Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Apollo 11 Facts Project [On-Orbit Lunar Module Checkout]

Footage is shown of the crew of Apollo 11 (Commander Neil Armstrong, Lunar Module Pilot Edwin Aldrin Jr., and Command Module Pilot Michael Collins) inside the spacecraft as they fly from the Earth to the Moon. The Moon is seen in its entirety and in close detail. Aldrin gives a brief demonstration on how the astronauts eat in space.

Source record↗

Pre-Test Analysis Predictions for the Shell Buckling Knockdown Factor Checkout Tests - TA01 and TA02

This report summarizes the pre-test analysis predictions for the SBKF-P2-CYL-TA01 and SBKF-P2-CYL-TA02 shell buckling tests conducted at the Marshall Space Flight Center (MSFC) in support of the Shell Buckling Knockdown Factor (SBKF) Project, NASA Engineering and Safety Center (NESC) Assessment. The test article (TA) is an 8-foot-diameter aluminum-lithium (Al-Li) orthogrid cylindrical shell with similar design features as that of the proposed Ares-I and Ares-V barrel structures. In support of the testing effort, detailed structural analyses were conducted and the results were used to monitor the behavior of the TA during the testing. A summary of predicted results for each of the five load sequences is presented herein.

Thornburgh, Robert P.↗

Checkout and Standard Use Procedures for the Mark III Space Suit Assembly

The operational pressure range is the range to which the suit can be nominally operated for manned testing. The top end of the nominal operational pressure range is equivalent to 1/2 the proof pressure. Structural pressure is 1.5 times the specified test pressure for any given test. Proof pressure is the maximum unmanned pressure to which the suit was tested by the vendor prior to delivery. The maximum allowable working pressure (MAWP) is 90% of the proof pressure. The pressure systems RVs are set to keep components below their MAWPs. If the suit is pressurized over its MAWP, the suit will be taken out of service and an in-depth inspection/review of the suit will be performed before the suit is put back in service. The procedures outlined in this document should be followed as written. However, the suit test engineer (STE) may make redline changes real-time, provided those changes are recorded in the anomaly section of the test data sheet. If technicians supporting suit build-up, check-out, and/or test execution believe that a procedure can be improved, they should notify their lead. If procedures are incorrect to the point of potentially causing hardware damage or affecting safety, bring the problem to the technician lead and/or STE s attention and stop work until a solution (temporary or permanent) is authorized. Certain steps in the procedure are marked with a DV , for Designated Verifier. The Designated Verifier for this procedure is an Advanced Space Suit Technology Development Laboratory technician, not directly involved in performing the procedural steps, who will verify that the step was performed as stated. The steps to be verified by the DV were selected based on one or more of the following criteria: the step was deemed significant in ensuring the safe performance of the test, the data recorded in the step is of specific interest in monitoring the suit system operation, or the step has a strong influence on the successful completion of test objectives. Prior to all manned test activities, Advanced Suit Test Data Sheet (TDS) Parts A-E shall be completed to verify system and team are ready for test. Advanced Suit TDS Parts F-G shall be completed at the end of the suited activity. Appendix B identifies tha appropriate Mark III suit emergency event procedures.

Valish, Dana J.↗

Perseverance Rover’s Robotic Arm and Turret Mounted Instruments’ Surface Commissioning

The Robotic Arm (RA) on the Perseverance rover is an integral component of the Sampling and Caching System necessary for completing the science goals of the Mars 2020 mission. While the Perseverance rover was based on the Curiosity rover which landed in 2012, the Robotic Arm was redesigned to carry a much larger turret with a new suite of payloads. Shortly after Perseverance landed in Jezero Crater, a series of checkouts was completed with the RA during the first 100 sols of the mission in order to ensure proper functionality of the RA and the instruments mounted on the turret. This period of time in the mission was called Surface Operations Transition (SOX). The objective of SOX was to systematically execute checkout activities for all the basic functionality so that the RA and instruments, as well as other rover components, could be released for scientific exploration.RA activities during SOX can be divided into a few different categories: Mechanism Checkouts, Rover Visual Inspections, Performance Characterization, and Instrument Functional Checkouts. Many of these checkouts built off of each other such that each subsequent activity would verify incrementally complex functionality. Many of the defined activities were executed several times throughout the development of the rover and served as a check that the RA’s performance is consistent with testing on Earth. Other activities were developed uniquely for SOX to respond to challenges discovered during development. They were designed to be verifiable without the help of ground support equipment or previous executions on the flight hardware to compare against.This paper discusses the formulation and conception of the various RA SOX checkout activities, verification and testing required to certify them for flight, execution of the activities on Mars, issues encountered, and finally results and findings as the mission transitioned to nominal science operations. We will be presenting the results and analysis using downlinked imaging and data from the flight vehicle to show how we verified the performance of the Robotic Arm and the turret mounted instruments in order to transition to science operations with a clean bill of health.

