Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “software engineering software verification validation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

191 records · Page 11

Modal Correlation of Complex Aerospace Joints Using Automated Variable Substitution

A critical task involved with being able to predict flight loads accurately in aerospace finite element models (FEMs) is the prior verification of the FEMs by conducting modal survey testing (MST). Experience comparing dynamic response of initial FEMs to MST data tends to demonstrate that FEMs can have unacceptable accuracy even when best modeling practices are followed. One inherent source of inaccuracy in linear dynamic FEMs is the modeling of nonlinear joints with mechanisms such as spherical bearings. These joints are usually designed to freely translate or rotate under the high levels of loading experienced in flight. Engineers who create linear FEMs conventionally model these joints without any stiffness in the mechanism degrees of freedom to meet this design intent. However, inaccuracy is observed during test validation of these FEMs, which usually relies on low-level force excitation orders of magnitude below flight load levels. This low-level modal test rarely overcomes the joint friction that is present, and thus the mechanism joints are able to react loads. This divide between the test results and the FEM creates a significant challenge to the engineer who is performing the correlation, in that the engineer has no basis for what stiffness value should be used to make the FEM match the test results. A compounding challenge is that complicated built-up aerospace structures commonly have multiple joints through a load path where each joint will “stick” and “slip” at different levels of force input. Explicitly matching the dynamics of a system containing these nonlinear mechanisms would require a nonlinear FEM, which is prohibitively costly for dynamic simulations of most aerospace systems. The objective of this paper is to present a workflow that can efficiently cycle through many iterations of a FEM, allowing a Monte Carlo style examination of the design space to identify candidate stiffness values for nonlinear mechanism joints. The outlined approach is specific to MSC Nastran and utilizes MSC Nastran’s symbolic substitution capabilities, coupled with the IMAT™ and Attune™ software packages developed by ATA Engineering, Inc. (ATA). The workflow is demonstrated with a case study from the correlation effort for The Boeing Company’s Crew Space Transportation (CST)-100 Starliner FEM. Keywords: Correlation, MSC Nastran, IMAT™, Attune™, Finite Element Model, Modal Testing

Correlation↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Validation of finite element analysis strategy to investigate acoustic levitation in a two-axis acoustic levitator

A two-axis acoustic levitator can be used to generate a standing pressure wave capable of levitating solid and liquid particles at appropriate input conditions. This work proposes a simulation framework to investigate the two-axis levitation particle stability using a commercial, computational fluid dynamics software based on the harmonic solution to the acoustic wave equation. The simulation produced predictions of the standing wave that include a strong "+" shaped pattern of nodes and anti-nodes that are aligned with the levitator axes. To verify the simulation, a levitator was built and used to generate the standing wave. The field was probed with a microphone and a motorized-scanning system. After scaling the simulated pressure to the measured pressure, the magnitudes of the sound pressure level at corresponding high-pressure locations were different by no more than 5%. This is the first time a measurement of a two-axis levitator standing pressure wave has been presented and shown to verify simulations. Furthermore, as an additional verification, the authors consulted high speed camera measurements of a reference-levitator transducer, which was found to have a maximum peak-to-peak displacement of 50 +/- 5 mu m. The reference-levitator is known to levitate water at 160 dB. The system for this work was simulated to match the operation of the reference-levitator so that it produced sound pressure levels of 160 dB. This pressure was achieved when the transducer maximum peak-to-peak displacement was 50.8 mu m. The agreement between the two levitators' displacements provides good justification that the modeling approach presented here produces reliable results.

