Preliminary estimates of operating costs for lighter than air transports

Presented is a preliminary set of operating cost relationships for airship transports. The starting point for the development of the relationships is the direct operating cost formulae and the indirect operating cost categories commonly used for estimating costs of heavier than air commercial transports. Modifications are made to the relationships to account for the unique features of airships. To illustrate the cost estimating method, the operating costs of selected airship cargo transports are computed. Conventional fully buoyant and hybrid semi-buoyant systems are investigated for a variety of speeds, payloads, ranges, and altitudes. Comparisons are made with aircraft transports for a range of cargo densities.

Smith, C. L.↗

Preliminary estimates of operating costs for lighter than air transports

A preliminary set of operating cost relationships are presented for airship transports. The starting point for the development of the relationships is the direct operating cost formulae and the indirect operating cost categories commonly used for estimating costs of heavier than air commercial transports. Modifications are made to the relationships to account for the unique features of airships. To illustrate the cost estimating method, the operating costs of selected airship cargo transports are computed. Conventional fully buoyant and hybrid semi-buoyant systems are investigated for a variety of speeds, payloads, ranges, and altitudes. Comparisons are made with aircraft transports for a range of cargo densities.

Smith, C. L.↗

Estimating the Deep Space Network modification costs to prepare for future space missions by using major cost drivers

This paper develops a cost model to do long range planning cost estimates for Deep Space Network (DSN) support of future space missions. The paper focuses on the costs required to modify and/or enhance the DSN to prepare for future space missions. The model is a function of eight major mission cost drivers and estimates both the total cost and the annual costs of a similar future space mission. The model is derived from actual cost data from three space missions: Voyager (Uranus), Voyager (Neptune), and Magellan. Estimates derived from the model are tested against actual cost data for two independent missions, Viking and Mariner Jupiter/Saturn (MJS).

Remer, Donald S.↗

NASA Standing Review Board Handbook

This handbook provides guidance based on best practices for the planning, preparation, review, reporting, and closeout of Standing Review Board (SRB) activities. Revision C updates the Revision B version of the SRB Handbook published in 2016 to incorporate updates to NASA Procedural Requirements (NPR) 7120.5F, NASA Space Flight Program and Project Management Requirements. These updates include: - Changing the Dissenting Opinion process to the Formal Dissent process, which retains the current process augmented with an expedited escalation path. - Updates to requirements for establishing an Agency Baseline Commitment (ABC) and for performing Joint Cost and Schedule Confidence Level (JCL) analyses for tightly coupled programs. - Additional requirements for performing a JCL analysis for single-project programs and projects over $1B Life-Cycle Cost (LCC). - Use of initial capability cost estimates instead of LCC estimates in specific, identified instances for single-project programs and projects that plan continuing operations and production, including integration of capability upgrades, with an unspecified Phase E end point. These single-project programs and projects define an initial capability during Phase A and develop an initial capability cost that establishes the ABC at Key Decision Point (KDP) C. Initial capability is the first operational mission flight (or as defined in the KDP B Review Plan) and is documented in the KDP B Decision Memorandum. Initial capability cost includes operations cost for the initial capability. The Phase E cost estimate for continuing operations and production is established separately as part of the Operational Readiness Review (ORR) and KDP E for the 5 years after initial capability and subsequently updated and documented annually for the next 5-year period. Upgrades during Phase E that meet the Agency criteria for a major project for external reporting are treated as projects for the purposes of establishing their own development ABC outside the Phase E cost estimate. The Phase E cost estimate is updated to include production and operations costs associated with these upgrades. Development, production, and operations costs of other (i.e., non-major) upgrades are included in the Phase E cost estimate. (See NPR 7120.5, Sections 2.4.1.5 and 2.4.1.6 and the NASA Space Flight Program and Project Management Handbook (PM Handbook), Section 5.5.4 for additional information.) The scope of the SRB’s assessment with respect to initial capability, Phase E cost estimate, and major upgrades for these single-project programs and projects is defined in the Terms of Reference (ToR).