Edgett, Kenneth↗

Shuttle payload processing at KSC

Two basic systems of Shuttle payload and checkout are discussed. The first system is called 'off-line' checkout and checks out payloads or payload segments after they are brought to the launch complex laboratories, as individual units and transfer them to an integration facility where they are assembled into a total Shuttle payload. In this scheme all payload assembly and checkout is performed away from the Orbiter. Any problems concerning the payloads will allow rescheduling another payload for flight and therefore not subjecting the Orbiter to delays in its recycling flow. The second payload processing scheme is the 'on-line' checkout which employs a 'factory to pad' concept. Payloads are delivered directly to the pad, placed in the Payload Changeout Room where they are checked out and integrated and, after completion of servicing, are installed vertically into the Orbiter. A combination of off-line and on-line processing will be used to meet all flight requirements.

Phillips, J. D.↗

External tank processing from barge to pad

Delivery and launch readiness events for the External Tanks (ET) are discussed. The ET is off-loaded at the KSC Barge Turning Basin and towed to the Vertical Assembly Building (VAB), High Bay Transfer Aisle. It is erected vertically and placed in the ET Checkout Area of High Bay 2 or 4 for standalone checkout. At the completion of checkout the ET is transferred to storage or to the Integration Area of High Bay 1 or 3 for SRB and Orbiter Mate. A Systems Integration Test performed with the Orbiter and Solid Rocket Booster is described. Final checkout activities are also described.

Carpenter, J. E.↗

Investigating On-Orbit Attitude Determination Anomalies for the Solar Dynamics Observatory Mission

The Solar Dynamics Observatory (SDO) was launched on February 11, 2010 from Kennedy Space Center on an Atlas V launch vehicle into a geosynchronous transfer orbit. SDO carries a suite of three scientific instruments, whose observations are intended to promote a more complete understanding of the Sun and its effects on the Earth's environment. After a successful launch, separation, and initial Sun acquisition, the launch and flight operations teams dove into a commissioning campaign that included, among other things, checkout and calibration of the fine attitude sensors and checkout of the Kalman filter (KF) and the spacecraft s inertial pointing and science control modes. In addition, initial calibration of the science instruments was also accomplished. During that process of KF and controller checkout, several interesting observations were noticed and investigated. The SDO fine attitude sensors consist of one Adcole Digital Sun Sensor (DSS), two Galileo Avionica (GA) quaternion-output Star Trackers (STs), and three Kearfott Two-Axis Rate Assemblies (hereafter called inertial reference units, or IRUs). Initial checkout of the fine attitude sensors indicated that all sensors appeared to be functioning properly. Initial calibration maneuvers were planned and executed to update scale factors, drift rate biases, and alignments of the IRUs. After updating the IRU parameters, the KF was initialized and quickly reached convergence. Over the next few hours, it became apparent that there was an oscillation in the sensor residuals and the KF estimation of the IRU bias. A concentrated investigation ensued to determine the cause of the oscillations, their effect on mission requirements, and how to mitigate them. The ensuing analysis determined that the oscillations seen were, in fact, due to an oscillation in the IRU biases. The low frequencies of the oscillations passed through the KF, were well within the controller bandwidth, and therefore the spacecraft was actually following the oscillating biases, resulting in movement of the spacecraft on the order of plus or minus 20 arcsec. Though this level of error met the ACS attitude knowledge requirement of [35, 70, 70] arcsec, 3 sigma, the desire of the ACS and instrument teams was to remove as much of the oscillation as possible. The Kearfott IRUs have an internal temperature controller, designed to maintain the IRU temperature at a constant temperature of approximately 70 C, thus minimizing the change in the bias drift and scale factors of the mechanical gyros. During ground testing of the observatory, it was discovered that the 83-Hz control cycle of the IRU heaters put a tremendous amount of stress on the spacecraft battery. Analysis by the power systems team indicated that the constant charge/discharge on the battery due to the IRU thermal control cycle could potentially limit the life of the battery. After much analysis, the decision was made not to run the internal IRU heaters. Analysis of on orbit data revealed that the oscillations in the IRU bias had a connection to the temperature of the IRU; changes in IRU temperature resulted in changes in the amplitude and period of the IRU biases. Several mitigating solutions were investigated, the result of which was to tune the KF with larger IRU noise assumptions which allows the KF to follow and correct for the time-varying IRU biases.

