At a Glance: Electric Vehicles
Electric vehicles (EVs) include all-electric vehicles - also referred to as battery electric vehicles (BEVs) - and plug-in hybrid electric vehicles (PHEVs).
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Electric vehicles (EVs) include all-electric vehicles - also referred to as battery electric vehicles (BEVs) - and plug-in hybrid electric vehicles (PHEVs).
With the support of DOE's Vehicle Technologies Office and the DOE/DOT Joint Office (JO), NREL has applied the EVI-X modeling suite to conduct a National Electric Vehicle Infrastructure Needs Assessment. This report considers a 2030 scenario in which 30-42 million light-duty electric vehicles are on the road (including plug-in hybrids). We consider the needs of vehicles used for typical daily driving, drivers without access to residential charging, corridor charging supporting long-distance travel, and ride-hailing electrification. We find that a national network of 28 million charging ports (including public and private infrastructure) will be necessary in our mid adoption scenario. This result is framed as a conservative estimate as the assumed costs include charging equipment and installation but exclude the cost of grid upgrades and distributed energy resources.
A system and method for power management of hybrid electric vehicles is provided. In some implementations, a plug-in series hybrid electric vehicle may include an engine, a motor/generator (MG), a traction motor, an energy storage device, and a controller. The controller is coupled to the engine and the MG to control operation of the engine and the MG such that a state-of-charge (SOC) of the energy storage device tracks a dynamic reference SOC profile during a trip and an average engine power (AEP) is maintained above a threshold. In some instances, maintaining AEP above a threshold supports emission control of the vehicle.
This document summarizes the software quality assurance (SQA) planning activities conducted for the Optimization of Real-time Capacity Allocation (ORCA) plug-in. It outlines the approaches and document structures adopted to maintain high standards of software quality. It also gives examples of certain SQA documents.
To accomplish net-zero carbon in the built environment by 2050, we must equitably decarbonize commercial buildings, which includes reducing plug and process loads (PPLs). PPLs are plug-in or hardwired electric and gas loads that are not directly associated with major building end uses like lighting and heating, ventilating, and air conditioning. PPLs account for a growing portion of U.S. commercial building energy consumption. Although commercial building PPL strategies and technologies are available today, they have not been adopted at a level sufficient to achieve significant savings and load flexibility across the building stock. In our "Pathways to Plug and Process Load Efficiency and Control" study, we investigated why these technologies and strategies have not seen widespread adoption and identified five behavior and technology pathways to increase PPL reduction in commercial buildings. In this paper, we expand beyond identifying the pathways and discuss approaches for achieving them. We discuss the importance of collecting and sharing data and case studies on PPL energy consumption and savings from control technology implementation, including code-required measures, for increasing adoption. Centralizing case studies and data, engaging industry organizations, and promoting awareness of PPL efficiency benefits to relevant groups are also key approaches. Additionally, funding, incentives, and rebate programs play important roles in driving PPL efficiency and control adoption. Finally, we discuss integrating PPL efficiency into broader company goals, such as environmental, social and governance (ESG) strategies and green building certifications, to further drive adoption.
Electric vehicles (EVs) include all-electric vehicles - also referred to as battery electric vehicles (BEVs) - and plug-in hybrid electric vehicles (PHEVs). This is the French translation of NREL/FS-5400-87123 (https://www.nrel.gov/docs/fy23osti/87123.pdf).
A 120 V heat pump water heater (HPWH) is a direct plug-in option to replace gas water heater (WH) without needing expensive electric panel upgrade to 220 V. To enable the smooth transition, the HPWH should provide comparable water heating capacity as the gas WH. WH capacities are rated in the form of first hour rating (FHR). Typical home gas WHs have FHRs > 65 gallon with a 40-gallon water tank. It imposes a major challenge on 120V HPWHs. Most 120V circuits in US can provide 1,800 to 2,400W, not adequate to drive electric resistance heat to boost FHRs. Thus, all the heat needs to come from the heat pump with its top power below 1500 Watts, which is constraint by the installation footprint. This study uses a hardware based, HPWH design model, i.e. the DOE/ORNL Heat Pump Design Model to design a 120V unit with a brazed plate condenser, fin-and-tube evaporator and an adequately sized compressor. To maximize the FHR, multiple strategies were simulated, including use of a mixing valve, overheating the tank temperature to 140F, a new sensing method for quicker response, and an innovative water circulation path. We also simulated 24-hour unform energy factors (UEF) to show the tradeoff between the capacity and operation efficiency. Additionally, we evaluated the impact of insulation thickness on FHR and UEF, to seek further footprint reduction or stretch the tank volume.
