Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “request for proposals”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

A contention-based bus-control scheme for multiprocessor systems

The authors study contention-based bus-control schemes for scheduling processors in using a bit-parallel shared bus. The protocol is designed under the requirements that each processor exhibit a random access behavior, that there be no centralized bus control in the system, and that access be granted in real time. The proposed scheme is based on splitting algorithms used in conventional contention-resolution schemes, and utilizes two-state information obtained from collision detection. Two versions of the bus-control scheme are studied. The static one resolves contentions of N requesting processors in an average of O(logW/2N) iterations, where W is the number of bits in the bit-parallel bus. An adaptive version resolves contentions in an average time that is independent of N.

Juang, Jie-Yong↗

Prototype and Evaluation of AutoHelp: A Case-based, Web-accessible Help Desk System for EOSDIS

AutoHelp is a case-based, Web-accessible help desk for users of the EOSDIS. Its uses a combination of advanced computer and Web technologies, knowledge-based systems tools, and cognitive engineering to offload the current, person-intensive, help desk facilities at the DAACs. As a case-based system, AutoHelp starts with an organized database of previous help requests (questions and answers) indexed by a hierarchical category structure that facilitates recognition by persons seeking assistance. As an initial proof-of-concept demonstration, a month of email help requests to the Goddard DAAC were analyzed and partially organized into help request cases. These cases were then categorized to create a preliminary case indexing system, or category structure. This category structure allows potential users to identify or recognize categories of questions, responses, and sample cases similar to their needs. Year one of this research project focused on the development of a technology demonstration. User assistance 'cases' are stored in an Oracle database in a combination of tables linking prototypical questions with responses and detailed examples from the email help requests analyzed to date. When a potential user accesses the AutoHelp system, a Web server provides a Java applet that displays the category structure of the help case base organized by the needs of previous users. When the user identifies or requests a particular type of assistance, the applet uses Java database connectivity (JDBC) software to access the database and extract the relevant cases. The demonstration will include an on-line presentation of how AutoHelp is currently structured. We will show how a user might request assistance via the Web interface and how the AutoHelp case base provides assistance. The presentation will describe the DAAC data collection, case definition, and organization to date, as well as the AutoHelp architecture. It will conclude with the year 2 proposal to more fully develop the case base, the user interface (including the category structure), interface with the current DAAC Help System, the development of tools to add new cases, and user testing and evaluation at (perhaps) the Goddard DAAC.

Mitchell, Christine M.↗

Assessment of Prone Positioning of Restrained, Seated Crewmembers in a Post Landing Stable 2 Orion Configuration

During the Orion landing and recovery subsystem design review, June 2009, it was noted that the human system and various vehicle systems, the environmental control and life support (ECLSS) and guidance, navigation and control (GN&C) systems for example, are negatively affected by Orion assuming a stable 2 (upside down; Figure A) configuration post landing. The stable 2 configuration is predicted to occur about 50% of the time based on Apollo landing data and modeling of the current capsule. The stable 2 configuration will be countered by an active up-righting system (crew module up-righting system; CMUS). Post landing balloons will deploy and inflate causing the vehicle to assume or maintain the stable 1 (up-right; Figure B) configuration. During the design review it was proposed that the up-righting system could be capable of righting the vehicle within 60 seconds. However, this time limit posed a series of constraints on the design which made it less robust than desired. The landing and recovery subsystem team requested an analysis of Orion vehicle systems as well as the human system with regard to the effect of stable 2 in order to determine if an up-righting response time greater than 60 seconds could be tolerated. The following report focuses on the assessment of the human system in the posture assumed when Orion is in the stable 2 configuration. Stable 2 will place suited, seated, and restrained crewmembers in a prone (facedown), head-up position for a period of time dependent on the functionality of the up-righting systems, ability of the crew to release themselves from the seat and restraints, and/or time to arrival of rescue forces. Given that the Orion seat and restraint system design is not complete and therefore, not available for evaluation, Space Medicine assessed how long a healthy but deconditioned crewmember could stay in this prone, restrained position and the physiological consequences of this posture by researching terrestrial analogs and considered the known physiological alterations and deconditioning experienced by long duration crewmembers.

