At least 253 records · Page 14

Challenging conventional assumptions in PV: a high-throughput open-air approach to low-cost perovskite module production

Perovskite solar modules (PSMs) offer a promising pathway to low-cost photovoltaics, yet their commercialization is challenged by manufacturing scalability, device uniformity, additive costs, interlayer complexity, and module stability. This study introduces a comprehensive technoeconomic analysis of single junction PSM's and projections for tandem perovskite-Si modules that integrate all materials and manufacturing steps, module performances, projected lifetimes, and manufacturing costs across scales. Here, we highlight an open-air manufacturing approach to fabricate all active layers of serially interconnected PSMs, including electrodes and charge transport layers, enabling high-throughput production without inert or vacuum environments. The analysis reveals two orders of magnitude throughput enhancement and cost reductions of 24% in all-open-air production, escalating to over 60% at 1 GW factory capacity compared to conventional methods. Levelized cost of energy (LCOE) projections for utility-scale installations over 30 years, accounting for module replacement and recycling, demonstrate the potential to achieve the 2030 US target of $0.03 per kWh with realistic 7–11-year PSM lifetimes, outperforming incumbent silicon-based modules. Neither four terminal (4T) nor two terminal (2T) tandem-Si PSMs improve over single junction perovskite or silicon LCOE regardless of higher efficiencies at any modeled lifetime. Addressing PSM technical challenges with a cost-modeling framework guides commercialization efforts and provides a convincing pathway for challenging incumbent Si-based PV.

14 SOLAR ENERGY↗

Initial Heliostat Supply Chain Analysis

Globally, the growing demand for concentrating solar power (CSP) technologies, primarily for electricity generation plants has been met with supply chains primarily composed of plentiful commodity materials such as steel, aluminum, and glass. Often the majority of the commodity materials are sourced within the domestic market where generating plants are constructed. Although specialty components are required for CSP solar field components - including mirror panels used for heliostat applications - these specialty components constitute about 30-50% of total system installed costs. Only a few companies and countries, including the United States, have developed the capacity to supply such specialty components. This report is an initial assessment of the global and U.S. heliostat supply chain.

14 SOLAR ENERGY↗

Thin Rechargeable Batteries for CMOS SRAM Memory Protection

New rechargeable battery technology is described and compared with classical primary battery back-up of SRAM PC cards. Thin solid polymer electrolyte cells with the thickness of TSOP memory components (1 mm nominal, 1.1 mm max) and capacities of 14 mAh/sq cm can replace coin cells. The SRAM PC cards with permanently installed rechargeable cells and optional electrochromic low battery voltage indicators will free the periodic PC card user from having to 'feed' their PC cards with coin cells and will allow a quick visual check of stored cards for their battery voltage status.

Crouse, Dennis N.↗

Federal Workplace Charging Program Guide

The 2015 Fixing America's Surface Transportation (FAST) Act authorizes the installation, operation, and maintenance of electric vehicle supply equipment (EVSE) for the purpose of recharging employees' privately owned vehicles (POVs) under the custody or control of the General Services Administration (GSA) or a Federal agency. It requires the collection of fees to recover the costs of installing, operating, and maintaining this equipment and imposes reporting requirements. This program guide reviews those requirements, excerpts the relevant language in Appendix A, and describes when and how fees may be required to cover costs of electricity, network costs, EVSE units, and installations in various scenarios. This program guide is designed to support Federal agencies developing and refining workplace charging programs for employee POVs. While it provides guidance and best practices, it does not replace agencywide policies or agency-specific legal counsel. It contains a roadmap for agency workplace charging programs and defines roles and responsibilities. This guide explains how to determine the number of POVs likely to charge at a given site and contains a sample employee survey in Appendix B. It reviews EVSE planning, including unit selection and acquisition, charger location(s), accounting for available power capacity, using existing infrastructure, and funding an incentive program. It also discusses the costs associated with EVSE acquisition, installation, and network management. These costs inform the subsequently provided information, which describes how to amortize costs to determine appropriate fees for each charging session. The final two sections of this guide address aspects of ongoing program management that the facility coordinator should consider and the reporting requirements associated with the FAST Act. The insights in this guide are applicable to all agency-owned and GSA-leased buildings or facilities offering the use of EVSE or a 120-volt receptacle for the purpose of recharging an employee's POV. However, the FAST Act requirements typically do not apply to any building or facility operated and maintained by a third-party vendor offering the use of EVSE as part of a commercial building lease unless the agency is managing the station and/or energy on behalf of the building and collecting POV fees.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Options for Upgrading Low-Voltage Spot Network Protection to Increase DER Interconnection Capacity

