Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “self scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

NDE Development for Inspection of the Ares I Crew Launch Vehicle

NASA is designing a new crewed launch vehicle called Ares I to replace the Space Shuttle after its scheduled retirement in 2010. This new launch vehicle will build on the Shuttle technology in many ways including using a first stage based upon the Space Shuttle Solid Rocket Booster, advanced aluminum alloys for the second stage tanks, and friction stir welding to assemble the second stage. Friction stir welding uses a spinning pin that is inserted in the joint between two panels that are to be welded. The pin mechanically mixes the metal together below the melting temperature to form the weld. Friction stir welding allows high strength joints in metals that would otherwise lose much of their strength as they are melted during the fusion welding process. One significant change from the Space Shuttle that impacts NDE is the implementation of self-reacting friction stir welding for non-linear welds on the primary metallic structure. The self-reacting technique differs from the conventional technique because the load of the pin tool pressing down on the metal being joined is reacted by a nut on the end of the tool rather than an anvil behind the part. No spacecraft has ever flown with a self-reacting friction stir weld, so this is a major advancement in the manufacturing process, bringing with it a whole new set of challenges for NDE to overcome. Another impact is the proposed usage of an aluminum face sheet, phenolic honeycomb sandwich structure for a common bulkhead between the fuel and oxidizer tanks. This design was used on the second stage of Saturn IB and the second and third stages of Saturn V, but both the manufacturing and subsequent inspection were very costly and time consuming so a more efficient inspection method is sought. The current state of development of these inspections will be presented, along with other information pertinent to NDE of the Ares I.

Richter, Joel↗

Development of Weld Inspection of the Ares I Crew Launch Vehicle Upper Stage

NASA is designing a new crewed launch vehicle called Ares I to replace the Space Shuttle after its scheduled retirement in 2010. This new launch vehicle will build on the Shuttle technology in many ways including using a first stage based upon the Space Shuttle Solid Rocket Booster, advanced aluminum alloys for the second stage tanks, and friction stir welding to assemble the second stage. Friction stir welding uses a spinning pin that is inserted in the joint between two panels that are to be welded. The pin mechanically mixes the metal together below the melting temperature to form the weld. Friction stir welding allows high strength joints in metals that would otherwise lose much of their strength as they are melted during the fusion welding process. One significant change from the Space Shuttle that impacts NDE is the implementation of self-reacting friction stir welding for non-linear welds on the primary metallic structure. The self-reacting technique differs from the conventional technique because the load of the pin tool pressing down on the metal being joined is reacted by a nut on the end of the tool rather than an anvil behind the part. No spacecraft has ever flown with a self-reacting friction stir weld, so this is a major advancement in the manufacturing process, bringing with it a whole new set of challenges for NDE to overcome. The metal microstructure and possible defects are different from other weld processes. Friction plug welds will be used to close out the hole remaining in the radial welds when friction stir welded. This plug welding also has unique challenges in inspection. The current state of development of these inspections will be presented, along with other information pertinent to NDE of the Ares I.

Russell, Sam↗

Deployment of Dynamic Neural Network Optimization to Minimize Heat Rate During Ramping for Coal Power Plants (Final Technical Report)