2 axis levitator↗

FY2021 Improvements to the New CTH Code Verification & Validation Test Suite

Over the past few years, the CTH multiphysics hydrocode has overhauled its software quality and testing processes, implementing current best practices in software quality and building a robust V&V test suite comprised of traditional hydrocode verification problems, including ASC Tri-Lab Test Suite and Enhanced Tri-Lab Test Suite problems, as well as validation problems for some of CTH’s most frequently used equations of state, materials models, and other key capabilities. Substantial progress towards building this new test suite was made in FY19 and FY20. In FY21, the test suite has been expanded to include verification and validation tests of the Steinberg-Guinan-Lund (ST) viscoplastic model and the Johnson Cook (JFRAC) fracture model. Additionally, two new verification tests were added, covering hydrodynamics and high explosive (HE) modeling capabilities: the Kidder Gaussian density problem and the Escape of HE Products (EHEP) problem from the Tri-Lab Test Suite. This report discusses each of these test problems in detail. Verification test results are compared to analytic solutions. Validation test results are compared to experimental data. Wherever possible, convergence or mesh refinement studies are included. Additionally, while implementing the Kidder verification problem, a bug was identified that affects the use of tables to initialize pressure or density in 1D or 2D calculations. A brief discussion of the bug and its fix is included. CTH demonstrates good performance overall on the new test suite problems. Simulation results showed good agreement with analytic solutions for the Kidder problem, with convergence rates ranging between 1.8 and sub-linear, and relatively good agreement for the EHEP problem, though convergence rates for pressure and density were nearly 0. The ST and JFRAC strain rate loading verification tests show good agreement with analytic solutions. Likewise, CTH simulation results show good agreement with experimental validation data, including Taylor rod impact testing, for the materials tested. Future V&V work will focus on adding 2D and 3D versions of existing verification tests as well as adding validation tests of other frequently used capabilities such as other fracture models.

42 ENGINEERING↗

Improving public communication through environmental data transparency at Los Alamos National Laboratory - 15306

The Los Alamos National Laboratory (LANL) environmental data span a wide range of media, including air, soil, sediment, water, foodstuff, and biota as well as over 1000 analytes and time periods extending over 4 decades, resulting in over 14 million records to manage and analyze. At a time of budget cuts and rapid social and technological change, the public, regulatory and compliance agencies, and stakeholders demand accelerated data delivery and efficiency, information sharing, and transparency in the dissemination and handling of samples collected in and around LANL. Meeting these requirements, while constraining the associated costs can be challenging; however, LANL has achieved this by adopting a cloud-based database called the Environmental Information Management (EIM) system and its public database counterpart, IntellusNM (Intellus) (www.intellusnm.com). To be consistent with federal initiatives to move government computing into cloud-based services, LANL chose to partner with an existing cloud-based vendor, Locus Technologies, to implement a software-as-a-service model. As an additional cost-saving measure, local regulatory and compliance agencies collaborated with LANL to incorporate their data into EIM and Intellus database. By adopting a single platform cloud-based solution to replace 12 different pre-existing environmental data systems, LANL has streamlined environmental data processes, resulting in over $15 million cost savings through 2015. EIM, LANL's internal cloud database, provides a cradle-to-grave process for data handling. EIM supports LANL's entire data process from detailed sample planning, mobile data collection using iOS mobile devices, to automated bottle labeling, generation of chain of custody, analytical lab electronic data deliverable upload, auto data validation, sample tracking, and custom regulatory and compliance reports. EIM has functionality to assess data in various ways such as the ability to design new formatted reports, a free-form structured query language tool of the entire database, exceedance reports, calculation engine, charting, trends, and statistics. EIM also has interactive geographic information system layers and analyte concentration color contour mapping capabilities. Additionally, and of greater importance to LANL, EIM supports the ability for third-party landowners to review data before release to the public, thus ensuring transparency and confidence in LANL's stewardship of human health and the environment. Intellus, the database counterpart of EIM, is the publicly available view of the entire LANL database and requires no data feeds or transformations. Intellus allows user-friendly access to LANL's environmental data as it is collected, providing the public, scientists, remediation teams, regulators, and stakeholders within hours of receipt. Full transparency in giving the public access to environmental data information provides LANL's overall solution to environmental data management for the public. By making the data easy to obtain, search, and query for interested stakeholders, the system enables confidence in LANL's stewardship of the environment. Working together identifies key topics of improvements, develop strategies and help support innovation and substantial advances within LANL's environmental data management system. (authors)

