Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “readiness review”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Making Technology Ready: Integrated Systems Health Management

This paper identifies work needed by developers to make integrated system health management (ISHM) technology ready and by programs to make mission infrastructure ready for this technology. This paper examines perceptions of ISHM technologies and experience in legacy programs. Study methods included literature review and interviews with representatives of stakeholder groups. Recommendations address 1) development of ISHM technology, 2) development of ISHM engineering processes and methods, and 3) program organization and infrastructure for ISHM technology evolution, infusion and migration.

Malin, Jane T.↗

Space Shuttle Systems Engineering Processes for Liftoff Debris Risk Mitigation

This slide presentation reviews the systems engineering process designed to reduce the risk from debris during Space Shuttle Launching. This process begins the day of launch from the tanking to the vehicle tower clearance. Other debris risks (i.e., Ascent, and micrometeoroid orbital debit) are mentioned) but are not the subject of this presentation. The Liftoff debris systems engineering process and an example of how it works are reviewed (i.e.,STS-119 revealed a bolt liberation trend on the Fixed Service Structure (FSS) 275 level elevator room). The process includes preparation of a Certification of Flight Readiness (CoFR) that includes (1) Lift-off debris from previous mission dispositioned, (2) Flight acceptance rationale has been provided for Lift-off debris sources/causes (3) Lift-off debris mission support documentation, processes and tools are in place for the up-coming mission. The process includes a liftoff debris data collection that occurs after each launch. This includes a post launch walkdown, that records each liftoff debris, and the entry of the debris into a database, it also includes a review of the imagery from the launch, and a review of the instrumentation data. There is also a review of the debris transport analysis process, that includes temporal and spatial framework and a computational fluid dynamics (CFD) analysis. which incorporates a debris transport analyses (DTA), debris materials and impact tests, and impact analyses.

Mitchell, Michael↗

Process modeling, techno-economic assessment, and life cycle assessment of the electrochemical reduction of CO 2 : a review

The electrochemical reduction of CO 2 has emerged as a promising alternative to traditional fossil-based technologies for the synthesis of chemicals. Its industrial implementation could lead to a reduction in the carbon footprint of chemicals and the mitigation of climate change impacts caused by hard-to-decarbonize industrial applications, among other benefits. However, the current low technology readiness levels of such emerging technologies make it hard to predict their performance at industrial scales. During the past few years, researchers have developed diverse techniques to model and assess the electrochemical reduction of CO 2 toward its industrial implementation. The aim of this literature review is to provide a comprehensive overview of techno-economic and life cycle assessment methods and pave the way for future assessment approaches. First, we identify which modeling approaches have been conducted to extend analysis to the production scale. Next, we explore the metrics used to evaluate such systems, regarding technical, environmental, and economic aspects. Finally, we assess the challenges and research opportunities for the industrial implementation of CO 2 reduction via electrolysis.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Flight Certification Approach for NASA's Space Launch System

NASA’s Space Launch System (SLS) vehicle was successfully launched on November 16, 2022, initiating the Artemis I mission to send the uncrewed Orion spacecraft to the Moon and further into space than any human-rated spacecraft had previously flown. Flight certification of the launch vehicle was part of the systems engineering and integration (SE&I) effort conducted by NASA to successfully certify the mission and begin a new era of human space exploration of the Moon and eventually Mars. This paper describes the SLS Program flight certification approach including the organization, processes, and reporting. This approach used traditional NASA SE&I milestone reviews and lessons learned from the Space Shuttle Program, as well as unique methods to certify the complex system, procedures, and personnel readiness. The approach utilized by the SLS Program to conduct flight certification for the Artemis I mission can be extended to address flight certification for other complex programs.

flight certification↗

Development of Acoustic Backscatter for In Situ Monitoring of Nuclear Sludge Wastes During Transfer - 20117

