Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Federal Programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Extending Safety Culture Development through Communication - 12366

The Norwegian Radiation Protection Authority has been implementing a regulatory support program in the Russian Federation for over 10 years, as part of the Norwegian government's Plan of Action for enhancing nuclear and radiation safety in northwest Russia. The overall long-term objective is the enhancement of safety culture. The project outputs have included appropriate regulatory threat assessments, to determine the hazardous activities which are most in need of enhanced regulatory supervision; and development of the norms, standards and regulatory procedures, necessary to address the often abnormal conditions at nuclear legacy sites. Project outputs have been prepared and subsequently confirmed as official regulatory documents of the Russian Federation. The continuing program of work focuses on practical application of the enhanced regulatory framework as applied to legacy sites, including safe management of radioactive wastes arising in the process of site remediation. One of the lessons learnt from this practical application is the importance of effective communication at all levels: - between managers and shop workers; - between different operators - e.g. waste producers and waste disposal organisations; - between operators and regulators; - between nuclear safety regulators, radiation protection regulators and other pollution and safety regulators; - between scientists, policy makers and wider stakeholders; and - between all of those mentioned above. A key message from this work is that it is not just an issue of risk communication; rather all aspects of communication can contribute to safety culture enhancement to support effective and efficient risk management, including the role of regulatory supervision. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lawrence Livermore National Laboratory Environmental Report 2010

The purposes of the Lawrence Livermore National Laboratory Environmental Report 2010 are to record Lawrence Livermore National Laboratory's (LLNL's) compliance with environmental standards and requirements, describe LLNL's environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites - the Livermore site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL's Environmental Protection Department. Submittal of the report satisfies requirements under DOE Order 231.1A, Environmental Safety and Health Reporting, and DOE Order 5400.5, Radiation Protection of the Public and Environment. The report is distributed electronically and is available at https://saer.llnl.gov/, the website for the LLNL annual environmental report. Previous LLNL annual environmental reports beginning in 1994 are also on the website. Some references in the electronic report text are underlined, which indicates that they are clickable links. Clicking on one of these links will open the related document, data workbook, or website that it refers to. The report begins with an executive summary, which provides the purpose of the report and an overview of LLNL's compliance and monitoring results. The first three chapters provide background information: Chapter 1 is an overview of the location, meteorology, and hydrogeology of the two LLNL sites; Chapter 2 is a summary of LLNL's compliance with environmental regulations; and Chapter 3 is a description of LLNL's environmental programs with an emphasis on the Environmental Management System including pollution prevention. The majority of the report covers LLNL's environmental monitoring programs and monitoring data for 2010: effluent and ambient air (Chapter 4); waters, including wastewater, storm water runoff, surface water, rain, and groundwater (Chapter 5); and terrestrial, including soil, sediment, vegetation, foodstuff, ambient radiation, and special status wildlife and plants (Chapter 6). Complete monitoring data, which are summarized in the body of the report, are provided in Appendix A. The remaining three chapters discuss the radiological impact on the public from LLNL operations (Chapter 7), LLNL's groundwater remediation program (Chapter 8), and quality assurance for the environmental monitoring programs (Chapter 9). The report uses System International units, consistent with the federal Metric Conversion Act of 1975 and Executive Order 12770, Metric Usage in Federal Government Programs (1991). For ease of comparison to environmental reports issued prior to 1991, dose values and many radiological measurements are given in both metric and U.S. customary units. A conversion table is provided in the glossary.

54 ENVIRONMENTAL SCIENCES↗

Carbon Life Cycle Analysis of CO 2 -EOR for Net Carbon Negative Oil (NCNO) Classification (Final Report)