Barr, Yael↗

Constellation Program (CxP) Crew Exploration Vehicle (CEV) Project Integrated Landing System

Crew Exploration Vehicle (CEV) Chief Engineer requested a risk comparison of the Integrated Landing System design developed by NASA and the design developed by Contractor- referred to as the LM 604 baseline. Based on the results of this risk comparison, the CEV Chief engineer requested that the NESC evaluate identified risks and develop strategies for their reduction or mitigation. The assessment progressed in two phases. A brief Phase I analysis was performed by the Water versus Land-Landing Team to compare the CEV Integrated Landing System proposed by the Contractor against the NASA TS-LRS001 baseline with respect to risk. A phase II effort examined the areas of critical importance to the overall landing risk, evaluating risk to the crew and to the CEV Crew Module (CM) during a nominal land-landing. The findings of the assessment are contained in this report.

Baker, John D.↗

Scheduling the future NASA Space Network: Experiences with a flexible scheduling prototype

NASA's Space Network (SN) provides telecommunications and tracking services to low earth orbiting spacecraft. One proposal for improving resource allocation and automating conflict resolution for the SN is the concept of flexible scheduling. In this concept, each Payload Operations Control Center (POCC) will possess a Space Network User POCC Interface (SNUPI) to support the development and management of flexible requests. Flexible requests express the flexibility, constraints, and repetitious nature of the user's communications requirements. Flexible scheduling is expected to improve SN resource utilization and user satisfaction, as well as reduce the effort to produce and maintain a schedule. A prototype testbed has been developed to better understand flexible scheduling as it applies to the SN. This testbed consists of a SNUPI workstation, an SN scheduler, and a flexible request language that conveys information between the two systems. All three are being evaluated by operations personnel. Benchmark testing is being conducted on the scheduler to quantify the productivity improvements achieved with flexible requests.

Happell, Nadine↗

NASA New England Outreach Center

The NASA New England Outreach Center in Nashua, New Hampshire was established to serve as a catalyst for heightening regional business awareness of NASA procurement, technology and commercialization opportunities. Emphasis is placed on small business participation, with the highest priority given to small disadvantaged businesses, women-owned businesses, HUBZone businesses, service disabled veteran owned businesses, and historically black colleges and universities and minority institutions. The Center assists firms and organizations to understand NASA requirements and to develop strategies to capture NASA related procurement and technology opportunities. The establishment of the NASA Outreach Center serves to stimulate business in a historically underserved area. NASA direct business awards have traditionally been highly present in the West, Midwest, South, and Southeast areas of the United States. The Center guides and assists businesses and organizations in the northeast to target opportunities within NASA and its prime contractors and capture business and technology opportunities. The Center employs an array of technology access, one-on-one meetings, seminars, site visits, and targeted conferences to acquaint Northeast firms and organizations with representatives from NASA and its prime contractors to learn about and discuss opportunities to do business and access the inventory of NASA technology. This stimulus of interaction also provides firms and organizations the opportunity to propose the use of their developed technology and ideas for current and future requirements at NASA. The Center provides a complement to the NASA Northeast Regional Technology Transfer Center in developing prospects for commercialization of NASA technology. In addition, the Center responds to local requests for assistance and NASA material and documents, and is available to address immediate concerns and needs in assessing opportunities, timely support to interact with NASA Centers on a local level, and develop easy access to information. The Center acts in the manner of a "NASA Center or Field Office" with direction from NASA Headquarters, Code K.

