Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Facility location”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Simulating the Impact Response of Three Full-Scale Crash Tests of Cessna 172 Aircraft

During the summer of 2015, a series of three full-scale crash tests were performed at the Landing and Impact Research Facility located at NASA Langley Research Center of Cessna 172 aircraft. The first test (Test 1) represented a flare-to-stall emergency or hard landing onto a rigid surface. The second test (Test 2) represented a controlled-flight- into-terrain (CFIT) with a nose down pitch attitude of the aircraft, which impacted onto soft soil. The third test (Test 3) also represented a CFIT with a nose up pitch attitude of the aircraft, which resulted in a tail strike condition. Test 3 was also conducted onto soft soil. These crash tests were performed for the purpose of evaluating the performance of Emergency Locator Transmitters and to generate impact test data for model calibration. Finite element models were generated and impact analyses were conducted to simulate the three impact conditions using the commercial nonlinear, transient dynamic finite element code, LS-DYNA®. The objective of this paper is to summarize test-analysis results for the three full-scale crash tests.

Jackson, Karen E.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, SLS is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress is on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance (ULA) in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the OSA and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center (MSFC) in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 t to LEO, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the EUS, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the proving ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations program is transforming Kennedy Space Center into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the Exploration Upper Stage, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the Proving Ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Finite Element Simulations of Two Vertical Drop Tests of F-28 Fuselage Sections

In March 2017, a vertical drop test of a forward fuselage section of a Fokker F-28 MK4000 aircraft was conducted as part of a joint NASA/FAA project to investigate the performance of transport aircraft under realistic crash conditions. In June 2017, a vertical drop test was conducted of a wing-box fuselage section of the same aircraft. Both sections were configured with two rows of aircraft seats, in a triple-double configuration. A total of ten Anthropomorphic Test Devices (ATDs) were secured in seats using standard lap belt restraints. The forward fuselage section was also configured with luggage in the cargo hold. Both sections were outfitted with two hat racks, each with added ballast mass. The drop tests were performed at the Landing and Impact Research facility located at NASA Langley Research Center in Hampton, Virginia. The measured impact velocity for the forward fuselage section was 346.8-in/s onto soil. The wing-box section was dropped with a downward facing pitch angle onto a sloping soil surface in order to create an induced forward acceleration in the airframe. The vertical impact velocity of the wing-box section was 349.2-in/s. A second objective of this project was to assess the capabilities of finite element simulations to predict the test responses. Finite element models of both fuselage sections were developed for execution in LS-DYNA(Registered Trademark), a commercial explicit nonlinear transient dynamic code. The models contained accurate representations of the airframe structure, the hat racks and hat rack masses, the floor and seat tracks, the luggage in the cargo hold for the forward section, and the detailed under-floor structure in the wing-box section. Initially, concentrated masses were used to represent the inertial properties of the seats, restraints, and ATD occupants. However, later simulations were performed that included finite element representations of the seats, restraints, and ATD occupants. These models were developed to more accurately replicate the seat loading of the floor and to enable prediction of occupant impact responses. Models were executed to generate analytical predictions of airframe responses, which were compared with test data to validate the model. Comparisons of predicted and experimental structural deformation and failures were made. Finally, predicted and experimental soil deformation and crater depths were also compared for both drop test configurations.

Jackson, Karen E.↗

Vertical Drop Test and Simulation of a Fokker F-28 Fuselage Section

In March 2017, a vertical drop test of a 3.048-m(10-ft) section of a Fokker F-28 aircraft was conducted as a part of a joint NASA/FAA effort to investigate the performance of transport aircraft under realistic crash conditions. The section was configured with two rows of aircraft seats, in a triple-double configuration. A total of ten Anthropomorphic Test Devices (ATDs) were secured in the seats using standard seat belt restraints. The section was also configured with luggage in the cargo hold. Two hat racks were added, each with mass loading of 37.2-kg per linear meter (25-lb/ft). The drop test was performed at the Landing and Impact Research facility located at NASA Langley Research Center in Hampton, Virginia. The planned impact velocity was 9.144-m/s (360-in/s) onto soil. A second objective was to assess the capabilities of finite element simulations to predict the test response. A finite element model was developed for execution in LS-DYNA, a commercial explicit nonlinear transient dynamic code. The model contained accurate representations of the airframe structure, the hat racks and hat rack masses, the floor and seat tracks, and the luggage in the cargo hold. Concentrated masses were used to represent the inertial properties of the seats, restraints, and ATD occupants. The model was executed to generate analytical predictions of airframe responses, which were compared with test data to validate the model.