Much success was achieved throughout the course of this project. A successful implementation of Dynamic Neural Network Optimization (D-NNO) was coupled with Adaptive Predictive Controls (APC) and a novel hardware installation comprised of an advanced sensor network (ASN) measuring mass-weighted averages of flue gas constituents above the horizontal superheater of a coal-fired utility boiler. From 2019 through 2023 (including an extension due to COVID delays), the team was able to prototype, evaluate, deploy, iterate, and ultimately finalize an advanced closed-loop control D-NNO system which demonstrated the ability to: •improve unit efficiency ~2.0% relative to unoptimized operation (represented as total fuel fired per MWh generated) •improve unit NOx emission rates 10%+ beyond static optimization baselines •improve unit temperature stability as much as 58% and on average 12% •improve operating load stability as much as 35% The culmination of this project has generated an advanced methodology of deploying specially designed recurrent neural networks (long short-term memory, gated recurrent unit, encoder-decoder networks, transformers, etc.), customized trajectory planning and closed-loop optimization modules capable of adapting to live electric grid responses and demands, self-tuning and adaptive expert controls constantly adjusting prediction parameters to real-time unit behavior, and a hardware/software package able to reliably calculate net unit heat rate (NUHR) in real-time using flue gas constituents, machine learning, and known combustion relationships. Through this real-time NUHR value, immediate feedback on system adjustments relative to operating efficiency was available, allowing for rapid improvements to system performance. In addition to development and deployment of the advanced D-NNO system, the approach methodology has been readily commercialized through the project platform Griffin Open Systems, LLC, the D-NNO software platform host. Similar methodologies to those developed by this project have already been deployed at 5 other units across the United States, with another 6 implementations scheduled, and more expected. Over the course of the project, multiple academic papers were submitted and accepted for publication within esteemed academic journals, and PhD students were trained and graduated, as well as undergraduate students becoming involved and participating to project objectives.

01 COAL, LIGNITE, AND PEAT↗

Crew Factors in Flight Operations X: Alertness Management in Flight Operations

In response to a 1980 congressional request, NASA Ames Research Center initiated a Fatigue/Jet Lag Program to examine fatigue, sleep loss, and circadian disruption in aviation. Research has examined fatigue in a variety of flight environments using a range of measures (from self-report to performance to physiological). In 1991, the program evolved into the Fatigue Countermeasures Program, emphasizing the development and evaluation of strategies to maintain alertness and performance in operational settings. Over the years, the Federal Aviation Administration (FAA) has become a collaborative partner in support of fatigue research and other Program activities. From the inception of the Program, a principal goal was to return the information learned from research and other Program activities to the operational community. The objectives of this Education and Training Module are to explain what has been learned about the physiological mechanisms that underlie fatigue, demonstrate the application of this information in flight operations, and offer some specific fatigue countermeasure recommendations. It is intended for all segments of the aeronautics industry, including pilots, flight attendants, managers, schedulers, safety and policy personnel, maintenance crews, and others involved in an operational environment that challenges human physiological capabilities because of fatigue, sleep loss, and circadian disruption.

Rosekind, Mark R.↗

A rule-based shell to hierarchically organize HST observations

An observing program on the Hubble Space Telescope (HST) is described in terms of exposures that are obtained by one or more of the instruments onboard the HST. These exposures are organized into a hierarchy of structures for purposes of efficient scheduling of observations. The process by which exposures get organized into the higher-level structures is called merging. This process relies on rules to determine which observations can be 'merged' into the same higher level structure, and which cannot. The TRANSformation expert system converts proposals for astronomical observations with HST into detailed observing plans. The conversion process includes the task of merging. Within TRANS, we have implemented a declarative shell to facilitate merging. This shell offers the following features: (1) an easy way of specifying rules on when to merge and when not to merge, (2) a straightforward priority mechanism for resolving conflicts among rules, (3) an explanation facility for recording the merging history, (4) a report generating mechanism to help users understand the reasons for merging, and (5) a self-documenting mechanism that documents all the merging rules that have been defined in the shell, ordered by priority. The merging shell is implemented using an object-oriented paradigm in CLOS. It has been a part of operational TRANS (after extensive testing) since July 1993. It has fulfilled all performance expectations, and has considerably simplified the process of implementing new or changed requirements for merging. The users are pleased with its report-generating and self-documenting features.

Bose, Ashim↗

Crew Factors in Flight Operations X: Alertness Management in Flight Operations

In response to a 1980 congressional request, NASA Ames Research Center initiated a Fatigue/Jet Lag Program to examine fatigue, sleep loss, and circadian disruption in aviation. Research has examined fatigue in a variety of flight environments using a range of measures (from self-report to performance to physiological). In 1991, the program evolved into the Fatigue Countermeasures Program, emphasizing the development and evaluation of strategies to maintain alertness and performance in operational settings. Over the years, the Federal Aviation Administration (FAA) has become a collaborative partner in support of fatigue research and other Program activities. From the inception of the Program, a principal goal was to return the information learned from research and other Program activities to the operational community. The objectives of this Education and Training Module are to explain what has been learned about the physiological mechanisms that underlie fatigue, demonstrate the application of this information in flight operations, and offer some specific fatigue counter-measure recommendations. It is intended for all segments of the aeronautics industry, including pilots, flight attendants, managers, schedulers, safety and policy personnel, maintenance crews, and others involved in an operational environment that challenges human physiological capabilities because of fatigue, sleep loss, and circadian disruption.

