The growing frequency of power outages has prompted increased interest in developing a more resilient power grid that can quickly recover from weather-related damage. At the distribution level, power restoration is a complex, multi-stage process involving multiple response entities. Providing utility stakeholders, government regulators, and the public with information about outage duration and estimated time to restoration is crucial. The research employs a multi-agent simulation approach, which allows for the simulation of decision-making behaviors among different entities and the incorporation of various uncertainties. Specifically, the study uses the open-source simulation package Mesa-Geo in conjunction with the Python language and constructs a road network using the open-source network extension pgRouting for routing queries. The research design includes several experiments focused on Florida as a case study, comparing repair crew sizes, power outage numbers, and road damage scenarios. The findings could offer valuable managerial guidance on resource allocation in the restoration process.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Chen, Yang, Omitaomu, Femi, Roberts, Nicholas, Kar, Bandana. 2023-12-01. Multi-Agent Simulation Based Framework for Power Restoration Time Estimation at Distribution Level. https://doi.org/10.1109/wsc60868.2023.10407135

Cite the original work for its findings. Save a collection to share your selection of sources.