Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Smart Planning for Radioactive Source Transport Advanced Tools for Increased Safety and Efficiency

End-of-life (EOL) management of high-activity radioactive sources is made uniquely challenging by the inherent risks associated with storage and transportation of these sources, the complex logistics involved, and the strict requirements for regulatory compliance. Traditional methods lack comprehensive tools for accurate site assessments and precision planning for the transportation of radioactive sources. They also frequently fail to provide the adaptability required to consider diverse operational environments, resulting in inefficiencies and potential safety concerns. This paper introduces a novel software solution developed to address these issues by integrating advanced technologies such as light detection and ranging (LiDAR)-based 3D environment modeling, smart dynamic route planning, and customizable measurement functionalities. This software enables detailed terrain visualizations, facilitating thorough environmental assessments and enabling users to virtually navigate, analyze, and plan site-specific operations. Among the key features are a user-centric interface for virtual navigation, precise site measurement tools for site evaluations, interactive visualizations that highlight potential operational hazards, dynamic route planning capabilities, and real-time collision detection to promote safe workflows. By demonstrating the effectiveness of this tool through real-world application, the present work underscores the tool’s potential to revolutionize radioactive source EOL management by improving operational efficiencies, minimizing risk, and advancing the state of practice to achieve suitable and secure radioactive material handling.

99 - GENERAL AND MISCELLANEOUS↗

Optimal Planning and Operation of Multi-Frequency HVac Transmission Systems

Low-frequency high-voltage alternating-current (LF-HVac) transmission scheme has been recently proposed as an alternative solution to conventional 50/60-Hz HVac and high-voltage direct-current (HVdc) schemes for bulk power transfer. This paper proposes an optimal planning and operation for loss minimization in a multi-frequency HVac transmission system. In such a system, conventional HVac and LF-HVac grids are interconnected using back-to-back (BTB) converters. The dependence of system MW losses on converter dispatch as well as the operating voltage and frequency in the LF-HVac is discussed and compared with that of HVdc transmission. Based on the results of the loss analysis, multi-objective optimization formulations for both planning and operation stages are proposed. The planning phase decides a suitable voltage level for the LF-HVac grid, while the operation phase determines the optimal operating frequency and power dispatch of BTB converters, generators, and shunt capacitors. A solution approach that effectively handles the variations of transmission line parameters with the rated voltage and operating frequency in the LF-HVac grid is proposed. The proposed solutions of the planning and operation stages are evaluated using a multi-frequency HVac system. The results show a significant loss reduction and improved voltage regulation during a 24-hour simulation.

Nguyen, Quan H.↗

Risk-controlled Expansion Planning with Distributed Resources (REPAIR) v1.0

The Risk-controlled Expansion Planning with Distributed Resources (REPAIR) is an innovative tool to support decisions around utility grid planning to prevent and mitigate the impact of outages caused by routine equipment failures (reliability) or by extreme events (resilience), such as storms, earthquakes or wildfires that long term interruption of service. REPAIR is a risk-based optimization and decision-making model allowing informed and transparent "cost vs risk" decisions regarding infrastructural planning of electric utilities. The model considers long-term resilience and reliability planning strategies that rely on traditional infrastructure upgrade (e.g. circuit hardening, reinforcement, new substations, etc.) or new investment alternatives, such as DERs.

Heleno, Miguel [Lawrence Berkeley National Laborat↗

Soil Sample Plan in Support of the Site 300 Explosives Waste Treatment Facility Ecological Risk Assessment Pursuant to the Hazardous Waste Facility Permit, Part V, Special Condition #14 a-f. August 2020

