Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power system parameter estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Scaling and excitation of combined convection in a rapidly rotating plane layer

The optimum (to my mind) scaling of the combined thermal and compositional convection in a rapidly rotating plane layer is proposed.This scaling follows from self-consistent estimates of typical physical quantities. Similarity coefficients are introduced for the ratio convection dissipation/convection generation (s) and the ratio thermal convection/compositional convection (r). The third new and most important coefficient δ is the ratio of the characteristic size normal to the axis of rotation to the layer thickness. The faster the rotation, the lower δ. In the case of the liquid Earth core, δ ~ 10{sup –3} substitutes for the generally accepted Ekman number (E ~ 10{sup –15}) and s ~ 10{sup –6} substitutes for the inverse Rayleigh number 1/Ra ~ 10{sup –30}. It is found that, at turbulent transport coefficients, number s and the Prandtl number are on the order of unity for any objects and δ is independent of transport coefficients. As a result of expansion in powers of δ, an initially 3D system of six variables is simplified to an almost 2D system of four variables without δ. The problem of convection excitation in the main volume is algebraically solved and this problem for critical values is analytically solved. Dispersion relations and general expressions for critical wavenumbers, numbers s (which determine Rayleigh numbers), other critical parameters, and asymptotic solutions are derived. Numerical estimates are made for the liquid cores in the planets that resemble the Earth. Further possible applications of the results obtained are proposed for the interior of planets, moons, their oceans, stars, and experimental objects.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Fully Implicit Conjugate Heat Transfer Analysis of the ARC-Class Vacuum Vessel

The coupled simulation of fusion reactor blankets including neutronics, thermal-hydraulics and thermo-mechanics is expected to speed up the design cycle of fusion reactor design concepts. In this work we demonstrate tight implicit coupling of conjugate heat transfer using the open-source Computational Fluid Dynamics software OpenFOAM for thermo-fluid mechanics and Diablo for thermo-solid mechanics. The heat transfer analysis is augmented by volumetric energy deposition from neutronic calculations using the Monte Carlo N-particle code on both solid and fluid parts of the vacuum vessel. An additional heat flux is imposed on the first wall estimated from the design power of the reactor. The tight coupling is realized through the open-source coupling library, preCICE, and tested on the vacuum vessel of the affordable, robust, compact reactor design by Commonwealth Fusion Systems. The features of the coupling and the influence of different coupling parameters such as coupling schemes, acceleration techniques and convergence criterion are discussed. The coupled simulation results are compared to a thermal-hydraulics simulation which includes only the fluid domains (the liquid immersion molten salt blanket and cooling channel) to demonstrate usefulness of a coupled simulation. Further analysis is performed to identify regions of hot spots for subsequent design improvement. This introduces the outline for integrating conjugate electromagnetics and fluid/solid mechanics (e.g., allow for deformation of the cooling channel walls) with our present approach for future analysis.

Sircar, Arpan↗

System Study: Emergency Power System 1998-2024

This report presents an unreliability evaluation of the emergency power system (EPS) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of EPS system start-only unreliability, but a statistically significant decreasing trend was identified in the industry-wide estimates of EPS system 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: High-Pressure Coolant Injection 1998-2024

This report presents an unreliability evaluation of the high-pressure coolant injection (HPCI) system at 22 U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period and yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCI results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: High-Pressure Core Spray 1998-2024

This report presents an unreliability evaluation of the high-pressure core spray (HPCS) at eight U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period and yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCS results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A case study of the Thunderstorm Research International Project storm of July 11, 1978. II - Interrelations among the observable parameters controlling electrification

This paper discusses electrical system parameters that would be consistent with observations of the Thunderstorm Research International Project storm at the Kennedy Space Center on July 11, 1978, described by Nisbet et al. (1990). Three-dimensional electrodynamic modeling of the thundercloud electrification made it possible to estimate the current moments and electrical power generated continuously throughout the evolution of the two cells of the storm. The current moments generated were compared with the current moments transferred by intercloud and cloud-to-ground lightning. It is shown that, for the southern cell, which produced a charge moment of about 8.4 MC m, lightning utilized about 84 percent of the charge moment separated; for the northern cell, which produced about 1.1 MC m, lightning utilized about 60 percent of the charge moment separated.

