Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Evaluation and certification of heater assemblies developed for thermal vacuum acceptance testing

Preparation of Rockwell International's Thermal Vacuum Chamber for acceptance testing of a mass produced satellite required the development of unique quartz lamp and hot wire heater assemblies. Testing performed on the basic elements of these heaters is described, as is the final testing done to certify that the heater assemblies meet the thermal requirements for acceptance testing. The methods and procedures of thermal mapping used during the development and final certification of these heater assemblies are presented. The absence of a definitive standard for determining flux distribution and heating boundaries for heaters of this type required the development of a test plan incorporating several thermal mapping techniques. These techniques include the development of heat flux using a multiple calorimeter array for both vacuum and ambient test conditions, and a photographic method for detecting heating boundaries. The test plan and thermal mapping techniques are discussed.

Allen, J. E.↗

Tensile testing grips are easily assembled under liquid nitrogen

Split-screw grips for tensile testing provide uniform loading on the specimen shoulders. Holes in the heads enable the screws and specimen to be threaded as an assembly into a grip body, closely controlled guides and seats afford positive seating, and precision machining of mating surfaces minimizes misalignment effects.

Skalka, R. J.↗

Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration

System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.

Greene, William D.↗

Thermal/vacuum vs. thermal atmospheric testing of space flight electronic assemblies

For space flight hardware, the thermal vacuum environmental test is the best test of a system's flight worthiness. Substituting an atmospheric pressure thermal test for a thermal/vacuum test can effectively reduce piece part temperatures by 20 C or more, even for low power density designs. Similar reductions in test effectiveness can also result from improper assembly level T/V test boundary conditions. The net result of these changes may reduce the effective test temperatures to the point where there is zero or negative margin over the flight thermal environment.

Gibbel, Mark↗

Assembly and Integrated Systems Testing for the Flow Boiling and Condensation Experiment (FBCE)

The Flow Boiling and Condensation Experiment (FBCE) is a flight experiment that is designed to operate in the Fluids Integrated Rack (FIR) on the International Space Station (ISS). The objective of the FBCE is to develop an integrated two-phase flow experiment that will serve as a primary platform for obtaining flow boiling and condensation heat transfer data in microgravity. This data will enable the design and analysis of two-phase thermal management systems for future NASA missions that require increased efficiency beyond the current single-phase systems. The FBCE consists of seven modules, each of which must link together mechanically, electrically, and fluidically upon final integration. Five of the modules provide the fluidic and electronic components required to bring the test fluid to the inlet conditions required by the test module, where the primary science is conducted. These inlet conditions encompass fluid quality ranging from a superheated vapor to a subcooled liquid at a variety of flow rates and pressures. The FBCE is currently manufacturing two test modules, each of which has its own separate test campaign with the five support modules. Each of the modules presents a unique challenge in its assembly and checkout, particularly related to ensuring the final hardware configuration can meet the fluid and thermal requirements levied upon them. Following assembly, a series of flight verification tests will be performed, including thermal testing, EMI testing, and final integration in a FIR Ground Integration Unit. This presentation discusses the status of the FBCE as it continues through final verification testing, including current test results and lessons learned throughout the assembly and integration phase of the project. In addition, future options for additional flight test sections will be explored that will benefit the broader NASA thermal and fluids community.

deFiebre, Jesse↗

X-33, Leading the Way to VentureStar(trademark)) in the Next Millennium

The X-33, NASA's flagship for reusable space plane technology demonstration, is on course to begin the flights of the X-33 that will permit industry and government decisions that can lead to VentureStar(trademark) by the end of 2000. Lockheed Martin, NASA's partner in this effort, took the bold step in January 1999 to announce formation of VentureStar(trademark) LLC. This move provides the focus for firm business planning needed to enable the decision by the time X-33 flies in mid 2000. The X-33 program began by accepting the mandate that included two unprecedented and highly challenging goals: 1) demonstrate single stage to orbit technologies in flight and ground by the end of 2000 and 2) demonstrate a new government and industry management relationship working together with industry in the lead. Since the IAF 49th Congress in Melbourne, the major hardware elements of X-33 have been through their assembly and test. The flight liquid oxygen tank was the first major element to complete final assembly. The liquid hydrogen tanks are currently in final assembly and testing. The first flight tank has been delivered to vehicle assembly, the second tank and the flight engines are expected this month. The aerospike engine is an engine concept that has never been flown, but has been extensively ground tested. It will be flown for the first time on the X-33. Major X-33 flight hardware has been tested, delivered, and assembly of the vehicle is nearly complete. Construction of the prototype spaceport was completed in November 1998. The flight test program commencing in the summer of 2000. The decision to proceed with a Single Stage To Orbit as a commercial venture is expected in the fall of 2000.

