expansion in the Western Interconnection through 2038, but hydropower flexibility impacts generation costs to a similar extent as climate.

13 HYDRO ENERGY↗

Update of Emission Factors of Greenhouse Gases and Criteria Air Pollutants, and Generation Efficiencies of the U.S. Electricity Generation Sector

The last decade has seen a steady evolution of the electricity generation sector. Fuels used for electricity generation have shifted from coal to cleaner energy sources such as natural gas and renewables including solar, wind, and other renewable sources. The share of U.S. electricity generated from coal decreased from 45% in 2010 to 24% in 2019, and is expected to decrease further to 13% by 2050. The conversion efficiency of electricity generation has also increased gradually for fuels such as natural gas due as less-efficient old generators are retired and more-efficient generators replace them. These changes in the electricity generation industry are likely to cause changes in the emissions from power generation units. Emission factors of greenhouse gases (GHG) including CO 2 , CH 4 , and N 2 O, and criteria air pollutants (CAPs) including CO, NO x , PM 10 , PM 2.5 , and SO x , from power plants are important parameters for estimating life-cycle emissions associated with vehicle electrification, energy systems, and the production of materials and chemicals. The electricity generation technologies and associated emission factors in the Greenhouse Gases, Regulated Emissions, and Energy Use in Technologies (GREET) model need to be updated to reflect recent developments in the electricity generation sector. The most recent update of the electricity generation emission factors in GREET adopted a mixed method. The emission factors of CH 4 , N 2 O, NO x , and SOx were estimated using a “topdown” approach by dividing the total emissions by the total net electricity generation, because emission data of these pollutants are readily available in the Emissions & Generation Resource Integrated Database (eGRID). For other CAPs such as CO, VOC, PM 10 , and PM 2.5 , emission data were not reported in eGRID. A “bottom-up” method was used to estimate the emission factors for these pollutants by considering generic uncontrolled emission factors and the pollutant removal efficiencies of emission control technologies adopted in the electricity generation sector. However, the uncontrolled emission factors and the emission removal efficiencies of various emission control technologies considered in the 2012 study came from the legacy AP-42 emission factors, and may not reflect the actual emission performances of the electricity generation sector of today. To leverage new data that recently became available, especially emission data measured from continuous emission monitoring systems (CEMS), we developed a new “top-down” approach to estimate efficiencies and GHG and CAP emission factors for electricity generation from combustion of individual fuel types by individual combustion technologies on the basis of power-generation data from U.S. Energy Information Administration’s (EIA’s) form EIA-923, and plant emission data from Environmental Protection Agency’s (EPA’s) Clean Air Markets Division (CAMD) dataset and National Emissions Inventory (NEI) dataset. Detailed discussion of the method and data used in this study can be found in Section 2.1. With this topdown approach, we aim to improve the estimates of energy efficiencies and emission factors for power plants using a more consistent methodology, and to update the emission factors, generation efficiencies, and generation technologies mixes in GREET to reflect recent technology advancements in the electricity generation sector.

20 FOSSIL-FUELED POWER PLANTS↗

Novel Algae Technology for CO2 Utilization

The United States, the world’s largest energy user and second largest CO2 emitter, is heavily dependent on fossil energy. In 2014, U.S. coal burning utilities emitted ~1562 million (MM) tons/year (TPY) of CO2 into the atmosphere, accounting for 76% of the total US power sector emissions1. Hence, reducing the CO2 emission footprint from coal plants is widely viewed as a key element in mitigating global warming. Despite significant interest, implementation of CO2 capture technologies has been constrained by the high capture cost which significantly increases the total cost of electricity. Not only is capturing CO2 with traditional technologies expensive, but generally the CO2 has little value and additional expense must be incurred for sequestration. This project funded by a SBIR grant from the U.S. D.O.E. to Helios-NRG in collaboration with the State University of New York at Buffalo (UB) and Membrane Technology and Research Inc. (MTR) aimed to develop a novel, algae based technology to capture CO2 from the effluent of coal-based power plants and convert it to renewable bio-fuels and higher value co-products such as animal feed and nutraceuticals with the potential to enable a substantial reduction in the net cost of carbon capture. The Phase 2 project was aimed at further demonstrating the technical feasibility of the proposed multi-stage continuous (MSC) flow CO2 capture system and the generation of high-value co-products to offset the CO2 capture cost. The project was completed and the project objectives were met and exceeded. A first-of-a-kind integrated, laboratory scale MSC process unit was fabricated and tested in a greenhouse. The tests were conducted with the preferred algae species identified in Phase I and simulated flue gas containing contaminants at levels typically present in the post flue gas desulfurization (FGD) stream, including ~12% CO2, acid gas (SOX, NOX), and a large number of heavy metals. The tests were successful and demonstrated a 25g/m2/day seasonal average algae productivity and an 80% CO2 capture efficiency. Two new algae species were identified for high-value nutraceutical production. Studies to improve growth rate and nutraceutical content of these algae species were performed and a pathway for further improvements was identified. A new dewatering technology called DeAqua was further advanced. Significant improvement in the performance index was achieved. The anti-fouling membrane was developed and fabricated into a module. The fabricated membrane module was tested with algae slurry and demonstrated improved fouling resistant properties, that can potentially reduce the cost and energy of the critical dewatering step. Test data were used to simulate operation of the overall process. The preliminary economic analysis was updated and modelled based on a 5000-acre algae farm. To the extent possible, the financial and operating assumptions used were the same as those used in the DOE’s 2022 projections for algae technology for CO2 capture and utilization. The results showed the proposed technology’s potential to significantly reduce the cost of CO2 capture compared to current options and that the high value products generated from the CO2 captured can make a step change in the cost of carbon capture. Plans to advance the technology to Phase 2B were developed and potential end-user partners were identified.