Kevin Michael Gilligan↗

The MERMAID project

The tendency for software development projects to be completed over schedule and over budget was documented extensively. Additionally many projects are completed within budgetary and schedule target only as a result of the customer agreeing to accept reduced functionality. In his classic book, The Mythical Man Month, Fred Brooks exposes the fallacy that effort and schedule are freely interchangeable. All current cost models are produced on the assumption that there is very limited scope for schedule compression unless there is a corresponding reduction in delivered functionality. The Metrication and Resources Modeling Aid (MERMAID) project, partially financed by the Commission of the European Communities (CEC) as Project 2046 began in Oct. 1988 and its goal were as follows: (1) improvement of understanding of the relationships between software development productivity and product and process metrics; (2) to facilitate the widespread technology transfer from the Consortium to the European Software Industry; and (3) to facilitate the widespread uptake of cost estimation techniques by the provision of prototype cost estimation tools. MERMAID developed a family of methods for cost estimation, many of which have had tools implemented in prototypes. These prototypes are best considered as toolkits or workbenches.

Cowderoy, A. J. C.↗

Orbit transfer vehicle engine study. Volume 3: Program costs

Budgetary and planning cost estimates are presented that were prepared for the development, production and operation and flight support phases for each of the engines proposed for OTV propulsion. The major features of each category engine are described. The development program estimates were structured to the preliminary program Work Breakdown Structures (WBS). Program costs are provided within the applicable WBS elements to Level 4 for each category engine. The production program cost estimates assume a first production lot of 50 units produced at a rate of two units per month. Cumulative average unit costs assume a 90% learning capability. The operations and flight support cost estimates are based on 15, 30 and 45 missions per year for the period 1988 through 1999. Estimated funding requirements were developed for each category and program phase. All cost estimates and funding data are presented in 1979 dollars. The assumptions and ground rules for these estimates are summarized.

Source record↗

An activity-based methodology for operations cost analysis

This report describes an activity-based cost estimation method, proposed for the Space Exploration Initiative (SEI), as an alternative to NASA's traditional mass-based cost estimation method. A case study demonstrates how the activity-based cost estimation technique can be used to identify the operations that have a significant impact on costs over the life cycle of the SEI. The case study yielded an operations cost of $101 billion for the 20-year span of the lunar surface operations for the Option 5a program architecture. In addition, the results indicated that the support and training costs for the missions were the greatest contributors to the annual cost estimates. A cost-sensitivity analysis of the cultural and architectural drivers determined that the length of training and the amount of support associated with the ground support personnel for mission activities are the most significant cost contributors.

Korsmeyer, David↗

SAMICS Validation. SAMICS Support Study, Phase 3

SAMICS provides a consistent basis for estimating array costs and compares production technology costs. A review and a validation of the SAMICS model are reported. The review had the following purposes: (1) to test the computational validity of the computer model by comparison with preliminary hand calculations based on conventional cost estimating techniques; (2) to review and improve the accuracy of the cost relationships being used by the model: and (3) to provide an independent verification to users of the model's value in decision making for allocation of research and developement funds and for investment in manufacturing capacity. It is concluded that the SAMICS model is a flexible, accurate, and useful tool for managerial decision making.

Source record↗

Modeling Operations Costs for Human Exploration Architectures

Operations and support (O&S) costs for human spaceflight have not received the same attention in the cost estimating community as have development costs. This is unfortunate as O&S costs typically comprise a majority of life-cycle costs (LCC) in such programs as the International Space Station (ISS) and the now-cancelled Constellation Program. Recognizing this, the Constellation Program and NASA HQs supported the development of an O&S cost model specifically for human spaceflight. This model, known as the Exploration Architectures Operations Cost Model (ExAOCM), provided the operations cost estimates for a variety of alternative human missions to the moon, Mars, and Near-Earth Objects (NEOs) in architectural studies. ExAOCM is philosophically based on the DoD Architecture Framework (DoDAF) concepts of operational nodes, systems, operational functions, and milestones. This paper presents some of the historical background surrounding the development of the model, and discusses the underlying structure, its unusual user interface, and lastly, previous examples of its use in the aforementioned architectural studies.

cost estimating↗

The System Complexity Metric (SCM) Explains Systems Design and is Correlated with Cost and Failure Rate

The human short term memory span and working capacity is limited to three to five items, especially if they are organized complex “chunks” of information. The impression of complexity occurs when a system is simply difficult to understand, where there is no apparent pattern to predict its behavior. Hierarchical systems design can reduce perceived complexity and increase the amount of information that can be managed. The SCM was developed to measure complexity and help compare proposed overall system architectures before detailed design information is available. The SCM is defined as the sum of the number of major nodes, N, in the system block diagram plus the number of one-way interactions, I, between the nodes. SCM = N + I. SCM’s are easily determined by direct inspection of high-level block diagrams of life support systems. Axiomatic design develops a hierarchy of subsystem requirements and designs together in a top-down, back-and-forth process. A coupling matrix is used to control the relationships between the subsystem functions and design concepts. Axiomatic design can improve system design by decoupling requirements and designs. Axiomatic design was applied to the planning of a closed life support system, similar to that used on the International Space Station. A materially open as opposed to a closed system design was created by removing the interconnections required to close the system. The open system had the same number of designed subsystems as the closed system, but it had many fewer interconnections and its SCM was lower by about half. The costs were estimated and the MTBF (Mean Time Before Failure) tabulated for open and closed space life support systems. The estimated costs were linearly proportional to SCM for the wide variations of SCM in life support, but small differences may not be significant. The flight and preflight MTBF’s both declined exponentially with increasing MTBF, faster than MTBF-2, even though the preflight estimated MTBF’s were about ten times higher than the flight MTBF’s.

