Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Day-Ahead Optimal Operation for Multi-Energy Residential Systems with Renewables

The intermittency and stochasticity nature of distributed renewable energy sources has introduced great challenges to the efficiency and security of energy distribution system operations. To address the negative impacts of intermittent renewable energy sources, this paper proposes here a day-ahead optimal operation strategy utilizing distributed energy resources based on the framework of the interconnected multi-energy system. First, a framework and mathematical models of multi-energy residential systems (MERS) are proposed. Based on the characteristics of residential energy distribution networks, the complex MERS models are reformulated to relieve the computational burden. Furthermore, the uncertainty factors such as renewable energy generation fluctuations and demand variations are handled by a reformulated chance con-strained programming technique. The feasibility and effectiveness of the proposed method are validated through a combined electric power and natural gas test system. Compared to similar models and methods in the existing literature, the proposed method performs better in terms of solution time, model scalability, and robustness in handling uncertainties.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LatticeAnalytics: Strut-Level Visualization and Inspection of Additively Manufactured Lattice Structures

Additive manufacturing (AM) is revolutionizing the production of custom components with complex internal geometries, essential for high-performance applications in diverse fields such as medicine and defense. These AM parts optimize strength while minimizing weight by utilizing internal lattice structures consisting of large quantities of small interconnected struts. However, the complexity of these structures, combined with the challenges of using X-ray Computed Tomography (XCT) data, makes validation of part reliability difficult. This ultimately inhibits the development of novel parts for our collaborating material scientists. Here, we introduce LatticeAnalytics, a novel framework specifically designed for visual inspection of defects in these lattice structures. Our framework offers an end-to-end solution that includes the data management of XCT scans, enables remote access for geographically dispersed teams through a web-based dashboard, and incorporates novel visualizations. Our analysis is facilitated by a coarse alignment between the lattice’s nominal model, a spatial graph, and the XCT data. We employ a simple VR-based approach for fast and rough alignment, followed by an offline registration and identification of the struts. With the nodes and struts aligned and identified in the volume, our framework allows querying of subvolumes containing a single strut at multiple resolutions. This avoids computation over the entire lattice and also allow for easy parallelization of down-stream computations, such as strut-specific metrics. To depict a fast overview of the strut quality, we introduce two innovative visual encodings, crucial for our collaborators’ research in creating novel AM parts: the Contour View and the Roughness Map, which depict critical geometrical and surface features of individual struts in standardized two 2D views. We evaluated the integrated system through expert interviews. The feedback confirms the framework’s practicality and its effectiveness in enhancing current inspection workflows. It solves major bottlenecks for our collaborators, ultimately helping them create novel parts with advanced properties.

Miao, Haichao [Lawrence Livermore National Laborat↗

Wasatch Solar Project Final Report

The Wasatch Solar Project was a collaborative effort to conduct stakeholder engagement and provide technical assistance and analysis to support solar market development in Utah. The Wasatch Solar Project addressed four topic areas: 1) technical analysis to inform an assessment of the net benefits and costs of solar in Utah; 2) development of a 10-Year Solar Deployment Plan to create a clear path for continued solar deployment in Utah; 3) demonstration of the costs and resiliency benefits of solar and storage for resiliency at emergency response facilities or public facilities; and 4) technical assistance to create a replicable Commercial Property Assessed Clean Energy (C-PACE) financing program in Utah. The Wasatch Solar Project identified that new technical new technical challenges arise as nascent markets grow to higher penetrations of solar, requiring more detailed interconnection standards and improved efficiency in the interconnection process; that it is difficult for entities served by utilities that do not collect hourly usage data to assess the economic value of solar and storage; that despite significant resiliency benefits, the high cost of battery storage limits its adoption at healthcare and emergency response facilities in states like Utah that have low electricity rates; that administration of C-PACE financing at a local jurisdictional level can be complex, cumbersome, and a barrier to widespread utilization; and that investments in distributed generation can result in long-term savings for utility customers.