Source record↗

A scientific assessment of a new technology orbital telescope

As part of a program designed to test the Alpha chemical laser weapons system in space, the Ballistic Missile Defense Organization (BMDO) developed components of an agile, lightweight, 4-meter telescope, equipped with an advanced active-optics system. BMDO had proposed to make space available in the telescope's focal plane for instrumentation optimized for scientific applications in astrophysics and planetary astronomy for a potential flight mission. Such a flight mission could be undertaken if new or additional sponsorship can be found. Despite this uncertainty, BMDO requested assistance in defining the instrumentation and other design aspects necessary to enhance the scientific value of a pointing and tracking mission. In response to this request, the Space Studies Board established the Task Group on BMDO New Technology Orbital Observatory (TGBNTOO) and charged it to: (1) provide instrumentation, data management, and science-operations advice to BMDO to optimize the scientific value of a 4-meter mission; and (2) support a space studies board assessment of the relative scientific merit of the program. This report deals with the first of these tasks, assisting the Advanced Technology Demonstrator's (ATD's) program scientific potential. Given the potential scientific aspects of the 4-meter telescope, this project is referred to as the New Technology Orbital Telescope (NTOT), or as the ATD/NTOT, to emphasize its dual-use character. The task group's basic conclusion is that the ATD/NTOT mission does have the potential for contributing in a major way to astronomical goals.

Source record↗

Ground-Level Solar Cosmic Ray Data from Solar Cycle 19

The purpose of this grant was to locate, catalog, and assemble, in standard computer format, ground-level solar cosmic ray data acquired by cosmic ray detectors for selected events in the 19th solar cycle. The events for which we initially proposed to obtain these data were for the events of 23 February 1956,4 May 1960, 12 and 15 November 1960 and 18 and 20 July 1961. These were the largest events of the 19th solar cycle. However, a severe (more than 50%) reduction in the requested funding, required the work effort be limited to neutron monitor data for the 23 February 1956 event and the three major events in 1960.

Shea, M. A.↗

Update transport - A new technique for update synchronization in replicated database systems

A fully distributed approach to update synchronization is presented where each site completely executes every update. This approach has several features-higher resiliency to different kinds of failures, higher parallelism, improved response to user requests, and low communication overhead. A fully distributed algorithm for concurrency control obtained by rehashing a previously published semidistributed algorithm into the fully distributed model of update execution is presented. A performance model of replicated database systems is presented and used to study the performance of the proposed algorithm and its semidistributed version. The results of the performance study reveal that the proposed approach can substantially improve the performance at the cost of moderate input/output overhead.

Singhal, Mukesh↗

Payload Planning for the International Space Station

A review of the evolution of the International Space Station (ISS) was performed for the purpose of understanding the project objectives. It was requested than an analysis of the current Office of Space Access and Technology (OSAT) Partnership Utilization Plan (PUP) traffic model be completed to monitor the process through which the scientific experiments called payloads are manifested for flight to the ISS. A viewing analysis of the ISS was also proposed to identify the capability to observe the United States Laboratory (US LAB) during the assembly sequence. Observations of the Drop-Tower experiment and nondestructive testing procedures were also performed to maximize the intern's technical experience. Contributions were made to the meeting in which the 1996 OSAT or Code X PUP traffic model was generated using the software tool, Filemaker Pro. The current OSAT traffic model satisfies the requirement for manifesting and delivering the proposed payloads to station. The current viewing capability of station provides the ability to view the US LAB during station assembly sequence. The Drop Tower experiment successfully simulates the effect of microgravity and conveniently documents the results for later use. The non-destructive test proved effective in determining stress in various components tested.

Johnson, Tameka J.↗

Experimental and theoretical research in high energy astrophysics

NASA grants to MIT for investigations in experimental and theoretical high energy astrophysics have, over the years, nurtured the infrastructure development and experimental activities that have led to successful proposals for the OSO 7, SAS 3, HEAO 1, and HEAO 2 missions and to the achievements in high energy astrophysics of the MIT Group. This report consists of excerpts from the progress reports of 1988 through 1990 that have been submitted as a regular feature of the renewal requests. These excerpts convey the flavor of the grant-supported activities, and a sense of the progress that has been made in each of the areas investigations.