The Department of Toxic Substances Control issued the Final Hazardous Waste Facility Permit to Lawrence Livermore National Laboratory, Site 300 in 2017. As part of the continual process to ensure waste treatment emissions are not impacting ecological receptors, LLNL analyzed soil samples in the vicinity of the Explosive Waste Treatment Facility (EWTF) Burn Units (i.e., Burn Cage and Burn Pan) and the Detonation Pad. Soil samples were analyzed by EPA Solid Waste 846 Methods for furans, explosives, metals, and semivolatile compounds. In all samples, furans, explosives, and semi-volatile organic compounds were not detected. Metals were detected at concentrations below background levels. This soil sample plan will sample the same four downwind areas of the Burn Units and the same downwind areas of the Detonation, as well as including four new sample locations. The four new locations will be located to the northeast and southwest of the Burn Units and Detonation (as shown in Figure 3). The constituents to be analyzed are in Tables 2 and 3. Perchlorate was not identified as a constituent of concern in the 2007 Soil Sampling Plan. However, for this plan, all soil samples will be analyzed for perchlorate. After completion of the sampling event, a soil sample report will be submitted to DTSC in accordance with requirements specified in the Hazardous Waste Facility Permit, Part V, Special Conditions 16 a-f. This proposed soil sampling plan will be fully implemented no later than one year after receiving DTSC approval, in accordance with the Hazardous Waste Facility Permit, Part V, Special Condition 15.

54 ENVIRONMENTAL SCIENCES↗

Wind Energy Technologies Office Multi-Year Program Plan Fiscal Years 2021—2025

WETO's Multi-Year Program Plan outlines the Office’s research priorities and plans through the year 2025. With the objectives of reducing the cost of wind energy, enabling the integration of substantial amounts of wind energy into the evolving national energy system, and creating siting and environmental solutions to reduce environmental impacts, the Plan provides insight into DOE’s wind energy research priorities, and will guide planning and execution of future R&D activities. It is organized in six sections: offshore wind, land-based wind, distributed wind, systems integration, modeling and analysis, and crosscutting initiatives.

17 WIND ENERGY↗

Site 300 (Facility ID N-472) Toxic Emissions Inventory Plan

The Air Toxics "Hot Spots" Information and Assessment Act (AB 2588 or the “Act”) was enacted in September 1987. Under the Act, stationary sources are required to report the types and quantities of certain toxic substances their facilities routinely release into the air. AB 2588 is designed to provide information to state and local agencies and to the general public on the extent of airborne emissions from stationary sources and the potential public health impacts of those emissions. The San Joaquin Valley Air Pollution Control District (the District) is mandated by the State to implement AB 2588. On March 6, 2015, The State Office of Environmental Health Hazard Assessment (OEHHA) adopted changes to the Air Toxics Hot Spots Program Guidance Manual for the Preparation of Health Risk Assessments. These revisions were designed to incorporate three technical support documents and to provide enhanced protection of children as required under state law (SB 25, Escutia, 1999). Due to these recent changes, and the corresponding potential increases in calculated health risk, the District notified LAWRENCE LIVERMORE NATL SECURITY, LLC that we must be re-evaluated under AB 2588. Pursuant to the Air Toxics "Hot Spots" Information and Assessment Act of 1987, we have prepared a comprehensive, site-specific Toxics Emissions Inventory Plan. The plan specifies in detail how LAWRENCE LIVERMORE NATL SECURITY, LLC will inventory our facility's emissions of all toxic substances on the list of substances subject to the Act. The plan provides a comprehensive and detailed description of the methods that will be used to quantify air releases or potential air releases of listed substances from all points of release. The plan also includes quantification methods which result in accurate and comprehensive characterization of releases and comply with all applicable requirements of the “Hot Spots” regulation.

54 ENVIRONMENTAL SCIENCES↗

DOE Environmental Management and Newport News Nuclear BWXT Briefing - LANL’s Campus Master Plan [Slides]

Triad proposed a robust integrated planning effort during the bidding process and began this effort soon after the LANL contract transition. Within months of Triad commencing this planning process, NA-LA delivered a Contracting Officer (CO) letter requiring: (1) Area Development Plan for the Pajarito Corridor delivered by end of FY19 (completed), and (2) The Campus Master Plan (CMP) to be delivered by end of FY21 (completed).

