Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “outage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

A Framework to Design Consumer-Centric Operational Strategies for Resilience Enhancement

Extreme temperature-related events like heat waves or cold snaps can significantly stress the power distribution grid as electricity demand spikes leading to brownouts or blackouts if not managed properly. In addition, such extreme events can exacerbate inequity, with vulnerable populations (for example, houses with poor insulation, located in non-critical zones, and lack of local resources) at greater risk. There is a growing deployment of distribution systems automation technologies such as advanced metering infrastructure, sensors, and automated control systems to enhance the visibility of the entire distribution grid while meeting resilience objectives. Here, this paper proposes a framework for investigating how automation can improve the distribution system's resilience and ensure customers' health and safety during such extremes. The proposed framework's efficacy will be demonstrated for the Electricity Reliability Council of Texas (ERCOT) during winter storm Uri with varying levels of distribution automation technologies such as feeder isolation using smart switches, remote outage signals using advanced meters, and comfort-aware outage using advanced analytics and communication. Simulation results show that an outage strategy involving advanced grid technology and communication can reduce the occupant exposure to severe cold by 93% and, simultaneously, reduce expected energy not served by 73.2% when compared against feeder isolation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Large Scale Bilevel Optimization for N-K SCOPF Using Adversarial Robustness

Ensuring a secure dispatch against multiple simultaneous outages has long been desired to maintain grid security in the presence of severe events, such as extreme weather phenomena. Traditionally denoted as N-k security constrained optimal power flow (N-k SCOPF), this problem is intractable to solve due to its size being combinatorial in the number of simultaneous outages and due to the non-convex nature of the AC network constraints. This hinders the use of N-k SCOPF for operating realistic-scale systems. In this paper, we introduce a methodology to scalably solve an AC-feasible dispatch that improves security over k simultaneous outages. Our methodology poses N-k SCOPF as a bilevel optimization problem and solves it using an adversarial robustness approach. We develop new efficient methods to solve each level of the bilevel optimization by employing knowledge of the physics of the underlying system. This yields significant improvements in speed and convergence that enable us to address the N-k SCOPF problem at scale. We demonstrate the effectiveness of our method by conducting a comprehensive analysis of an N-3 SCOPF for a 500-bus network. Furthermore, we emphasize the ability of our physics-driven techniques to handle larger systems by successfully scaling up to 12,000 buses.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power System Resilience Enhancement in Typhoons Using a Three-Stage Day-Ahead Unit Commitment

In this work, we propose a three-stage resilient unit commitment model which considers uncertain typhoon paths and line outages to improve the power system resilience against typhoon events. The proposed solution coordinates resources in response to the worst-case scenario for each possible typhoon path. The optimal decision is based on the characterization of the power system schedule into three stages of preventive control, emergency control, and restoration. Preventive control is performed before the typhoon occurs by quickly adjusting the three-stage resilient unit commitment schedule; emergency control is conducted during the typhoon by shedding local loads to meet the power balance, while other control strategies are assumed to be unavailable due to possible interruptions in the communication system; restoration is realized after the typhoon, when resources are optimally dispatched to repair the outages of critical devices and recover the normal operation state of the power system quickly. Considering the typhoon path uncertainty, we have introduced a stochastic model for possible typhoon paths where all possible affected lines along each typhoon path are assumed to be on outage during the typhoon. Accordingly, we explore the strategy for co-optimizing the three stages in unit commitment. The proposed model is tested on the IEEE 118-bus system and the real-world provincial system to verify its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-Agent Simulation Based Framework for Power Restoration Time Estimation at Distribution Level

The growing frequency of power outages has prompted increased interest in developing a more resilient power grid that can quickly recover from weather-related damage. At the distribution level, power restoration is a complex, multi-stage process involving multiple response entities. Providing utility stakeholders, government regulators, and the public with information about outage duration and estimated time to restoration is crucial. The research employs a multi-agent simulation approach, which allows for the simulation of decision-making behaviors among different entities and the incorporation of various uncertainties. Specifically, the study uses the open-source simulation package Mesa-Geo in conjunction with the Python language and constructs a road network using the open-source network extension pgRouting for routing queries. The research design includes several experiments focused on Florida as a case study, comparing repair crew sizes, power outage numbers, and road damage scenarios. The findings could offer valuable managerial guidance on resource allocation in the restoration process.