Existing standards and policies for interconnecting distributed energy resources (DERs) into low voltage spot networks severely limits the amount of DER installed on those networks to avoid negative impacts on protection systems. This report investigates options for upgrading the protection systems of spot networks to allow for additional DER installations beyond the normal limits (i.e., no reverse power flows allowed onto the MV system). Eight potential upgrade options are discussed that span various methods for new network protector algorithms, hardware upgrades, and the addition of communication. Each method has tradeoffs in terms of accuracy of detecting faults, requirements to upgrade equipment in the spot networks, need for communication, and sensitivity to false trips—all of which are explored in this report.

42 ENGINEERING↗

Understanding Solar Photovoltaic System Performance: An Assessment of 75 Federal Photovoltaic Systems

This report presents a performance analysis of 75 photovoltaic systems based on PV system production data collected as part of a FEMP Federal PV Performance Assessment project combined with co-incident insolation, and ambient temperature to analyze how actual performance compares with a performance model. FEMP collaborated with 17 Federal agencies and sub-agencies to collect the information required to analyze the performance of each system. The systems represent a total capacity of 30,714 kW and range in size from 1 kW to 4,043 kW, with an average size of 410 kW, and were installed between 2011 and 2020. The data is analyzed for Key Performance Indicators, Availability, Performance Ratio and Energy Ratio by comparing the measured production data to model production data. The System Advisor Model (SAM) combines a description of the system (such as inverter capacity, de-rating for temperature, balance-of-system efficiency) with environmental parameters (coincident solar and temperature data) to calculate predicted performance. The performance metrics are calculated by lining up the measured production data with the model estimate on an hour-by-hour, day-by-day, or month-by-month basis (depending on the interval resolution of the production data). A report with system description, photo of the system, special assumptions made for the site, graph of measured production and model production, table of key performance indicators, and links to O&M resources that might improve performance was produced and delivered to site and agency staff with a short on-line briefing.

14 SOLAR ENERGY↗

What you get is not always what you see—pitfalls in solar array assessment using overhead imagery

Effective integration planning for small, distributed solar photovoltaic (PV) arrays into electric power grids requires access to high quality data: the location and power capacity of individual solar PV arrays. Unfortunately, national databases of small-scale solar PV do not exist; those that do are limited in their spatial resolution, typically aggregated up to state or national levels. While several promising approaches for solar PV detection have been published, strategies for evaluating the performance of these models are often highly heterogeneous from study to study. The resulting comparison of these methods for practical applications for energy assessments becomes challenging and may imply that the reported performance evaluations overly optimistic. The heterogeneity comes in many forms, each of which we explore in this work: the degree of diversity of the locations and sensors (e.g. different satellites, aerial photography) from which the training and validation data originate, the validation of ground truth (manual annotation of imagery vs known solar PV locations), the level of spatial aggregation (e.g. array-level vs regional estimates), and inconsistencies in the training and validation datasets (e.g. different datasets are used for each study and those data are not always made accessible). For each, we discuss emerging practices from the literature to address them or suggest directions of future research. As part of our investigation, we evaluate solar PV identification performance in two large regions: the entire state of Connecticut and the city of San Diego, CA. In Connecticut, we also use 33,114 known parcel-level solar PV installations from Berkeley Lab’s Tracking the Sun dataset to evaluate parcel-level performance and evaluate capacity estimates using 169 municipalities. We also make our code (which we call SolarMapper), pre-trained models, training data, and predictions publicly available and provide a web portal for interactively inspecting each prediction that was made. Here our findings suggest that traditional performance evaluation of the automated identification of solar PV from satellite imagery may be optimistic due to common limitations in the validation process. The takeaways from this work are intended to inform and catalyze the large-scale practical application of automated solar PV assessment techniques by energy researchers and professionals.

14 SOLAR ENERGY↗

Bill Savings vs. Backup Power: Evaluating operational tradeoffs for home solar+storage systems [Slides]

Adoption of residential solar photovoltaic+energy storage systems (PVESS) is driven by both bill savings opportunities and customer demand for backup power. Prior work by this team (Gorman et al., 2022; Gorman et al., 2023) explored PVESS backup power capabilities during long-duration power interruptions (e.g., due to severe weather events), when customers are assumed to be able to anticipate the event and charge their batteries in advance. In many cases, however, power interruptions are unpredictable (and often relatively short); for those types of events, a customer will typically set its battery to maintain some minimum capacity in reserve in case of an interruption, which reduces the capacity available for managing utility bills. This study evaluates this operational tradeoff to help customers and installers configure backup reserve settings, and to inform decision-making more generally about the customer value of backup power services compared to utility bill savings. This study utilizes Berkeley Lab’s PRESTO tool to produce stochastic simulations of (predominantly short-duration) power interruption events, and builds on an earlier case-study demonstrating PVESS backup performance during short-duration interruptions (Baik et al., 2023).