54 ENVIRONMENTAL SCIENCES↗

Implementation of a Pressure Correction Term in the CTF Subchannel Code

CTF is a modernized and improved version of the legacy subchannel code COBRA-TF, being jointly developed and maintained by Oak Ridge National Laboratory (ORNL) and North Carolina State University. The code was adopted by ORNL for use in the Consortium for Advanced Simulation of Light Water Reactors (CASL) in 2012 to help address CASL challenge problems. Since that time, activities related to CTF have included implementing software quality assurance measures, implementing new features and models, performing validation and verification testing, establishing and supporting a CTF user group, and developing the code for use in coupled applications. CTF is applicable to single- and two-phase flows in light water reactor geometries at normal and accident operating conditions. The two-phase flow model consists of the six-equation two-phase flow model augmented by equations for the droplet field, and it also includes appropriate source terms. This work focuses on the numerical stability of the six-equation two-phase flow model and is part of a recent effort to improve CTF capabilities for simulating flows in boiling water reactors (BWRs). The six-equation two-phase flow model is not strongly hyperbolic, meaning that some of its eigenvalues are either not real or not distinct. In a Cauchy sense, and for an initial-value problem, strong hyperbolicity was found to be equivalent to well-posedness, which ensures the uniqueness of the solution in the space-time used. This concept is also of importance when designing high-order numerical methods and also when implementing boundary conditions that rely on real eigenvalues such as Riemann solvers. A tremendous amount of research is available in the literature on how to hyperbolize the six-equation two-phase flow model by adding ad hoc terms to the system of equations. Such terms are often referred to as virtual mass or interfacial pressure correction terms. From a mathematical perspective, this approach adds terms to the phasic momentum equation containing first-order partial derivatives of the unknowns to modify the Jacobian matrix, thus the imaginary part of the eigenvalues. For this work, an interfacial pressure correction (IPC) term on the same model as what was used for the CATHARE system code, is implemented in CTF. This allows for recovery of a two-pressure formulation. In the following, the six-equation two-phase flow model is recalled, along with the IPC term and its influence on the eigenvalues. Then, numerical results and convergence studies are presented for a water-faucet problem at a pressure of 10 bar. Finally, conclusions and future work are addressed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cybersecurity Platform and Certification Framework Development for Extreme Fast Charging (XFC)-Integrated Charging Ecosystem (Final Project Report)

This report summarizes a pioneering effort in Electric Vehicle charging infrastructure ecosystem cybersecurity requirements, assessment methodologies, functional verification, as well as embodiment of the key technologies in the form of hardware and software tools being made available to the public. EPRI led a team of experts, as well as a stakeholder coalition encompassing all key actors in the EV charging infrastructure ecosystem that includes eXtreme Fast Charging (XFC) equipment (defined as 200kW or above). EV charging infrastructure in the United States is a patchwork of networks that have continued to grow organically and have been designed to serve the charging needs of the EV owners, who are their customers. In doing so, each network provider, as well as their connected entities such as the cloud Electric Vehicle Service Providers or EVSPs, utility back office, utility AMI networks, payment networks, as well as Original Equipment Manufacturer (EV manufacturer) telematics networks, have designed systems that may work well individually, but no single entity is responsible for the entire ecosystem to be secure in terms of data exchange. Furthermore, there is no uniformity in how each actor has implemented the cybersecurity requirements since no system-wide cybersecurity requirements existed prior to this project. The final project report describes the technical approach guided by the EV charging infrastructure cybersecurity working group, convened specifically for this project. The technical approach included definition of requirements at the ecosystem level, treated as a ‘system of systems’, and then passed down to individual systems (EVSE, EV, cloud EVSP, utility, and the payment networks), followed by developing the cybersecurity risk and vulnerability assessment methods, that were later applied to real-world cyber-physical systems at EPRI, ANL, and NREL laboratories, to validate both the process and the results. Finally, in a spotlight over the most vulnerable equipment, which is the EV charge station (AC or DC), the team developed a multi-layer cybersecurity implementation in the embedded domain embodied by the open-source Secure Network Interface Card (SNIC) demonstrating the various ways in which the infrastructure can be secured protecting against the identified attack surfaces. Finally, the entire process of EV infrastructure cybersecurity assessment was encapsulated in the Electric Vehicle Charging Cybersecurity Management (EVC2M) online GUI-based tool, that is expected to be released to the public. The report presents the objectives, the technical approach, the key results, and recommendations for future work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electronics Upgrades to the Green is Clean Phoswich Detector Systems and Programmatic Implementation at LANL - Phase II Completion - 18403