Vess, Melissa F.↗

Initial in-orbit operation of the soft X-ray spectrometer Resolve onboard the X-ray imaging and spectroscopy mission satellite

The X-Ray Imaging and Spectroscopy Mission satellite was launched on September 6, 2023 (UT). Its Resolve instrument is a high-resolution X-ray spectrometer enabled by a microcalorimeter array thermally anchored to a 50-mK heat sink. Many sensitive, critical sub-systems comprise Resolve, including a multistage cryogenic cooling system, thin-film aperture filters, low-noise electronics, on-board signal processing, and several sources of X-rays for calibration. We summarize the initial on-orbit power-on and checkout of Resolve that commenced immediately after launch. Soon after launch, the cryocoolers were activated, and their operation was successfully established. On October 9, 2023, the first cycle of the adiabatic demagnetization refrigerator was carried out, bringing the sensors to their steady-state operational temperatures. Following this, the energy resolution at 5.9 keV was successfully measured. The energy scale of the system is highly sensitive to the thermal environment surrounding both the sensors and their analog electronics. Gain correction was performed using reference X-ray lines from onboard calibration sources. To optimize cooler frequency settings, noise spectra were collected across a range of frequencies, and the most suitable frequency pair was selected based on the in-orbit environment. During the final phase of the checkout, an attempt was made to open the gate valve, which is designed to protect the Dewar’s interior from external pressure during ground operations and launch. Unfortunately, this attempt was unsuccessful. As a result, the checkout process was temporarily paused, and a stable operational strategy was subsequently developed to enable Resolve to function effectively with the gate valve remaining closed.

X-ray micro-calorimeter↗

Shuttle avionics and the goal language including the impact of error detection and redundancy management

The relationship is examined between the space shuttle onboard avionics and the ground test computer language GOAL when used in the onboard computers. The study is aimed at providing system analysis support to the feasibility analysis of a GOAL to HAL translator, where HAL is the language used to program the onboard computers for flight. The subject is dealt with in three aspects. First, the system configuration at checkout, the general checkout and launch sequences, and the inventory of subsystems are described. Secondly, the hierarchic organization of onboard software and different ways of introducing GOAL-derived software onboard are described. Also the flow of commands and test data during checkout is diagrammed. Finally, possible impact of error detection and redundancy management on the GOAL language is discussed.

Flanders, J. H.↗

ATM test and integration

The test and checkout philosophy of the test program for the Skylab ATM module and the overall test flow including in-process, post-manufacturing, vibration, thermal vacuum, and prelaunch checkout activities are described. Capabilities and limitations of the test complex and its use of automation are discussed. Experiences with the organizational principle of using a dedicated test team for all checkout activities are reported. Material on the development of the ATM subsystems, the experimental program and the requirements of the scientific community, and the integration and verification of the complex systems/subsystems of the ATM are presented. The performance of the ATM test program in such areas as alignment, systems and subsystems, contamination control, and experiment operation is evaluated. The conclusions and recommendations resulting from the ATM test program are enumerated.

Moore, J. W.↗

Application of a space station to communications satellites

The economic benefits of a space station relative to communications satellites are discussed in terms of technology experiments, spacecraft checkout, repair, servicing, and refurbishment (RSR), and mating an OTV with satellites for boost to GEO. The zero gravity, vacuum conditions, and atmosphere free long ranges are environmental features that can be used for testing large, flexible antennas and laser communications devices. Some resistance might be encountered to checkout in LEO due to the substantial success of launches to GEO without LEO checkout. However, new generations of larger, more complex satellites may warrant the presence of a space station to verify performance of new spacecraft. One RSR positive aspect for a space station is as a storage site for propellant, as well as for reusable OTV booster engines. Also, the space station can serve as a base for manned or unmanned repair spacecraft which will travel to GEO to fix malfunctions in geostationary satellites.