This final report summarizes the work that was conducted to achieve the project’s general objective of developing a clear and repeatable methodology to determine whether the oil produced in a conventional CO 2 enhanced oil recovery (CO 2 -EOR) operation can be classified as Net Carbon Negative Oil (NCNO). The report also summarizes the reservoir mass accounting methodology and the monitoring, verification, and accounting (MVA) methodology, which are critical elements that support the general objective and were conceived as project goals. Because the purpose is to classify the EOR product (crude oil) and not the EOR project itself, and as the rate of crude oil production varies significantly with time, the methodology uses a novel dynamic carbon lifecycle analysis (d-LCA) that links instant energy demand and associated greenhouse gas (GHG) emissions to instant operational performance. The EOR operational performance is assessed through CO 2 utilization rates, which relate usage of CO 2 to oil production This dynamic method provides a better understanding of the evolution of the environmental impact (CO 2 emissions) and mitigation (geologic CO 2 storage) associated with an expanded carbon capture, utilization and storage (CCUS) system, from start to closure of operations. The dynamic interplay between operational and environmental performance forms the basis of our CCUS technology analysis. The LCA part of the work is meant to complement previous NETL LCA work, and so it focused on EOR/storage efficiency, its variability through time, and the impact of this variability on LCA results. The environmental impact of the CCUS system was assessed for 3 system boundaries: (1) gate-to-gate, (2) gate-to-grave, and (3) cradle-to-grave. The environmental impact was also assessed considering the electricity displacement from other generation facilities. Another goal of our study was to use results to make recommendations on EOR field development strategies that are conducive to producing NCNO. Because field operational strategies have a significant impact on reservoir engineering parameters that affect both CO 2 storage and oil production (e.g., sweep efficiency, flood conformance, fluid saturation distribution), we conducted a scenario analysis that assesses the operational and environmental performance of four common and novel CO 2 -EOR field development strategies. Results show that all CO 2 -EOR evaluated scenarios start operating with a negative carbon footprint and, years into the project, transition into operating with a positive carbon footprint. Having achieved a result that proves that all CO 2 -EOR operations produce NCNO during the first years of production is critical in the context of the urgency of climate change mitigation. Transition points are significantly different in each scenario. ii In a cradle-to-grave CCUS system, if the capture facility displaces a conventional power source and credits are added for displacement, the adverse impact caused by the system expansion not only is reversed but transformed into a significant environmental benefit. The effect of the displacement more than compensates the emissions associated with the electricity generation requirements for the production of CO 2 , as much more electricity will be displaced. Results provide an understanding of the evolution of the system’s net carbon balance of all four field development strategies studied. This information can be useful to CO 2 -EOR operators seeking value in storing more CO 2 through a carbon credit program (e.g., the 45Q federal carbon credit program). Most importantly, this study serves as confirmation that CO 2 -EOR can be operationally designed to both enhance oil production and reduce greenhouse gas emissions to the atmosphere.

02 PETROLEUM↗

Environmental Report 2007

The purposes of the 'Lawrence Livermore National Laboratory Environmental Report 2007' are to record Lawrence Livermore National Laboratory's (LLNL's) compliance with environmental standards and requirements, describe LLNL's environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites--the Livermore site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL's Environmental Protection Department. Submittal of the report satisfies requirements under DOE Order 231.1A, Environmental Safety and Health Reporting, and DOE Order 5400.5, Radiation Protection of the Public and Environment. The report is distributed electronically and is available at https://saer.lln.gov/, the website for the LLNL annual environmental report. Previous LLNL annual environmental reports beginning in 1994 are also on the website. Some references in the electronic report text are underlined, which indicates that they are clickable links. Clicking on one of these links will open the related document, data workbook, or website that it refers to. The report begins with an executive summary, which provides the purpose of the report and an overview of LLNL's compliance and monitoring results. The first three chapters provide background information: Chapter 1 is an overview of the location, meteorology, and hydrogeology of the two LLNL sites; Chapter 2 is a summary of LLNL's compliance with environmental regulations; and Chapter 3 is a description of LLNL's environmental programs with an emphasis on the Environmental Management System including pollution prevention. The majority of the report covers LLNL's environmental monitoring programs and monitoring data for 2007: effluent and ambient air (Chapter 4); waters, including wastewater, storm water runoff, surface water, rain, and groundwater (Chapter 5); and terrestrial, including soil, sediment, vegetation, foodstuff, ambient radiation, and special status wildlife and plants (Chapter 6). Complete monitoring data, which are summarized in the body of the report, are provided in Appendix A. The remaining three chapters discuss the radiological impact on the public from LLNL operations (Chapter 7), LLNL's groundwater remediation program (Chapter 8), and quality assurance for the environmental monitoring programs (Chapter 9). The report uses Systeme International units, consistent with the federal Metric Conversion Act of 1975 and Executive Order 12770, Metric Usage in Federal Government Programs (1991). For ease of comparison to environmental reports issued prior to 1991, dose values and many radiological measurements are given in both metric and U.S. customary units. A conversion table is provided in the glossary.

