Evaluation of Selected Chemical Processes for Production of Low-cost Silicon, Phase 3
The construction of the 50 MT Si/year experimental process system development unit was deferred until FY 1980, and the fluidized bed, zinc vaporizer, by-product condenser, and electrolytic cell were combined with auxiliary units, capable of supporting 8-hour batchwise operation, to form the process development unit (PDU), which is scheduled to be in operation by October 1, 1979. The design of the PDU and objectives of its operation are discussed. Experimental program support activities described relate to: (1) a wetted-wall condensor; (2) fluidized-bed modeling; (3) zinc chloride electrolysis; and (4) zinc vaporizer.