Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installed capacity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Unlocking the Path to Decarbonized Building Thermal Systems: Strategies for Designers and Contractors: Preprint

The design and construction community plays a pivotal role in facilitating the transition to decarbonized thermal systems that maintain human comfort while reducing building emissions. Through the U.S. Department of Energy Better Buildings initiative's Design and Construction Allies, a cohort of leading architecture, engineering, and construction firms have identified top ranked barriers that designers and contractors face when implementing solutions for building owners. These barriers to decarbonizing thermal - especially heating - systems include equipment availability; electrical capacity constraints; space allocations; complex system configurations; and lack of experience in designing, installing, and maintaining heat pumps. These impediments significantly amplify the risk and financial burden associated with the adoption of decarbonized solutions. The barriers also decrease the likelihood that designers, contractors, and owners will adopt decarbonization strategies without clear plans and guidance on how to implement these solutions, mitigate risk, and overcome the identified barriers. The National Renewable Energy Laboratory, the Design and Construction Allies, and the American Society of Heating, Refrigerating, and Air-Conditioning Engineers have developed "how to" thermal decarbonization guidance based on best practices. The subjects covered range from the role of energy efficiency in facilitating decarbonized heating solutions to strategies for decarbonizing new and existing heating, ventilating, and air-conditioning systems. The focus is on overcoming barriers so that energy-efficient, electrified buildings - both new and retrofit - become the industry standard. This paper outlines 1) the method used to collect and organize this guidance, 2) industry barriers to decarbonization, and 3) decarbonization techniques that have broad market applicability.

building heating↗

Masking of photovoltaic system performance problems by inverter clipping and other design and operational practices

We describe how performance problems can be “masked,” or not readily evident by several causes: by photovoltaic (PV) system configuration (such as the size of the PV array capacity relative to the size of the inverter and the resultant clipped operating mode); by instrumentation design, installation, and maintenance (such as a misaligned or dirty pyranometer); by contract clauses (when operational availability is transformed to contractual availability, which excludes many factors); and by identified management and operational practices (such as reporting on a portfolio of plants rather than individually). A simple method based on a duration curve is introduced to overcome shortcomings of Performance Ratio based on nameplate capacity and Performance Index based on hourly simulation when quantifying masking effects, and inverter clipping and pyranometer soiling are presented as two examples of the new method. With a better understanding of the non-transparency of masking issues, stakeholders can better interpret performance data and deliver improved AC and DC plant conditions through PV system operation and maintenance (O&M) for improved performance, reduced O&M costs, and a more consistently delivered, and reduced, levelized cost of energy (LCOE).

14 SOLAR ENERGY↗

Cost Benefit Analysis of Solar PV for the City of Oldsmar, FL

The City of Oldsmar is in the early stages of exploring renewable energy opportunities as a part of their initiative to reduce energy costs, improve backup power capacity, and begin the transition to more sustainable operations. The city is particularly interested in deploying a floating or ground-mounted solar PV system at its wastewater treatment plant. Currently, there are no solar PV installations in Oldsmar and there has been hesitancy to implement such a project due to the possible capital costs and limited technical capacity. Despite this the initiative has gained internal buy-in among staff working for the city. To assist with gaining more buy-in and making future decisions the city sought technical assistance (TA) from the Energy to Communities (E2C) Expert Match Program. Through the Expert Match Program, the city received TA provided by the Pacific Northwest National Lab (PNNL) to evaluate the cost effectiveness of several solar options. This report details the analysis and results of the work performed for TA.

14 SOLAR ENERGY↗

Utility-Scale Solar Data Update (2020 Edition) [Slides]

Berkeley Lab’s 2020 update of utility-scale solar data and trends provides an overview of key trends in the U.S. market, with a focus on 2019. Highlights of this year’s update include: More than 4.5 GWAC of utility-scale solar (i.e., ground-mounted solar projects larger than 5 MWAC) achieved commercial operations in 2019, bringing cumulative capacity to 29 GWAC. Projects are spread across all 10 regions that we track, though more heavily concentrated in the sunniest regions. The median installed cost of projects that came online in 2019 fell to $\$$1.4/WAC ($\$$1.2/WDC), down 20% from 2018 and down by more than 70% from 2010. 77% of projects and 88% of capacity added in 2019 used single-axis tracking. Average capacity factors range from 17% in the least-sunny regions to 30% where it is sunniest. Single-axis tracking adds roughly five percentage points to capacity factor in the regions with the strongest solar resource. Nationwide average levelized power purchase agreement (PPA) prices fell to $\$$24/MWh in 2019, down 17% from 2018 and more than 80% since 2010. Thirty-nine projects (totaling 4.2 GWAC) in our PPA price sample include battery storage (totaling 2.3 GWAC and 9.5 GWh). In the “lower 48” states, a number of these recent PV+battery PPAs have been inked in the mid-$\$$20/MWh range (levelized in 2019 dollars).Not including the 30% investment tax credit (ITC), the median levelized cost of energy (LCOE) from utility-scale PV has declined by 85% since 2010, to $\$$40/MWh in 2019. When the 30% ITC is included within the LCOE calculation, the median LCOE closely tracks the median PPA price over time. In higher-penetration markets like CAISO, the value of solar has been declining, but falling PPA prices have largely kept pace, preserving solar's net value. At the end of 2019, there were nearly 370 GW of solar in interconnection queues from all 7 ISOs and 30 additional utilities across the country. Nearly a third of this proposed solar capacity is paired with battery storage.