Clark, George W.↗

A Participating Scientist Program for the STARDUST Mission

It is the Policy of NASA s Office of Space Science to emphasize and encourage the addition of Participating Scientist Programs (PSP s) to broaden the scientific impact of missions. A Participating Scientist Program for the STARDUST Mission: STARDUST is the fourth Discovery mission, and it is the first sample return mission selected within the Discovery Program. The STARDUST Spacecraft will fly through the coma of comet PIwildt-2 in early January 2004, and return the samples to the Earth in January 2006. The Principal Investigator of the STARDUST mission, Dr. Donald Brownlee, has generously requested the implementation of a PSP for STARDUST in order to provide more community participation in the initial characterization and analysis of the samples from PIwildt-2. In particular participating scientists will fill out the membership of the Preliminary Examination Team (PET) called for in the original 1994 STARDUST proposal accepted by NASA in 1995. The work of the PET will be organized around major subdiscipline areas such as mineralogy and petrology, isotopic abundances, and elemental composition. There will be leaders for each of these areas, and also a number of team members within each. Support will be commensurate with the level of participation.

Morgan, T. H.↗

An Example of Risk Informed Design

NASA Engineering requested a Probabilistic Risk Assessment (PRA) to compare the difference in the risk of Loss of Crew (LOC) and Loss of Mission (LOM) between different designs of a fluid assembly. They were concerned that the configuration favored by the design team was more susceptible to leakage than a second proposed design, but realized that a quantitative analysis to compare the risks between the two designs might strengthen their argument. The analysis showed that while the second design did help improve the probability of LOC, it did not help from a probability of LOM perspective. This drove the analysis team to propose a minor design change that would drive the probability of LOM down considerably. The analysis also demonstrated that there was another major risk driver that was not immediately obvious from a typical engineering study of the design and was therefore unexpected. None of the proposed alternatives were addressing this risk. This type of trade study demonstrates the importance of performing a PRA in order to completely understand a system's design. It allows managers to use risk as another one of the commodities (e.g., mass, cost, schedule, fault tolerance) that can be traded early in the design of a new system.

Banke, Rick↗

NASA Biological Specimen Repository

The NASA Biological Specimen Repository (NBSR) was established in 2006 to collect, process, preserve and distribute spaceflight-related biological specimens from long duration ISS astronauts. This repository provides unique opportunities to study longitudinal changes in human physiology spanning may missions. The NBSR collects blood and urine samples from all participating ISS crewmembers who have provided informed consent. These biological samples are collected once before flight, during flight scheduled on flight days 15, 30, 60, 120 and within 2 weeks of landing. Postflight sessions are conducted 3 and 30 days after landing. The number of in-flight sessions is dependent on the duration of the mission. Specimens are maintained under optimal storage conditions in a manner that will maximize their integrity and viability for future research The repository operates under the authority of the NASA/JSC Committee for the Protection of Human Subjects to support scientific discovery that contributes to our fundamental knowledge in the area of human physiological changes and adaptation to a microgravity environment. The NBSR will institute guidelines for the solicitation, review and sample distribution process through establishment of the NBSR Advisory Board. The Advisory Board will be composed of representatives of all participating space agencies to evaluate each request from investigators for use of the samples. This process will be consistent with ethical principles, protection of crewmember confidentiality, prevailing laws and regulations, intellectual property policies, and consent form language. Operations supporting the NBSR are scheduled to continue until the end of U.S. presence on the ISS. Sample distribution is proposed to begin with selections on investigations beginning in 2017. The availability of the NBSR will contribute to the body of knowledge about the diverse factors of spaceflight on human physiology.

McMonigal, K. A.↗

SHARP Demonstration Flight: Video Broadcast System for Research in Intelligent Flight Characterization and Control

The NASA Ames Research Center (Thermal Protection Materials and Systems Branch) is investigating new ceramic materials for the thermal protection of atmospheric entry vehicles. An incremental approach to proving the capabilities of these materials calls for a lifting entry flight test of a sharp leading edge component on the proposed SHARP (Slender Hypervelocity Aerothermodynamic Research Probe) vehicle. This flight test will establish the aerothermal performance constraint under real lifting entry conditions. NASA Ames has been developing the SHARP test flight with SSDL (responsible for the SHARP S I vehicle avionics), Montana State University (responsible for the SHARP S I vehicle airframe), the Wickman Spacecraft and Propulsion Company (responsible for the sounding rocket and launch operations), and with the SCU Intelligent Robotics Program, The SCU team was added well after the rest of the development team had formed. The SCU role was to assist with the development of a real-time video broadcast system which would relay onboard flight video to a communication groundstation. The SCU team would also assist with general vehicle preparation as well as flight operations. At the time of the submission of the original SCU proposal, a test flight in Wyoming was originally targeted for September 2000. This date was moved several times into the Fall of 2000. It was then postponed until the Spring of 2001, and later pushed into late Summer 2001. To date, the flight has still not taken place. These project delays resulted in SCU requesting several no-cost extensions to the project. Based on the most recent conversations with the project technical lead, Paul Kolodjiez, the current plan is for the overall SHARP team to assemble what exists of the vehicle, to document the system, and to 'mothball' the vehicle in anticipation of future flight and funding opportunities.

