Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Hanford Site”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Part I: Predicting performance of Purolite A532E resins for remediation of comingled contaminants in groundwater

Ion exchange (IX) resins are used in pump-and-treat (P&T) facilities to remove soluble groundwater contaminants. However, natural anions present at concentrations orders of magnitude higher than contaminants can compete for IX sites and impact resin lifecycles. Here, the Hanford Site’s 200 West Area P&T facility (Washington State, USA) was selected as a case study because it currently uses two IX resins: Purolite® A532E (A532E) to remove pertechnetate (TcO 4 - ) and DOWEX 21K (DOWEX) to remove uranium from groundwater. Nitrate (NO 3 - ), sulfate (SO 4 2- ), chloride (Cl - ), and carbonate (CO 3 2- ) anions have been identified to potentially compete for A532E and DOWEX IX sites. Hanford-relevant anion groundwater concentrations were used to design a series of laboratory-scale batch experiments to evaluate the impact of competing anions on resin performance and potential kinetic effects. These data are then modeled to obtain Cl--normalized equilibrium exchange coefficients (K) needed to predict IX resin performance. The work is presented in two parts, with IX performance evaluated for A532E in Part I and DOWEX in Part II. Part I results demonstrate that TcO 4 - uptake is not impacted by NO 3 - , SO 4 2- , Cl - , CO 3 2- (as HCO 3 - ) and U(VI) carbonate anions, with K TcO4-/Cl- > 4,000, likely due to the high selectivity of A532E trihexylammonium sites for the large, weakly hydrated TcO 4 - anion. Other anion K values were K NO3-/Cl- = 20, K SO4--/Cl- = 0.2, K HCO3-/Cl- = 0.09, K U/Cl- = 370–1000. These K values provide conservative parameters for predicting A532E performance, and demonstrate that, under these test conditions, A532E will remove TcO 4 - from current and future influent streams to meet groundwater treatment objectives.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Updates to Composite Analysis Base Case and Null Space Monte Carlo Sensitivity Based on New Unit Dose Factors

This environmental calculation file (ECF) presents the results of the exposure route-specific and total radiological dose assessments for the groundwater exposure pathway as a part of the updated Composite Analysis for Low-Level Waste Disposal in the Hanford Site Central Plateau (FY 2022), based on revised unit dose factors (UDFs) published in CA Special Studies: Updates to the Groundwater Pathway Radiological Dose. The reason for these radiological dose assessments is to estimate the cumulative radiological impacts from all screened sources of ionizing radiation and exposure routes that could potentially contribute to the projected dose to a hypothetical member of the public. Sources of ionizing radiation can include existing or future disposal facilities and other sources including past-practice discharge sites. Additionally, the results of the exposure route-specific and total radiological dose assessments have been revised for the groundwater pathway based on the null space Monte Carlo (NSMC) groundwater concentrations and the most recent updates to the UDFs as a part an uncertainty analysis for the updated Hanford Site CA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of a Uranium Groundwater Plume along the Columbia River

The 300 Area is adjacent to the Columbia River on the southeastern end of Hanford, approximately one mile north of the city of Richland. Uranium fuel fabrication took place in the 300 Area from 1943 to 1988. In this chapter, the historical waste releases that occurred within the 300 Area of the Hanford Site, and specifically the resulting uranium plume, will be used as a case study. There are 3 different operable units (OU) that were established in the 300 Area for cleanup purposes: The 300-FF-1 OU, 300-FF-2 OU and the 300-FF-5 groundwater OU. To determine the location of contaminant plumes within the Hanford Site’s 300 Area, several puzzle pieces must be put together using multiple resources. The first piece of the puzzle is determining the location and chemistry of waste disposed of in the area. Records beginning in the 1940’s can help piece this information together, and the known waste sites and waste disposed of are an example of that process knowledge. Characterization of the subsurface and groundwater is important to determine where the contaminants are now, and what form they are in. This information can be used to design a remediation strategy, as well as to inform modeling efforts to predict where the contaminants will move to next.