14 SOLAR ENERGY↗

Plasma Photocathodes

Abstract Plasma wakefield accelerators offer accelerating and focusing electric fields three to four orders of magnitude larger than state‐of‐the‐art radiofrequency cavity‐based accelerators. Plasma photocathodes can release ultracold electron populations within such plasma waves and thus open a path toward tunable production of well‐defined, compact electron beams with normalized emittance and brightness many orders of magnitude better than state‐of‐the‐art. Such beams will have far‐reaching impact for applications such as light sources, but also open up new vistas on high energy and high field physics. This paper reviews the innovation of plasma photocathodes, and reports on the experimental progress, challenges, and future prospects of the approach. Details of the proof‐of‐concept demonstration of a plasma photocathode in 90° geometry at SLAC FACET within the E‐210: Trojan Horse program are described. Using this experience, alongside theoretical and simulation‐supported advances, an outlook is given on future realizations of plasma photocathodes such as the upcoming E‐310: Trojan Horse‐II program at FACET‐II with prospects toward excellent witness beam parameter quality, tunability, and stability. Future installations of plasma photocathodes also at compact, hybrid plasma wakefield accelerators, will then boost capacities and open up novel capabilities for experiments at the forefront of interaction of high brightness electron and photon beams.

Habib, Ahmad Fahim↗

Georectified polygon database of ground-mounted large-scale solar photovoltaic sites in the United States.

Over 4,400 large-scale solar photovoltaic (LSPV) facilities operate in the United States as of December 2021, representing more than 60 gigawatts of electric energy capacity. Of these, over 3,900 are ground-mounted LSPV facilities with capacities of 1 megawatt direct current (MW dc ) or more. Ground-mounted LSPV installations continue increasing, with more than 400 projects appearing online in 2021 alone; however, a comprehensive, publicly available georectified dataset including spatial footprints of these facilities is lacking. The United States Large-Scale Solar Photovoltaic Database (USPVDB) was developed to fill this gap. Using US Energy Information Administration (EIA) data, locations of 3,699 LSPV facilities were verified using high-resolution aerial imagery, polygons were digitized around panel arrays, and attributes were appended. Quality assurance and control were achieved via team peer review and comparison to other US PV datasets. Data are publicly available via an interactive web application and multiple downloadable formats, including: comma-separated value (CSV), application programming interface (API), and GIS shapefile and GeoJSON.

14 SOLAR ENERGY↗

Smart Meter Data: A Gateway for Reducing Solar Soft Costs with Model-Free Hosting Capacity Maps

Public-facing solar hosting capacity (HC) maps, which show the maximum amount of solar energy that can be installed at a location without adverse effects, have proven to be a key driver of solar soft cost reductions through a variety of pathways (e.g., streamlining interconnection, siting, and customer acquisition processes). However, current methods for generating HC maps require detailed grid models and time-consuming simulations that limit both their accuracy and scalability—today, only a handful out of almost 2,000 utilities provide these maps. This project developed and validated data-driven algorithms for calculating solar HC using data from AMI without the need of detailed grid models or simulations. The algorithms were validated on utility datasets and incorporated as an application into NRECA’s Open Modeling Framework (OMF.coop) for the over 260 coops and vendors throughout the US to use. The OMF is free and open-source for everyone.