14 SOLAR ENERGY↗

Bridging the Gap for Powering Data Centers

The rapid expansion of data centers, primarily driven by artificial intelligence, is outpacing the adaptability of the U.S. electric grid. This report, developed by Idaho National Laboratory (INL) , presents a gap analysis of some of the infrastructure challenges associated with large-scale data center deployment. Drawing from a national workshop hosted by INL in October of 2025, the report synthesizes stakeholder insights, survey data, and technical discussions to identify critical barriers and research needs. Key findings highlight the growing preference for behind-the-meter generation, the perceived inadequacy of legacy interconnection processes, and the urgent need for improved coordination between utilities, regulators, and data center developers. Environmental concerns such as water use and noise pollution, as well as economic constraints like equipment lead times and cost allocation, are also explored. The report outlines national lab capabilities in modeling, simulation, and technical assistance, and proposes targeted R&D priorities to support resilient, scalable, and efficient integration of data centers into the grid.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

2008 WIND TECHNOLOGIES MARKET REPORT

The U.S. wind industry experienced a banner year in 2008, again surpassing even optimistic growth projections from years past. At the same time, the last year has been one of upheaval, with the global financial crisis impacting near-term growth prospects for the wind industry, and with federal policy changes enacted to push the industry towards continued aggressive expansion. This rapid pace of development has made it difficult to keep up with trends in the marketplace. Yet, the need for timely, objective information on the industry and its progress has never been greater. This report - the third of an ongoing annual series - attempts to meet this need by providing a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2008. As with previous editions, this report begins with an overview of key wind power installation-related trends: trends in wind capacity growth in the U.S., how that growth compares to other countries and generation sources, the amount and percentage of wind in individual states and serving specific utilities, and the quantity of proposed wind capacity in various interconnection queues in the United States. Next, the report covers an array of wind industry trends, including developments in turbine manufacturer market share, manufacturing and supply-chain investments, wind turbine and wind project size, project financing developments, and trends among wind power developers, project owners, and power purchasers. The report then turns to a discussion of wind project price, cost, and performance trends. In so doing, it reviews the price of wind power in the United States, and how those prices compare to the cost of fossil-fueled generation, as represented by wholesale power prices. It also describes trends in installed wind project costs, wind turbine transaction prices, project performance, and operations and maintenance expenses. Next, the report examines other policy and market factors impacting the domestic wind power market, including federal and state policy drivers, transmission issues, and grid integration. Finally, the report concludes with a preview of possible near- to medium-term market developments. This version of the Annual Report updates data presented in the previous editions, while highlighting key trends and important new developments from 2008. New to this edition is an executive summary of the report and an expanded final section on near- to medium-term market development. The report concentrates on larger-scale wind applications, defined here as individual turbines or projects that exceed 50 kW in size. The U.S. wind power sector is multifaceted, however, and also includes smaller, customer-sited wind turbines used to power the needs of residences, farms, and businesses. Data on these applications are not the focus of this report, though a brief discussion on Distributed Wind Power is provided on page 4. Much of the data included in this report were compiled by Berkeley Lab, and come from a variety of sources, including the American Wind Energy Association (AWEA), the Energy Information Administration (EIA), and the Federal Energy Regulatory Commission (FERC). The Appendix provides a summary of the many data sources used in the report. Data on 2008 wind capacity additions in the United States are based on information provided by AWEA; some minor adjustments to those data may be expected. In other cases, the data shown here represent only a sample of actual wind projects installed in the United States; furthermore, the data vary in quality. As such, emphasis should be placed on overall trends, rather than on individual data points. Finally, each section of this document focuses on historical market information, with an emphasis on 2008; with the exception of the final section, the report does not seek to forecast future trends.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cloud-Based Demonstration of the Eastern Interconnection Situational Awareness Monitoring System (ESAMS)