Rosekind, Mark R.↗

Requirements Document for a Replacement Data Acquisition System

A flight vehicle is in the developmental stages. While in development flight testing is required by both the manufacturer and customer to rate design performance. The performance of the vehicle must fulfill the agreed upon requirements. Testing of a flight vehicle during operation requires various sensors in order to record and monitor performance for evaluation. A Data Acquisition System (DAQ) is needed in order to control and capture data from various sensors placed throughout the vehicle during flight. This DAQ will receive the analog data from the suite of sensors and convert them to a digital signal that can be transmitted to a recording station where the data will later be analyzed by test experts. Some of the key features to be included in the DAQ will be a self-check operation to verify the health of all sensors including the DAQ. The DAQ will also have the capability to store sensor calibration data files loaded during assembly and transmit those files to the recording station during flight. Breakthroughs in new technologies has allowed for higher resolution recording systems and faster sampling rates. Improved sensor data using a new Data Acquisition System (DAQ) can provide important answers to questions discovered during the last few flight tests. These questions arose when the flight system expressed unexpected behaviors. Having the capability of the new DAQ in flight tests would allow for more high-fidelity data to be captured from the system during flight tests and ultimately reducing the number of required flight test. Reducing the number of flight tests also reduce developmental cost and schedule.

42 ENGINEERING↗

The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into useful knowledge that equips the team to design and develop superior products for customers and stakeholders. It has been more than 30 years since the Space Shuttle was designed; therefore, the current aerospace workforce has limited experience with developing new designs for human-rated spaceflight hardware. To accomplish these activities, NASA is using a wide range of state-of-the-art information technology tools that connect its diverse, decentralized teams and provide timely, accurate information for decision makers. In addition, business professionals are assisting technical managers with planning, tracking, and forecasting resource use against an integrated master schedule that horizontally and vertically interlinks hardware elements and milestone events. Furthermore, NASA is employing a wide variety of strategies to ensure that it has the motivated and qualified staff it needs for the tasks ahead. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates its resources to create an engineering business environment that promotes mission success, which is defined by replacing the Space Shuttle by 2014 and returning to the Moon by 2020.

Kidd, Luanne↗

Fatigue in U.S. Astronauts Onboard the International Space Station: Environmental Factors, Operational Impacts, and Implementation of Countermeasures

Since 2000, US astronauts have been supporting missions up to a six month duration on the International Space Station (ISS). Crewmembers have experienced fatigue for reasons similar to military deployments. Astronauts experience psychological stressors such as heavy workloads, extended duty periods, circadian misalignment, inadequate/ineffective sleep, and loss of the environmental cues of a gravity environment. Complicating the psychological stressors are environmental factors; distracting background noise, unexpected and variable mission schedules, unfavorable thermal control, elevated CO2 levels, and an unusual sleep environment with schedules that impinge on pre‐sleep periods. Physiological contributors to poor sleep and fatigue include a cephalad fluid shift and back pain. Restful sleep is further challenged due to a lack of gravity‐related proprioceptive cues and need for restraints. The term "space fog" has been used by astronauts to describe a phenomenon of forgetfulness, slowed reaction time and transient confusion while trying to complete tasks. There is a distinct temporal correlation with arrival on the Space Station and the onset of slowed cognitive skills and a spontaneous resolution that may take up to 6 weeks. The Genesis of this phenomenon may be chronic fatigue secondary to transitioning from a planar environment to a 360deg microgravity perspective. Recently, countermeasures to improve sleep duration and quality in astronauts on the ISS have been instituted with moderate degrees of success as measured by self‐reaction time (psychomotor vigilance task testing), actigraphy, and subjective reports. Judicious use of stimulants and hypnotics, light therapy, controlled sleep periods and sleep shifting and reducing ambient CO2 levels are a few of the most promising countermeasures being used in space to improve sleep and reduce fatigue.