To meet long-term goals for reducing carbon emissions and lessen the impacts of climate change, the U.S. plans to decarbonize its building stock, which includes the replacement of fossil fuel-burning end uses with energy efficient electric alternatives. As part of this strategy, the replacement of fossil fuel water heaters with heat pump water heaters (HPWH) has the potential to avoid substantial carbon emissions. An estimated 10-15 million single-family homes with fossil fuel water heaters do not have the electrical panel capacity to install a 240-volt, 30-amp HPWH. For these homes, a technology recently introduced to the market, the 120-volt plug-in HPWH, can provide energy efficient electrification of water heating without an expensive panel and wiring retrofit. This paper presents the results of an ongoing 120-volt HPWH field study conducted in 17 homes in New Orleans, LA. Key installation scenarios are profiled for retrofitting from gas-fired water heaters to 120-volt HPWHs, accounting for space, air volume, air temperature, condensate drainage, and electrical. Each HPWH had its surrounding air temperature, relative humidity, inlet and outlet water temperature, flow, and energy consumption monitored. Using these data, hot water delivery and energy efficiency performance were analyzed based on home characteristics. Hot water run outs were investigated to understand how hot water usage, inlet water temperature, and surrounding air temperature impact the HPWH’s ability to meet load. From these results, best practices for 120-volt HPWH siting, sizing, and installation were developed. In addition, results are explored further to add insight for electrification policies and product development.
Multi-split variable refrigerant flow (VRF) systems are highly energy-efficient HVAC (heating, ventilation and air conditioning) technologies that connect a single outdoor unit to multiple independent indoor terminal units using a common refrigerant circuit and a variable-speed compressor. Building energy simulations that incorporate VRF systems help model their unique operational characteristics and predict energy consumption in specific building designs. Traditionally, EnergyPlus models these systems by employing multiple sets of performance curves to characterize both individual terminal units and the outdoor unit. However, producing these curves is labor intensive and error prone, and they often do not capture all the key input and output variables. This paper introduces a novel approach that uses multi-dimensional performance maps to model VRF systems in building environments for space cooling. In this approach, performance maps are developed at the component level—separately for the outdoor unit and for each indoor terminal. The new modeling method is validated within EnergyPlus via a Python plug-in that contains a simple solver loop to coordinate the component-level, indoor, and outdoor unit maps. Furthermore, because performance maps can span more variables than traditional performance curves, they offer the opportunity to implement advanced controls, such as enhanced dehumidification and compressor modulation. A VRF air conditioner’s hardware system was modeled using the DOE/ORNL Heat Pump Design Model, which was automated to produce extensive performance maps for both the indoor and outdoor units.
Not Available
This document describes the contents of the following data products: 1. ALL-survey_results_NREL_LiveWire_04_14_2023 (Excel file with two worksheets) 2. eCab_DOE_NREL_LiveWire_04_14_2023_results_all_surveys_except_SP_csv (CSV file) 3. eCab_DOE_NREL_LiveWire_04_14_2023_SP_survey_results_only_csv (CSV file). These data products contain the results of the surveys conducted throughout the DOE-funded Electric First-/Last-Mile On-Demand Shuttle Service for Rural Communities in Central Texas project. The Excel file is the original database of all the survey results (contained in two worksheets). The CSV files are those two worksheets saved as individual CSV files.