This report describes a cloud-based implementation and field demonstration of the Eastern Interconnection Situational Awareness and Monitoring System (ESAMS). ESAMS was developed to support the detection and source localization of forced oscillations using synchrophasor measurements from tie-lines connecting areas served by different reliability coordinators (RCs), so that RCs could better coordinate their response to wide-area events. A previous effort had identified deployment barriers associated with hosting shared situational awareness tools at a single RC. To address these barriers, ESAMS was migrated to Amazon Web Services and evaluated in a six-month field demonstration. ISO New England (ISO-NE) and PJM streamed data to the platform using AWS Direct Connect and a site-to-site VPN, respectively. The resulting multi-utility measurement footprint enabled regional source localization across major portions of the U.S. Eastern Interconnection and supported routine identification of oscillation events. During the final three months of the trial, 24 events above 2 MW/MVAR were detected. The largest detected oscillation approached a 25 MW peak-to-peak amplitude, and the longest persisted intermittently for more than 11 hours. The demonstration also assessed operational considerations—including data transfer volumes, end-to-end latency, and cloud computing costs—and found that network and compute requirements were modest relative to typical cloud capabilities while providing performance comparable to prior on-premises deployments. Overall, the results indicate that cloud hosting can provide a practical path to shared interconnection-wide oscillation monitoring. The cloud ESAMS demonstration establishes a foundation for broader utility participation and for building future wide-area analytics that leverage measurements across organizational boundaries.

Follum, James D.↗

Generator Interconnection Cost Analysis in the Midcontinent Independent System Operator (MISO) territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the Midcontinent Independent System Operator (MISO), representing nearly 50% of all projects requesting interconnection from 2010 to 2020. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessing Solar Cybersecurity: Questions for States to Ask Electric Utilities

To help State Energy Officials and Public Utility Commissions engaging investor-and consumer-owned utilities and the solar industry in topical discussions about their cybersecurity practices and priorities in general, and for interconnected solar systems, specifically, this report outlines discussions prompts for these discussions. By using the questions in this tool states can explore aspects of utilities’ cybersecurity risk management programs that target solar devices, systems, and communication pathways. Such discussions help states identify cybersecurity gaps and assist in emergency response planning, as well as general risk awareness.

14 SOLAR ENERGY↗

IEEE 1547 and 2030 Standards for Distributed Energy Resources Interconnection and Interoperability with the Electricity Grid

Public-private partnerships have been a mainstay of the U.S. Department of Energy and the National Renewable Energy Laboratory (DOE/NREL) approach to research and development. These partnerships also include technology development that enables grid modernization and distributed energy resources (DER) advancement, especially renewable energy systems integration with the grid. Through DOE/NREL and industry support of Institute of Electrical and Electronics Engineers (IEEE) standards development, the IEEE 1547 series of standards has helped shape the way utilities and other businesses have worked together to realize increasing amounts of DER interconnected with the distribution grid. And more recently, the IEEE 2030 series of standards is helping to further realize greater implementation of communications and information technologies that provide interoperability solutions for enhanced integration of DER and loads with the grid. For these standards development partnerships, for approximately $\$$1 of federal funding, industry partnering has contributed $\$$5. In this report, the status update is presented for the American National Standards IEEE 1547 and IEEE 2030 series of standards. A short synopsis of the history of the 1547 standards is first presented, then the current status and future direction of the ongoing standards development activities are discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators

The rapid expansion of data centers, driven by the exponential growth in data-processing and storage needs, presents significant challenges and opportunities for various stakeholders, including data center developers, nuclear energy providers, and utility companies. Data centers are projected to consume 6.7–12% of United States (U.S.) electricity by 2028, driven by artificial intelligence (AI) and cloud-computing demands. Nuclear energy offers reliability and dispatchable baseload power, but data centers need power now while nuclear still needs time to address siting, fast power ramping, and regulatory hurdles. Utilities must keep pace with the unprecedented acceleration of large load interconnection requests and urgently adapt to high-density loads while maintaining grid stability, reliability, and accelerating interconnection timelines. This report dives into these challenges and proposes key collaboration strategies to streamline data center integration that aligns with recent federal initiatives like America’s AI Action Plan and related executive orders that emphasize the importance of data center growth, nuclear energy expansion, and maintaining a competitive edge in the global AI race.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Draft Electric Rule 21 Test Protocols for Advanced Inverter Functions