Scheuring, R. A.↗

Meeting Hanford's Infrastructure Requirements - 12505

Hanford, by all accounts, is an enormous and complex project, with thousands of disparate, but co-mingled activities in motion on any given day. The primary target of the mission at Hanford is cleanup of the 586 square-mile site, but there is the equally vital mission of site services and infrastructure. Without functions like the well-maintained site roads, electricity, water, and emergency management services, not a single cleanup project could be undertaken. As the cleanup projects evolve - with new work-scope emerging, while existing projects are completed - there becomes a very real need to keep projects integrated and working to the same 'blueprint'. And the Hanford blueprint extends for years and includes myriad variables that come with meeting the challenges and complexities associated with Hanford cleanup. Because of an innovative and unique contracting strategy, the Department of Energy (DOE) found a way to keep the cleanup projects un-encumbered from the side task of having to self-provide their individual essential site services, thus allowing the cleanup contractors to concentrate their efforts on their primary mission of cleaning up the site. These infrastructure and support services also need to be provided efficiently and cost effectively - done primarily through 'right-sizing' efforts. The real innovation came when DOE had the foresight to include a second provision in this contract which specifically asked for a specialized role of site integrator and innovator, with a special emphasis placed on providing substantial cost savings for the government. The need for a true site integrator function was necessitated by the ever-increasing complexity of projects at Hanford and the progression of cleanup at others. At present, there are two main DOE offices overseeing the cleanup work and six primary contractors performing that work. Each of these contractors works to separate schedules and cleanup milestones, and the nature of the cleanup differs, but all are intertwined in their need for essential site services. One of the key tasks spelled out in the Mission Support Contract (MSC) is to take the volumes of cost, schedule and budget forecasting data each contractor is responsible for and consolidate that data into a 'one Hanford' perspective, with a clear and well-defined 'map' of the future, taking into account the many cross-cutting priorities at the site. This function is termed 'portfolio management' in the MSC. In 2009, the DOE awarded the MSC to Mission Support Alliance, LLC. (MSA), a team made up of industry leaders with key government services credentials, Lockheed Martin, Jacobs Engineering and WSI. Now into its third year managing the contract, MSA has continually shown tangible results in its oversight of the MSC. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alternate paddle configuration for improved wear resistance in the saltstone mixer