Jackson, K. E.↗

Orion Capsule Parachute Assembly System (CPAS) Overload Testing Approach and Results

The qualification of the Orion Capsule Parachute Assembly System (CPAS) system includes exposure to loads and dynamic pressures above the required values as validation of the parachutes' structural integrity. As outlined in the certification plan, each of the four parachutes of the system are to be subjected to 110% of their respective maximum dynamic pressure requirements. The Main and Drogue parachutes have satisfied this overload condition in drop testing and due to cost and schedule constraints, the Forward Bay Cover Parachute (FBCP) and Pilot parachute were subjected to the overload condition in the ground testing described in this document. The test objectives and pass/fail criteria were established and require the parachutes to achieve and maintain a target riser load (associated with a minimum of 110% dynamic pressure overload) for a minimum of three seconds while sustaining no failures of any structural members (vent hoop, radials, suspension line) or any damage which propagates into catastrophic failure of the canopy. Considering the assumptions and limitations associated with the ground testing (primarily non-uniform flow field of the ground test system and variations in parachute manufacturing), a method of establishing the desired overload condition was determined by the technical community and covers the 2-sigma bounds of the drag area distribution derived from drop testing. On June 27, 2017 the testing was executed at the High Velocity Airflow System (HiVAS) facility located at the Weapon Survivability Laboratory (WSL) at the Naval Air Warfare Center, Weapons Division (NAWCWD) China Lake. Engineering Development Unit (EDU) parachutes were used as pathfinders to gain experience with achieving the test conditions. Additional runs were executed to measure the airflow at the same location as the canopy skirt, although this data is not required to satisfy the test objectives and parachute pass/fail criteria. The qualification parachutes were successfully exposed to the target conditions and sustained only minor damage.

Daum, Jared S.↗

Calibration Probe Uncertainty and Validation for the Hypersonic Material Environmental Test System

This paper presents an uncertainty analysis of the stagnation-point calibration probe surface predictions for conditions that span the performance envelope of the Hypersonic Materials Environmental Test System facility located at NASA Langley Research Center. A second-order stochastic expansion was constructed over 47 uncertain parameters to evaluate the sensitivities, identify the most significant uncertain variables, and quantify the uncertainty in the stagnation-point heat flux and pressure predictions of the calibration probe for a low- and high-enthalpy test condition. A sensitivity analysis showed that measurement bias uncertainty is the most significant contributor to the stagnation-point pressure and heat flux variance for the low-enthalpy condition. For the high-enthalpy condition, a paradigm shift in sensitivities revealed the computational fluid dynamics model input uncertainty as the main contributor. A comparison between the prediction and measurement of the stagnation-point conditions under uncertainty showed that there was evidence of statistical disagreement. A validation metric was proposed and applied to the prediction uncertainty to account for the statistical disagreement when compared to the possible stagnation-point heat flux and pressure measurements.

Brune, Andrew J.↗

Components Refurbishment and Chemical Analysis Facility Hot Spot 1 Year 2 Annual Performance Monitoring Report

The Performance Monitoring Report presents the Year 2 operations, maintenance, and monitoring (OM&M) activities for the hydraulic containment system (HCS) Interim Measures (IM) at the Components Refurbishment and Chemical Analysis (CRCA) Facility located at John F. Kennedy Space Center (KSC), Florida. Year 2 operations extended from September 2020 to August 2021 and included: operation, maintenance and monitoring of the HCS; performance monitoring through collection of groundwater samples; and sub-slab gas and ambient air sampling. The existing hydrogeologic model was also updated. The system is performing as designed, and groundwater data demonstrate contaminant reduction.

CRCA↗

Noise Impact Analysis for Urban Air Mobility in Dallas-Fort Worth Metroplex

This study supports re-design of airspace and procedures for management of Urban Air Mobility (UAM) fleet operations in a given metropolitan area. A goal of UAM is to maintain geographic separation of UAM flight tracks from densely populated areas in order to reduce the potential negative community impact of UAM and manage flight trajectory in anticipation of allowable noise levels and current land use. A UAM route inventory and a demographic-data-optimized topographic map are developed for the Dallas-Fort Worth metroplex to identify routes or baseline route segments for reduction of noise impact. Noise contours are computed for baseline route and alternative route design given the desired UAM demand level. The impact of UAM fleet noise is predicted based on predicted number of people and noise-sensitive facilities located inside the noise contours.