14 SOLAR ENERGY↗

Use of Multi-Attribute Utility Analyses to Assess Transportation Routes from ISFSIs - 20535

With two consolidated interim storage facilities for used nuclear fuel (UNF) having applied for storage licenses, there is the potential need to transport UNF in the U.S. from shutdown reactor sites to complete the site cleanup and from operating reactor sites who may be running out of storage options (e.g., spent fuel pools are nearly full and dry storage facilities are reaching licensed capacity). At some of the shutdown reactor sites, only the independent spent fuel storage installation (ISFSI) exists and often there remains a degraded transportation infrastructure for performing shipments from these sites. At other sites (e.g., operating reactor plants), the existing transportation infrastructure on the site is unchanged and sufficient for moving UNF, but the environment around the route may have changed (e.g., what was once a rural setting has transformed into a more urban setting) and/or local stakeholders want their input taken into consideration in UNF transportation activities. So, although preliminary evaluations have been performed to identify viable modes of transport from these sites using rail, barge, and/or heavy haul truck, if multiple options exist for moving the UNF from the site (e.g., multiple truck routes or a truck and a barge route both exist) then an evaluation that takes input from multiple stakeholders should be considered to identified the preference (e.g., ranking) of routes from a site. Orano has supported the development of several studies examining the viable routes for removing UNF from some of these sites and has utilized a multi-attribute utility analysis (MUA) to establish a ranking of routes and associated modes to move the UNF from the ISFSIs to a Class I rail carrier. The ultimate result from the MUA is a list(s) of the most to the least favored/preferred routes from the site. This paper provides an overview of the MUA methodology and provides an example of its application to a site with a shutdown reactor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Digital Twin-Enabled Adaptive Control for Hydroelectric Systems: Turbine Governor and Voltage Regulation

This paper presents a comprehensive digital twin (DT) framework for hydroelectric systems that enables adaptive control of turbine governors and excitation systems without requiring detailed manufacturer specifications. The proposed framework integrates neural network-based system identification with stabilizing adaptive control laws for the installed turbine controller and middle-branch adaptive tuning for the installed voltage regulator. Using real operational data from Unit C-8 at Rocky Reach Dam (1,349 MW capacity), highfidelity neural network models are developed to capture turbine and generator dynamics without requiring detailed manufacturer specifications. The DT enables safe controller synthesis and validation in simulation before deployment. For turbine control, the proposed method achieves a 79.9% mean square error (MSE) reduction compared with that of an optimal controller. For voltage regulation, the adaptive excitation controller achieves approximately 42.6% MSE reduction while preserving installed protection logic. The results demonstrate that DT technology provides a practical pathway for modernizing hydropower control systems with minimal operational disruption.

Gui, Yonghao [ORNL] (ORCID:0000000250435534)↗

Integration of a thermoelectric subcooler with an air‑source heat pump to enhance heating capacity and dehumidification

This study presents an innovative configuration of a thermoelectric subcooler (TES) integrated with an air-source heat pump (ASHP). The TES is installed in the liquid line, where it absorbs heat from the refrigerant. On its hot side, it discharges heat to the return air in heating mode or to the supply air in cooling mode, enabling year-round operation. The ASHP–TES system was evaluated under various conditions to reduce supplemental heating needs and improve dehumidification. Experimental heating tests revealed that activating the TES increased the heating capacity by 12%–20%. However, this occurred with a 7.6%–10% reduction in heating coefficient of performance (COP). In cooling mode, TES operation significantly improved moisture removal. The TES reduced the sensible heat ratio (SHR) and enhanced dehumidification, removing 20%–50% more moisture than a conventional system when meeting the same sensible load. The TES can be turned off to use the refrigerant subcooler for reheat supply air or turned on to substantially boost dehumidification. When meeting the same latent load, the ASHP–TES system achieved up to 33% energy savings compared with a conventional ASHP using resistance heating. Relative to a conventional ASHP paired with a whole-house dehumidifier, the ASHP–TES system provided up to 20% energy savings. These findings underscore the potential of TES integration to improve latent load control and enhance overall energy efficiency in hybrid ASHP systems, especially in cold and humid climates.

Hu, Yifeng [ORNL] (ORCID:0000000242875185)↗

Challenging conventional assumptions in PV: a high-throughput open-air approach to low-cost perovskite module production