Ramler, J. R.↗

The US National Transonic Facility, part 1

The construction of the National Transonic Facility was completed in September 1982, and checkout operations started the following month, with the maximum Reynolds number being obtained in May 1983. Following, most of the effort was devoted to installing the model access housings, and adjusting or altering various tunnel hardware systems. In May 1984, preliminary aerodynamic calibration of the tunnel was initiated in parallel with checkout of the tunnel operating systems, and in August 1984, the tunnel was declared operational and turned over to the user organization for a complete aerodynamic calibration and research and development testing. The facility has been operated in both the air and nitrogen modes covering a Mach number range of 0.2 to 1.22 at pressures up to 8.5 atm and at temperatures down to 100K. This paper presents a status of the tunnel operating systems and an overview of the major milestones during checkout.

Bruce, W. E., Jr.↗

The US National Transonic Facility, part 2

The construction of the National Transonic Facility was completed in September 1982, and checkout operations started the following month with the maximum Reynolds number being obtained in May 1983. Afterwards, effort was primarily devoted to installing the model access housings and adjusting or altering various tunnel hardware systems. In May 1984, the aerodynamic calibration started and was performed in parallel with checkout of the tunnel systems. In August 1984, the final operation readiness review was conducted and the facility declared operational for research testing. The facility has been operated in both air and nitrogen modes covering a Mach number range of 0.2 to 1.22 at pressures up to 8.5 atm and at temperatures doen to 100K. A limited amount of tunnel circuit performance information has been obtained and is presented in this paper. An aerodynamic calibration plan has been outlined, and the first part of the steady-state calibration has been completed, of which some results are presented in this paper. The first aerodynamic vehicle, Pathfinder I, was installed in December 1984 for checkout of instrumentation systems, and a status report and some results are presented.

Bruce, W. E., Jr.↗

Work on Planetary Atmospheres and Planetary Atmosphere Probes

A major objective of the grant was to complete the fabrication, test, and evaluation of the atmosphere structure experiment on the Galileo Probe, and to receive, analyze, and interpret data received from the spacecraft. The grantee was competitively selected to be Principal Investigator of Jupiter's atmosphere structure on the Galileo Probe. His primary motivation was to learn as much as possible about Jupiter's atmosphere by means of a successful atmosphere structure experiment, and to support the needs and schedule of the Galileo Project. After a number of launch delays, the Flight instrument was shipped to Kennedy Space Center 2 years after the start of this collaboration, on April 14, 1989, at which time it was determined from System level tests of the ASI on the Probe that the instrument was in good working order and ready for flight. The spacecraft was launched on October 18, 1989. Data analysis of test and calibration data taken over a period of years of instrument testing was continued in preparation for the encounter. The initial instrument checkout in space was performed on October 26, 1989. The data set received by telemetry was thoroughly analyzed, and a report of the findings was transmitted to the Probe Operations Office on Feb. 28, 1990. Key findings reported were that the accelerometer biases had shifted by less than 1 mg through launch and since calibration at Bell Aerospace in 1983; accelerometer scale factors, evaluated by means of calibration currents, fell on lines of variation with temperature established in laboratory calibrations; pressure sensor offsets, correlated as a function of temperature, fell generally within the limits of several years of ground test data; atmospheric and engineering temperature sensor data were internally consistent within a few tenths of a degree; and the instrument electronics performed all expected functions without any observable fault. Altogether, this checkout was highly encouraging of the prospects of instrument performance, although performed greater than 5 years prior to Jupiter encounter. Capability of decoding the science data from the Experiment Data Record to be provided at encounter was developed and exercised using the tape recording of the first Cruise Checkout data. A team effort was organized to program the selection and combination of data words defining pressure, temperature, acceleration, turbulence, and engineering quantities; to apply decalibration algorithms to convert readings from digital numbers to physical quantities; and to organize the data into a suitable printout. A paper on the Galileo Atmosphere Structure Instrument was written and submitted for publication in a special issue of Space Science Reviews. At the Journal editor's request, the grantee reviewed other Probe instrument papers submitted for this special issue. Calibration data were carefully taken for all experiment sensors and accumulated over a period of 10 years. The data were analyzed, fitted with algorithms, and summarized in a calibration report for use in analyzing and interpreting data returned from Jupiter's atmosphere. The sensors included were the primary science pressure, temperature, and acceleration sensors, and the supporting engineering temperature sensors. This report was distributed to experiment coinvestigators and the Probe Project Office.

Seiff, Alvin↗