Austin, Robert E.↗

Operation of the 25kW NASA Lewis Research Center Solar Regenerative Fuel Cell Tested Facility

Assembly of the NASA Lewis Research Center(LeRC)Solar Regenerative Fuel Cell (RFC) Testbed Facility has been completed and system testing has proceeded. This facility includes the integration of two 25kW photovoltaic solar cell arrays, a 25kW proton exchange membrane (PEM) electrolysis unit, four 5kW PEM fuel cells, high pressure hydrogen and oxygen storage vessels, high purity water storage containers, and computer monitoring, control and data acquisition.

Solar Regenerative Fuel Cell electrolyzer↗

Orion Capsule Parachute Assembly System (CPAS) Overload Testing Approach and Results

The qualification of the Orion Capsule Parachute Assembly System (CPAS) system includes exposure to loads and dynamic pressures above the required values as validation of the parachutes' structural integrity. As outlined in the certification plan, each of the four parachutes of the system are to be subjected to 110% of their respective maximum dynamic pressure requirements. The Main and Drogue parachutes have satisfied this overload condition in drop testing and due to cost and schedule constraints, the Forward Bay Cover Parachute (FBCP) and Pilot parachute were subjected to the overload condition in the ground testing described in this document. The test objectives and pass/fail criteria were established and require the parachutes to achieve and maintain a target riser load (associated with a minimum of 110% dynamic pressure overload) for a minimum of three seconds while sustaining no failures of any structural members (vent hoop, radials, suspension line) or any damage which propagates into catastrophic failure of the canopy. Considering the assumptions and limitations associated with the ground testing (primarily non-uniform flow field of the ground test system and variations in parachute manufacturing), a method of establishing the desired overload condition was determined by the technical community and covers the 2-sigma bounds of the drag area distribution derived from drop testing. On June 27, 2017 the testing was executed at the High Velocity Airflow System (HiVAS) facility located at the Weapon Survivability Laboratory (WSL) at the Naval Air Warfare Center, Weapons Division (NAWCWD) China Lake. Engineering Development Unit (EDU) parachutes were used as pathfinders to gain experience with achieving the test conditions. Additional runs were executed to measure the airflow at the same location as the canopy skirt, although this data is not required to satisfy the test objectives and parachute pass/fail criteria. The qualification parachutes were successfully exposed to the target conditions and sustained only minor damage.

Daum, Jared S.↗

Advanced Manufacturing of the SLS Block 1B Payload Adapter: Engineering Development Unit

The Payload Adapter (PLA) for the Space Launch System Block 1B configuration (SLS B1B) is a structural frustum that interfaces with the Exploration Upper Stage (EUS) and the Universal Stage Adapter (USA) or the cargo fairing at the aft end and interfaces with the primary or co-manifested payload at the forward end. The primary structure is composed of a single piece aluminum forward ring, a segmented aluminum aft ring, eight carbon composite sandwich panels, and composite bonded longitudinal joints. The PLA is designed and fabricated in-house at MSFC. Development and flight article builds are joint efforts between the Materials & Processes Laboratory (EM), the Spacecraft & Vehicle Systems Department (EV), the Space Systems Department (ES), and the Test Laboratory (ET). The large-scale manufacturing efforts associated with this task include the fabrication of pathfinder panels; the fabrication and assembly of a full-scale Manufacturing Demonstration Article (MDA); the fabrication, assembly, and test of an Engineering Demonstration Unit (EDU); the fabrication, assembly, and test of a qualification Article; and the fabrication, assembly, and proof test of subsequent flight articles. The PLA team recently completed assembly of the EDU. The final assembly included the instillation of the co-manifested secondary payload, NEST, and the instillation and tensioning of the Payload Separation System (PSS). This poster will detail the assembly process which includes: (1) composite panel to ring assembly, (2) adhesive bonding for the longitudinal joints, and (3) instillation of the NEST and PSS. The PLA EDU is prepared to undergo modal and static load testing.