This project seeks to synergize vehicle automated driving and connectivity data to improve mobility and energy efficiency of groups of mixed vehicles operating in close proximity (vehicle cohort) on various infrastructure. A custom cellular communication network links vehicles operating as a cohort with infrastructure to a centralized system-of-systems digital twin with an AI-based optimal behavior planner. The data contained in this set are from final testing and technology demonstrations to U.S. Department of Energy staff at the American Center for Mobility. The data contain single-lane, single-light scenarios; multi-lane, multi-light arterial scenarios; and limited-access highway scenarios. All test cases were derived from simulations and replicated on the test track. The project employed two and four light-duty vehicles with connectivity and drive automation for the testing. The baseline scenario without connectivity was run under the control of the system-of-systems centralized planner but operating each vehicle with an intelligent driver model controlling the velocity, lane utilization, and vehicle gap. This was to ensure the highest compatibility with the simulation in terms of dynamic behavior. The connected cohort case utilized AI optimization to perform coordinated and cooperative control for energy, as well as safe, comfortable behavior for the cohort. The dataset is appropriately named with unconnected and connected designations, with comparisons sharing the same run index number. The included PowerPoint and PDF files describe the test setup and provide an overview of results from the project. 
Assumptions for this work was collected and the analysis was completed in FY22. This contains information for more than 20 types of medium and heavy duty vehicles. Vehicles with various levels of hybridization, electric and fuel cell powertrains are considered in this work. More details are available in the report published by Argonne accessible from https://vms.taps.anl.gov/research-highlights/u-s-doe-vto-hfto-r-d-benefits/. TechScape, a convenient data visualization tool is also provided by Argonne for this data, accessible from [TechScape Web](https://vms.taps.anl.gov/data/techscape-web-2023/).
The Transportation Annual Technology Baseline (ATB) provides detailed cost and performance data, estimates, and assumptions for vehicle and fuel technologies in the United States. It includes current and projected estimates for vehicle technologies as well as conventional and alternative fuels, and it details the assumptions used to calculate those costs, such as gas and electricity prices, discount rates, and vehicle miles traveled. The 2022 update added more classes of light-duty vehicles, medium and heavy-duty vehicles, an aviation page, and it aligned diesel pathways with aviation pathways.
Recent U.S. Environmental Protection Agency (EPA) notices of proposed rulemakings for GHG emissions standards for light-, medium-, and heavy-duty on-road vehicles would accelerate ongoing advancements already happening in the industry because of private investment, consumer demand, state-level policies, and federal incentives. As the EPA finalizes these regulations, questions persist regarding the cost of the requisite charging infrastructure and associated upgrades to the nation's electric grid. With support from the U.S. Department of Energy, U.S. Joint Office of Energy and Transportation, and the EPA, a multidisciplinary team conducted a Multi-State Transportation Electrification Impact Study that quantitatively assesses the incremental investment necessary to enable the levels of vehicle electrification expected to be induced by pending EPA regulations and to estimate the potential value of deferred investments in electric distribution infrastructure stemming from proactive vehicle-grid integration planning and deployment. This study finds the simulated incremental capital cost of charging infrastructure (including grid upgrades) to be at least 2.5 times smaller than the lifetime net benefits of vehicle electrification (including fuel savings but excluding the value of avoided emissions). Additionally, the incremental distribution grid upgrade cost of the EPA Action-Unmanaged scenario was found to be approximately 3% of existing utility distribution system investments (on an annual basis). Finally, the potential for managed charging to defer distribution grid upgrades was found to be significant with costs found to decrease from $2.3 billion to an incremental cost of $1 billion across five states in the Action-Managed scenario (relative to the No Action-Unmanaged scenario).