54 ENVIRONMENTAL SCIENCES↗

Environmental Report 2008

The purposes of the Lawrence Livermore National Laboratory Environmental Report 2008 are to record Lawrence Livermore National Laboratory's (LLNL's) compliance with environmental standards and requirements, describe LLNL's environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites - the Livermore site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL's Environmental Protection Department. Submittal of the report satisfies requirements under DOE Order 231.1A, Environmental Safety and Health Reporting, and DOE Order 5400.5, Radiation Protection of the Public and Environment. The report is distributed electronically and is available at https://saer.lln.gov/, the website for the LLNL annual environmental report. Previous LLNL annual environmental reports beginning in 1994 are also on the website. Some references in the electronic report text are underlined, which indicates that they are clickable links. Clicking on one of these links will open the related document, data workbook, or website that it refers to. The report begins with an executive summary, which provides the purpose of the report and an overview of LLNL's compliance and monitoring results. The first three chapters provide background information: Chapter 1 is an overview of the location, meteorology, and hydrogeology of the two LLNL sites; Chapter 2 is a summary of LLNL's compliance with environmental regulations; and Chapter 3 is a description of LLNL's environmental programs with an emphasis on the Environmental Management System including pollution prevention. The majority of the report covers LLNL's environmental monitoring programs and monitoring data for 2008: effluent and ambient air (Chapter 4); waters, including wastewater, storm water runoff, surface water, rain, and groundwater (Chapter 5); and terrestrial, including soil, sediment, vegetation, foodstuff, ambient radiation, and special status wildlife and plants (Chapter 6). Complete monitoring data, which are summarized in the body of the report, are provided in Appendix A. The remaining three chapters discuss the radiological impact on the public from LLNL operations (Chapter 7), LLNL's groundwater remediation program (Chapter 8), and quality assurance for the environmental monitoring programs (Chapter 9). The report uses Systeme International units, consistent with the federal Metric Conversion Act of 1975 and Executive Order 12770, Metric Usage in Federal Government Programs (1991). For ease of comparison to environmental reports issued prior to 1991, dose values and many radiological measurements are given in both metric and U.S. customary units. A conversion table is provided in the glossary. The report is the responsibility of LLNL's Environmental Protection Department. Monitoring data were obtained through the combined efforts of the Environmental Protection Department; Environmental Restoration Department; Physical and Life Sciences Environmental Monitoring Radiation Laboratory; and the Hazards Control Department.

54 ENVIRONMENTAL SCIENCES↗

Holistic Energy Management Yields Cost Savings and Resilience Benefits for the U.S. Coast Guard Academy

As the U.S. Coast Guard's third largest energy consumer, the 86-year-old Coast Guard Academy in New London, Connecticut, was ripe for an energy management overhaul. That overdue overhaul was made possible by the largest utility energy service contract (UESC) in U.S. Department of Homeland Security history. Awarded in September 2017, the $72.6 million contract provided for $39 million in capital improvements and is expected to cut total energy costs by 80% - more than $2 million - each year. On-site generation of 82% of the site's electricity needs will dramatically improve site-wide resilience, and savings generated from implementation of the project will pay for all project costs. The UESC project team developed and executed an energy management project to meet several priority objectives, including implementing essential infrastructure improvements, increasing reliability, and enhancing resilience - and engaged the Federal Energy Management Program (FEMP) Utility Partnerships Program for project assistance.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Federal Activities Report on the Bioeconomy: Algae

The Algae Interagency Working Group under the Biomass Research and Development (BR&D) Board meets to discuss U.S. federal funding and regulatory activities to increase awareness and coordination among algae relevant government programs. The Federal Activities Report on the Bioeconomy: Algae is a follow on report to the BR&D Board’s Federal Activities Report on the Bioeconomy that summarizes Bioeconomy Initiative activities for the algae stakeholder community.