This paper presents an overview into the use of acoustic backscatter systems (ABS) for the in situ characterization of nuclear waste sludge concentration, size and aggregation, highlighting key achievements from the University of Leeds. Previous projects funded through the Engineering and Physical Sciences Research Council (EPSRC) UK and Innovate UK are firstly reviewed and linked to current research within the new TRANSCEND consortium. Detailed are a number of developments at various stages of technology readiness level, from the use of ABS to monitor small-scale sludge settling in columns, to large-scale jet-mixing and waste transfer operations. Current work with Sellafield Ltd will see new technology and world leading analysis methods deployed to measure the consolidation of complex wastes currently undergoing containment, the first time full industrial utilization of these systems has been achieved. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Controllable Thin‐Film Approaches for Doping and Alloying Transition Metal Dichalcogenides Monolayers

Abstract Two‐dimensional (2D) transition metal dichalcogenides (TMDs) exhibit exciting properties and versatile material chemistry that are promising for device miniaturization, energy, quantum information science, and optoelectronics. Their outstanding structural stability permits the introduction of various foreign dopants that can modulate their optical and electronic properties and induce phase transitions, thereby adding new functionalities such as magnetism, ferroelectricity, and quantum states. To accelerate their technological readiness, it is essential to develop controllable synthesis and processing techniques to precisely engineer the compositions and phases of 2D TMDs. While most reviews emphasize properties and applications of doped TMDs, here, recent progress on thin‐film synthesis and processing techniques that show excellent controllability for substitutional doping of 2D TMDs are reported. These techniques are categorized into bottom–up methods that grow doped samples on substrates directly and top–down methods that use energetic sources to implant dopants into existing 2D crystals. The doped and alloyed variants from Group VI TMDs will be at the center of technical discussions, as they are expected to play essential roles in next‐generation optoelectronic applications. Theoretical backgrounds based on first principles calculations will precede the technical discussions to help the reader understand each element's likelihood of substitutional doping and the expected impact on the material properties.

36 MATERIALS SCIENCE↗

Status of high power electric propulsion technology

The growing emphasis on very challenging missions and the anticipated availability of high power levels in space have led to renewed interest in high power electric propulsion. The status of high power electric propulsion technology and its applicability to various missions are reviewed. The major thruster and system technology issues are identified which must be addressed in a focussed program in order to assure technology readiness for these missions.

Byers, David C.↗

A Historical Review of Brayton and Stirling Power Conversion Technologies for Space Applications

Dynamic power conversion technologies, such as closed Brayton and free-piston Stirling, offer many advantages for space power applications including high efficiency, long life, and attractive scaling characteristics. This paper presents a historical review of Brayton and Stirling power conversion technology for space and discusses on-going development activities in order to illustrate current technology readiness. The paper also presents a forecast of potential future space uses of these power technologies.

Mason, Lee S.↗

Deployment Readiness Framework Subtask 1.2 Outreach Report: Common Themes Among Clean Energy Transition Technical Assistance Projects

Island and remote coastal communities face an uncertain energy future. These communities build, operate, and maintain energy infrastructure in extremely challenging environments and pay the highest prices for electricity and fuels. Moreover, climate change increasingly affects grid reliability, resiliency, and, ultimately, the cost of energy. Marine energy could address many of the challenges faced by island and remote coastal communities, but these communities often have limited resources and capacity to invest in complex energy and coastal resilience issues. The Deployment Readiness Framework (DRF) is being developed to support community-driven energy transitions in these coastal communities and to better understand the readiness of communities for marine energy demonstration and operation. Led by the National Renewable Energy Laboratory and Pacific Northwest National Laboratory, the DRF builds on the Energy Transitions Initiative Partnership Project (ETIPP) supported in part by the U.S. Department of Energy's Water Power Technologies Office. This report details the results from the stakeholder outreach and engagement effort linked to the previously reported literature review.

16 TIDAL AND WAVE POWER↗

AgMIP Training in Multiple Crop Models and Tools

The Agricultural Model Intercomparison and Improvement Project (AgMIP) has the goal of using multiple crop models to evaluate climate impacts on agricultural production and food security in developed and developing countries. There are several major limitations that must be overcome to achieve this goal, including the need to train AgMIP regional research team (RRT) crop modelers to use models other than the ones they are currently familiar with, plus the need to harmonize and interconvert the disparate input file formats used for the various models. Two activities were followed to address these shortcomings among AgMIP RRTs to enable them to use multiple models to evaluate climate impacts on crop production and food security. We designed and conducted courses in which participants trained on two different sets of crop models, with emphasis on the model of least experience. In a second activity, the AgMIP IT group created templates for inputting data on soils, management, weather, and crops into AgMIP harmonized databases, and developed translation tools for converting the harmonized data into files that are ready for multiple crop model simulations. The strategies for creating and conducting the multi-model course and developing entry and translation tools are reviewed in this chapter.