Los Alamos National Laboratory (LANL) radiological facilities produce low-density room trash that, in many cases, is not contaminated with radioactivity. It has been estimated that 50 to 90% of low-density room trash is free of radioactive contamination and eligible for inclusion in LANL's Green is Clean (GIC) program. The GIC program is a verification program for non-regulated waste from radiation controlled areas that has been actively segregated as nonradioactive through the use of the waste generator's acceptable knowledge. The GIC program has employed two large area Phoswich gamma ray detector systems (HERCULES and ZEUS) to verify that GIC candidate low-density waste contains no radioactivity above background. The large area (127 cm{sup 2}) Phoswich detectors consist of a thin NaI front crystal (3 mm thick) that is optically coupled to a thick CsI back crystal (50 mm thick). The scintillation properties of the two crystals are different enough to allow the system's electronic components to identify the origin of any pulse. The original systems utilize Nuclear Instrumentation Module (NIM) electronics to process the detector signals. The electronics currently in use by the systems are out of date and some components are no longer manufactured. In 2015, phase I upgrades to the GIC detector systems were completed. Phase I objectives included identifying more modern commercially available electronics that could replace the NIM electronics. A pulse shape discriminator (PSD) module, the Digital Gamma Finder (DGF) Pixie-4 made by XIA LLC, that fits in a compact National Instruments{sup TM} PXI chassis was identified to replace the majority of the original NIM bin electronics - a single Pixie-4 module replaces four NIM amplifiers and four NIM pulse shape analyzers (PSAs). Another phase I objective was to show that that new PSD could separate out the NaI and CsI detector signals in a manner equivalent to or better than the NIM electronics. Proof of concept was achieved in 2015 when a prototype upgrade system on ZEUS was built and tested and gating parameter settings were determined that successfully separated the NaI and CsI signals. Phase II required establishing a LabVIEW software interface with Pixie-4 electronics in lieu of the manufacturer provided Pixie-4 software called the Pixie Viewer. In addition, phase II included 1) final optimization of the gating parameters on the prototype Pixie-4 ZEUS system, 2) finalizing Requirements, Design and Test Plan documents, 3) LabVIEW software interface quality assurance (QA) testing, 4) setting up the HERCULES system with the Pixie-4 upgrade electronics, 5) check source and background calibration of both systems, 6) absolute efficiency determination on both systems and 7) procedure revisions and implementation of both systems into routine operations. In 2017 phase II was completed including the preparation of detailed Requirements, Design and Test Plan documents. The LabVIEW interface software that communicates and controls the Pixie-4 has been completed, merged with the preexisting LabVIEW operations software and fully tested. Gating parameter optimization, configuration of HERCULES with the Pixie-4 electronics, check source and background calibrations and absolute efficiency determinations have all been performed - quantitative results are presented in the full paper. For performance validation, comparison measurements of actual GIC bags on both the HERCULES system using the old NIM Bin electronics and the ZEUS system using the upgraded Pixie-4 electronics have been done and evaluated. Finally, procedure revisions and implementation of both systems into routine operations is currently in process and planned to be complete by the end of calendar year 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