Perovskite solar modules (PSMs) offer a promising pathway to low-cost photovoltaics, yet their commercialization is challenged by manufacturing scalability, device uniformity, additive costs, interlayer complexity, and module stability. This study introduces a comprehensive technoeconomic analysis of single junction PSM's and projections for tandem perovskite-Si modules that integrate all materials and manufacturing steps, module performances, projected lifetimes, and manufacturing costs across scales. Here, we highlight an open-air manufacturing approach to fabricate all active layers of serially interconnected PSMs, including electrodes and charge transport layers, enabling high-throughput production without inert or vacuum environments. The analysis reveals two orders of magnitude throughput enhancement and cost reductions of 24% in all-open-air production, escalating to over 60% at 1 GW factory capacity compared to conventional methods. Levelized cost of energy (LCOE) projections for utility-scale installations over 30 years, accounting for module replacement and recycling, demonstrate the potential to achieve the 2030 US target of $0.03 per kWh with realistic 7–11-year PSM lifetimes, outperforming incumbent silicon-based modules. Neither four terminal (4T) nor two terminal (2T) tandem-Si PSMs improve over single junction perovskite or silicon LCOE regardless of higher efficiencies at any modeled lifetime. Addressing PSM technical challenges with a cost-modeling framework guides commercialization efforts and provides a convincing pathway for challenging incumbent Si-based PV.

14 SOLAR ENERGY↗

Initial Heliostat Supply Chain Analysis

Globally, the growing demand for concentrating solar power (CSP) technologies, primarily for electricity generation plants has been met with supply chains primarily composed of plentiful commodity materials such as steel, aluminum, and glass. Often the majority of the commodity materials are sourced within the domestic market where generating plants are constructed. Although specialty components are required for CSP solar field components - including mirror panels used for heliostat applications - these specialty components constitute about 30-50% of total system installed costs. Only a few companies and countries, including the United States, have developed the capacity to supply such specialty components. This report is an initial assessment of the global and U.S. heliostat supply chain.

14 SOLAR ENERGY↗

Federal Workplace Charging Program Guide

The 2015 Fixing America's Surface Transportation (FAST) Act authorizes the installation, operation, and maintenance of electric vehicle supply equipment (EVSE) for the purpose of recharging employees' privately owned vehicles (POVs) under the custody or control of the General Services Administration (GSA) or a Federal agency. It requires the collection of fees to recover the costs of installing, operating, and maintaining this equipment and imposes reporting requirements. This program guide reviews those requirements, excerpts the relevant language in Appendix A, and describes when and how fees may be required to cover costs of electricity, network costs, EVSE units, and installations in various scenarios. This program guide is designed to support Federal agencies developing and refining workplace charging programs for employee POVs. While it provides guidance and best practices, it does not replace agencywide policies or agency-specific legal counsel. It contains a roadmap for agency workplace charging programs and defines roles and responsibilities. This guide explains how to determine the number of POVs likely to charge at a given site and contains a sample employee survey in Appendix B. It reviews EVSE planning, including unit selection and acquisition, charger location(s), accounting for available power capacity, using existing infrastructure, and funding an incentive program. It also discusses the costs associated with EVSE acquisition, installation, and network management. These costs inform the subsequently provided information, which describes how to amortize costs to determine appropriate fees for each charging session. The final two sections of this guide address aspects of ongoing program management that the facility coordinator should consider and the reporting requirements associated with the FAST Act. The insights in this guide are applicable to all agency-owned and GSA-leased buildings or facilities offering the use of EVSE or a 120-volt receptacle for the purpose of recharging an employee's POV. However, the FAST Act requirements typically do not apply to any building or facility operated and maintained by a third-party vendor offering the use of EVSE as part of a commercial building lease unless the agency is managing the station and/or energy on behalf of the building and collecting POV fees.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Options for Upgrading Low-Voltage Spot Network Protection to Increase DER Interconnection Capacity

Existing standards and policies for interconnecting distributed energy resources (DERs) into low voltage spot networks severely limits the amount of DER installed on those networks to avoid negative impacts on protection systems. This report investigates options for upgrading the protection systems of spot networks to allow for additional DER installations beyond the normal limits (i.e., no reverse power flows allowed onto the MV system). Eight potential upgrade options are discussed that span various methods for new network protector algorithms, hardware upgrades, and the addition of communication. Each method has tradeoffs in terms of accuracy of detecting faults, requirements to upgrade equipment in the spot networks, need for communication, and sensitivity to false trips—all of which are explored in this report.

42 ENGINEERING↗

Understanding Solar Photovoltaic System Performance: An Assessment of 75 Federal Photovoltaic Systems

This report presents a performance analysis of 75 photovoltaic systems based on PV system production data collected as part of a FEMP Federal PV Performance Assessment project combined with co-incident insolation, and ambient temperature to analyze how actual performance compares with a performance model. FEMP collaborated with 17 Federal agencies and sub-agencies to collect the information required to analyze the performance of each system. The systems represent a total capacity of 30,714 kW and range in size from 1 kW to 4,043 kW, with an average size of 410 kW, and were installed between 2011 and 2020. The data is analyzed for Key Performance Indicators, Availability, Performance Ratio and Energy Ratio by comparing the measured production data to model production data. The System Advisor Model (SAM) combines a description of the system (such as inverter capacity, de-rating for temperature, balance-of-system efficiency) with environmental parameters (coincident solar and temperature data) to calculate predicted performance. The performance metrics are calculated by lining up the measured production data with the model estimate on an hour-by-hour, day-by-day, or month-by-month basis (depending on the interval resolution of the production data). A report with system description, photo of the system, special assumptions made for the site, graph of measured production and model production, table of key performance indicators, and links to O&M resources that might improve performance was produced and delivered to site and agency staff with a short on-line briefing.