Urban Air Mobility↗

Noise Impact Analysis for Urban Air Mobility in Dallas-Fort Worth Metroplex

This study supports re-design of airspace and procedures for management of Urban Air Mobility (UAM) fleet operations in a given metropolitan area. A goal of UAM is to maintain geographic separation of UAM flight tracks from densely populated areas in order to reduce the potential negative community impact of UAM and manage flight trajectory in anticipation of allowable noise levels and current land use. A UAM route inventory and a demographic-data-optimized topographic map are developed for the Dallas-Fort Worth metroplex to identify routes or baseline route segments for reduction of noise impact. Noise contours are computed for baseline route and alternative route design given the desired UAM demand level. The impact of UAM fleet noise is predicted based on predicted number of people and noise-sensitive facilities located inside the noise contours.

Urban Air Mobility↗

Sample Return and Preliminary Examination Timeline for the OSIRIS-REx Mission

NASA’s OSIRIS-REx spacecraft collected a sample of asteroid (101955) Bennu on October 20, 2020, using the Touch-and-Go Sample Acquisition Mechanism (TAGSAM) [1,2,3]. After sample acquisition, the TAGSAM collection head was stowed in the Sample Return Capsule (SRC; Fig. 1) for transport back to Earth. On September 24, 2023, the OSIRIS-Rex spacecraft will fly by Earth and release the SRC, which will land at the Utah Test and Training Range (UTTR). The sample will be transported to the OSIRIS-REx curation facility, located within NASA’s Johnson Space Center (JSC), where it will be examined, cataloged, and allocated for scientific analyses. Here we describe the timeline of operations for the return, recovery, and initial characterization of the Bennu sample.

Asteroid↗

Subsonic Ultra Green Aircraft Research: Phase V – Buffet Test Report

This test report summarizes work performed by the Boeing Subsonic Ultra-Green Aircraft Research (SUGAR) team in the Phase V Transonic Truss-Braced Wing contract task. The task was awarded in September 2020, and ended at the end of September 2022. As a part of the SUGAR Phase V contract task, Boeing developed a wind tunnel test plan, model requirements, then fabricated and conducted a dedicated transonic buffet wind tunnel test. The test focused on the investigation of buffet onset, and the ability to accurately predict buffet onset for the TTBW configuration. This report summarizes the results and post-test analysis of the 9% scale, semispan, Transonic Truss-Braced Wing (TTBW) transonic buffet model tested at the NASA Ames Research Center Unitary Plan Wind Tunnel (UPWT) 11-Foot Transonic Wind Tunnel (11-Ft TWT) facility located at Moffett Field, CA. It was tested from January 24, 2022, through February 18, 2022. The wind tunnel test was successful in capturing buffet onset at the model design dynamic pressure. Multiple configurations were tested starting in the wing-body-strut configuration and ending with the full configuration including wing-body-strut-nacelle/pylon, and flap hinge. The test also measured the effect of control surface deflections (ailerons and spoilers), as well as the effect of an outboard strut flap. Steady data collected during the test included standard force and moment measurements, as well as wing, strut, nacelle, and body (fuselage) static pressures. These data were collected in a standard pitch-pause mode. Unsteady data captured in the test, collected in continuous pitch mode, included wing and strut dynamic pressures, accelerations, and strains. According to test data, previous concerns regarding critical buffet onset on the strut (at low vehicle lift coefficient) and in the wing-strut channel have been mitigated. Buffet onset on the TTBW appears to follow conventional wing-induced buffet onset mechanisms. However, the critical station where buffet onset first occurs has moved inboard to the wing-strut juncture span location (55-60% span) from the typical ~70% span location. Test data obtained by unsteady pressure transducers provided a good match to expected buffet onset modes. An assessment of different tools and methodologies for predicting buffet onset was conducted. Reasonable agreement was found for buffet boundary predictions between most of the methods examined when using a forward trip location, with the greatest discrepancies from the pitching moment break and trailing edge pressure divergence methods. When an aft trip location was used the buffet boundary predictions diverged more significantly from unsteady pressure measurements. In addition, good agreement between the buffet onset trends were found when the Reynolds number, configuration, or spanload was changed.