Nisbet, John S.↗

Life Cycle Greenhouse Gas Emissions of Trough and Tower Concentrating Solar Power Electricity Generation: Systematic Review and Harmonization

In reviewing life cycle assessment (LCA) literature of utility-scale concentrating solar power (CSP) systems, this analysis focuses on reducing variability and clarifying the central tendency of published estimates of life cycle greenhouse gas (GHG) emissions through a meta-analytical process called harmonization. From 125 references reviewed, 10 produced 36 independent GHG emissions estimates passing screens for quality and relevance: 19 for parabolic trough (trough) technology and 17 for power tower (tower) technology. The interquartile range (IQR) of published estimates for troughs and towers were 83 and 20 grams of carbon dioxide equivalent per kilowatt-hour (g CO2-eq/kWh),1 respectively; median estimates were 26 and 38 g CO2-eq/kWh for trough and tower, respectively. Two levels of harmonization were applied. Light harmonization reduced variability in published estimates by using consistent values for key parameters pertaining to plant design and performance. The IQR and median were reduced by 87% and 17%, respectively, for troughs. For towers, the IQR and median decreased by 33% and 38%, respectively. Next, five trough LCAs reporting detailed life cycle inventories were identified. The variability and central tendency of their estimates are reduced by 91% and 81%, respectively, after light harmonization. By harmonizing these five estimates to consistent values for global warming intensities of materials and expanding system boundaries to consistently include electricity and auxiliary natural gas combustion, variability is reduced by an additional 32% while central tendency increases by 8%. These harmonized values provide useful starting points for policy makers in evaluating life cycle GHG emissions from CSP projects without the requirement to conduct a full LCA for each new project.

14 SOLAR ENERGY↗

System Study: High-Pressure Safety Injection 1998-2022

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hours, and failure data from calendar years 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. Highly statistically significant increasing trends were identified in both the HPSI system start-only unreliability and 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: Auxiliary Feedwater 1998-2022

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar year 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of AFW system start-only unreliability, but a highly statistically significant decreasing trend was identified in the industry-wide estimates of AFW system 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: Reactor Core Isolation Cooling 1998-2022

This report presents an unreliability evaluation of the reactor core isolation cooling (RCIC) system at 28 U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. Statistically significant decreasing trends were identified in both the RCIC system start-only unreliability and 8-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Estimates of Power Plant NOx Emissions and Lifetimes from OMI NO2 Satellite Retrievals

Isolated power plants with well characterized emissions serve as an ideal test case of methods to estimate emissions using satellite data. In this study we evaluate the Exponentially-Modified Gaussian (EMG) method and the box model method based on mass balance for estimating known NOx emissions from satellite retrievals made by the Ozone Monitoring Instrument (OMI). We consider 29 power plants in the USA which have large NOx plumes that do not overlap with other sources and which have emissions data from the Continuous Emission Monitoring System (CEMS). This enables us to identify constraints required by the methods, such as which wind data to use and how to calculate background values. We found that the lifetimes estimated by the methods are too short to be representative of the chemical lifetime. Instead, we introduce a separate lifetime parameter to account for the discrepancy between estimates using real data and those that theory would predict. In terms of emissions, the EMG method required averages from multiple years to give accurate results, whereas the box model method gave accurate results for individual ozone seasons.

Emissions inventory↗

Natural Language Processing-Enhanced Nuclear Industry Operating Experience Data Analysis: Aggregation and Interpretation of Multi-Report Analysis Results

Industry-wide operating experience is a critical source of raw data for reliability and risk model parameter estimations for nuclear power plants. A large portion of operating experience data are failure events stored as reports that contain unstructured data, such as narratives. In current practice, a failure report is usually reviewed and manually coded by analysts. The coding is based on extracting several event characteristics such as system name, component type, sub-part type, failure mode, and failure cause. Event narratives are mostly used to help understand events and extract their characteristics. In this line of research, we aim to maximize the usage of event narratives by leveraging natural language processing (NLP) methods to automatically convert an event narrative to a causal graph. This research has promise to improve physical understanding of failure initiation and propagation and to facilitate use of non-failure data (e.g., near-misses and degradations) to complement the limited data pool of failures. In our previous work, we developed an NLP tool and applied it to analyze a number of licensee event reports submitted by U.S. nuclear power plants to the Nuclear Regulatory Commission. In this paper, we will report our recent research progress in aggregating the results of multiple reports, developing network model(s), and drawing statistical insights.