Monique Wallace↗

Water system microbial check valve development

A residual iodine microbial check valve (RIMCV) assembly was developed and tested. The assembly is designed to be used in the space shuttle potable water system. The RIMCV is based on an anion exchange resin that is supersaturated with an iodine solution. This system causes a residual to be present in the effluent water which provides continuing bactericidal action. A flight prototype design was finalized and five units were manufactured and delivered.

Colombo, G. V.↗

Automotive Stirling Engine Development Program

Activities performed on Mod I engine testing and test results; the manufacture, assembly, and test of a Mod I engine in the United States; design initiation of the Mod I-A engine system; transient performance testing; Stirling reference engine manufacturing and reduced size studies; components and subsystems; and the study and test of low cost alloys are summarized.

Nightingale, N.↗

Assessing damping uncertainty in space structures with fuzzy sets

NASA has been interested in the development of methods for evaluating the predictive accuracy of structural dynamic models. This interest stems from the use of mathematical models in evaluating the structural integrity of all spacecraft prior to flight. Space structures are often too large and too weak to be tested fully assembled in a ground test lab. The predictive accuracy of a model depends on the nature and extent of its experimental verification. The further the test conditions depart from in-service conditions, the less accurate the model will be. Structural damping is known to be one source of uncertainty in models. The uncertainty in damping is explored in order to evaluate the accuracy of dynamic models. A simple mass-spring-dashpot system is used to illustrate a comparison among three methods for propagating uncertainty in structural dynamics models: the First Order Method, the Numerical Simulation Method, and the Fuzzy Set Method. The Fuzzy Set Method is shown to bound the range of possible responses and thus to provide a valuable limiting check on the First Order Method near resonant conditions. Fuzzy Methods are a relative inexpensive alternative to numerical simulation.

Ross, Timothy J.↗

Performance Testing of a Russian Mir Space Station Trace Contaminant Control Assembly

A filter assembly which is incorporated into the Russian Trace Contaminant Control Assembly was tested for removal of airborne trace chemical contaminants in a closed loop 9 m(exp 3) system. Given contaminant loading rates and maximum allowable atmospheric concentrations, the Russian system was able to maintain system air concentrations below maximum allowable limits. This was achieved for both a new filter system and for a system where a part of it was pre-loaded to emulate 3 years of system age.

Curtis, R. E.↗

Multiphase Flow Technology Impacts on Thermal Control Systems for Exploration

The Two-Phase Flow Facility (TPHIFFy) Project focused on bridging the critical knowledge gap by developing and demonstrating critical multiphase fluid products for advanced life support, thermal management and power conversion systems that are required to enable the Vision for Space Exploration. Safety and reliability of future systems will be enhanced by addressing critical microgravity fluid physics issues associated with flow boiling, condensation, phase separation, and system stability. The project included concept development, normal gravity testing, and reduced gravity aircraft flight campaigns, in preparation for the development of a space flight experiment implementation. Data will be utilized to develop predictive models that could be used for system design and operation. A single fluid, two-phase closed thermodynamic loop test bed was designed, assembled and tested. The major components in this test bed include: a boiler, a condenser, a phase separator and a circulating pump. The test loop was instrumented with flow meters, thermocouples, pressure transducers and both high speed and normal speed video cameras. A low boiling point surrogate fluid, FC-72, was selected based on scaling analyses using preliminary designs for operational systems. Preliminary results are presented which include flow regime transitions and some observations regarding system stability.