strut↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 SWMU #041 Year 3 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 3 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 3 PMR extends from September 2021 through October 2022. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 3 reporting period was approximately 91%, with the majority of downtime attributed to system maintenance and repair. This is generally consistent with Year 1 and Year 2 runtimes of 85% and 92%, respectively. To help reduce downtime, an anti-scaling amendment, Redux 390, has been used to reduce scaling and help maintain system design parameters. Over nine million gallons of groundwater were treated during Year 3 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 97%. This PMR describes the activities that were performed during Year 3 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 3 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 3 plume conditions. Therefore, it can be assumed that the projected path remains valid for transition to MNA in one to two years of continuous HCS operation. The contents of this Year 3 PMR were presented during the February 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Replacement of MW0019 and VMP04 was also recommended, as well as additional direct-push technology sampling to further delineate the downgradient plume and confirm overall site-wide low-concentration plume boundaries. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 Solid Waste Management Unit #041 Year 4 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 4 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 4 PMR extends from November 2022 through September 2023. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 4 reporting period was approximately 94%, with the majority of downtime attributed to associated groundwater sampling events, maintenance, and Hurricane Nicole. Almost five million gallons of groundwater were treated during Year 4 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 99%. This PMR describes the activities that were performed during Year 4 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 4 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 4 plume conditions. A supplemental DPT study conducted in 2022 and 2023. This study indicated that low-concentration plume conditions, where concentrations exceed State of Florida Groundwater Cleanup Target Levels, expanded westward to Kennedy Parkway North and northward to the vicinity of the railroad tracks. Based on these results, recommendations were made to install 14 wells to monitor the downgradient and boundary conditions of the expanded LCP. The contents of this Year 4 PMR were presented during the November 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

FINAL TECHNICAL AND ECONOMIC FEASIBILITY STUDY ON THE APPLICATION OF A HEAT INTEGRATED POST-COMBUSTION CO2 CAPTURE SYSTEM WITH HITACHI ADVANCED SOLVENT INTO EXISTING COAL-FIRED POWER PLANT

This report contains the results of a techno-economic assessment (TEA) conducted of a heat integrated post-combustion CO2 capture process with Hitachi advanced solvent for retrofit into an existing coal-fired power plant (but treated as greenfield plant on cost analysis). The process has been developed by the University of Kentucky Center for Applied Energy (UK CAER). EPRI was chiefly responsible for this analysis, with significant input from WorleyParsons, Hitachi Power Systems America (Hitachi) and UK CAER. The project also involves the design, fabrication, installation, testing, and analyses of a slipstream facility located at L&GE-KU’s E.W. Brown Generating Station to demonstrate the UK CAER carbon capture system that could utilize heat integration with the main power plant. The design, start-up, and baseline of the pilot system was performed with a generic 30 wt% MEA solvent to obtain data for direct comparison with the DOE/NETL Reference Case followed by testing Hitachi’s proprietary solvent H3-1. In this techno-economic analysis, two cases utilizing the UK CAER process are compared, using different approach temperatures and solvent, against the DOE/NETL Reference Case (Case 10). The results are shown comparing the energy demand for post-combustion CO2 capture and the net higher heating value (HHV) efficiency of the power plant integrated with the post-combustion capture (PCC) plant. A levelized cost of electricity (LCOE) assessment was performed showing the costs of the options presented in the study. The key factors contributing to the reduction of LCOE were identified as CO2 partial pressure increase at the flue gas inlet, thermal integration of the process, and performance of the Hitachi H3-1 solvent. Recent UK CAER process pilot-scale testing data and process simualtion data showed that the packing heights of absorber and stripper columns were significantly oversized in the prelimanary TEA (Task 2 of this project) and thus updated in this final TEA for the H3-1 case only. In addition, the solvent make-up cost for H3-1 was updated based on lattest test results. Finally, a heat integration with the main power plant was applied in this final TEA to increase overall energy effciency for both the MEA and H3-1 cases. Additonal reductions in capital and operational costs are expected but not taken into account here. Shorter columns result in reduced pressure drops, smaller blower head and pump hydraulic head requirements. An increase in overall energy efficiency resuls in a decreased size of the power plant, the CCS and a reduced parasitic steam requirement to the CCS. The net efficiency of the UK CAER integrated PC power plant with CO2 capture changes from 26.2% for the Reference Case 10 plant in 2010 revised DOE/NETL baseline report to 27.6% for the MEA options considered, and 29.1% for the options utilizing the Hitachi advanced solvent. The UK CAER Process + Hitachi case also produces an extra 30.9 MW of generation compared to the UK CAER Process + MEA case and total 60.9 MW more than DOE Case 10. LCOE ($/MWh) values are $172.08/MWh for the MEA option and $157.65/MWh for the Hitachi H3-1 solvent cases considered in comparison to $189.59/MWh in January 2012 dollar for the Reference Case 10. The UK CAER CCS process with MEA case lowers energy consumption for CO2 capture to 1340 Btu/lb-CO2 captured as compared to 1540 Btu/lb-CO2 in the Reference Case 10. The UK CAER CCS process with H3-1 case further lowers energy consumption for CO2 capture to 973 Btu/lb-CO2 captured, for an advantage of 36.8% less energy consumption than Case 10. The study also shows 38.1% less heat rejection associated with the carbon capture system from 3398 MBtu/hr (Case 10) to 2104 MBtu/hr for the UK CAER + MEA system. Heat rejection is reduced to 2464 MBtu/hr in the UK CAER + H3-1 case, for a 27.5 % decrease compared to Case 10. Modeling outputs show that in the UK CAER process, the cooling water that is 2-5°C cooler than conventional cooling tower water can be achieved for ambient conditions common to the midwest and other regions. The results from the techno-economic assessment show that the proposed technology can be investigated further as a viable alternative to conventional CO2 capture technology. The evaluation also shows the effect of the critical parameters on the LCOE, with the main variables being the approach temperature and CO2 partial pressure increase at the flue gas inlet. A summary of the key advantages of the UK CAER Process + H3-1 case for LCOE and other economic factors compared to the DOE Case 10 is as follows: • A lower variable operating cost by $1.56/MWh ($1.08MWh less than the UK CAER Process + MEA Case), a 11.7% reduction compared to the DOE Case 10 • A lower COE by $25.32MWh ($13.94/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower LCOE by $31.94/MWh ($17.51/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower cost of CO2 captured by $18.65/tonne CO2 ($9.44/tonne CO2 lower than the UK CAER Process + MEA Case), a 30.4% reduction compared to the DOE Case 10 • A lower cost of CO2 avoided by $34.95/tonne CO2 ($18.53 tonne CO2 lower than the UK CAER Process + MEA Case), a 38.7% reduction compared to the DOE Case 10