14 SOLAR ENERGY↗

Combined Heat and Power Technology Fact Sheet Series: Thermal Energy Storage

This fact sheet provides an overview of thermal energy storage (TES) technologies, which heat or cool a storage medium and, when needed, deliver the stored thermal energy to meet heating or cooling needs. TES systems are used in commercial buildings, industrial processes, and district energy installations to deliver stored thermal energy during peak demand periods, thereby reducing peak energy use. TES systems are often integrated with electric or absorption chillers to reduce peak electricity costs and, in the case of new construction, to reduce capital costs by optimizing chiller size. TES technologies can support sites that have either renewable or fossil power generation, including combined heat and power (CHP) installations. With CHP, TES can help optimize equipment size by reducing the required peak CHP thermal capacity and increasing annual CHP usage. TES can also provide turbine inlet cooling for gas turbines used in CHP applications, which increases power production in hot ambient conditions.

Combined Heat and Power, CHP, Thermal Energy, Tech↗

IDAES Enterprise: Generation Expansion Planning with Enhanced Requirements for Capacity Adequacy Under Renewable Intermittency

Achieving net zero carbon emissions likely requires future power systems to integrate new, flexible energy technologies to accommodate higher levels of capacity from variable renewable energy sources. To determine the optimal deployment of new electricity capacity and to study the likelihood of deployments of new energy technologies, an expansion planning model has been developed as part of the IDAES-Enterprise suite of grid models. The Generation Expansion Planning (GEP) model is a multi-period model in which investment decisions occur yearly, and a Unit Commitment (UC) problem is examined on an hourly timescale. To reduce computational complexity of the GEP model, the UC problem is solved for average “representative days” which leaves out extreme, but relatively common, scenarios in which low renewable generation occurs, leaving the system with inadequacy in capacity. The IDAES-Enterprise GEP model has been modified to include these extreme scenarios while keeping the model reasonably tractable. Specifically, a lazy constraint technique was implemented to check for capacity adequacy on an hourly basis over a large data set of aligned load-wind-solar profiles. As a vast majority of the capacity constraints will not be violated, the technique lowers computational expense by searching for violated capacity constraints over an “iterative manner,” adding those infeasible constraints back into the model. Results on a test case of the Southwest Power Pool shows that the lazy constraint technique significantly reduces retirements and increases installments of natural gas combined cycles and flexible natural gas units. It also reduces some retirements of coal units. These modifications provide a more reasonable estimation of required dispatchable power generation capacity to ensure feasibility during peak net load.

Liu, Peng↗

Storing Affordability: Battery Storage as an Asset to Reduce Data Center Cost Shifts

This report examines how battery energy storage systems (BESS) can help utilities accommodate large load growth while protecting affordability for existing ratepayers. Rapid growth in electricity demand from artificial intelligence (AI) data centers is straining the U.S. grid. Furthermore, many new data centers are entering rural markets, which could offer economic benefits but may also pose implementation challenges for smaller utilities. At the same time, retail electricity prices are increasing faster than inflation, elevating customer affordability as a key challenge. While data centers have not been the primary driver of increases in residential prices to date, they have pushed wholesale energy and capacity prices higher in several markets. Fundamental utility cost-allocation principles show that data center growth can be rate-positive for existing customers only if new peak demand grows faster than the costs a utility must incur to serve it. Several factors, including a utility’s degree of wholesale market exposure, forecast uncertainty and stranded-asset risk, and tariff design can determine the outcome of load growth on retail rates. Energy storage can make several affordability contributions in the face of this landscape of uncertainty and market volatility, including deferral of higher-cost grid investments through improved utilization of existing assets and flexibility of new large loads, insulation from volatile wholesale prices through peak shaving, and reliability support to address grid risks stemming from the behavior of AI data center loads. Different potential BESS deployment pathways—utility-scale front-of-the-meter systems, aggregated small-scale storage installations, and data center-sited behind-the-meter storage—are compared against each other and against conventional capacity alternatives. This framework is intended as a conceptual resource to utilities, particularly smaller public utilities with rural service territories, who may be considering the role that energy storage can play in insulating existing ratepayers from data center cost shifts.