09 BIOMASS FUELS↗

Techniques to improve maneuver stability characteristics of a nonlinear wide-body transport airplane in cruise flight

The maneuver control stability characteristics of an aircraft are a flying qualities parameter of critical importance, to ensure structural protection as well as adequate predictability to the pilot. Currently, however, maneuver stability characteristics are not uniquely addressed in the Federal Aviation Regulations (FAR) Part 25, for transport aircraft. In past transport category certification programs, the Federal Aviation Administration (FAA) has used a combination of requirements (longitudinal control, vibration and buffeting, high-speed characteristics, and out-of-trim characteristics) to ensure safe and controllable maneuver stability characteristics over a range of flight conditions and airplane configurations. Controversies exist regarding each of these regulations, however, and considerable expenditures in terms of design studies and testing time have resulted from the requirements. It is also recognized that additional engineering guidance is needed for identifying acceptable nonlinear maneuver stability characteristics, particularly as they relate to relaxed stability, highly augmented transport configurations. The current trend in large aircraft design is toward relaxed, or even negative, static margins for improved fuel efficiency. The advanced flight control systems developed for these aircraft, in many instances, have rendered current aforementioned maneuver stability criteria either too stringent or of little practical use. Current design requirements do not account for these advanced designs. The objective was to evaluate a broad spectrum of linear and nonlinear longitudinal stability characteristics to generate data for defining satisfactory and unacceptable maneuver characteristics, as defined by pilot opinion. Primary emphasis was placed on two techniques of varying column force per normal acceleration. This study was a joint venture with four pilots participating; one from NASA, one from the FAA, and two from industry.

Grantham, William D.↗

FEMP Renewable Energy Program Overview

Fact sheet describing how the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP) provides Federal agencies with information, guidance, and assistance in using renewable energy.

Department of Energy↗

Curation of Federally Owned Archeological Collections at NASA Langley Research Center

As a Federal agency, NASA has a moral and legal obligation to the public to manage the archeological heritage resources under its control. Archeological sites are unique, nonrenewable resources that must be preserved so that future generations may experience and interpret the material remains of the past. These sites are protected by a wide array of federal regulations. These regulations are intended to ensure that our nation's cultural heritage is preserved for the study and enjoyment of future generations. Once a site has been excavated, all that remains of it are the artifacts and associated records which, taken together, allow researchers to reconstruct the past. With the contextual information provided by associated records such as field notes, maps and photographs, archeological collections can provide important information about life in the past. An integral component of the federal archeology program is the curation of these databases so that qualified scholars will have access to them in years to come. Standards for the maintenance of archeological collections have been codified by various professional organizations and by the federal government. These guidelines focus on providing secure, climate-controlled archival storage conditions for the collections and an adequate study area in which researchers can examine the artifacts and documents. In the 1970's and early 1980's, a group of NASA employees formed the LRC Historical and Archeological Society (LRCHAS) in order to pursue studies of the colonial plantations that ha been displaced by Langley Research Center (LaRC). They collected data on family histories and land ownership as well as conducting archeological surveys and excavations at two important 17th-20th century plantation sites in LaRC, Cloverdale and Chesterville. The excavations produced a wealth of information in the form of artifacts, photographs, maps and other documents. Unfortunately, interest on the part of the LRCHAS membership waned before a report was written, and since 1982 the artifacts have moldered in a flimsy trailer with no climate controls, which had once served as a field laboratory but which threatened to become a tomb for the collection. A recent analysis of Langley's cultural resources by Gray & Pape, Inc. recommended that the collection be organized, cataloged, and placed in a proper curation facility in accordance with Federal regulations. The project for the LARSS program was to research curation standards, organize the collection, catalog it, and prepare it for transfer to a facility which could provide adequate long-term curation conditions for the artifacts and documents. The first phase was to organize the artifacts, which were lying about the lab in various stages of cleaning, analysis, and conservation. Once all of the artifacts from the various excavation units and levels had been regrouped, they were cleaned and/or repackaged in archivally-stable materials. A basic catalog was prepared which will provide interested parties with a rough idea of what we have and where it can be found. Another aspect of the project was to organize the records left by the LRCHAS. Bundles of papers, photographs, and field data found in every corner and drawer of the laboratory trailer were put into order and, where appropriate, copies were made on acid-free Permabond paper for long term storage. Finally, the entire collection and most of the lab equipment was transferred into a secure, climate controlled room which will serve as an archive and study space for qualified scholars interested in exploring LaRC's rich historical heritage.