The Saltstone Production Facility has a 10-inch Readco-Kurimoto continuous mixer that mixes the premix dry feeds and low-level waste salt solution to make fresh (uncured) saltstone. Inspection of the mixer in January 2013 showed significant wear on the third, fourth and fifth paddle pairs after the conveying augers. A 2-inch Readco-Kurimoto continuous mixer was used to test alternate paddle configurations for use in the 10-inch mixer to decrease the wear rate on the paddles. Two wear tests were conducted to investigate a method of reducing wear on the mixer paddles. The first test (wear test 2a) had a paddle configuration similar to the currently installed 10-inch mixer in the SPF. This test established baseline wear. The second test (wear test 2b) had a reconfigured paddle arrangement that replaced the flat paddles with helical paddles for paddle pairs 2 - 6 and aligned paddle pair 1 with the augers. The intent of the reconfiguration was to more effectively convey the partially wetted dry feeds through the transition region and into the liquid feed where paddle wear is reduced due to dry feeds and salt solution being mixed at the intended water to premix ratio. The design of the helical paddles provides conveyance through the transition region to the liquid feed inlet. The alignment with the auger is aimed to provide a smoother transition (minimizing the discontinuity between the auger and paddle pair 1) into the downstream paddles. A soft metal with low wear resistance (6000 series aluminum) was used for the wear testing paddles to determine wear patterns while minimizing run time and maximizing wear rate. For the two paddle configurations tested using the scaled 2-inch Readco-Kurimoto continuous mixer, with the first six paddles after the augers replaced by the wear paddles and the remaining paddles were stainless steel. Since the 10-inch SPF mixer is designed with the liquid inlet centered over paddle pairs 5 and 6, the scaled 2-inch mixer was configured the same way. The wear rate from wear test 2a was approximately double the wear rate from wear test 2b for paddle pairs 4 and 5. For both configurations, there was little or no wear on paddle pairs 1, 2, 3 and 6 based on mass change, indicating that the un-wetted and fully wetted premix materials cause less wear than the partially wetted premix. Additionally, inspection of the wear surface of the paddles showed more deformation on the flat paddles than the helical paddles which was consistent with the wear rates. Aligning of the auger discharge flight with paddle pair 1 resulted in a lower wear rate paddle pair 1 rather than having them misaligned with the feed augers. During the paddle wear tests, polishing wear was observed on the inside barrel of the mixer. The polishing wear is evident on the upper housing clamshell and the lower housing clamshell primarily at paddle pairs 4 and 5, which is the transition region of the mixer. Wear on the mixer barrel increases the space between the paddles and the barrel, resulting in increased grout build up on the barrel. Since the mixer barrel cannot be reconfigured or replaced in the SPF, the method for mitigating wear on the barrel is to move the more viscous grout through the transition region as quickly as possible. In addition, the location of the liquid inlet does not allow for sufficient cleaning of the mixer since residual grout remains on paddle pairs 1 - 4. As the paddles continue to wear and the self-cleaning capability of the paddles is lost, the lack of sufficient flushing would aid in grout build up between the barrel and the paddles which could eventually lead to decreased throughput capacity of the dry feeds. Changing the paddle configuration from flat to helical resulted in no change to the rheological properties of the grout mixture. Both tests produced a grout that is within the processing range of the SPF. Based on the results of this testing, it is recommended for the currently installed SPF mixer that paddle pairs 1 through 6 be helical rather than flat, with the paddle pair 1 aligned with the feed augers in order to minimize the wear occurring in the SPF mixer. Based on the results of this testing, it is recommended that the mixer be inspected and critical measurements be taken whenever the SPF processing schedule allows in order to establish a wear rate of the 10-inch mixer paddles.5 Based on these measurements, the lifetime of paddles in the transition region can be established in order to set up a maintenance schedule for the mixer. Since replacing the entire mixer is very expensive and time intensive, replacing the worn paddles after a specific time period would allow for planned shutdowns as well as process optimization such that the mixer throughput is not compromised. In addition, further testing should be performed to determine an alternate liquid inlet location to better flush the mixer of residual grout at the end of processing. Sufficiently cleaning the mixer will help eliminate another potential source of wear. Another potential method for reducing the wear rate in the mixer is to reduce the mixer speed without affecting the throughput capacity. Since wear rate is a function of impact velocity of the grout and mixing paddles, testing could be done using the 2-inch mixer determine the optimum mixer speed to reduce wear but not adversely impact facility operations (e.g. throughput capacity and grout properties).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using Model-Based Systems Engineering to Provide Artifacts for NASA Project Life-cycle and Technical Reviews

This paper is for the AIAA Space Conference. The ability of systems engineers to use model-based systems engineering (MBSE) to generate self-consistent, up-to-date systems engineering products for project life-cycle and technical reviews is an important aspect for the continued and accelerated acceptance of MBSE. Currently, many review products are generated using labor-intensive, error-prone approaches based on documents, spreadsheets, and chart sets; a promised benefit of MBSE is that users will experience reductions in inconsistencies and errors. This work examines features of SysML that can be used to generate systems engineering products. Model elements, relationships, tables, and diagrams are identified for a large number of the typical systems engineering artifacts. A SysML system model can contain and generate most systems engineering products to a significant extent and this paper provides a guide on how to use MBSE to generate products for project life-cycle and technical reviews. The use of MBSE can reduce the schedule impact usually experienced for review preparation, as in many cases the review products can be auto-generated directly from the system model. These approaches are useful to systems engineers, project managers, review board members, and other key project stakeholders.