farm crops↗

Qualification of a Hybrid Propulsion System for the Mars Ascent Vehicle

Technology for a hybrid based propulsion system is being developed to support a potential Mars Sample Return campaign. A Mars Ascent Vehicle (MAV) concept for launching samples off of Mars, and delivering them to orbit for further transport to Earth may utilize hybrid propulsion due to the predicted favorable low temperature characteristics and high performance of this option. However, the hybrid option is still undergoing technology development to demonstrate these capabilities. Once development of a capable hybrid propulsion system is proven, further work will be required. This will include environmental testing relative to the mission, and integration with the vehicle reaction control systems and payload. Qualification of such a system will be a significant effort. It will require specialized procurements for the propellants and environments involved, and further testing of the more specialized designs. This paper details an estimate of the tasks required to complete development efforts from Technical Readiness Level 5 (TRL5) through qualification. A success based program was formulated to reach the required performance metrics sufficient for a standard Preliminary Design Review (PDR). Using task level inputs from team members cost and schedule were conceived for continued progress to Critical Design Review (CDR), then through Qualification.

Prince, Andrew↗

Modeling in High Temperature Corrosion: A Review and Outlook

Realizing higher operating temperatures to increase efficiency of future applications for energy conversion and storage while minimizing cost is a challenge for development of high-temperature materials. Simultaneous optimization of mechanical properties and corrosion resistance continues to be a difficult task but is essential due to the need to significantly accelerate the transition between technology readiness levels in the future. Furthermore, oxidation-induced degradation will be a critical life-limiting mechanism at increased operating temperatures. Suitable high-temperature materials cannot be solely identified by time-consuming experiments and reliable computational methods incorporating the relevant physics of processes must be considered to complement the experimental efforts. In the present work, a review of the methods employed to model oxidation-induced material degradation described in literature will be discussed. Furthermore, their capability to predict lifetime and aid in material selection will be evaluated.

36 MATERIALS SCIENCE↗

Aerospace Safety Advisory Panel Annual Report for 1999

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for the calendar year 1999.This was a year of notable achievements and significant frustrations. Both the Space Shuttle and International Space Station (ISS) programs were delayed.The Space Shuttle prudently postponed launches after the occurrence of a wiring short during ascent of the STS-93 mission. The ISS construction schedule slipped as a result of the Space Shuttle delays and problems the Russians experienced in readying the Service Module and its launch vehicle. Each of these setbacks was dealt with in a constructive way. The STS-93 short circuit led to detailed wiring inspections and repairs on all four orbiters as well as analysis of other key subsystems for similar types of hidden damage. The ISS launch delays afforded time for further testing, training, development, and contingency planning. The safety consciousness of the NASA and contractor workforces, from hands-on labor to top management, continues high. Nevertheless, workforce issues remain among the most serious safety concerns of the Panel. Cutbacks and reorganizations over the past several years have resulted in problems related to workforce size, critical skills, and the extent of on-the-job experience. These problems have the potential to impact safety as the Space Shuttle launch rate increases to meet the demands of the ISS and its other customers. As with last year's report, these work- force-related issues were considered of sufficient import to place them first in the material that follows. Some of the same issues of concern for the Space Shuttle and ISS arose in a review of the launch vehicle for the Terra mission that the Panel was asked by NASA to undertake. Other areas the Panel was requested to assess included the readiness of the Inertial Upper Stage for the deployment of the Chandra X-ray Observatory and the possible safety impact of electromagnetic effects on the Space Shuttle. The findings and recommendations in this report do not highlight any major, immediate issues that might compromise the safe pursuit of the various NASA programs. They do, however, cover concerns that the Panel believes should be addressed in the interest of maintaining NASA's excellent safety record.The Panel is pleased to note that remedial efforts for some of the findings raised are underway. Given appropriate funding and cooperative efforts among the Administration, the Congress and the various contractors, the Panel is convinced that safety problems can be avoided or solved resulting in lower risk for NASA's human space and aeronautics programs. Section II of this report contains specific findings and recommendations generated by Panel activities during the calendar year 1999. Section III presents more detailed information in support of these findings and recommendations. A current roster of Panel members, consultants, and staff is included as Appendix A. Appendix B contains NASA's response to the findings and recommendations from the 1998 annual report. It has been augmented this year to include brief explanations of why the Panel classified the NASA response as " open,""continuing," or "closed." Appendix C lists the fact-finding activities of the Panel in 1999.