Disclaimer: The following document includes draft certification protocols and should not be viewed as a consensus-based performance standard. Distributed energy resources (DERs), such as photovoltaic (PV) systems, when deployed in a large scale, are capable of significantly influencing the operation of bulk and local power systems. Looking to the future, European and American stakeholders are working on standards to make it possible to manage the potentially complex interactions between DER and the power system. One of the jurisdictions considering modifications to the DER interconnection requirements is California. To determine what changes could improve electric grid reliability and allow greater penetrations of renewable energy, the California Public Utilities Commission (CPUC) and the California Energy Commission (CEC), in conjunction with consultant Frances Cleveland, convened the Smart Inverter Working Group (SIWG) in January 2013. The SIWG--composed of state agencies, utility engineers, national laboratories, manufacturers, trade associations, and advocacy groups--provided the CPUC a set of recommendations in early 2014 1 . The recommendations included specific advanced DER functions and interoperability requirements, along with a proposed timeline, for California to add new capabilities to grid-interconnected DER. On August 18, 2014 the three California Investor-Owned Utilities (IOUs)--Pacific Gas and Electric Company (PG&E), Southern California Edison Company (SCE) and San Diego Gas & Electric Company (SDG&E)--drafted a Advice Letter filing to the CPUC setting forth revisions to Electric Tariff Rule 21 to conform to the seven recommendations made by the Working Group 2 . After a comment period, the CPUC issued an update to the IOU recommendations 3 . At the time of this publication, there was no final legal ruling on the CPUC Rulemaking (R.) 11-09-011 ("Order Instituting Rulemaking on the Commission's Own Motion to improve distribution level interconnection rules and regulations for certain classes of electric generators and electric storage resources"). In the U.S., Nationally Recognized Test Laboratories (NRTLs) independently verify products to safety and functional standards. PV inverters are certified to Underwriters Laboratories (UL) Standard 1741 4 . However, new advanced inverter functions described in the SIWG and IOU proposals are not included in this standard, so there is a critical need to develop test protocols for these functions in preparation of a positive ruling by the CPUC. Through a California Solar Initiative Grant, Sandia National Laboratories (Sandia or SNL), Underwriters Laboratories (UL), Electric Power Research Institute, Inc. (EPRI), Xanthus Consulting, SunSpec Alliance, Loggerware, and utility and PV inverter manufacturers have collaborated to draft this certification protocol for the Rule 21 SIWG Phase 1 advanced inverter functions. This report also includes test procedures for Phase 2 and Phase 3 functions that will be demonstrated later in the CSI4 project. This collaborative effort was performed in close junction with the UL 1741 Standards Technical Panel (STP) working group. This document represents a snapshot of the draft testing protocols at the time of publication and not a consensus certification protocol for advanced inverters. 1 California Public Utilities Commission, "Recommendations for Updating the Technical Requirements for Inverters in Distributed Energy Resources, Smart Inverter Working Group Recommendations," Filed 7 Feb 2014. 2 J.J. Newlander, R.G. Litteneker, S.W. Walter, M. Dwyer, Joint motion of Pacific Gas and Electric Company (U 39 E), Southern California Edison Company (U 338 E) and San Diego Gas & Electric Company (U 902 E) regarding implementation of smart inverter functionalities, Rulemaking 11-09-011 Advice Letter, 18 July, 2014. 3 J.T. Sullivan, CPUC Rulemaking 11-09-011 Agenda ID #13460, 13 Nov, 2014. 4 Underwriters Laboratories Std. 1741 Ed. 2, "Inverters, Converters, Controllers and Interconnection System Equipment for use with Distributed Energy Resources," 2010.

42 ENGINEERING↗

Measurements of Schottky barrier at the low-k SiOC:H/Cu interface using vacuum ultraviolet photoemission spectroscopy

The band alignment between copper interconnects and their low-k interlayer dielectrics is critical to understanding the fundamental mechanisms involved in electrical leakage in low-k/Cu interconnects. In this work, vacuum-ultraviolet (VUV) photoemission spectroscopy is utilized to determine the potential of the Schottky barrier present at low-k a-SiOC:H/Cu interfaces. By examining the photoemission spectra before and after VUV exposure of a low-k a-SiOC:H (k = 3.3) thin film fabricated by plasma-enhanced chemical-vapor deposition on a polished Cu substrate, it was found that photons with energies of 4.9 eV or greater can deplete accumulated charge in a-SiOC:H films, while VUV photons with energies of 4.7 eV or less, did not have this effect. These critical values were identified to relate the electric potential of the interface barrier between the a-SiOC:H and the Cu layers. Using this method, the Schottky barrier at the low-k a-SiOC:H (k = 3.3)/Cu interface was determined to be 4.8 ± 0.1 eV.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