S4PST: Sustainability for Programming Systems and Tools: May Workshop Report

The US Department of Energy (DOE) Exascale Computing Project (ECP) has fostered and strengthened the use of modern software engineering practices for developing applications and libraries, and this effort has resulted in the coordinated and interoperable E4S1 and xSDK2 ecosystems. Although this approach is cost-effective, it relies on robust programming systems and tools (PST) as the underlying foundation for our HPC software. At present, our primary PST stack consists of traditional high-performance computing (HPC) languages, namely Fortran, C, C++, and the popular Python language for data analysis and AI workflows. These languages support various programming frameworks and run-time abstractions that enable parallelism and concurrency across multiple node architectures and thousands of nodes through a variety of interconnect systems. However, to accommodate users’ diverse needs, certain aspects of the HPC ecosystem are delegated to vendor-specific or third-party implementations that extend beyond a particular scientific domain. This broader scope results in a multitude of specifications and variations, which leads to a complex orchestration of many-ecosystems. Unfortunately, this complexity in the ecosystem imposes additional overhead costs on consumers during the latter stages of the development cycle. In addition to the software ecosystem challenge, the upcoming conclusion of the ECP by December 2023 has raised significant concerns within the HPC programming systems community, from both the economic and social perspectives. The ECP has implemented a management structure for software development and funding decisions across all ECP participants by following a conventional hierarchical and centralized approach. However, this structure has prompted certain considerations within the community, particularly in anticipation of the Software Sustainability initiative by the DOE’s Advanced Scientific Computing Research Program (ASCR). For the success of this new initiative, it is of utmost importance to secure consistent funding and foster close engagement with researchers and core developers of existing programming-system products. This collaboration is vital to maintaining the critical capabilities of the current software during the transition phase while proactively adapting to future technology and workforce trends. The community recognizes the significance of adapting to emerging trends and is aware of the inherent fragility of the HPC software ecosystem, particularly in relation to programming systems that cater to all users. The ability to adapt and evolve is essential to staying relevant and effectively addressing these technical, economic, and social challenges. The S4PST team, which represents one of the six ASCR Software Sustainability seedling projects, is dedicated to tackling these challenges through community-based approaches that go beyond the scope of the DOE. This involves collaboration between national laboratories with academia, non-DOE institutions, hardware and system vendors, and international partners. By fostering these partnerships, we aim to create a robust and sustainable HPC software ecosystem that can effectively meet the needs of the community. This new community effort, driven by the eight DOE labs, will take on the responsibility of guiding funding decisions for programming-systems development and maintenance with transparency and consistency across all decisions. Additionally, the team will offer common technical services to the programming systems community, irrespective of their funding situations, and facilitate community-wide incubation to proactively nurture the software ecosystem. By actively engaging with stakeholders and employing a collaborative approach, we can collectively shape the future of programming systems and ensure a robust and thriving HPC software landscape. On May 11–12, 2023, the S4PST team conducted its inaugural kick-off workshop at the Innovative Computing Laboratory (ICL) in the University of Tennessee, Knoxville, hosted by Hartwig Anzt. The workshop encompassed various sessions dedicated to presentations and discussions, with the aim of comprehending the team members’ perspectives on the vision of software sustainability. Additionally, the workshop aimed to identify the technical, economic, and social requirements for sustaining the programming-systems community in the field of HPC. This report provides a summary of the S4PST effort by highlighting five major thrust areas discussed during the workshop: (i) community, (ii) technical support, (iii) training and diversity, (iv) verification, validation and correctness, and (v) emerging technologies. It also encompasses an overview of the presentations and discussions held throughout the event, our views and potential synergies with other seedling efforts, along with the outcomes and key takeaways from our initial discussions.