Chen, Yang↗

Managing Wildfire Risk and Promoting Equity through Optimal Configuration of Networked Microgrids

As climate change increases the risk of large-scale wildfires, wildfire ignitions from electric power lines are a growing concern. To mitigate the wildfire ignition risk, many electric utilities de-energize power lines to prevent electric faults and failures. These preemptive power shutoffs are effective in reducing ignitions, but they could result in wide-scale power outages. Advanced technology, such as networked microgrids, can help reduce the size of the resulting power outages; however, even microgrid technology might not be sufficient to supply power to everyone, thus forcing hard questions about how to prioritize the provision of power among customers. In this paper, we present an optimization problem that configures networked microgrids to manage wildfire risk while maximizing the power served to customers; however, rather than simply maximizing the amount of power served in kilowatts, our formulation also considers the ability of customers to cope with power outages, as measured by social vulnerability, and it discourages the disconnection of particularly vulnerable customer groups. To test our model, we leverage a synthetic but realistic distribution feeder, along with publicly available social vulnerability indices and satellite-based wildfire risk map data, to quantify the parameters in our optimal decision-making model. Our case study results demonstrate the benefits of networked microgrids in limiting load shed and promoting equity during scenarios with high wildfire risk.

distribution systems↗

Power Distribution Designing For Resilience Application

The number of power outages have been on the rise as extreme weather patterns have been occurring more frequently due to climate change. These outages have an economic impact in the billions of dollar. The modernization of the power grid and adoption of high penetration of distributed generation such as wind and solar have the potential to reduce the number and length of time of these power outages. However, planners and operators need a way to value the resilience the distributed assets provide to the grid. PowDDeR is a tool that allows them to evaluate the resilience each asset provides as well as how they provide resilience over the connected network.

Phillips, TylerB↗

Westinghouse advanced fuel management strategies leveraging high enrichment and high burnup fuel to optimize PWR economics

In the US, nuclear power plants have been focused on increasing electricity generation for over three decades via longer operating cycles, reduced number of outages and duration, and the implementation of power up-rates. The potential for zero-carbon emission credits and other carbon-reduction initiatives further makes nuclear power utilities to focus on increasing generation capability. Longer operating cycles provide increased energy generation and enable economic savings to nuclear utilities when the increase in fuel loading required to achieve the extended cycle energy target and resulting increase in total fuel cost is offset by the savings from outage avoidance and reduced replacement power costs. For the current licensed limits of 5 w/o {sup 235}U enrichment and 62 GWd/tU peak pin burnup, higher power density PWR plants, which are prevalent in the PWR fleet, require an excessively penalizing fraction of feed fuel assemblies to operate for the extended cycle duration, with inevitably poor fuel use and fuel cycle economics that cannot be counterbalanced by the savings on outage cost avoidance. To overcome this barrier, the nuclear industry is pursuing development of high enrichment/high burnup fuel technology ({sup 235}U enrichment up to 8 w/o and peak pin burnup up to 75 GWd/tU) which increases fuel energy generation capability and can enable high power density plants to achieve positive economics on 24-month cycle of operation. This paper presents advanced fuel management strategies developed by Westinghouse to enable transition of PWR reactors from 18-month to 24-month cycle of operation, with and without a core thermal power uprate, which are then used as basis to assess the economics of a direct transition from 18 to 24-month cycles with high enrichment/high burnup fuel. The results show that these fuel management strategies, especially if coupled with thermal power up-rates, present the opportunity for substantial economic benefits to utilities. The systematic review of fuel management strategies presented can provide an illustrative reference for decision makers as they consider how to maximize nuclear energy generation economically. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ReNew100: Reliable Power System Operation with 100% Renewable Generation

The ReNew100 project has developed and demonstrated an operator support system (OSS) to operate power systems with 100% renewable power generation from inverter-based resources (IBRs) like wind and solar that significantly reduces the risk of widespread power outages in a simulated operational environment at Technology Readiness Level (TRL) 6. The OSS achieves resilient operation for power systems under changing operation modes including varying combinations of conventional and renewable generation, including cases with 100% renewable generation from wind and solar IBRs. The OSS continuously monitors the N-1 security of the power system, which refers to the ability of the power systems to survive single outages of power system elements, like the loss of a generator or a power line, without causing widespread power outages beyond those expected and planned for. If the OSS identifies that the system is not N-1 secure, an automatic Controller Parameter Optimization (CoPO) developed within Renew100 is activated to optimize the N-1 security of the system by tuning controller parameters within different assets like batteries, wind, and solar plants. The core innovation of ReNew100 is the development of this CoPO as well as the demonstration of the OSS for a real-time simulation of the Hawai'i Island power system. Moreover, Renew100 has developed new model calibration techniques for dynamic power system models and demonstrated them for Hawai'i Island.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LA100 Equity Strategies. Chapter 7: Housing Weatherization and Resilience