300-FF-5, uranium, 300 area, hanford book project↗

A History of Hanford Tank Waste, Implications for Waste Treatment and Disposal

More than 40 years of plutonium processing have left almost 56 million gallons of mixed radioactive waste sequestered in 177 underground tanks on the Hanford Site. Three different processing technologies were employed for plutonium purification in addition to uranium scavenging and fission product removal from the tank waste. All of these chemical processes have contributed to a complex waste stream that varies from tank to tank that presents downstream processing challenges to render the waste into a safe form for long-term storage. The current disposition pathway for Hanford tank waste is vitrification. To maximize waste loading and minimize the number of high-level waste canisters stored in a geologic repository, pretreatment of the waste is required. Both pretreatment and vitrification operations are impacted by the waste composition.

Separations, filtration, ion exchange↗

Vadose Zone Model for A Trenches Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3. Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The scope of this ECF is to document the development and results of the A Trenches Area vadose zone model. The A Trenches Area model covers the region between the 200 East Area and southwest of the 216-B-3 Pond. The primary waste sites in this area are cribs associated with PUREX Plant (202-A).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium Partitioning upon Ammonia Gas Treatment on Phyllosilicate Minerals

In the past, > 200,000 kg of U was released to the Hanford Site vadose zone from disposal and leakage of waste byproducts from plutonium production during World War II and the Cold War (Zachara et al., 2007). U is highly mobile due to the presence of carbonates and oxidizing conditions, with K{sub d} of 0.1 - 8 mL/g at the site (Zachara et al., 2007; Szecsody et al., 2013; Serne et al., 2008). NH{sub 3} (gas) injection is being investigated as a remediation technique as it is an in situ method that will not introduce additional liquid that could drive contaminants deeper into vadose zone towards groundwater. Objectives: To understand the impact of alkaline injection on geochemical processes in the Hanford Site vadose zone, including: 1)Long-term fate of uranium (U); 2)Dissolution and re-precipitation of secondary minerals. Apparent K{sub d}'s increase significantly with NH{sub 3} gas treatment, especially for six-month aging. - K{sub d} decreases after aeration, primarily due to U desorption at lower pH. U removal is still significantly greater than natural conditions (K{sub d} < 8 vs. > 100 mL/g). - Three-day aeration has higher loading than six-month after ammonia gas treatment and aeration. However, significantly greater desorption of U occurs with aeration in the six-month aged sample potentially due to transformation into different, more soluble solid phases with longer term aging. - U removal is primarily due to (1) co-precipitation of U with secondary minerals and (2) adsorption to minerals' surface, although further research is required to identify dominant mechanisms. Future experiments will focus on garnering a better understanding of the solid phase U speciation. Solids will be characterized using SEM-EDS, EMPA, XPS, XAFS, and TEM to better understand the effects of basic treatments on initial minerals and formation of secondary precipitates.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Project Report for Cold Spray Phase 2 (Tasks 9-20)

In support of the ongoing environmental protection mission at the Hanford Site, led by Washington River Protection Solutions (WRPS), the cold spray team has continued development of the tank refurbishment technology. Orano Federal Services, along with subcontractors VRC Metal Systems (VRC) and Robotic Technologies of Tennessee (RTT), have worked with WRPS experts to refine the tools demonstrated in Phase 1 of this project, with the potential to refurbish double shell tanks (DST)s on the Hanford Site, extending the service lives of these vital waste storage facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Project Report for Cold Spray: Phase 2

In support of the ongoing environmental protection mission at the Hanford Site, led by Washington River Protection Services (WRPS), the cold spray team has continued development of the tank refurbishment technology. Orano Federal Services, along with subcontractors VRC Metal Systems (VRC) and Robotic Technologies of Tennessee (RTT), have worked with WRPS experts to refine the tools demonstrated in Phase 1 of this project, with the potential to refurbish double shell tanks (DST)s on the Hanford Site, extending the service lives of these vital waste storage facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing a remediation framework

When harmful contaminants are detected in soil, sediment, or groundwater (or suspected due to industrial activities), remediation efforts may be required to protect human health and the environment. This chapter will introduce and discuss the steps in the general site remediation process that are key when approaching any remediation strategy, regardless of the site complexity. While these steps are described in a linear fashion, in most cases, the approach is more fluid and iterative depending on the desired outcomes and success of each progressive clean-up effort along the way. This chapter will additionally articulate some key considerations which may be important to the overall remediation strategy depending on the particular needs and desired outcomes. From these more general discussions, the chapter will branch into a case-study of the remediation approach, or process steps, previously/currently/in the future taking place at the Hanford Site, as one example of a complex waste sites in the United States. As indicated earlier, while a remediation strategy can be more simply described by a progression of general process steps, it is far more likely to observe fluidity and strategy evolution over time from the first conceived strategy as remediation progress occurs. The chapter concludes with a brief discussion of how the strategy at the Hanford Site has evolved to provide a singular example of what this evolution might look like for other complex waste sites.