MBSE↗

Using Model-Based Systems Engineering To Provide Artifacts for NASA Project Life-Cycle and Technical Reviews

The ability of systems engineers to use model-based systems engineering (MBSE) to generate self-consistent, up-to-date systems engineering products for project life-cycle and technical reviews is an important aspect for the continued and accelerated acceptance of MBSE. Currently, many review products are generated using labor-intensive, error-prone approaches based on documents, spreadsheets, and chart sets; a promised benefit of MBSE is that users will experience reductions in inconsistencies and errors. This work examines features of SysML that can be used to generate systems engineering products. Model elements, relationships, tables, and diagrams are identified for a large number of the typical systems engineering artifacts. A SysML system model can contain and generate most systems engineering products to a significant extent and this paper provides a guide on how to use MBSE to generate products for project life-cycle and technical reviews. The use of MBSE can reduce the schedule impact usually experienced for review preparation, as in many cases the review products can be auto-generated directly from the system model. These approaches are useful to systems engineers, project managers, review board members, and other key project stakeholders.

SE Product↗

A Case for Molecular Recognition in Nuclear Separations: Sulfate Separation from Nuclear Wastes

In this paper, we present the case for molecular-recognition approaches for sulfate removal from radioactive wastes via the use of anion-sequestering systems selective for sulfate, using either liquid liquid extraction or crystallization. Potential benefits of removing sulfate from the waste include improved vitrification of the waste, reduced waste-form volume, and higher waste-form performance, all of which lead to potential cleanup schedule acceleration and cost savings. The need for sulfate removal from radioactive waste, especially legacy tank wastes stored at the Hanford site, is reviewed in detail and primarily relates to the low solubility of sulfate in borosilicate glass. Traditional methods applicable to the separation of sulfate from radioactive wastes are also reviewed, with the finding that currently no technology has been identified and successfully demonstrated to meet this need. Fundamental research in the authors laboratories targeting sulfate as an important representative of the class of oxoanions is based on the hypothesis that designed receptors may provide the needed ability to recognize sulfate under highly competitive conditions, in particular where the nitrate anion concentration is high. Receptors that have been shown to have promising affinity for sulfate, either in extraction or in crystallization experiments, include hexaurea tripods, tetraamide macrocycles, cyclo[8]pyrroles, calixpyrroles, and self-assembled urea-lined cages. Good sulfate selectivity observed in the laboratory provides experimental support for the proposed molecular-recognition approach.

Moyer, Bruce A↗

Parametric Data from a Wind Tunnel Test on a Rocket-Based Combined-Cycle Engine Inlet

A 40-percent scale model of the inlet to a rocket-based combined-cycle (RBCC) engine was tested in the NASA Glenn Research Center 1- by 1-Foot Supersonic Wind Tunnel (SWT). The full-scale RBCC engine is scheduled for test in the Hypersonic Tunnel Facility (HTF) at NASA Glenn's Plum Brook Station at Mach 5 and 6. This engine will incorporate the configuration of this inlet model which achieved the best performance during the present experiment. The inlet test was conducted at Mach numbers of 4.0, 5.0, 5.5, and 6.0. The fixed-geometry inlet consists of an 8 deg.. forebody compression plate, boundary layer diverter, and two compressive struts located within 2 parallel sidewalls. These struts extend through the inlet, dividing the flowpath into three channels. Test parameters investigated included strut geometry, boundary layer ingestion, and Reynolds number (Re). Inlet axial pressure distributions and cross-sectional Pitot-pressure surveys at the base of the struts were measured at varying back-pressures. Inlet performance and starting data are presented. The inlet chosen for the RBCC engine self-started at all Mach numbers from 4 to 6. Pitot-pressure contours showed large flow nonuniformity on the body-side of the inlet. The inlet provided adequate pressure recovery and flow quality for the RBCC cycle even with the flow separation.