The LA100 Equity Strategies project integrates community guidance with robust research, modeling, and analysis to identify strategy options that can increase equitable outcomes in Los Angeles' clean energy transition. This chapter focuses on housing weatherization and access to cooling as means to achieve more equitable resilience to heat waves during unplanned power outages. Specifically, NREL used weather, housing, and socioeconomic data to characterize LA's residential building stock. We?developed a residential building stock model to simulate the energy use of 50,000 dwellings representing the diversity of housing types, appliances, climate zones, and household incomes across Los Angeles. We then simulated and evaluated the impacts of 10 building envelope and cooling upgrades on indoor temperature - a main cause of heat-induced health risks-over a 4-day power outage during a heat wave. We examined occupant exposure to extreme heat and how heat exposure changes with each upgrade across income, tenure (renter/owner status), building type, and disadvantaged community (DAC) status. We also examined upgrade costs and utility bills. Based on the results of our analysis and community guidance, we identified building envelope upgrades and cooling strategies that could save lives and maintain safe home temperatures for LA's low-income households in the event of a planned or unplanned power outage during a summer heat wave. Research was guided by input from the community engagement process, and associated equity strategies are presented in alignment with that guidance.

building envelope↗

Advanced Coating Compositions and Microstructures to Improve Uptime and Operational Flexibility in Cyclic, Low-Load Thermal Utility Plants

GE, the University of Tennessee, and Oak Ridge National Laboratory collaborated from 2020 to 2023 developing two key technologies for improving the viability of fuel switching and load following in thermal utility plants: a) cost-effective weld overlay compositions for boiler tubing b) cathodic arc coatings that deliver improvements in both erosion resistance and oxidation resistance in high temperature steam for HP turbine blades The team worked through a robust, logical project map to de-risk these two technologies and advance them from TRL 3 to TRL 6. For the cost-effective weld overlay, the team developed a ferritic filler material which was fabricated at a vendor for 18% the average market cost of Inconel 625 wire, had a corrosion rate 3x lower in conditions simulating a biomass-fired superheater and 10x lower in conditions simulating a coal-fired superheater, and was fabricated into prototype overlaid tubing that passed ASME requirements including transverse bending, dye penetrant inspection, and ASTM G-76 evaluation. For the cathodic arc coatings applied to steam turbine blades, the team developed a novel composition that was successfully transferred to a qualified vendor. The vendor was able to produce coated prototypes with 4x the as-deposited erosion resistance and 10.4x the post-steam-exposure erosion resistance of the TiN coating the vendor currently applies on GE steam turbine components, without significantly increasing process cost. These coated prototypes also passed a GE inspection and showed favorable performance in high temperature erosion, nanoindentation, sliding wear, scratch adhesion, and high cycle fatigue testing. If successfully deployed by GE, it is anticipated that the technologies will enable the following: • 25%-50% increase in time between outages for both boilers and HP turbines. • 50% decrease in cost for weld overlay on a per foot basis relative to todays NiCr alloys. • Adequate oxidation resistance and erosion for HP turbine inlet steam at >620°C and >220 bar. • No need for changes in component supply chain or any notable Capital Expenditures. 5 Decreasing component cost, increasing performance, and extending time between outages represent direct value propositions to GE and their customers. For the American consumer, these objectives translate into increased grid reliability (fewer unexpected outages), decreased Levelized Cost of Electricity, and improved environmental health (low-loading/load following to accelerate penetration of renewables). The results also have implications for wear resistant tooling, wire arc additive manufacturing, more durable components for syngas cleanup, and deployment of more efficient thermochemical pathways for carbon negative fuel production

09 BIOMASS FUELS↗

Evaluating Utility Costs Savings and Resilience: A Case Study in Port Arthur, Texas

This study evaluates the techno-economic feasibility of integrating solar photovoltaics (PV), battery energy storage systems (BESS), and generators to enhance both cost savings and resilience in critical community facilities in Port Arthur, Texas. Using NREL's REopt model, we analyze four facilities: the Golden Triangle Empowerment Center (GTEC), Lamar State College (LSC), Port Arthur Independent School District (PAISD), and Port Arthur Transit (PAT). A key aspect of the analysis is the incorporation of the Value of Lost Load (VoLL) and microgrid upgrade costs to assess the hidden value of resilience during grid outages. While standalone PV scenarios show moderate cost reductions and a 10-15% decrease in CO2 emissions, the inclusion of resilience measures with BESS and generators significantly increases system costs. However, the hidden value of resilience - quantified through avoided outage costs - leads to a substantial improvement in financial outcomes, resulting in positive Net Present Value (NPV) at many sites. The study demonstrates that resilient solar and storage systems offer both economic and resilience benefits, particularly for underserved communities, by balancing energy savings and enhanced operational continuity during outages.