Blomberg, Richard D.↗

FEED Study of CarbonCapture Inc DAC and CarbonCure Utilization Technologies Using United States Steel’s Gary Works Plant Waste Heat (Final Report)

The University of Illinois at Urbana-Champaign (UIUC) led this project to produce a front-end engineering design (FEED) study of an advanced Direct Air Capture and Utilization System (DACUS) system that can remove a minimum of 5,000 tonnes/yr net of carbon dioxide from air (based on cradle-to-gate LCA) and utilizing the CO 2 to produce low carbon intensity ready mix concrete. The designed system, if built, would be larger than any currently existing Direct Air Capture (DAC) collector in the U.S. Such carbon capture technologies are critical to meeting the goals of the DOE’s program to accelerate climate-critical technology. In addition to the power sector, industrial facilities for the manufacture of steel and cement/concrete are among the major sources of anthropogenic CO 2 . DAC is a promising new technology for reducing CO 2 , a potent greenhouse gas, in the atmosphere but is expensive, in part due to the energy required to adsorb and desorb captured CO 2 during cycles. By integrating CarbonCapture Inc. (CCI) DAC modules at United States Steel's Gary Works (USS) and utilizing the site's waste heat, energy, and location this project evaluates the feasibility of utilizing the captured CO 2 and the logistics of transportation. CarbonCapture Inc. has developed an innovative DAC system using novel adsorbents to cost-effectively capture CO 2 . The captured, liquified gas will be trucked to ready-mix concrete plants within the region, the closest of which is approximately 3.5 miles away, where CarbonCure will inject it into concrete during the mixing process at the facilities. The carbon dioxide reacts with concrete, mineralizing into calcium carbonate (CaCO 3 ), permanently locking the greenhouse gas into the matrix of the building material. This FEED study demonstrated a full CO 2 value chain for DACUS from industrial facilities. It also provided a means for Visage Energy Corp. (Visage) to assess the impact of this holistic approach on job creation, regional economic impact, and environmental justice. The project team also included Sargent & Lundy (S&L) to provide the constructability review and costing of the integration of the DAC with the steel plant. Ecotek Engineering USA, LLC designed the outside battery limit (OSBL) infrastructure to connect the DAC and the plant. Activities performed during the project included: (1) Project Management Plan; (2) Technology Maturation Plan (TMP); (3) Initial Workforce Readiness Plan; (4) Workforce Readiness Plan; (5) Front-End Engineering Design (FEED) Study; (6) Project Design Basis; (7) Hazards and Operability (HAZOP) Study; (8) Constructability Review; (9) Project Cost Assessment; (10) Logistics Analysis of CO 2 Transportation to the Utilization Site; (11) Business Case Analysis; (12) Life Cycle Analysis (LCA); (13) Environmental Health and Safety (EH&S) Analysis; (14) Environmental Justice Analysis; and (15) Economic Revitalization and Job Creation Outcomes Analysis. This report provides a summary of the outcomes and results of the project, which was performed between Oct. 1, 2022, through Sept. 30, 2024.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Ares I and Ares V First Stage - Powering Exploration