Muller, Katherine A.↗

Panel Session 98B: Treatment of Low-Activity Tank Waste at Hanford: Considering the Alternatives

This panel focused on alternative treatment of the Hanford Low-Activity Tank Waste. Currently, Tank Waste at the Hanford Site is to be separated into low-activity (LAW) and high-level waste (HLW) fractions, and then vitrified to produce immobilized LAW glass for onsite disposal, and HLW glass for ultimate geologic disposal. This panel discussed several commissioned studies by the National Laboratories, National Academies, and General Accountability Office to evaluate the risks, costs, and benefits associated with considering options for immobilizing portions of the Hanford LAW waste forms. Panelists with presentations: Analysis of Supplemental Treatment Approaches for Low-Activity Waste at the Hanford Nuclear Reservation Overview and Conclusions (Michael Stone); Analysis of Supplemental Treatment Approaches for Low-Activity Waste at the Hanford Nuclear Reservation: Disposal Performance Evaluation (Tom Brouns); National Academies Review of the Study on Supplemental Treatment Approaches of Low-Activity Waste at the Hanford Nuclear Reservation (Charles Ferguson); GAO Observations on Immobilizing Low-Activity Waste at DoE's Hanford Site (David Trimble)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for SALDS for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037,Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed "dry" in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Composite Analysis Special Studies FY2025 - Groundwater Flow Simulation for use in a Comparison of Simulated Concentrations in the Saturated Zone Estimated by the Plateau-to-River Model Versions 8.3 and 9.1

In order to meet the requirements of U.S. Department of Energy (DOE) in DOE O 435.1, Radioactive Waste Management, a composite analysis (CA) must be completed for the Central Plateau at the Hanford Site. The CA requires estimates of fate and transport of radionuclides in the groundwater from multiple sources within the modeling domain. This Environmental Calculation File (ECF) details the application of the Plateau-to-River (P2R) Model (CP-57037, Rev. 3, Model Package Report for the P2R Model: Version 9.1) to predict the flow of groundwater on the Central Plateau for the 10,000-year simulation to support a special analysis associated with the Hanford Site CA. The simulated flow field will support the simulation of fate and transport of contaminants for comparison to the results obtained as part of the CA to evaluate impact of the updated version of the P2R Model.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Robust Reference Electrode in Aggressive Chemical and Radiation Environments in the Hanford Waste Tanks