14 SOLAR ENERGY↗

Value of Nuclear Energy to the Reliability of the North American Power System: Results for Western and Eastern Interconnections

This report documents the fulfillment of a milestone for the United States (U.S.) Department of Energy Office of Nuclear Energy Light Water Reactor Sustainability Program: completing a baseline study of regional impact of nuclear power plants and hydrogen production in maintaining grid services and power quality. Models have been comprehensively demonstrated for the Western Interconnection, or Western Electric Coordinating Council area, and in the Eastern Interconnection for scenarios representative of past extreme events (e.g., drought and heat waves). Understanding the impact on the reliability of the bulk electric system of any reduction in generation capacity from nuclear power, for any reason, is the motivation of this work. Factors that might lead to the premature or unplanned closure of nuclear plants, extended outages, or repurposing of nuclear power include: • Aging infrastructure: Many nuclear power plants in the U.S. are nearing the end of their designed operating lives. Upgrading aging infrastructure can be expensive, and some utilities may choose to retire plants rather than invest in costly upgrades. • Low wholesale electricity prices: The deregulation of the electricity market in many states has led to increased competition and driven down wholesale electricity prices, causing nuclear power operators to seek other revenue sources for their heat and power such as clean hydrogen production. • Renewables growth: The rapid growth of renewable energy sources like solar and wind power is posing a challenge to traditional generation sources like nuclear. While many see renewables as a key part of the clean energy transition, their intermittent nature requires additional grid solutions for reliable power supply. • The potential for regulatory decisions to be in conflict: In its 2021 rulemaking, EPA rule (86 FR 880), the Environmental Protection Agency (EPA) set a compliance date for the ban on processing and distribution in commerce of Decabromodiphenyl Ether (DecaBDE). Since DecaBDE is in many components, particularly wiring, of nuclear power plants which are deemed safety-related or important to safety, three plants would not have been able to restart after their 2023 spring outages, and numerous others would have faced issues in the near future. Fortunately, in this case, the EPA provided relief to the nuclear energy industry. The report provides a summary of the significant role nuclear energy plays in the United States’ power generation mix, supplying around 20% of the nation’s electricity generation, spread across 28 U.S. states. Nuclear power is reliable, mostly unaffected by weather and seasonal changes, and provides a consistent source of baseload power. In terms of capacity, nuclear power plants account for as much as 26% of balancing area power generation capacity. Nuclear power also provides a substantial contribution (e.g., 10% of the inertia in the Eastern Interconnection) of the synchronous spinning mass/inertia that buffers the rate at which frequency changes when a load and generation imbalance occurs (e.g., a large plant trips or a load is suddenly shed due to a transmission outage). This contribution is critical for maintaining grid stability during sudden changes in load or generation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Application of Mobile Energy Storage for Enhancing Power Grid Resilience: A Review

Natural disasters can lead to large-scale power outages, affecting critical infrastructure and causing social and economic damages. These events are exacerbated by climate change, which increases their frequency and magnitude. Improving power grid resilience can help mitigate the damages caused by these events. Mobile energy storage systems, classified as truck-mounted or towable battery storage systems, have recently been considered to enhance distribution grid resilience by providing localized support to critical loads during an outage. Compared to stationary batteries and other energy storage systems, their mobility provides operational flexibility to support geographically dispersed loads across an outage area. This paper provides a comprehensive and critical review of academic literature on mobile energy storage for power system resilience enhancement. As mobile energy storage is often coupled with mobile emergency generators or electric buses, those technologies are also considered in the review. Allocation of these resources for power grid resilience enhancement requires modeling of both the transportation system constraints and the power grid operational constraints. These aspects are discussed, along with a discussion on the cost–benefit analysis of mobile energy resources. The paper concludes by presenting research gaps, associated challenges, and potential future directions to address these challenges.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Series FACTS Devices for Increasing Resiliency in Severe Weather Conditions