25 ENERGY STORAGE↗

Bishop Paiute's Residential Solar Program Phase III

The project consisted of the design, installation, inspection, interconnection and monitoring of 40 grid-tied solar electric systems, totaling up to 108 kW rated capacity, on qualified existing low-income single-family homes located within the Bishop Paiute Reservation. The systems are to provide at least 30-75% savings in displaced electricity totaling 175,000 kWh/year. After the DOE grant contract was signed, the Tribal Employment Rights Ordinance (TERO) board voted to reduce the tribal tax to work on the reservation for these low-income projects from 4% to 1%. This generous reduction was applied back into the community solar project and two additional tribal homes were added for a new total of 40 grid-tied solar electric systems, totaling up to 113 kW rated capacity (two more than originally planned) projects. Additionally, each homeowner was educated on energy efficiency and how solar works and saves them money. The estimated 75% savings on monthly electric bills brings financial relief to tribal homeowners and makes a significant difference on the reservation; giving low-income families money to spend on other essential items, while reducing their carbon footprint in this remote tribal reservation. The GRID IE program and this tribal project had a training component for tribal members to get free hands-on job training on 8 of the 40 homes. Those tribal members that came out to train with GRID IE could then be eligible for the “train to hire” portion of the program, on the remaining 32 homes. Overall, the triple impact of the Bishop Paiute Tribe Residential Solar Program Phase III—affordable energy for low-income families, on-site clean energy production, and hands-on solar installation jobs for local workers—these all help build the Tribe’s energy, economic, environmental goals and offers local self-sufficiency while supporting energy independence to the neediest on the Reservation.

14 SOLAR ENERGY↗

Physical and Operational Status of the Photovoltaic Systems in the Municipality of Pinotepa de Don Luis, Oaxaca, One Year after Their Installation [Estado fisico y operativo de los sistemas fotovoltaicos en el municipio de Pinotepa de Don Luis, Oaxaca un ano despues de su instalacion]

In November 1990, an inspection visit was made to the residential lighting photovoltaic systems that had been installed approximately one year before in the rural communities of the Municipality of Pinotepa de Don Luis, in the State of Oaxaca. The main purpose of the visit was to evaluate the physical and operational status of these systems. The systems typically consist of a photovoltaic module with a capacity of 30 or 35 Watts, an automotive type battery, an indicator of the status of charge of the battery, 3 fluorescent lamps and the corresponding installation, including cables, connection or outlet box and switches. It can be seen that the systems are in good physical condition and do not show any signs of intentionally caused damage. However, the incidence of failures is higher than what had been expected; therefore the operational status of these systems is considered to be below a level that could be accepted, with a tendency to getting worse. The main problem that has been detected is the lack of automatic charge controllers. This problem has caused other important failures. Serious deficiencies were appreciated in the installations, which show evidence of the poor workmanship of the installers. The lack of system standardization is evident, both regarding the components and the installation. As a consequence, there are technical factors which indicate that the installed systems will keep deteriorating at a rate faster than normal, and will stop operating in a short time unless urgent preventive and corrective measures are taken. The attitude of the users with respect to the systems is generally positive. However, there are elements that make the correct operation and maintenance of these systems a very difficult task. The users did not receive any training regarding the best way to operate and take care of their systems, nor any other information in relation to their technical limitations.

14 SOLAR ENERGY↗

Analysis of degradation in residential battery energy storage systems for rate-based use-cases

This article examines the impact of residential battery energy storage (BES) systems' operational modes on the life (i.e. usable energy capacity) of the battery under several climatic conditions and battery chemistries. The sharp increase in residential BES installations has been a result of decreasing costs of batteries, increase in rate structures motivated applications such as solar self-consumption and time-of-use energy management, and customers purchasing these systems for backup power. While these different modes of operations provide a combination of increased bill savings, reliability of supply, and energy sustainability to the customer, their operational characteristics vary significantly between use-cases. Functional life of BES systems is known to be strongly dependent on their operating conditions. In this article, we analyze the operation of residential BES systems under different rate-based use-cases, for different battery chemistries and cell designs, and under different environmental conditions. This is conducted by simulating the control of BES operations using rate-based cycling algorithms and analyzing the prognosis of multiple battery lifetime models that consider complex nonlinear dependencies of operational stress factors such as state-of-charge, depth-of-discharge, and temperature on degradation. Significant variations in battery life are observed owing to the differences in characteristics of the uses-cases coupled with environmental conditions and battery chemistries. Such differences lead to the conclusion that choice of residential BES technologies and chemistries should account for their intended use-cases.