The Hanford site stores more than 200 million liters of radioactive and chemically hazardous wastes from the production of weapons materials. The wastes are stored in 177 underground carbon-steel storage tanks, separated between 149 single shell tanks (SSTs) and 28 double shell tanks (DSTs). The DSTs provide critical retrieval and interim storage before the waste is vitrified in the Waste Treatment and Isolation Plant (WTP). The tanks will need to remain in-service far beyond the initial 40-year design life, and effective corrosion control practices must remain in force to extend the tanks’ lifespans. This effort includes direct measurements of corrosion rate (e.g., ultrasonic measurements and corrosion coupons) and electrochemical processes (e.g., linear polarization measurements and open circuit potential measurements). The Hanford site began monitoring the corrosion potential in select DSTs in 2008. Of the 45 reference electrodes that have been installed, 29 have failed and 6 others provided unreliable results. DOE-EM is supporting a 3-year program to develop a chemical and radiation resistant reference electrode for application in the Hanford tanks. The first year of the program focused on understanding the failure mechanism for the reference electrodes and identification of candidate construction materials that would mitigate degradation of the electrodes in the waste environment. During the second year of the program, the objectives were to: 1) test candidate materials under simulated waste conditions, 2) design components that will extend the service life of the electrode, 3) fabricate materials for prototype reference electrodes, and 4) assemble prototype reference electrodes for accelerated testing. The reference electrode is constructed of four principal parts: 1) junction, 2) casing, 3) inner chamber backfill materials, and 4) the sensing wire. Principally, improvements of the junction, casing, and inner chamber backfill materials are being pursued. The junction material at the interface between the waste and the inner chamber of the reference electrode was identified as a critical component in the failure of the reference electrodes. Nine candidate replacement junction materials were tested under simulated waste conditions to evaluate permeation rate. These materials included a variety of polymeric and ceramic materials, some of which were 3-D printed. Thus far, porous polyvinylidene fluoride materials have performed satisfactorily and are being considered for prototype development. The commercial electrode casing materials in general have performed well. Additionally, 3-D printing of chemically and mechanically stable materials is being investigated as a means for further improvement in fabrication consistency. SRNL has also investigated altering the reference electrode design to extend the service life. The new design of the interior of the reference electrode casing creates a longer, more tortuous path between the junction material and the electrode sensing wire. A finite element model was used to optimize the design without adversely impacting the circuit resistance of the electrode during the measurements, thus preserving the measurement accuracy while enhancing the service life. The inner chamber back fill materials are also critical to the performance of the reference electrode. Materials that are resistant to intruding tank waste and provide a conductive path to the sensing wire were investigated. Gel and powder materials that are interspersed with a conductive chloride bearing material were tested for their influence on diffusion and electrode resistance. All the investigated materials and components will be assembled, with collaboration from commercial vendors, to fabricate the initial prototypes. Accelerated testing of the prototypes will be initiated in Year 2 of the program and will be completed in Year 3. A recommendation on the materials of construction and the design of the new robust reference electrode will be presented to the Hanford tank farm facility.

Sykes, Kiana [Savannah River National Laboratory (↗

Summer Bat Monitoring Report for Calendar Year 2022

Bats belong to the order Chiroptera, which means “hand-wing.” They use a thin membrane of skin stretched between their fingers to fly. All bat species known in the state of Washington are insectivorous and each bat can consume 600-1000 insects per hour while feeding. Bats typically give birth once per year to only one pup, making bat populations vulnerable to impacts and slow to recover. Several species of bats have been documented on the Hanford Site, with nine species identified during the Nature Conservancy surveys in 1997 and 1998, and an additional seven species listed as potentially present (Soll et al. 1999). Previous U.S. Department of Energy, Richland Operations Office (DOE-RL) acoustic surveys conducted in 2012 also confirmed the presence of the same nine species documented by Soll et al. (HNF-53759). In 2021, an additional species, the spotted bat, was observed roosting on the exterior of a facility by Hanford Site personnel; the species was confirmed via photograph by site biologists (Table 1).

54 ENVIRONMENTAL SCIENCES↗

Summer Bat Monitoring Report for Calendar Year 2021

Bats belong to the order Chiroptera, which means “hand-wing.” They use a thin membrane of skin stretched between their fingers to fly. All bat species known in the state of Washington are insectivorous, and each bat can consume 600-1000 insects per hour while feeding. Unlike rodents, who give birth to multiple litters of several young each year, bats typically give birth once per year to only one pup, making bat populations more vulnerable to impacts and slower to recover. Several species of bats have been documented on the Hanford Site, with nine species identified during The Nature Conservancy surveys in 1997 and 1998, and an additional seven species listed as potentially present (Soll et al. 1999). Previous U.S. Department of Energy, Richland Operations Office (DOE-RL) acoustic surveys conducted in 2012 also confirmed the presence of the same nine species documented by Soll et al. (HNF-53759). In 2021, an additional species, the spotted bat, was observed roosting on the exterior of a facility by Hanford Site personnel; the species was confirmed via photograph by site biologists (Table 1).