97 MATHEMATICS AND COMPUTING↗

Sorption Modeling and Verification for Off-Gas Treatment

This project was successfully executed to provide valuable adsorption data and improve a comprehensive model developed in previous work by the authors. Data obtained were used in an integrated computer program to predict the behavior of adsorption columns. The model is supported by experimental data and has been shown to predict capture of off gas similar to that evolving during the reprocessing of nuclear waste. The computer program structure contains (a) equilibrium models of off-gases with the adsorbate; (b) mass-transfer models to describe off-gas mass transfer to a particle, diffusion through the pores of the particle, and adsorption on the active sites of the particle; and (c) incorporation of these models into fixed bed adsorption modeling, which includes advection through the bed. These models are being connected with the MOOSE (Multiphysics Object-Oriented Simulation Environment) software developed at the Idaho National Laboratory through DGOSPREY (Discontinuous Galerkin Off-gas SeParation and REcoverY) computer codes developed in this project. Experiments for iodine and water adsorption have been conducted on reduced silver mordenite (Ag0Z) for single layered particles. Adsorption apparatuses have been constructed to execute these experiments over a useful range of conditions for temperatures ranging from ambient to 250°C and water dew points ranging from -69 to 19°C. Experimental results were analyzed to determine mass transfer and diffusion of these gases into the particles and to determine which models best describe the single and binary component mass transfer and diffusion processes. The experimental results were also used to demonstrate the capabilities of the comprehensive models developed to predict single-particle adsorption and transients of the adsorption-desorption processes in fixed beds. Models for adsorption and mass transfer have been developed to mathematically describe adsorption kinetics and transport via diffusion and advection processes. These models were built on a numerical framework for solving conservation law problems in one-dimensional geometries such as spheres, cylinders, and lines. Coupled with the framework are specific models for adsorption in commercial adsorbents, such as zeolites and mordenites. Utilizing this modeling approach, the authors were able to accurately describe and predict adsorption kinetic data obtained from experiments at a variety of different temperatures and gas phase concentrations. A demonstration of how these models, and framework, can be used to simulate adsorption in fixed- bed columns is provided. The CO 2 absorption work involved modeling with supportive experimental information. A dynamic model was developed to simulate CO 2 absorption using high alkaline content water solutions. The model is based upon transient mass and energy balances for chemical species commonly present in CO 2 absorption. A computer code was developed to implement CO 2 absorption with a chemical reaction model. Experiments were conducted in a laboratory scale column to determine the model parameters. The influence of geometric parameters and operating variables on CO 2 absorption was studied over a wide range of conditions. Continuing work could employ the model to control column operation and predict the absorption behavior under various input conditions and other prescribed experimental perturbations. The value of the validated models and numerical frameworks developed in this project is that they can be used to predict the sorption behavior of off-gas evolved during the reprocessing of nuclear waste and thus reduce the cost of the experiments. They can also be used to design sorption processes based on concentration limits and flow-rates determined at the plant level.

42 ENGINEERING↗

Subtask 1.3 – Integrated Carbon Capture and Storage for North Dakota Ethanol Production