System Complexity Metric (SCM)↗

Cost Validation Using PRICE H

PRICE H was introduced into the JPL cost estimation tool set circa 2003. It became more available at JPL when IPAO funded the NASA-wide site license for all NASA centers. PRICE H was mainly used as one of the cost tools to validate proposal grassroots cost estimates. Program offices at JPL view PRICE H as an additional crosscheck to Team X (JPL Concurrent Engineering Design Center) estimates. PRICE H became widely accepted ca, 2007 at JPL when the program offices moved away from grassroots cost estimation for Step 1 proposals. PRICE H is now one of the key cost tools used for cost validation, cost trades, and independent cost estimates.

cost estimation↗

Summary and evaluation of the parametric study of potential early commercial MHD power plants (PSPEC)

Two parallel contracted studies were conducted. Each contractor investigated three base cases and parametric variations about these base cases. Each contractor concluded that two of the base cases (a plant using separate firing of an advanced high temperature regenerative air heater with fuel from an advanced coal gasifier and a plant using an intermediate temperature metallic recuperative heat exchanger to heat oxygen enriched combustion air) were comparable in both performance and cost of electricity. The contractors differed in the level of their cost estimates with the capital cost estimates for the MHD topping cycle and the magnet subsystem in particular accounting for a significant part of the difference. The impact of the study on the decision to pursue a course which leads to an oxygen enriched plant as the first commercial MHD plant is described.

Staigner, P. J.↗

A review of findings of a study of rocket based combined cycle engines applied to extensively axisymmetric single stage to orbit vehicles

Extensively axisymmetric and non-axisymmetric Single Stage To Orbit (SSTO) vehicles are considered. The information is presented in viewgraph form and the following topics are presented: payload comparisons; payload as a percent of dry weight - a system hardware cost indicator; life cycle cost estimations; operations and support costs estimation; selected engine type; and rocket engine specific impulse calculation.

Foster, Richard W.↗

Latest NASA Instrument Cost Model (NICM): Version VI

The NASA Instrument Cost Model, NICM, is a suite of tools which allow for probabilistic cost estimation of NASA's space-flight instruments at both the system and subsystem level. NICM also includes the ability to perform cost by analogy as well as joint confidence level (JCL) analysis. The latest version of NICM, Version VI, was released in Spring 2014. This paper will focus on the new features released with NICM VI, which include: 1) The NICM-E cost estimating relationship, which is applicable for instruments flying on Explorer-like class missions; 2) The new cluster analysis ability which, alongside the results of the parametric cost estimation for the user's instrument, also provides a visualization of the user's instrument's similarity to previously flown instruments; and 3) includes new cost estimating relationships for in-situ instruments.

Mrozinski, Joe↗

Selected Tether Applications Cost Model

Diverse cost-estimating techniques and data combined into single program. Selected Tether Applications Cost Model (STACOM 1.0) is interactive accounting software tool providing means for combining several independent cost-estimating programs into fully-integrated mathematical model capable of assessing costs, analyzing benefits, providing file-handling utilities, and putting out information in text and graphical forms to screen, printer, or plotter. Program based on Lotus 1-2-3, version 2.0. Developed to provide clear, concise traceability and visibility into methodology and rationale for estimating costs and benefits of operations of Space Station tether deployer system.

Keeley, Michael G.↗

Costing the satellite power system

The paper presents a methodology for satellite power system costing, places approximate limits on the accuracy possible in cost estimates made at this time, and outlines the use of probabilistic cost information in support of the decision-making process. Reasons for using probabilistic costing or risk analysis procedures instead of standard deterministic costing procedures are considered. Components of cost, costing estimating relationships, grass roots costing, and risk analysis are discussed. Risk analysis using a Monte Carlo simulation model is used to estimate future costs.

Hazelrigg, G. A., Jr.↗