99 GENERAL AND MISCELLANEOUS↗

System Study: Reactor Core Isolation Cooling 1998-2024

This report presents an unreliability evaluation of the reactor core isolation cooling (RCIC) system at 28 U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period and yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the RCIC results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Auxiliary Feedwater 1998-2024

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period and yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of AFW system start-only unreliability, but a statistically significant decreasing trend was identified in the industry-wide estimates of AFW system 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: High-Pressure Safety Injection 1998-2024

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period and yearly estimates for system unreliability are provided for the entire active period. Statistically significant decreasing trends were identified in both the HPSI system start-only unreliability and 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Comparative Study of Optical and Radio-Frequency Communication Systems for a Deep-Space Mission

We have performed a study on telecommunication systems for a hypothetical mission to Mars. The objective of the study was to evaluate and compare the benefits that microwave-X-band (8.4 GHz) and Ka-band (32 GHz) - and optical communications technologies a afford to future missions. The telecommunication systems were required to return data after launch and in orbit at 2.7 AU with daily data volumes of 0.1, 1.0, or 10.0 Gbits (Gb). Spacecraft terminals capable of delivering each of the three data volumes were proposed and characterized in terms of mass, power consumption, size, and cost. The estimated parameters for X-band, Ka-band, and optical frequencies are compared and presented here. For all cases, the optical light terminal exhibits about 60 percent of the mass of the corresponding radio frequency (RF) subsystem. Power consumption is comparable for all three technologies at a 0.1 Gb/day data volume, but the power required at either Ka-band or optical is less than half of the X-band requirement at 10 Gb/day. These benefits can be obtained only with a suitable investment in reception facilities for Ka-band or optical frequencies.

Hemmati, H.↗

Case Study for Lunar ISRU Systems Utilizing Polar Water

In-Situ Resource Utilization (ISRU) is key to long term presence at any extraterrestrial destination. Current NASA direction is to achieve a sustainable presence on the lunar surface by 2028. Mission plans currently target the lunar South Pole to leverage the extended periods of solar illumination and allows for potential access to water ice in the permanently shadowed areas around the poles. With water, it is possible to produce both fuel and oxidizer to fully refuel a vehicle. In order to address ISRU infusion into mission planning, a study of an end-to-end ISRU propellant production system was initiated to assess ISRU architectures and obtain mass and power estimates for each. The results of these case studies will be presented. For this study, The ISRU system architecture involved two sites; the mine site in a shadowed crater where water ice is excavated and extracted from the regolith and the propellant production site at an illuminated ridge where the water is processed into liquefied O2 and H2 propellants. Fixed hardware would be emplaced at each site, with two alternating water tankers to transport water between them. Notional lunar sites were identified for this architecture for baseline environmental parameters. Technology solutions for each subsystem were selected based on those with the highest fidelity models or those that have empirical laboratory data to anchor to. While power needs were identified for each location, a power solution was not prescribed, therefore the masses presented do not include surface power systems. The baseline case in this study assumed that 10 mT of oxygen, along with enough hydrogen to support a propulsion mixture ratio of 6, must be produced in 225 days. Therefore 15 mT of water would need to be collected and processed. The baseline solution resulted in a system mass of5 mT and a total required power of 68kW. The majority of the mass was split between the ridge site system and the two water tankers (2.6 mTand 1.8mTrespectively). The majority of the required power was with three subsystems at approximately 20 kW each: hydrogen liquefaction, electrolysis, and the water extractor subsystem. Trades for four key variables are also presented, namely production rate, water concentration, dry overburden depth, and number of water transport trips. This can be compared to a system that targets oxygen from the minerals in the surface regolith material. A carbothermal reduction reactor system was used for this comparison. The use of direct solar thermal energy to process the regolith and the ease of access of the resource resulted in significantly lower values for the oxygen case: approximately 2.7 mT and 11.8 kW. However, the mass trade would favor the water case over successive missions where the hydrogen up-mass of 2 mT per mission will accrue against the oxygen system.1Aerospace Research Engineer, Chemical and Thermal Propulsion Systems Branch, Senior Member.2Mechanical Engineer, Propulsion and Power Division/Energy Conversion Systems, 2101 Nasa Pkwy/Mailcode EP3 Houston, TX 77058, AIAA member.

Lunar↗

Melting temperatures of the ZrO{sub 2}-MOX system

Severe accidents occurred at the Fukushima Daiichi Nuclear Power Plant Units 1-3 on March 11, 2011. MOX fuels were loaded in the Unit 3. For the thermal analysis of the severe accident, melting temperature and phase state of MOX corium were investigated. The simulated coriums were prepared from 4%Pu-containing MOX, 8%Pu-containing MOX and ZrO{sub 2}. Then X-ray diffraction, density and melting temperature measurements were carried out as a function of zirconium and plutonium contents. The cubic phase was observed in the 25%Zr-containing corium and the tetragonal phase was observed in the 50% and 75%Zr-containing coria. The lattice parameter and density monotonically changed with Pu content. Melting temperature increased with increasing Pu content; melting temperature were estimated to be 2932 K for 4%Pu MOX corium and 3012 K for 8%Pu MOX corium in the 25%ZrO{sub 2}-MOX system. The lowest melting temperature was observed for 50%Zr-containing corium. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