Severe weather conditions are low-probability, high-impact events that affect grid operations. The majority of power outages are caused by severe weather conditions. Grid resiliency to weather events can be enhanced by decreasing the reliance on its affected sections. One way to do this is to reduce the power flow through lines vulnerable to severe weather. If a line is disconnected, its initial power flow is distributed through the neighbor lines, which may cause congestion in the grid. FACTS devices can be used to control the power flow of lines that have a higher chance of power outages. Most previous works do not consider weather events in power flow control. In this work, a linearized optimal power flow (OPF)–based algorithm is developed to minimize the real power flow of vulnerable lines considering the thermal limits of lines to prevent infeasible solutions; the simulation is fast, making it suitable for large-scale systems. The proposed optimization problem is presented as a mixed-integer linear program (MILP), making it capable of using short-term load forecasting due to its high solution speed. The proposed optimization problem considers multiple lines with different outage probabilities and the uncertainties of the weather forecast. Moreover, it estimates the power reduction in vulnerable lines due to changes in the series FACTS devices. The performance of the proposed optimization problem is tested on IEEE 14-, 30-, and 118-bus systems for several scenarios. The results are validated with the AC power flow results from MATPOWER.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Resilient Integrated Resource Planning Framework for Transmission Systems: Analysis and Optimization

This article presents a resilient Integrated Resource Planning (IRP) framework designed for transmission systems, with a specific focus on analyzing and optimizing responses to High-Impact Low-Probability (HILP) events. The framework aims to improve the resilience of transmission networks in the face of extreme events by prioritizing the assessment of events with significant consequences. Unlike traditional reliability-based planning methods that average the impact of various outage durations, this work adopts a metric based on the proximity of outage lines to generators to select HILP events. The system’s baseline resilience is evaluated by calculating load curtailment in different parts of the network resulting from HILP outage events. The transmission network is represented as an undirected graph. Graph-theoretic techniques are used to identify islands with or without generators, potentially forming segmented grids or microgrids. This article introduces Expected Load Curtailment (ELC) as a metric to quantify the system’s resilience. The framework allows for the re-evaluation of system resilience by integrating additional generating resources to achieve desired resilience levels. Optimization is performed in the re-evaluation stage to determine the optimal placement of distributed energy resources (DERs) for enhancing resilience, i.e., minimizing ELC. Case studies on the IEEE 24-bus system illustrate the effectiveness of the proposed framework. In the broader context, this resilient IRP framework aligns with energy sustainability goals by promoting robust and resilient transmission networks, as the optimal placement of DERs for resilience enhancement not only strengthens the system’s ability to withstand and recover from disruptions but also contributes to efficient resource utilization, advancing the overarching goal of energy sustainability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Performance characteristics of wind profiling radars

Doppler radars used to measure winds in the troposphere and lower stratosphere for weather analysis and forecasting are lower-sensitivity versions of mesosphere-stratosphere-troposphere radars widely used for research. The term wind profiler is used to denote these radars because measurements of vertical profiles of horizontal and vertical wind are their primary function. It is clear that wind profilers will be in widespread use within five years: procurement of a network of 30 wind profilers is underway. The Wave Propagation Laboratory (WPL) has operated a small research network of radar wind profilers in Colorado for about two and one-half years. The transmitted power and antenna aperture for these radars is given. Data archiving procedures have been in place for about one year, and this data base is used to evaluate the performance of the radars. One of the prime concerns of potential wind profilers users is how often and how long wind measurements are lacking at a given height. Since these outages constitute an important part of the performance of the wind profilers, they are calculated at three radar frequencies, 50-, 405-, and 915-MHz, (wavelengths of 6-, 0.74-, and 0.33-m) at monthly intervals to determine both the number of outages at each frequency and annual variations in outages.

Strauch, R. G.↗

Terrestrial Energy Storage SPS Systems

Terrestrial energy storage systems for the SSP system were evaluated that could maintain the 1.2 GW power level during periods of brief outages from the solar powered satellite (SPS). Short-term outages of ten minutes and long-term outages up to four hours have been identified as "typical" cases where the ground-based energy storage system would be required to supply power to the grid. These brief interruptions in transmission could result from performing maintenance on the solar power satellite or from safety considerations necessitating the power beam be turned off. For example, one situation would be to allow for the safe passage of airplanes through the space occupied by the beam. Under these conditions, the energy storage system needs to be capable of storing 200 MW-hrs and 4.8 GW-hrs, respectively. The types of energy storage systems to be considered include compressed air energy storage, inertial energy storage, electrochemical energy storage, superconducting magnetic energy storage, and pumped hydro energy storage. For each of these technologies, the state-of-the-art in terms of energy and power densities were identified as well as the potential for scaling to the size systems required by the SSP system. Other issues addressed included the performance, life expectancy, cost, and necessary infrastructure and site locations for the various storage technologies.