14 SOLAR ENERGY↗

What you get is not always what you see—pitfalls in solar array assessment using overhead imagery

Effective integration planning for small, distributed solar photovoltaic (PV) arrays into electric power grids requires access to high quality data: the location and power capacity of individual solar PV arrays. Unfortunately, national databases of small-scale solar PV do not exist; those that do are limited in their spatial resolution, typically aggregated up to state or national levels. While several promising approaches for solar PV detection have been published, strategies for evaluating the performance of these models are often highly heterogeneous from study to study. The resulting comparison of these methods for practical applications for energy assessments becomes challenging and may imply that the reported performance evaluations overly optimistic. The heterogeneity comes in many forms, each of which we explore in this work: the degree of diversity of the locations and sensors (e.g. different satellites, aerial photography) from which the training and validation data originate, the validation of ground truth (manual annotation of imagery vs known solar PV locations), the level of spatial aggregation (e.g. array-level vs regional estimates), and inconsistencies in the training and validation datasets (e.g. different datasets are used for each study and those data are not always made accessible). For each, we discuss emerging practices from the literature to address them or suggest directions of future research. As part of our investigation, we evaluate solar PV identification performance in two large regions: the entire state of Connecticut and the city of San Diego, CA. In Connecticut, we also use 33,114 known parcel-level solar PV installations from Berkeley Lab’s Tracking the Sun dataset to evaluate parcel-level performance and evaluate capacity estimates using 169 municipalities. We also make our code (which we call SolarMapper), pre-trained models, training data, and predictions publicly available and provide a web portal for interactively inspecting each prediction that was made. Here our findings suggest that traditional performance evaluation of the automated identification of solar PV from satellite imagery may be optimistic due to common limitations in the validation process. The takeaways from this work are intended to inform and catalyze the large-scale practical application of automated solar PV assessment techniques by energy researchers and professionals.

14 SOLAR ENERGY↗

Bill Savings vs. Backup Power: Evaluating operational tradeoffs for home solar+storage systems [Slides]

Adoption of residential solar photovoltaic+energy storage systems (PVESS) is driven by both bill savings opportunities and customer demand for backup power. Prior work by this team (Gorman et al., 2022; Gorman et al., 2023) explored PVESS backup power capabilities during long-duration power interruptions (e.g., due to severe weather events), when customers are assumed to be able to anticipate the event and charge their batteries in advance. In many cases, however, power interruptions are unpredictable (and often relatively short); for those types of events, a customer will typically set its battery to maintain some minimum capacity in reserve in case of an interruption, which reduces the capacity available for managing utility bills. This study evaluates this operational tradeoff to help customers and installers configure backup reserve settings, and to inform decision-making more generally about the customer value of backup power services compared to utility bill savings. This study utilizes Berkeley Lab’s PRESTO tool to produce stochastic simulations of (predominantly short-duration) power interruption events, and builds on an earlier case-study demonstrating PVESS backup performance during short-duration interruptions (Baik et al., 2023).

14 SOLAR ENERGY↗

Combined Heat and Power Technology Fact Sheet Series: Thermal Energy Storage

This fact sheet provides an overview of thermal energy storage (TES) technologies, which heat or cool a storage medium and, when needed, deliver the stored thermal energy to meet heating or cooling needs. TES systems are used in commercial buildings, industrial processes, and district energy installations to deliver stored thermal energy during peak demand periods, thereby reducing peak energy use. TES systems are often integrated with electric or absorption chillers to reduce peak electricity costs and, in the case of new construction, to reduce capital costs by optimizing chiller size. TES technologies can support sites that have either renewable or fossil power generation, including combined heat and power (CHP) installations. With CHP, TES can help optimize equipment size by reducing the required peak CHP thermal capacity and increasing annual CHP usage. TES can also provide turbine inlet cooling for gas turbines used in CHP applications, which increases power production in hot ambient conditions.

Combined Heat and Power, CHP, Thermal Energy, Tech↗