DOE OSTI · 1752969
Oxy-Combustion System Process Optimization
Abstract
The overall objective of this work is to develop a new chemical absorbent-based, high pressure, CO 2 purification system to remove the residual oxygen that currently contaminates the recovered CO 2 , and to optimize the Pressurized Oxy-Combustion (POxC) process to minimize the Cost of Electricity (COE) generated in this advanced combustion process. TDA developed and validated the performance of the oxygen removal system for CO 2 purification. In collaboration with the Advanced Power & Energy Program (APEP) of University of California, Irvine (UCI), we optimized the POxC process, including thermal management, heat integration, and power cycle optimization using process design and modeling supported with Aspen Plus® process simulations. The techno-economic analysis results indicate that the pressurized oxycombustion coal power plant with Ion-transport membrane (ITM) air separation unit (ASU) (Case 2 – 30.55%) does not show an advantage over a cryogenic ASU (Case 1 – 31.24%) while TDA’s sorption-based ASU (Case 4 - 32.61%) shows a significant advantage over the cryogenic ASU (Case 1 – 331.24%). The specific plant costs show a wide range with a low of $2544/kW for Case 11C (TDA ASU, co-sequestering the SO x , and ultra-supercritical steam cycle) to a high of $2975/kW for Case 12A (cryogenic ASU and sCO 2 cycle). In general, the ITM ASU based cases have lower specific plant costs than the corresponding cryogenic ASU based cases while the TDA ASU based cases show the lowest specific plant costs. The main reason for lowering these costs is the higher overall plant thermal efficiency which decreases the plant cost on a $ per kW basis. Next comparing the cases with different power cycle working fluid conditions in terms of temperature and pressure while all utilizing steam, similar trends as the plant costs may be observed. However, with the supercritical CO 2 (sCO 2 ) cycle, the increase in thermal efficiency of the sCO 2 cycle was not able to offset its increase in plant cost making the plant costs higher than those of the corresponding steam cycle cases. The Cost of Electricity (COE) again shows similar trends as the specific plant costs. The COE for Case 11C at $110.1/MWh is also the lowest, but among all cases that do not co-sequester the SO x , Case 12C (TDA ASU and sCO 2 cycle) has the lowest COE at $\$$117.5/MWh while the highest is for Case 8A (cryogenic ASU and supercritical steam cycle) at $130.4/MWh.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Alptekin, Gokhan, Jayaraman, Ambalavanan, Rao, Ashok. 2020-12-29. Oxy-Combustion System Process Optimization. https://doi.org/10.2172/1752969
Cite the original work for its findings. Save a collection to share your selection of sources.