McQuillen, John↗

Cryogenic Fiber Optic Assemblies for Spaceflight Environments: Design, Manufacturing, Testing, and Integration

Fiber optic assemblies have been used on spaceflight missions for many years as an enabling technology for routing, transmitting, and detecting optical signals. Due to the overwhelming success of NASA in implementing fiber optic assemblies on spaceflight science-based instruments, system scientists increasingly request fibers that perform in extreme environments while still maintaining very high optical transmission, stability, and reliability. Many new applications require fiber optic assemblies that will operate down to cryogenic temperatures as low as 20 Kelvin. In order for the fiber assemblies to operate with little loss in optical throughput at these extreme temperatures requires a system level approach all the way from how the fiber assembly is manufactured to how it is held, routed, and integrated. The NASA Goddard Code 562 Photonics Group has been designing, manufacturing, testing, and integrating fiber optics for spaceflight and other high reliability applications for nearly 20 years. Design techniques and lessons learned over the years are consistently applied to developing new fiber optic assemblies that meet these demanding environments. System level trades, fiber assembly design methods, manufacturing, testing, and integration will be discussed. Specific recent examples of ground support equipment for the James Webb Space Telescope (JWST); the Ice, Cloud and Land Elevation Satellite-2 (ICESat-2); and others will be included.

Fiber Optic↗

Global Microwave Imager (GMI) Spin Mechanism Assembly Design, Development, and Performance Test Results

The GMI Spin Mechanism Assembly (SMA) is a precision bearing and power transfer drive assembly mechanism that supports and spins the Global Microwave Imager (GMI) instrument at a constant rate of 32 rpm continuously for the 3 year plus mission life. The GMI instrument will fly on the core Global Precipitation Measurement (GPM) spacecraft and will be used to make calibrated radiometric measurements at multiple microwave frequencies and polarizations. The GPM mission is an international effort managed by the National Aeronautics and Space Administration (NASA) to improve climate, weather, and hydro-meteorological predictions through more accurate and frequent precipitation measurements [1]. Ball Aerospace and Technologies Corporation (BATC) was selected by NASA Goddard Space Flight Center (GSFC) to design, build, and test the GMI instrument. The SMA design has to meet a challenging set of requirements and is based on BATC space mechanisms heritage and lessons learned design changes made to the WindSat BAPTA mechanism that is currently operating on-orbit and has recently surpassed 8 years of Flight operation.

Kubitschek, Michael↗

Assembly and Integration Status of a High Fidelity Ground Test Bed for the Water Processor Assembly

The Water Recovery System (WRS) is a critical component of life support aboard the International Space Station (ISS) and will play an essential role in future missions beyond Low Earth Orbit (LEO). Its primary functional units – the Urine Processor Assembly (UPA), Brine Processor Assembly (BPA), and Water Processor Assembly (WPA) – must be evaluated for extended operation, dormancy resilience, material obsolescence, and reliability under exploration-driven constraints. Ground testing is vital for developing these technologies and generating statistically relevant reliability assessments, which requires extended runtime under integrated, Flight-like conditions. Currently, no high-fidelity, fully integrated WPA ground test bed exists to support these objectives. To address this gap, NASA is developing a WPA test bed at Marshall Space Flight Center (MSFC) that combines downgraded ISS flight hardware with functionally flight-like components in a cost-effective configuration while maintaining priority hardware investigations. This paper describes the current status of hardware assembly and integration, outlines key challenges such as simulating microgravity effects and mitigating obsolescence, and presents future test objectives including software development, reliability assessments, dormancy studies, and exploration-oriented upgrades.

Water Processor Assembly↗

Assembly and Integration Status of a High Fidelity Ground Test Bed for the Water Processor Assembly

The Water Recovery System (WRS) is a critical component of life support aboard the International Space Station (ISS) and will play an essential role in future missions beyond Low Earth Orbit (LEO). Its primary functional units – the Urine Processor Assembly (UPA), Brine Processor Assembly (BPA), and Water Processor Assembly (WPA) – must be evaluated for extended operation, dormancy resilience, material obsolescence, and reliability under exploration-driven constraints. Ground testing is vital for developing these technologies and generating statistically relevant reliability assessments, which requires extended runtime under integrated, Flight-like conditions. Currently, no high-fidelity, fully integrated WPA ground test bed exists to support these objectives. To address this gap, NASA is developing a WPA test bed at Marshall Space Flight Center (MSFC) that combines downgraded ISS flight hardware with functionally flight-like components in a cost-effective configuration while maintaining priority hardware investigations. This paper describes the current status of hardware assembly and integration, outlines key challenges such as simulating microgravity effects and mitigating obsolescence, and presents future test objectives including software development, reliability assessments, dormancy studies, and exploration-oriented upgrades.

Mary-Elizabeth Davis↗