42 ENGINEERING↗

International Radiological/Nuclear Training for Emergency Response - Major Public Events Virtual Workshop: Nuclear Security Planning and Operations (Day 3) [Slides]

This module will provide an overview of best practices for nuclear security planning requirements to include building a nuclear security plan and a concept of operations. It will introduce best practices for nuclear security planning to include the following: (1) Develop a Nuclear Security Plan, (2) Review 10 key elements of a Concept of Operations, (3) Estimate resources for an MPE, and (4) Capture lessons learned and best practices.

61 RADIATION PROTECTION AND DOSIMETRY↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada National Security Site, Nevada, (Rev.0, with ROTC 1)

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 114 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada National Security Site (formerly, the Nevada Test Site): 25-41-03, EMAD Facility; 25-99-23, Manned Control Car (MCC) and Engine Installation Vehicle (EIV); and 25-33-05, Building 3901, Engine Transport System Maintenance Building. This plan provides the methodology for field activities needed to gather the necessary information for closing CAU 114. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective actions for CAU 114. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. The purpose of the corrective action investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. If specific conditions or findings fall outside the bounds of the SAFER Plan, the Nevada Division of Environmental Protection (NDEP) will be consulted to determine the path forward before proceeding. Upon completion of SAFER activities, a closure report will be prepared and submitted to NDEP for review and approval. The schedule for completion of the closure report will be established at the FFACO annual meeting.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Security, LLCSite 300: Toxic Emissions Inventory Plan for ABA 2588 California Air Toxics "Hot Spots" Information and Assessment Act of 1987 (Revision 3.0)

The Air Toxics "Hot Spots" Information and Assessment Act (AB 2588 or the “Act”) was enacted in September 1987. Under the Act, stationary sources are required to report the types and quantities of certain toxic substances their facilities routinely release into the air. AB 2588 is designed to provide information to state and local agencies and to the general public on the extent of airborne emissions from stationary sources and the potential public health impacts of those emissions. The San Joaquin Valley Air Pollution Control District (the District) is mandated by the State to implement AB 2588. On March 6, 2015, The State Office of Environmental Health Hazard Assessment (OEHHA) adopted changes to the Air Toxics Hot Spots Program Guidance Manual for the Preparation of Health Risk Assessments. These revisions were designed to incorporate three technical support documents and to provide enhanced protection of children as required under state law (SB 25, Escutia, 1999). Due to these recent changes, and the corresponding potential increases in calculated health risk, the District notified LAWRENCE LIVERMORE NATIONAL SECURITY, LLC that we must be re-evaluated under AB 2588. Pursuant to the Air Toxics "Hot Spots" Information and Assessment Act of 1987, we have prepared a comprehensive, site-specific Toxics Emissions Inventory Plan. The plan specifies in detail how LAWRENCE LIVERMORE NATIONAL SECURITY, LLC will inventory our facility's emissions of all toxic substances on the list of substances subject to the Act. The plan provides a comprehensive and detailed description of the methods that will be used to quantify air releases or potential air releases of listed substances from all points of release. The plan also includes quantification methods which result in accurate and comprehensive characterization of releases and comply with all applicable requirements of the “Hot Spots” regulation.