54 ENVIRONMENTAL SCIENCES↗

Annual Status Report (FY 2020): Performance Assessment for the Disposal of Low Level Waste in the 200 East Area Burial Grounds

This annual review provides the projected dose estimates of radionuclide inventories disposed in the 200 East Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. These estimates are calculated using the original dose methodology developed in the performance assessment (PA) analysis (WHC-SD-WM-TI-730). The estimates are compared with requirements of DOE O 435.1 Chg 1 and performance objectives defined in companion documents DOE M 435.1-1 Chg 1and DOE-STD-5002-2017). All performance objectives are currently satisfied, and operational waste acceptance criteria (HNF-EP-0063) and waste acceptance practices continue to be sufficient to maintain compliance with performance objectives. Inventory estimates and associated dose estimates from future waste disposal actions are unchanged from previous years’ evaluations that indicate potential impacts well below performance objectives; therefore, future compliance with DOE O 435.1 Chg 1 is expected. A new PA study was initiated in fiscal year (FY) 2019 for evaluation of active disposal sites within the 200 East and 200 West Areas (Trench 94 in 200 East; Trenches 31 and 34 in 200 West) due to extended time elapsing between the current annual status report and the original PA for the active disposal sites. The new PA for the active disposal sites is expected to be completed in FY 2021. Within the active burial grounds in the 200 East Area, low-level waste and mixed low-level waste will continue to be disposed of in the dedicated U.S. Navy reactor compartment trench at the 218-E-12B Burial Ground (Trench 94). During this reporting period (FY 2020, from October 1, 2019, through September 30, 2020), two reactor compartments were disposed in Trench 94. Results from sorption experiments are summarized for this reporting period to quantify the efficacy of concrete waste forms in retaining key radionuclides (e.g., technetium-99 and iodine-129). The test durations ranged from 1 to 3 months. Continued groundwater monitoring of the 200 East Area LLBGs indicates no groundwater contamination due to LLBG waste. Current assumptions about future land use at the Hanford Site are consistent with PA analysis1 assumptions of a post-closure facility that will not be degraded by human activity. The LLBGs are located in an area identified for waste management and containment of residual contamination. This area will remain after final environmental remediation and the proposed shrinkage of Hanford Site boundaries to small sections within the 200 East and 200 West Areas in the Central Plateau (DOE/EIS-0391). The current closure plan for the LLBGs (DOE/RL-2000-707) estimates that the 200 East LLBGs will be closed in the 2050 timeframe. The Disposal Authorization Statement, other technical basis documents, and the radioactive waste management basis are of continued adequacy to meet the performance objectives of DOE O 435.1 Chg 1. Overall, there are no substantive changes to primary PA assumptions nor the PA analysis conclusion; therefore, compliance with DOE O 435.1 Chg 1 and the Disposal Authorization Statement is maintained.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Demolition of Hanford's Plutonium Finishing Plant - 20507

U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC), a Jacobs owned company, is making significant progress demolishing the Plutonium Finishing Plant (PFP), which has long been known as one of the most hazardous buildings in the DOE Environmental Management Complex (DOE Complex). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut down in 1996, and material processing was completed in 2004. After approximately 25 years of demolition preparations, open-air demolition of the main portions of the Hazard Category II nuclear facility began in November 2016. To prepare the PFP for demolition, CHPRC employees performed some of the most hazardous work across the DOE Complex. In addition to extensive demolition preparations, including a wide-reaching communication strategy across the Hanford Site, CHPRC implemented robust controls and monitoring during demolition, and when necessary, adjusted demolition practices and sequence to maintain employee safety and project efficiency. Demolition of the main PFP building began in November 2016. The technical complexity, high hazards and radiological concerns have all led to a difficult demolition environment. Following a spread of contamination at the project site beyond the radiological boundaries in December 2017, work was halted and a recovery plan was generated to allow the demolition work to continue. After the implementation of additional controls and concurrence from regulatory agencies and DOE, the demolition was ready to resume work and reinitiated in August 2018. There are a number of lessons learned from the demolition activities and recovery plan process. This paper allows CHPRC and DoE's Richland Operations Office (RL) to share lessons learned and progress to date with other challenging and hazardous projects across the DOE Complex. Understanding the risk acceptance level is critical to execution of any open-air demolition project and is unique to each facility. Four key lessons learned from this project include: 1) plan execution issues, 2) stakeholder communication issues, 3) watching for summit fever and 4) minimizing exposed contaminated surfaces during demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Infrastructure and DFLAW Support at Hanford - 20443

Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