Fernandez, Rene↗

The International Space Station human life sciences experiment implementation process

The selection, definition, and development phases of a Life Sciences flight research experiment has been consistent throughout the past decade. The implementation process, however, has changed significantly within the past two years. This change is driven primarily by the shift from highly integrated, dedicated research missions on platforms with well defined processes to self contained experiments with stand alone operations on platforms which are being concurrently designed. For experiments manifested on the International Space Station (ISS) and/or on short duration missions, the more modular, streamlined, and independent the individual experiment is, the more likely it is to be successfully implemented before the ISS assembly is completed. During the assembly phase of the ISS, science operations are lower in priority than the construction of the station. After the station has been completed, it is expected that more resources will be available to perform research. The complexity of implementing investigations increases with the logistics needed to perform the experiment. Examples of logistics issues include- hardware unique to the experiment; large up and down mass and volume needs; access to crew and hardware during the ascent or descent phases; maintenance of hardware and supplies with a limited shelf life,- baseline data collection schedules with lengthy sessions or sessions close to the launch or landing; onboard stowage availability, particularly cold stowage; and extensive training where highly proficient skills must be maintained. As the ISS processes become better defined, experiment implementation will meet new challenges due to distributed management, on-orbit resource sharing, and adjustments to crew availability pre- and post-increment. c 2001. Elsevier Science Ltd. All rights reserved.

Research↗

Lessons Learned From Decommissioning B411 Decontamination Centre at Whiteshell Laboratories - 18211

Whiteshell Laboratories, located in Manitoba, Canada, provided research facilities for the Canadian nuclear industry since the early 1960's. The facility was centered on the largest organically cooled, heavy water moderated nuclear reactor in the world, the WR-1. It is now operated by Canadian Nuclear Laboratories (CNL) and is the first major decommissioning project of a nuclear research establishment in Canada. One of the major projects to support the closure of Whiteshell Laboratories (WL) is the decommissioning and demolition of the Building 411 (B411) Decontamination Centre, which provided a decontamination service for maintaining research and development of experimental rigs, equipment and tools in a safe usable state. It also provided a laundry service for radioactively contaminated clothing. The team successfully self-performed their first demolition of a nuclear facility, but not without challenges. The baseline decommissioning strategy assumed most of the facility would meet unconditional clearance levels; however when characterization revealed the extent of contamination exceeded initial assumptions projected from process knowledge, in conjunction with resource challenges and a waste disposal pathway not firmly established, active remediation of the facility was undertaken. With an unknown waste acceptance criteria for the future waste disposal facility, sludge that had accumulated in a tank used to collect xylene and organic coolant from contaminated tools and equipment and the selection of appropriate waste packages for waste storage, transportation and disposal forced the project team to adjust their demolition timeline. This, coupled with developing an open air demolition plan and managing an uncertain end state criteria, were just some of the major tasks the team successfully navigated. The impact on both schedule and cost performance caused by the change in strategy, and the lessons learned experienced by the WL Decommissioning Project Team that are being applied as the Whiteshell Laboratories Closure Project (WLCP) moves forward with the next major decommissioning challenge, are highlighted in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhancing Active Distribution Systems Resilience by Fully Distributed Self-Healing Strategy

Distributed restoration can exploit smart grid technologies to enhance the resilience of active distribution networks toward a self-healing smart grid. However, the large number of decision variables, especially the binary ones for reconfiguration, bring challenges to developing scalable distributed distribution service restoration (DDSR) strategies. This paper proposes a fully distributed solution procedure based on the alternating direction method of multipliers (ADMM) for mixed-integer programming problems and applies to develop the DDSR framework. The method consists of relax-drive-polish phases, 1) relaxing binary variables, and applying the convex ADMM as a warm start; 2) driving the solutions toward Boolean values through a proximal operator; 3) fixing the obtained binding binary variables and solving the rest of the problem to polish results and achieve a high-quality suboptimal solution. Then, an autonomous clustering strategy and consensus ADMM are integrated with the proposed method to realize the fully distributed cluster-based framework of DDSR. This framework can first determine DER scheduling and switch status for reconfiguration to energize the out-of-service areas from local faults, and then provide the load restoration solution in a distributed manner for total blackouts in large-scale distribution networks. Furthermore, the effectiveness and scalability of the proposed DDSR framework are demonstrated through testing on the IEEE 123-node, IEEE 8500-node, and synthetic 100k-node test feeders.

24 POWER TRANSMISSION AND DISTRIBUTION↗