25 ENERGY STORAGE↗

Muckleshoot Indian Tribe-Energy Deployment (MITED) Project

The Muckleshoot Indian Tribe (MIT) collaborated with our Project Partner, GRID Alternatives (GRID), to install 132 kilowatts of direct current (kW-DC) of rooftop solar on three Tribal facilities. The three facilities are the Tribe’s Youth Drop-In Center, Canoe Shed, and Water Treatment Facility. The solar PV systems were originally anticipated to offset approximately 45% of the aggregate annual electricity usage of the three buildings. A major aspect of the MIT-ED project was providing hands-on paid training to five Muckleshoot Building Maintenance workers in solar PV installations, operations, and maintenance. The scope of work aligns with the Tribe’s goals of building local capacity and providing real world work experience and potential career opportunities in solar PV to its citizens. The Building Maintenance Department committed five of its current FTE employees to the project. GRID provided guidance for the MIT project team on identifying paid trainees as well as end goals of skill development through training, including a long-term Operations and Maintenance (O&M) plan tailored to the Tribe’s goals of local capacity building and stewardship of natural resources.

14 SOLAR ENERGY↗

Design review and analysis for a Pratt and Whitney fluid-film bearing and seal testing rig

A design review has been completed for a Pratt and Whitney (P&W)-designed fluid-film bearing and annular-seal test rig to be manufactured and installed at George C. Marshall Space Flight Center (MSFC). Issues covered in this study include: (1) the capacity requirements of the drive unit; (2) the capacity and configuration of the static loading system; (3) the capacity and configuration of the dynamic excitation system; (4) the capacity, configuration, and rotordynamic stability of a test bearing, support bearings, and shaft; and (5) the characteristics and configuration of the measurement transducers and data channels.

Childs, Dara W.↗

Optimizing digital 8mm drive performance

The experience of attaching over 350,000 digital 8mm drives to 85-plus system platforms has uncovered many factors which can reduce cartridge capacity or drive throughput, reduce reliability, affect cartridge archivability and actually shorten drive life. Some are unique to an installation. Others result from how the system is set up to talk to the drive. Many stem from how applications use the drive, the work load that's present, the kind of media used and, very important, the kind of cleaning program in place. Digital 8mm drives record data at densities that rival those of disk technology. Even with technology this advanced, they are extremely robust and, given proper usage, care and media, should reward the user with a long productive life. The 8mm drive will give its best performance using high-quality 'data grade' media. Even though it costs more, good 'data grade' media can sustain the reliability and rigorous needs of a data storage environment and, with proper care, give users an archival life of 30 years or more. Various factors, taken individually, may not necessarily produce performance or reliability problems. Taken in combination, their effects can compound, resulting in rapid reductions in a drive's serviceable life, cartridge capacity, or drive performance. The key to managing media is determining the importance one places upon their recorded data and, subsequently, setting media usage guidelines that can deliver data reliability. Various options one can implement to optimize digital 8mm drive performance are explored.

Schadegg, Gerry↗

Low global warming potential (GWP) refrigerant supermarket refrigeration system modeling and its application

As an environmentally friendly low global warming potential (GWP) refrigerant, Carbon dioxide (CO 2 ) has continuously gained popularity and research attention as alternative refrigerant for supermarket refrigeration system. In this paper, to fulfill the increasing need of accurate Low-GWP supermarket refrigeration models for development of supervisory level control and optimization strategies, a high fidelity model is developed for CO 2 transcritical supermarket refrigeration system which includes compressor rack of low temperature (LT) compressors and medium temperature (MT) compressors, air-cooled gas cooler, evaporator, expansion valves and other auxiliary equipment. A resistance-capacity model structure is proposed to simulate the display cases. Semi-thermodynamic models are proposed to estimate reciprocating compressors volumetric efficiency and power consumption. Furthermore the zone modeling approach is used for evaporator simulation, and air-cooled gas cooler is modeled with distributed modeling method. The expansion valve simulation is based on orifice flow model. To calibrate these models, both manufacture performance data and experimental data are used. The experiments are conducted with a full instrumental CO 2 supermarket refrigeration system installed in Oak Ridge National Lab Flexible Research Platform (FRP). The simulation model can predict the system performance, including power consumption, cooling capacity, mass flow rate, temperature, and pressure, with high accuracy (within ±4%) compared to experimental data. In addition, this developed model has been used to create the system optimum high side pressure for high side expansion valve control, and to generate wide operating range simulation data for developing the batter-equivalent commercial refrigeration system model which can be used in grid interactive control development.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