54 ENVIRONMENTAL SCIENCES↗

The Low-Yield Nuclear Monitoring (LYNM) Experimental Science Plan

The Low-Yield Nuclear Monitoring (LYNM) Program is a long-term NNSA research and development effort designed to improve the United States’ explosion monitoring capabilities, particularly with respect to low-yield and potentially evasive underground nuclear testing. The LYNM Program focuses on researching, discovering, and exploiting unique and useful signatures, from all available technologies and sensors (e.g., seismic, acoustic, electromagnetic, gases, and particulates (both stable and radioactive)). Four Department of Energy laboratories participate in LYNM and together are referred to as the ‘quad-lab’. The R&D program execution is performed under NNSA defined structures known as “ventures”. Four science ventures were established: 1) Explosion Source Functions; 2) Containment of Low-Yield Underground Tests; 3) Local Signatures; 4) Dynamic Monitoring Networks. To organize and execute the large field scale experiment a fifth venture was established: 5) Physics Experiment One (PE-1). As part of the LYNM Program, a series of experiments are planned at various scales and levels of venture involvement. These vary from those that involve a subset of labs and/or LYNM ventures (e.g., small experiments), to full quad-lab LYNM Program field-scale integrated experiments. Such experiments may involve chemical explosions with tracer materials or other means of simulating the expected signals from a nuclear explosion. The LYNM Program does not conduct actual nuclear explosions. Since 1992, the U.S. has observed a moratorium on underground nuclear explosions. This document is intended to provide the underlying scientific basis for the LYNM planned experimental work. Each specific LYNM experiment will develop a goals, objectives, and requirements (GOR) plan following the guidance in this document. The LYNM technical staff will define the numbers and types of experiments required over the course of the Program based on technical needs and within funding constraints. As with any scientific experiment series, the number and types of experiments may change based upon the experimental results obtained. An experiment that agrees with models/codes/software signature predictions may need fewer repetitions/variations, depending upon the level of statistical rigor desired, as compared to one in which the predictions and experimental data do not match. The large LYNM field-scale integrated experiments require the longest lead-time for planning, and these are discussed in more detail near the end of this document.

58 GEOSCIENCES↗

Invasive Plant Species Management Plan for Los Alamos National Laboratory (Rev.3)

Native species are plants and animals that continually occupy a natural range without direct or indirect introduction and/or care by humans. They are adapted to the environmental conditions and processes of the ecosystem in which they reside. A species introduced into a novel ecosystem can either exploit that ecosystem and thrive or be unable to survive in that ecosystem (Hobbs et al. 2006). Alien or non-native species are species that are intentionally or accidentally introduced into a novel ecosystem and are capable of living and propagating within the physical parameters of that ecosystem. Invasive species is a species that is non-native (or alien) to the ecosystem under consideration and a noxious species are those whose introduction causes or is likely to cause economic or environmental harm. The term invasive species is applicable to plants and animals alike; however, this invasive species management plan currently focuses on invasive vegetation. Invasive plant species are usually capable of rapid colonization of disturbed ground, such as after a change in wildfire regime intensity and frequency (Reilly et al. 2020) or anthropogenic ground disturbance (Burke and Grime 1996; Hobbs and Huenneke 1992). Climate change facilitates the spread and establishment of many alien species and creates new opportunities for them to become invasive (Turbelin and Catford 2021). As climate change impacts increase in the coming decades, we may see in an increase in invasive species establishment. See a list of definitions of terms pertinent to this document in Appendix A: Definitions. Los Alamos National Laboratory (LANL) hosts populations of non-native and invasive species all typical of the northern New Mexico region (Martin 2004; NMDA 2020). By implementing an invasive species management plan, LANL will have readily accessible management strategies for invasive species that are found on-site. The benefits of managing invasive species include a decrease in wildland fire risks, an increase in soil productivity, an increase in (productive or beneficial) wildlife habitat, an increase in water quantity and quality, and the restoration of impacted areas (Burke and Grime 1996; Hobbs and Huenneke 1992; D’Antonio and Hobbie 2005; MacDougall et al. 2013; Reilly et al. 2020). The aforementioned benefits from invasive species management directly enable the LANL mission by ensuring compliance requirements are met and site-wide programs, such as the Vulnerability Assessment and Resilience Plan, are supported for a mutually beneficial outcome. An example for the LANL site specifically, controlling non-native annual plant species, for example, could reduce the costs associated with stabilizing soils during the stormwater pollution prevention compliance process. Roadway and utility right-of-way areas are another place where an integrated vegetation management strategy would promote low growing perennial plants in a way that is mutually beneficial to habitat and the institution through lowered maintenance costs. There is also an economic benefit to managing invasive species. In one nationwide study, invasive plants had an estimated impact cost of $190.45 billion (Fantel-Lepczyk et al. 2022). Investing in preventative measures and surveillance could help to offset future control and management costs of invasive species that have the potential to become established. The State of New Mexico has developed plant species lists and recommendations through the New Mexico Department of Agriculture’s Noxious Weeds Management Act, Article 7D (NM Statute § 76-7D-4 2021); however, effective invasive species management must rely on local knowledge of the site and region. Los Alamos County (LAC) has already compiled a target invasive plant species list and species-specific management objectives (Martin 2004). Therefore, the New Mexico Noxious Weed List and the LAC invasive plant species list, as well as management objectives from those documents, are integrated into LANL’s invasive plant species management plan.