Eastman, John Arnold↗

Performance Assurance Planning Guide for Utility Energy Service Contracts: 2025 Edition

Administered by the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP), the Utility Program has fostered collaboration among federal agencies and their serving utilities for more than 25 years. The Utility Program supports agencies using Utility Energy Service Contracts (UESCs), a well-developed, effective contracting vehicle that enable the latest approaches to cost-effective energy management at federal sites. Federal agencies have successfully used UESCs to award over 2,000 energy and water efficiency and renewable energy projects, investing approximately $\$$2.8 billion in furthering the Federal Government's efforts to reduce energy intensity. Authorized by 42 U.S. Code section 8256 (10 U.S. Code section 2913 for the Department of Defense), a UESC is a limited-source acquisition between a federal agency and an eligible serving utility for energy management services that generate savings from the implementation of energy- and water -conservation measures (collectively referred to as ECMs), with 42 U.S. Code section 8287 (Defense Federal Acquisition Regulation Supplement, Part 241), providing the term of a UESC, which may extend up to 25 years. Through a UESC, the utility partner assesses designs, and implements the desired ECMs - which can range from lighting retrofits and renewable energy systems, to combined heat and power plants or other technologies and strategies, and may provide financing for the project. The agency may use any combination of appropriations and third-party financing to pay for the project, providing useful flexibility. There is no limit to the project size, big or small, that can be implemented using a UESC. To assist agencies implementing a UESC, FEMP has developed a Utility Energy Service Contract Guide and this companion guidance document to help agencies and their utility partners better understand the best practices for to ensure UESCs continue to perform and generate savings throughout their performance period. These best practices utilize a combination of effective project management, communication, documentation, and a detailed Performance Assurance Plan. This plan is a project specific set of actionable protocols that define important tasks and responsibilities throughout the contract term and reflects the site conditions, complexities, agency capabilities, and operating and maintaining planned ECMs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Using National-Scale Data to Inform Coal Power Plant Redevelopment and Coal Community Revitalization Planning

In the United States, individual coal plants have high variation in their construction and operation. Coal plants commonly have multiple units, with different commissioning ages, operational position, and maintenance conditions – even multiple fuels. These units may be in changing states of utilization, with variation in productivity depending on economic contexts. Coal plants themselves may be temporarily offline, mothballed, retired, or decommissioned due to owner/operator portfolios or market conditions, and the current posture of the plant may be difficult to ascertain without local news sources (Tarekegne et al. 2021). Anticipated dates of plant closures are prospectively represented to regulators and to the Energy Information Administration (EIA), but may also experience uncertainty due to the engineering, environmental, economic and social complexity of closing a very large power plant. As noted in this report, closure of the first unit to the last within a single plant may span more than 20 years. Yet tracking and predicting the position of our nation’s coal fleets on a national scale is deeply important. In developing a case for federal datasets and an approach to building and curating these data, this report identified that data must have high fidelity at the plant-level to be meaningful in aggregate. Plant-scale detail is also a match for its application: national priorities in federal investment range from economic revitalization for coal plant communities to maintaining reliable electric grid operations. This document is organized into a statistical review of coal plant retirements, past and prospective, in the United States; trends in the relationship between closures and existing federal investment programs for community revitalization; and potential methods for accelerating site redevelopment through advanced geospatial analysis based on federal data.