Kitts, Christopher↗

A RAM architecture for concurrent access and on-chip testing

A novel RAM architecture supporting concurrent memory access and on-chip testing (CMAT) is proposed. A large-capacity memory chip is decomposed into test neighborhoods (TNDs), each of which is tested independently. When there are data stored in a TND, the data are saved into a buffer before testing the TND, and the TND's contents are restored using buffered data after testing the TND. If an external request is not made to the TND, the request can be directed to the addressed memory cells. Otherwise, the buffered data can be loaded back into the TND, or the request is detoured to a corresponding buffer. By deriving an analytical model, the performance penalty and hardware overhead of the CMAT architecture are shown to be very small.

Liu, Jyh-Charn↗

CINTEX: International Interoperability Extensions to EOSDIS

A large part of the research under this cooperative agreement involved working with representatives of the DLR, NASDA, EDC, and NOAA-SAA data centers to propose a set of enhancements and additions to the EOSDIS Version 0 Information Management System (V0 IMS) Client/Server Message Protocol. Helen Conover of ITSL led this effort to provide for an additional geographic search specification (WRS Path/Row), data set- and data center-specific search criteria, search by granule ID, specification of data granule subsetting requests, data set-based ordering, and the addition of URLs to result messages. The V0 IMS Server Cookbook is an evolving document, providing resources and information to data centers setting up a VO IMS Server. Under this Cooperative Agreement, Helen Conover revised, reorganized, and expanded this document, and converted it to HTML. Ms. Conover has also worked extensively with the IRE RAS data center, CPSSI, in Russia. She served as the primary IMS contact for IRE-CPSSI and as IRE-CPSSI's liaison to other members of IMS and Web Gateway (WG) development teams. Her documentation of IMS problems in the IRE environment (Sun servers and low network bandwidth) led to a general restructuring of the V0 IMS Client message polling system. to the benefit of all IMS participants. In addition to the IMS server software and documentation. which are generally available to CINTEX sites, Ms. Conover also provided database design documentation and consulting, order tracking software, and hands-on testing and debug assistance to IRE. In the final pre-operational phase of IRE-CPSSI development, she also supplied information on configuration management, including ideas and processes in place at the Global Hydrology Resource Center (GHRC), an EOSDIS data center operated by ITSL.

Graves, Sara J.↗

A Monte Carlo Simulation Study of Interference Effect from Multiple HDFS Transmitters above 30 GHz

Commercial operators are now proposing to install thousands of High Density Fixed Services (HDFS) microwave transmitters in large urban centers, such as Los Angeles. These transmitters will share the same frequencies in the Ka band (32 GHz and 37 - 38 GHz) as some Space Research Service (SRS) receiving Earth stations. To face this challenge, Resolution 126 (WRC-97) has requested the International Telecommunications Union-Radiocommunications (ITU-R) to conduct, as a matter of urgency and in time for WRC-99, appropriate studies to determine sharing criteria between stations in the fixed service and stations in other services. The three DSN tracking stations worldwide utilize this frequency band and may become vulnerable to interference from the planned deployments of HDFS transmitters. These HDFS transmitters operate at a relatively strong signal power (up to -60 dBW/Hz). Thus, they will seriously interfere with the sensitive DSN receivers. It has become imperative to accurately predict the impact of HDFS transmitters on NASA's DSN receivers in the Ka band.

Ho, Christian↗