54 ENVIRONMENTAL SCIENCES↗

Developing a Facility NMAC Plan

The table presented below suggests the basic information that should be covered in a facility NMAC Plan for an NMAC program that is designed for nuclear security. The topics are appropriate for and should be addressed by all facilities in their NMAC Plans. They are appropriate for NMAC Plans for nuclear power plants, research reactors, fuel manufacturing facilities, facilities that produce medical isotopes, and other facilities. The difference is in the intensity with which the various measures are applied and the thoroughness of the description of the application (i.e., the program requirements). The robustness of a facility NMAC program and the content of its NMAC Plan should be graded in accordance with the type of facility and the category of its nuclear material.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

EMP, Attachment 1: Sampling and Analysis Plan (Rev.1)

This Sampling and Analysis Plan (SAP) is written for the Environmental Radiation Task activities related to radioactive air emissions (stack) monitoring and environmental radiological ambient air surveillance of Pacific Northwest National Laboratory (PNNL) operations at the PNNL-Richland campus and PNNL-Sequim campus. PNNL is a U.S. Department of Energy Office of Science laboratory in Richland, Washington. This plan is an attachment to PNNL’s Environmental Radiological Air Monitoring Plan (EMP) (PNNL-20919) and addresses a discrete, vital subject area that is subject to revision independent of the main text of the EMP document. This SAP provides the requirements for planning sampling events and the requirements imposed on the services provided by the analytical laboratory to the PNNL Environmental Radiation Task.

40 CFR 61 Subpart H↗

National Electric Vehicle Infrastructure Formula Program (ANNUAL REPORT | PLAN YEAR 2023–2024)

The 2021 Infrastructure Investment and Jobs Act, also known as the Bipartisan Infrastructure Law (BIL), invests $\$$7.5 billion to build out a national electric vehicle (EV) charging network and created the Joint Office of Energy and Transportation (Joint Office) to “study, plan, coordinate, and implement issues of joint concern between the two agencies.” The BIL represents a historic effort to electrify the U.S. transportation system, which has significant potential to reduce U.S. greenhouse gas emissions and help tackle the climate crisis. The U.S. transportation sector accounts for one-third of the nation’s greenhouse gas emissions—the largest share of all primary sectors, including electricity production, industry, commercial and residential, and agriculture. The National Electric Vehicle Infrastructure (NEVI) Formula Program, one of the BIL funding programs, was launched in February 2022, providing nearly $\$$5 billion over 5 years to help states, the District of Columbia, and Puerto Rico (hereafter referred to as “states”) create a network of EV charging stations beginning with designated Federal Highway Administration (FHWA) Alternative Fuel Corridors (AFCs), with an emphasis on the Interstate Highway System. The funding is made available to the states in allocations each year pending FHWA certification of the state’s annual deployment plan. The NEVI program is in its third year, so there's a lot to celebrate. As of July 2024, 39 states have released solicitations for their NEVI programs and eight states have opened their first NEVI-funded stations (61 ports in total), which have already powered thousands of charging sessions for EV drivers across America. Additional stations are in the pipeline with more than 2,500 additional ports having been awarded or conditionally awarded by the states. All states released their Fiscal Year (FY) 2024 deployment plan updates to reflect the new minimum requirements and guidance, and several states added newly designated EV AFCs in their FY 2024 deployment plan updates, bringing the total AFC network of EV corridors to more than 81,000 miles.