01 COAL, LIGNITE, AND PEAT↗

Columbia River Hatchery Reform System-Wide Report.

The US Congress funded the Puget Sound and Coastal Washington Hatchery Reform Project via annual appropriations to the US Fish and Wildlife Service (USFWS) beginning in fiscal year 2000. Congress established the project because it recognized that while hatcheries have a necessary role to play in meeting harvest and conservation goals for Pacific Northwest salmonids, the hatchery system was in need of comprehensive reform. Most hatcheries were producing fish for harvest primarily to mitigate for past habitat loss (rather than for conservation of at-risk populations) and were not taking into account the effects of their programs on naturally spawning populations. With numerous species listed as threatened or endangered under the Endangered Species Act (ESA), conservation of salmon in the Puget Sound area was a high priority. Genetic resources in the region were at risk and many hatchery programs as currently operated were contributing to those risks. Central to the project was the creation of a nine-member independent scientific review panel called the Hatchery Scientific Review Group (HSRG). The HSRG was charged by Congress with reviewing all state, tribal and federal hatchery programs in Puget Sound and Coastal Washington as part of a comprehensive hatchery reform effort to: conserve indigenous salmonid genetic resources; assist with the recovery of naturally spawning salmonid populations; provide sustainable fisheries; and improve the quality and cost-effectiveness of hatchery programs. The HSRG worked closely with the state, tribal and federal managers of the hatchery system, with facilitation provided by the non-profit organization Long Live the Kings and the law firm Gordon, Thomas, Honeywell, to successfully complete reviews of over 200 hatchery programs at more than 100 hatcheries across western Washington. That phase of the project culminated in 2004 with the publication of reports containing the HSRG's principles for hatchery reform and recommendations for Puget Sound/Coastal Washington hatchery programs, followed by the development in 2005 of a suite of analytical tools to support application of the principles (all reports and tools are available at www.hatcheryreform.us). In 2005, Congress directed the National Oceanic and Atmospheric Administration-Fisheries (NOAA Fisheries) to replicate the Puget Sound and Coastal Washington Hatchery Reform Project in the Columbia River Basin. The HSRG was expanded to 14 members to include individuals with specific knowledge about the Columbia River salmon and steelhead populations. This second phase was initially envisioned as a one-year review, with emphasis on the Lower Columbia River hatchery programs. It became clear however, that the Columbia River Basin needed to be viewed as an inter-connected ecosystem in order for the review to be useful. The project scope was subsequently expanded to include the entire Basin, with funding for a second year provided by the Bonneville Power Administration (BPA) under the auspices of the Northwest Power and Conservation Council's (NPCC) Fish and Wildlife Program. The objective of the HSRG's Columbia River Basin review was to change the focus of the Columbia River hatchery system. In the past, these hatchery programs have been aimed at supplying adequate numbers of fish for harvest as mitigation primarily for hydropower development in the Basin. A new, ecosystem-based approach is founded on the idea that harvest goals are sustainable only if they are compatible with conservation goals. The challenge before the HSRG was to determine whether or not conservation and harvest goals could be met by fishery managers and, if so, how. The HSRG determined that in order to address these twin goals, both hatchery and harvest reforms are necessary. The HSRG approach represents an important change of direction in managing hatcheries in the region. It provides a clear demonstration that current hatchery programs can indeed be redirected to better meet both conservation and harvest goals. For each Columbia River Basin Environmentally Significant Unit (ESU), Distinct Population Segment (MPG) or Major Population Group (MPG) reviewed, the HSRG presents its findings and recommendations in the form of an HSRG solution. This package of recommended changes to current hatchery and harvest program design and operation is intended to demonstrate how the programs could be managed to significantly increase the likelihood of meeting the managers goals for both harvest and conservation of the ESU/DPS/MPG. The 'HSRG solution' also highlights the biological principles that the HSRG believes must form the foundation for successful use of hatcheries and fisheries as management tools.