The overall objectives of the project were to (1) Identify personal and social norms, peer effects, demographics and contextual factors (such as household energy expenditures, experience with outages, charging infrastructure availability) that may facilitate or hinder Solar-EV co-adoption; (2) outline strategies for the design of programs and practices that will enable reasoned RPV and EV adoption and their co-adoption; and (3) assemble a dataset comprised of survey responses of RPV-EV co-adopters, RPV-only adopters, EV-only adopters, and non-adopters. These objectives were only partially fulfilled given the decision to terminate the project. The research team was able to complete the semi-structured interviews, the core BY1 task and summarize the results below. As well, once the team learned of the research project’s fate, it sought and obtained the DOE SETO Technical Manager’s approval to repurpose funds for BY2 tasks to the extent feasible. Rather than invest further resources in expanding the pool of potential survey respondents and having no budget to survey, the research team repurposed funds subject and undertook a more limited (geographically) survey, but also expanded to it to include contingent valuation questions. The analysis of the survey data will necessarily be delayed given the lack of budget support, although some information on the respondent sample is in the results. Given a lack of attention to co-adoption previously, the insights generated in this project should assist decision-makers and industry actors in the development of programs and practices that enable reasoned RPV adoption and EV adoption and their co-adoption.
The 2015 Fixing America's Surface Transportation (FAST) Act authorizes the installation, operation, and maintenance of electric vehicle supply equipment (EVSE) for the purpose of recharging employees' privately owned vehicles (POVs) under the custody or control of the General Services Administration (GSA) or a Federal agency. It requires the collection of fees to recover the costs of installing, operating, and maintaining this equipment and imposes reporting requirements. This program guide reviews those requirements, excerpts the relevant language in Appendix A, and describes when and how fees may be required to cover costs of electricity, network costs, EVSE units, and installations in various scenarios. This program guide is designed to support Federal agencies developing and refining workplace charging programs for employee POVs. While it provides guidance and best practices, it does not replace agencywide policies or agency-specific legal counsel. It contains a roadmap for agency workplace charging programs and defines roles and responsibilities. This guide explains how to determine the number of POVs likely to charge at a given site and contains a sample employee survey in Appendix B. It reviews EVSE planning, including unit selection and acquisition, charger location(s), accounting for available power capacity, using existing infrastructure, and funding an incentive program. It also discusses the costs associated with EVSE acquisition, installation, and network management. These costs inform the subsequently provided information, which describes how to amortize costs to determine appropriate fees for each charging session. The final two sections of this guide address aspects of ongoing program management that the facility coordinator should consider and the reporting requirements associated with the FAST Act. The insights in this guide are applicable to all agency-owned and GSA-leased buildings or facilities offering the use of EVSE or a 120-volt receptacle for the purpose of recharging an employee's POV. However, the FAST Act requirements typically do not apply to any building or facility operated and maintained by a third-party vendor offering the use of EVSE as part of a commercial building lease unless the agency is managing the station and/or energy on behalf of the building and collecting POV fees.
Recent U.S. Environmental Protection Agency (EPA) notices of proposed rulemakings for GHG emissions standards for light-, medium-, and heavy-duty on-road vehicles would accelerate ongoing advancements already happening in the industry because of private investment, consumer demand, state-level policies, and federal incentives. As the EPA finalizes these regulations, questions persist regarding the cost of the requisite charging infrastructure and associated upgrades to the nation's electric grid. With support from the U.S. Department of Energy, U.S. Joint Office of Energy and Transportation, and the EPA, a multidisciplinary team conducted a Multi-State Transportation Electrification Impact Study that quantitatively assesses the incremental investment necessary to enable the levels of vehicle electrification expected to be induced by pending EPA regulations and to estimate the potential value of deferred investments in electric distribution infrastructure stemming from proactive vehicle-grid integration planning and deployment. This study finds the simulated incremental capital cost of charging infrastructure (including grid upgrades) to be at least 2.5 times smaller than the lifetime net benefits of vehicle electrification (including fuel savings but excluding the value of avoided emissions). Additionally, the incremental distribution grid upgrade cost of the EPA Action-Unmanaged scenario was found to be approximately 3% of existing utility distribution system investments (on an annual basis). Finally, the potential for managed charging to defer distribution grid upgrades was found to be significant with costs found to decrease from $2.3 billion to an incremental cost of $1 billion across five states in the Action-Managed scenario (relative to the No Action-Unmanaged scenario).