Bhown, Abhoyjit S.↗

Are You Resilient? Site Energy and Water Resilience Indicators

There is growing interest among operators of individual or co-located facilities to plan for utility disruptions caused by natural hazards and threats. Energy and water resilience at the site level can be characterized as the ability to withstand, adapt, and recover from an energy and/or water supply disruption. But how can a site’s energy and water resilience posture be measured? An evaluation framework with clear performance measures or indicators can help organizations establish what it means to be energy and water resilient and assess progress towards meeting resilience goals across sites and over time. Tracking a consistent set of indicators can help organizations identify problem areas that should be addressed and ascertain if energy and water resilience has improved as a result of investments or operational or policy changes. Resilience indicators also provide a means for organizations with geographically distributed sites to identify common problem areas that may require higher-level attention. This paper outlines an approach that organizations can use to measure site energy and water resilience. This approach was developed by Pacific Northwest National Laboratory for the U.S. Department of Energy’s Federal Energy Management Program as part of an effort to help federal agencies plan for energy and water resilience in a more systematic and rigorous way. The paper defines a general structure for defining energy and water resilience indicators, and provides example indicators and potential rating methods.

resilience, metrics for resilience, site resilienc↗

Modeling of the High Temperature Test Facility PG-26 Transient Using RELAP-7

The High Temperature Test Facility (HTTF) is an electrically heated, helium cooled, experimental facility located at Oregon State University (OSU). Modeling of the HTTF PG-26 transient using a multi-app approach utilizing MOOSE and RELAP-7 was conducted. A 3-D model of the HTTF core, reflector, core barrel, and RPV was generated, and 3-D heat conduction throughout the structure was coupled to 1-D fluid flow results from RELAP-7. The model was able to accurately predict peak ceramic core temperatures experienced during the transient which helps validate the capability of RELAP-7 to model advanced gas-cooled nuclear reactors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Considerations for Safeguards Implementation in the Post-Operational Facility Life Cycle

Hundreds of facilities around the world under International Atomic Energy Agency (IAEA) safeguards are currently permanently shutdown or undergoing decommissioning. For facilities in States with a comprehensive safeguards agreement (CSA) in force, safeguards obligations under the CSA extend until the IAEA has determined for safeguards purposes that a facility has been decommissioned (i.e., the IAEA has verified that the nuclear material has been removed and residual structures and equipment essential for its use have been removed or rendered inoperable). The IAEA Department of Safeguards recently issued a report providing high-level guidance to States on IAEA safeguards implementation throughout the post-operational life cycle phases of facilities and locations outside facilities. These phases include permanent shutdown, closed-down, and decommissioned for safeguards purposes. Additional consideration is needed for how post-operational facilities might be consistently evaluated when developing State-level safeguards approaches. This work presents ideas about how the IAEA might implement the State-level concept and associated elements (e.g., State-specific factors) throughout the post-operational life cycle, focusing on maintaining effectiveness and gaining efficiencies where appropriate. Considerations include whether State-specific factors should influence facility status, how a change in a facility’s post-operational status might impact a State’s acquisition path analysis, and how rendering inoperable/removal of essential equipment could affect resources expended on safeguards implementation.

Hogue, Karen↗