13 HYDRO ENERGY↗

Natural Capital Management: An Evolutionary Paradigm for Sustainable Restoration Investment - 13455

Unlike other forms of capital assets (built infrastructure, labor, financial capital), the supply of usable or accessible air, land, and water elements (termed Natural Capital Assets or NCA) available to enterprise processes is structurally shrinking due to increased demand and regulatory restriction. This supply/demand imbalance is affecting all forms of public and private enterprise (including Federal Facilities) in the form of encroachment, production limits, cost increases, and reduced competitiveness. Department of Energy (DOE) sites are comprised of significant stocks of NCA that function as both conserved capital (providing ecosystem services and other reserve capacity), and as natural infrastructure (supporting major Federal enterprise programs). The current rubric of 'Environmental Stewardship' provides an unduly constrained management paradigm that is focused largely on compliance process metrics, and lacks a value platform for quantifying, documenting, and sustainably re-deploying re-capitalized natural asset capacity and capability. By adopting value-based system concepts similar to built infrastructure accounting and information management, 'stewarded' natural assets relegated to liability- or compliance-focused outcomes become 're-capitalized' operational assets able to support new or expanded mission. This growing need for new accounting and management paradigms to capture natural capital value is achieving global recognition, most recently by the United Nations, world leaders, and international corporations at the Rio+20 Summit in June of 2012. Natural Capital Asset Management (NCAM){sup TM} is such an accounting framework tool. Using a quantification-based design, NCAM{sup TM} provides inventory, capacity and value data to owners or managers of natural assets such as the DOE that parallel comparable information systems currently used for facility assets. Applied to Environmental Management (EM) and other DOE program activities, the natural asset capacity and value generated by EM projects and other investment and operational programming can be recorded and then allocated to mission and/or ecosystem needs as part of overall site, complex, and Federal decision-making. NCAM{sup TM} can also document post-restoration asset capability and value for use in weighing loss mitigation and ecosystem damage claims arising from past operational activities. A prototype NCAM{sup TM} evaluation developed at the Savannah River Site (SRS) demonstrates use of this framework as an advanced paradigm for NCA accounting and decision-making for the larger DOE complex and other enterprise using natural capital in operations. Applying a quantified value paradigm, the framework catalogues the results of activities that sustain, restore, and modernize natural assets for enterprise-wide value beyond that of compliance milestones. Capturing and assigning recapitalization value using NCAM{sup TM} concepts and tools improves effective reuse of taxpayer-sustained assets, records ecosystem service value, enables mission and enterprise optimization, and assures the sustainability of shared natural capital assets in regional pools vital to both complex sites and local and regional economies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

International Workshop on Next Generation Gamma-Ray Source

A workshop on The Next Generation Gamma-Ray Sources , sponsored by the Office of Nuclear Physics at the Department of Energy, was held November 17--19, 2016 in Bethesda, Maryland. The goals of the workshop were to identify basic and applied research opportunities at the frontiers of nuclear physics that would be made possible by the beam capabilities of an advanced laser Compton beam facility. To anchor the scientific vision to realistically achievable beam specifications using proven technologies, the workshop brought together experts in the fields of electron accelerators, lasers, and optics to examine the technical options for achieving the beam specifications required by the most compelling parts of the proposed research programs. An international assembly of participants included current and prospective $\gamma$-ray beam users, accelerator and light-source physicists, and federal agency program managers. Sessions were organized to foster interactions between the beam users and facility developers, allowing for information sharing and mutual feedback between the two groups. The workshop findings and recommendations are summarized in this report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

REopt Screenings Catalyze Development of Hundreds of Megawatts of Renewable Energy for Federal Agencies

The U.S. Department of Energy's (DOE's) Federal Energy Management Program (FEMP) offers project assistance to federal agencies, which often begins with a desktop screening to develop a prioritized portfolio of renewable energy project opportunities. FEMP uses the National Renewable Energy Laboratory's (NREL) REopt energy planning platform to quickly and efficiently screen potential renewable energy opportunities at a single site or across a range of sites. REopt helps organizations prioritize the most economically and technically viable projects for further study, and identifies the size and mix of technologies that meet the organization's goals at minimum cost, along with the optimal operating strategies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