33 ADVANCED PROPULSION SYSTEMS↗

EMP - Environmental Radiological Air Monitoring Plan: PNNL Operations in Washington

The Environmental Radiological Air Monitoring Plan (EMP) for Pacific Northwest National Laboratory (PNNL) describes systems/processes/practices related to radiological operations in Richland and Sequim, Washington, that are associated with environmental radiological air monitoring and surveillance activities. The activities described support the lab’s responsibility to maintain safe operations and minimize negative impacts to both onsite and offsite persons and environment. Dose assessments required by regulations and DOE Orders for the public and biota are described. PNNL conducts environmental air surveillance monitoring as part of the PNNL Site Radioactive Air Emissions License (RAEL)-005 for Richland Campus, issued in 2010 with its most recent renewal effective in January 2021. The radioactive air emissions license for the PNNL-Sequim campus (RAEL-014) was issued to the U.S. Department of Energy in 2012 with its most recent renewal effective in January 2023. The EMP is a compilation of the following four documents: - Environmental Radiological Air Monitoring Plan (this main document) (PNNL-20919) - Sampling and Analysis Plan (Attachment 1) (PNNL-20919-1) - Data Management Plan (Attachment 2) (PNNL-20919-2) - Dose Assessment Guidance (Attachment 3) (PNNL-20919-3).

40 CFR 61 Subpart H↗

Aquifer Hydraulic Testing and Characterization Plan for the Ringold Formation Unit A in the Hanford 200-ZP-1 Groundwater Operable Unit and Vicinity

This document presents a plan for testing and characterizing the hydraulic properties of the Ringold Formation, member of Wooded Island – unit A (Rwia) in the 200-ZP groundwater operable unit. The testing approach includes multiple field methods and associated analyses designed to investigate and understand aquifer hydraulic properties over a range of scales. Testing was designed to achieve specific testing objectives identified previously in the 200 ZP-1 Groundwater Operable Unit Ringold Formation Unit A Characterization Sampling and Analysis Plan (Ringold A SAP). The test plan provides necessary technical and operational detail for writing subsequent field test instruction documents specific to each testing location. Hydraulic characterization activities will proceed in a phased manner focusing on areas identified to have knowledge gaps and also critical for remedy modifications and/or selection. These activities are designed to minimize impact to pump-and-treat (P&T) operations and to use existing P&T injection and extraction wells as stress wells, and include use of the new Rwia monitoring wells installed for Ringold A SAP activities. ZP-1 hydraulic testing will include slug testing in new Rwia wells, shutdown-recovery tests in multiple Rwia and composite Ringold Formation member of Wooded Island – unit E (Rwie)-Rwia aquifer test locations, installation of new Automated Water Level Network stations in Rwia monitoring wells, characterization of P&T and barometric responses, identifying the vertical distribution of hydraulic conductivity in the Rwia and Rwie units using electromagnetic borehole flowmeter tests, and single-well tracer testing in select Rwia monitoring wells. Slug testing to be conducted during drilling is described under the Ringold A SAP. The remaining testing activities are to be conducted after well drilling and completion and are described in this test plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving Transparency in Electric Distribution System Planning to Support Affordability [Slides]

This resource identifies opportunities for communities to participate in the distribution system planning process to achieve their energy goals, including affordability. It begins with background information on the distribution system and distribution system planning, and then focuses on topical areas where communities could focus their engagement (e.g., non-wires alternatives, DER forecast, scenario analysis). The report concludes with illustrative examples of how communities have engaged in distribution system planning. The appendix provides procedural guidance on engagement in utility planning processes.

24 POWER TRANSMISSION AND DISTRIBUTION↗