Brandhorst, Henry W., Jr.↗

AGC-4 Experiment Irradiation Monitoring Data Qualification Final Report

The Graphite Technology Development Program ran a series of six experiments to quantify the effects of irradiation on nuclear grade graphite. This report focuses on the fourth experiment, Advanced Graphite Creep 4 (AGC 4). The Advanced Reactor Development (ARD) Technology Development Office (TDO) Program for research and development activities require documentation of qualified monitoring data to design and license the first high-temperature reactor nuclear plant. Qualified data meets the requirements for use as described in the experiment planning and quality assurance documents. Failed data do not meet the requirements and provide no useable information. Trend data may not meet all requirements but still provide some useable information. Use of Trend data requires assessment of how any deficiencies affect a particular use of the data. AGC-4 began with Advanced Test Reactor (ATR) Cycle 157D on May 30, 2015. After irradiating the graphite for two cycles, the capsule was removed from the reactor after ATR Cycle 158A, which ended on January 2, 2016, due to interference with another experiment. Irradiation was resumed with Cycle 162A on October 7, 2017 after the interfering experiment was removed from the reactor. AGC-4 irradiation completed by the end of Cycle 166B on January 10, 2020. Between Cycles 162A and 166B, AGC-4 capsule was removed from the reactor core during two Powered Axial Locator Mechanism (PALM) Cycles 163A and 165A to avoid overheating. All thermocouples (TCs) have functioned throughout the AGC-4 experiment. A total of 9,256,184 out of all 11,167,213 temperature records (or 82.9%) are Qualified for use by the ARD Program and 1,911,029 missing values are Failed. Argon, helium, and total gas flow data were within expected ranges, except only eight out-of-range values occurred during outages. A total of 21,240,627 out of all 22,288,5103 gas flow rates (or 92.8%) are Qualified for use by the ARD Program and 1,644,476 are Failed records mostly due to missing values. Discharge gas line moisture values were consistently low during full ATR power, except for 162B, when moisture content was increasing to more than 200 ppmv by the end of this cycle. During outages, moisture content reached as high as 700 ppmv. 1,089,941 out of a total of 1,107,331 moisture values (or 98.4%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 17,390 missing moisture values are Failed. Graphite creep specimens were subjected to one of three loads: 393, 491, or 589 lbf. For a brief period during Cycle 157D between 12:19 on June 2, 2015, and 08:23 on June 11, 2015, the load cells were wired incorrectly, resulting in missing stack load data. Missing stack loads were estimated from measured ram pressures using regression equations developed from the existing data from Cycle 157D. Estimated stack loads during this period are considered to be an accurate representation of actual load applied to the stacks. These loads deviate slightly from the planned loads. This deviation does not prevent the data from being Qualified for use but must be taken into account when analyzing the effect of load on creep. 6,095,728 out of a total of 6,403,985 moisture values (or 95.2%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 308,257 missing load values are Failed. Stack displacement increased consistently throughout the eight cycles, with total displacement reached highest value of 2.4 in by the end of irradiation. During ATR outages, a set of pneumatic rams raised the stacks of graphite creep specimens to ensure the specimens were not stuck within the test train. This stack raising was performed seven times throughout irradiation. All stacks were raised successfully each time. 4,744,974 out of a total of 6,094,513 displacement values (or 77.9%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 1,349,539 displacement values are Failed mostly due to missing values. Analyses were conducted on correlations between TCs to look for trends and step changes that might indicate instrument degradation or failure. Correlation analysis was used to identify instances when TCs form short circuits, referred to as virtual junctions, which result in TCs reporting temperatures from some location in the capsule other than the location where they were intended to read. No evidence of virtual junctions was found. Analyses were also conducted on control charts of temperature differences of between two TCs, which are expected to behave consistently throughout the entire irradiation period. Upward or downward trend over time indicates at least one TC in the pair was drifted. Examining control charts for all 66 possible pairs out of twelve TCs installed in the AGC-4 capsules reveal no clear drift failures occurred, except unstable behavior of two TCs in Zone 3, TC-7 and TC-8, over irradiation time. In conclus

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