The Energy & Environmental Research Center (EERC), in partnership with Red Trail Energy, LLC (RTE), a North Dakota ethanol producer; the North Dakota Industrial Commission (NDIC) Renewable Energy Program (REP); and the U.S. Department of Energy (DOE), conducted a feasibility and implementation study for a commercial carbon capture and storage (CCS) effort. This subtask provided technical support and developed recommended practices of how small-scale industrial CO2 emitters (<1,000,000 tonnes of CO2 emitted annually) may economically deploy CCS. The 64-million-gallon dry mill RTE ethanol facility, emitting an average 180,000 tonnes of CO2 annually, was the subject of the case study. The positive outcome of this research, which shows technical and economic potential for ethanol–CCS in North Dakota, has resulted in RTE acquiring an approved Permit to Drill on December 2, 2019, for a stratigraphic test well in early 2020, a necessary step toward a North Dakota CO2 Storage Facility Permit (SFP) for the RTE CCS effort. Outcomes include 1) validating the Broom Creek Formation as a regional target for CCS, 2) determining the full carbon life cycle of an industrial fuel production facility with CCS, 3) developing a field implementation plan (FIP) for small-scale CCS, and 4) determining the validity and pathway for using CCS to meet low-carbon fuel (LCF) standards. The technical team included the EERC, RTE, Trimeric Corporation, Schlumberger Carbon Services, and Computer Modelling Group (CMG). Findings from activities conducted November 2016 – May 2020 are summarized as follows. Several key steps have been accomplished toward validating the Broom Creek Formation as a CO2 injection and storage target at the RTE CCS site, including verification of the presence and structure of sandstone layers that may comprise the potential CO2 storage reservoir and the several thousand feet of overlying confining zone. Work included site characterization using existing data, interpretation of seismic data within the study area, and geologic modeling simulation of CO2 injection. Interpreted results estimate 3000 feet of confining zone between the Broom Creek Formation (storage target) and the lowermost underground source of drinking water (e.g., the Fox Hills Formation). The thickness of the Broom Creek injection target varies 230–420 ft within the survey area. Results were used to inform the location of a stratigraphic test well and associated characterization test program. No impediments were identified within the targeted CO2 storage complex that would prevent the project from moving forward. A stratigraphic test well is the next step to validate these results and to acquire remaining data necessary to develop a North Dakota CO2 SFP application. The EERC generated full carbon life cycle estimates for CCS integration with the RTE ethanol facility. Results indicated that an average 40% reduction in CO2 emissions is possible through CCS implementation. Approximately half of the carbon in the overall life cycle for a dry mill ethanol plant is generated through the fermentation process and emitted to the atmosphere; this is the CO2 stream targeted for CCS. The remaining carbon is attributed to corn feedstock farming (diesel, fertilizer), energy for fuel processing (natural gas, electricity), and transportation (diesel) of the fuel product. Life cycle carbon estimates are also affected by the anticipated energy consumption of a potential capture facility, which depend on the type of CO2 product generated. For example, a 30%–40% net CO2 emission reduction is estimated if a liquefied CO2 facility were incorporated compared to a 40%–50% net CO2 reduction if a supercritical “injection-grade” CO2 product is generated; i.e., more energy is required to further refine the CO2 stream, affecting the full carbon life cycle estimates. A CCS FIP was developed and initiated at the RTE CCS site, resulting in the development of several guidance documents: a CO2 Capture Process Design Package, a North Dakota CO2 geologic Storage Permits Template, and a Public Outreach Package for CCS in North Dakota. General FIP components include CO2 capture system, pipeline and well designs; monitoring, verification, and accounting (MVA) plans; geologic characterization and testing programs; and permitting and outreach plans. Vendor bids were also acquired for the CO2 liquefaction facility. Near-surface characterization (groundwater and soil gas sampling) and geologic characterization (seismic survey) were initiated to inform development of a UIC Class VI-compliant MVA plan compliant with a North Dakota CO2 SFP. Designs (well and geologic testing) were completed for a stratigraphic test well compliant with a North Dakota CO2 SFP. In addition, the outreach plan was executed, including community open houses, meetings with city/county/state officials, and development of public materials. Although other entities continued to mature incentive programs in 2019–2020, California and the Internal Revenue Service (IRS) currently provide the most advanced economic opportunities for CCS integrated with fuel production. The California Low-Carbon Fuel Standard (LCFS) adopted a CCS Protocol in January 2019, allowing submittal of a design-based pathway (DBP) application for an approved temporary (not certified) carbon intensity value for a fully engineered facility. An ethanol–CCS DBP application to the California LCFS Program (officially approved February 28, 2020) was developed to show that the RTE CCS effort meets LCFS requirements. The approved DBP provides confidence to advance the project and supports potential investments. Other entities continue to mature incentive programs. The IRS issued guidance in February 2020 that addresses the definition of beginning of construction and revenue procedure on partnerships for the Enhancement of Carbon Dioxide Sequestration Credit (a.k.a. Section 45Q) CCS tax credit program; the IRS anticipates issuing further guidance on issues such as secure geologic storage, utilization qualifications, and recapture of claimed credits. Maturing incentive programs coupled with workable permitting regulations provide confidence to advance CCS projects in North Dakota and support financial investment to proceed with designing, constructing, and implementing CCS projects at small-scale fuel production facilities. The largest hurdles for CCS implementation at small-scale industrial systems are often business/economic-related (i.e., not technical). Market uncertainty already exists for agriculture-based alternative fuels such as corn ethanol, for which production has increased by ~33%, and prices have correspondingly lowered since 2015. Passing the Section 45Q tax credit program improves economic feasibility for CCS but may require external investors for a small business to achieve maximum benefits. Public–private partnerships with NDIC and DOE have resulted in foundational technical and regulatory knowledge, growing stakeholder confidence, and a pathway to implementation that enables similar industrial CCS projects in the region to advance. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by NDIC and RTE. The authors would also like to thank CMG, ESRI, IHS, Neuralog, and Schlumberger for allowing the use of their software packages in support of this work.

42 ENGINEERING↗