The National Aeronautics and Space Administration (NASA) Ares Projects Office (APO) is continuing to make progress toward the final design of the first stage propulsion system for the Ares I crew launch vehicle and the Ares V cargo launch vehicle. Ares I and Ares V will provide the space launch capabilities needed to fulfill NASA' s exploration strategy of sending human beings to the Moon, Mars, and beyond. As primary propulsion for the Ares launch vehicles, the Space Shuttle-derived Reusable Solid Rocket Motor (RSRM) is one of the first and most important components to be tested. The first flight of Ares I, called Ares I-X, will occur in April 2009, with booster integration to begin at Kennedy Space Center (KSC) by autumn 2008. The Ares I-X flight will use a combination of flight and simulation hardware to obtain data on controlling the long and narrow crew launch vehicle configuration. The test will use a four-segment RSRM from the Shuttle inventory and a fifth spacer segment to simulate the size and weight of the operational five-segment motor to be used on later flights. The upper stage, Orion crew exploration vehicle, and launch abort system will all be replaced with simulator hardware. Manufacturing work has begun on the spacer segment, as well as the new forward hardware for the booster. Atlas V avionics will be adapted to control Ares I-X' s first stage. That hardware is undergoing hardware-in-the-loop testing in a contractor-provided systems integration laboratory (SIL); a critical design review (CDR) was completed in December 2007. Drogue and main parachute drop tests have also been conducted successfully at Yuma Proving Grounds, allowing the First Stage team to begin fabricating parachutes for Ares I-X. The Ares I-X flight test will be the first flight test for the parachutes. A series of preliminary design technical interchange meetings is being conducted prior to the Ares I-X CDR in January 2007 to ensure readiness for the flight. Much of the First Stage activity in 2007 has focused on a series of preliminary design (PDR) activities associated with each booster subsystem. These events will culminate in a formal preliminary design review in 2008, where subsystems and component specifications will be developed and associated analyses and drawings will be evaluated for technical adequacy. The first stage also has been undergoing a series of trade studies to determine means for upgrading booster performance and reducing operational costs. Performance improvement studies have included changing from polybutadiene acrylonitrile (PBAN) propellant to hydroxyl-terminated polybutadiene (HTPB); replacing aluminum with composite motor casings; and optimizing or upgrading the propellant grain and nozzle structures. Some or all of these changes could result in a block upgrade to the Ares I first stage, after becoming the standard configuration for the Ares V. The cost reduction studies included a change from reusable or recoverable boosters to completely expendable boosters; changing from hydrazine-powered to more environmentally friendly electrohydrostatic actuators (EHAs) on the thrust vector control (TVC) system; and changing the location of the separation plane to reduce the likelihood of recontact upon booster separation. The expendability trade study resulted in a decision to keep the recoverable boosters, as the new hardware costs significantly outweighed the potential operational cost savings due to reduced ground operations. Likewise, due to cost considerations, the team continued using existing hydrazine-powered actuators for the TVC system. The separation plane location for Ares I is still being studied, with results to be announced in 2008. In short, the Ares launch vehicles' first stage is building upon NASA's close familiarity with this Shuttle-derived system, while continuing to seek out improvements for long-term exploration.

Priskos, Alex S.↗

EOS Terra Constellation Exit Review

This package presents the plans for Terra lowering its orbit by 5-6 kms and effectively removing itself from the 705km constellation in October 2022. Also, presented is all the work done to get ready for these maneuvers from both the Flight Dynamics and Flight Operations Team perspective, as well discussion of any contingencies and their associated pre-planned responses.

Dimitrios Mantziaras↗

A Review of Remote Welding and Nondestructive Examination Technologies for the DOE Standard Canister

The U.S. Department of Energy (DOE) manages a wide variety of spent nuclear fuel (SNF) that poses a unique management challenge. To help address this challenge, the DOE Standard Canister (DOESC), designed to remain sealed during handling, storage, transportation, and disposal, was conceptualized as a standardized containment vessel to accommodate DOE-managed SNF. Since 1999, several welding and examination processes have been independently developed for the DOESC’s closure welds. However, neither the DOESC nor these processes have been realized in an operational capacity. This review paper seeks to present and compare previously developed DOESC closure weld, nondestructive examination, and repair processes and technologies. Specific processes developed for the Idaho Spent Fuel Facility, in preparation for the Yucca Mountain geological repository, and the recent Road-Ready Demonstration Project are discussed. Further, specific focus is given to how different operating constraints and the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (BPVC) have driven certain welding and nondestructive examination requirements. Historical DOESC welding and examination strategies are assessed against current regulatory and BPVC requirements. The comparison of welding processes, technologies, and DOESC designs presented in this review paper will inform further construction efforts for other commercial and DOE-managed SNF containments, including the DOESC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