Maloney, James↗

Repurposing Fossil-Fueled Assets For Energy Storage

The annual retirement of U.S. coal-fired electricity generation units (CF-EGU) is at an all-time high and is expected to continue. This loss of reliable baseload generation, combined with predicted growth of variable renewable energy (VRE) generation, is expected to stress grid reliability as the number of load-following resources drops below the experienced load variability. Many regions are already experiencing challenges, and fossil retirement-related warnings by the North American Electric Reliability Corp. are becoming more dire. All CF-EGU retirements pose significant challenges to asset owners, local workforces, and their communities. Repurposing a retiring CF-EGU as a long-duration energy storage plant can address these challenges and offer a suite of additional benefits to asset owners, the grid, and society. This project performed a techno-economic evaluation and assessment of repurposing a Duke Energy fossil-fueled asset (in particular, a coal plant) into an energy storage system by integrating the retiring asset with a Malta long duration Pumped Heat Energy Storage (PHES) system. The project validated the technoeconomic benefits of repurposing retiring coal plants into long-duration energy storage using Malta’s PHES. Key findings for this project are summarized below: (1) Technical: (a) Retiring coal plants (and other steam turbine fossil generation) can be repurposed to enable the clean energy transition using Malta’s technology. (b) For older retiring coal plants, repurposing the site and electrical interconnection for a standalone PHES plant is the most economically favorable option. (c) For newer coal plants where there is also a local peaking capacity need, repowering the steam cycle into a hybrid integration with PHES is attractive. (d) A process was developed to assist fossil generation owners in choosing the best path for each plant’s circumstances. (2) Economic (a) Communities facing economic challenges caused by the retirement of fossil generation would benefit from repurposing the plant as long-duration energy storage using Malta’s PHES. (b) On a $/MW basis, repowering retiring coal units into Malta PHES plants can maintain the same number and types of jobs and economic activity. (c) For a 70% carbon reduction scenario, a 10-hour Malta PHES plant is more economic for the asset owner than similar-power 4-hour batteries. This project showed that repurposing a retiring coal unit into thermal energy storage, by integrating it with a Malta PHES system, makes techno-economic sense. At least two integration options are available, with the optimal solution depending on the coal plant and its location. Repurposing retiring coal plant into energy storage results in economic benefits for the plant owner and local communities.

20 FOSSIL-FUELED POWER PLANTS↗

Demonstrations of Holistic, Lower Cost/Energy Effluent Water Management Approaches for Coal-Fired Energy Plants

The project work conducted under DOE award DE-FE0031678 was comprised of three overarching project goals: (1) evaluate the performance of Saltworks’ Flex EDR Selective process for treating wet flue gas desulfurization (FGD) wastewater, (2) conduct bench-scale testing of wastewater encapsulation as a byproduct management technology for the EDR generated brine, and (3) develop a dynamic water balance model encompassing the results of the aforementioned testing.

01 COAL, LIGNITE, AND PEAT↗

Oxy-Combustion System Process Optimization

The overall objective of this work is to develop a new chemical absorbent-based, high pressure, CO 2 purification system to remove the residual oxygen that currently contaminates the recovered CO 2 , and to optimize the Pressurized Oxy-Combustion (POxC) process to minimize the Cost of Electricity (COE) generated in this advanced combustion process. TDA developed and validated the performance of the oxygen removal system for CO 2 purification. In collaboration with the Advanced Power & Energy Program (APEP) of University of California, Irvine (UCI), we optimized the POxC process, including thermal management, heat integration, and power cycle optimization using process design and modeling supported with Aspen Plus® process simulations. The techno-economic analysis results indicate that the pressurized oxycombustion coal power plant with Ion-transport membrane (ITM) air separation unit (ASU) (Case 2 – 30.55%) does not show an advantage over a cryogenic ASU (Case 1 – 31.24%) while TDA’s sorption-based ASU (Case 4 - 32.61%) shows a significant advantage over the cryogenic ASU (Case 1 – 331.24%). The specific plant costs show a wide range with a low of $2544/kW for Case 11C (TDA ASU, co-sequestering the SO x , and ultra-supercritical steam cycle) to a high of $2975/kW for Case 12A (cryogenic ASU and sCO 2 cycle). In general, the ITM ASU based cases have lower specific plant costs than the corresponding cryogenic ASU based cases while the TDA ASU based cases show the lowest specific plant costs. The main reason for lowering these costs is the higher overall plant thermal efficiency which decreases the plant cost on a $ per kW basis. Next comparing the cases with different power cycle working fluid conditions in terms of temperature and pressure while all utilizing steam, similar trends as the plant costs may be observed. However, with the supercritical CO 2 (sCO 2 ) cycle, the increase in thermal efficiency of the sCO 2 cycle was not able to offset its increase in plant cost making the plant costs higher than those of the corresponding steam cycle cases. The Cost of Electricity (COE) again shows similar trends as the specific plant costs. The COE for Case 11C at $110.1/MWh is also the lowest, but among all cases that do not co-sequester the SO x , Case 12C (TDA ASU and sCO 2 cycle) has the lowest COE at $\$$117.5/MWh while the highest is for Case 8A (cryogenic ASU and supercritical steam cycle) at $130.4/MWh.

20 FOSSIL-FUELED POWER PLANTS↗