Prototype solar power satellite options

The choice of options for the prototype solar power satellite is addressed relative to risk and cost. Emphasis is placed on the reduction of the risk of failure. Risk is the program cost multiplied by the reduction in probability of program success due to the risky action. Four classes of risk are identified. It is suggested that prototyping would reduce the technical risk as well as reduce the effects of the other three types of risk by allowing them to be quantified earlier. Prototype demonstration requirements addressed include electromagnetic power link feasibility demonstration, component integration verification, construction technology verification, and cost performance verification. Specific prototype requirements are listed and prototyping options are given in tabular form.

Sperber, B. R.↗

Uncertainty analysis for Ulysses safety evaluation report

As part of the effort to review the Ulysses Final Safety Analysis Report and to understand the risk of plutonium release from the Ulysses spacecraft General Purpose Heat Source-Radioisotope Thermal Generator, the Interagency Nuclear Safety Review Panel (INSRP) performed an integrated, quantitative analysis of the uncertainties of the calculated risk of plutonium release from Ulysses. Using state-of-art probabilistic risk assessment technology, the uncertainty analysis accounted for both variability and uncertainty of the key parameters of the risk analysis. The results show that INSRP had high confidence that risk of fatal cancers from potential plutonium release associated with calculated launch and deployment accident scenarios is low.

Frank, Michael V.↗

Advanced Exploration Systems Atmosphere Resource Recovery and Environmental Monitoring

In September 2011, the Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project was commissioned by NASA's Advanced Exploration Systems program to advance Atmosphere Revitalization Subsystem (ARS) and Environmental Monitoring Subsystem (EMS) technologies for enabling future crewed space exploration missions beyond low Earth orbit. The ARREM project's period of performance covered U.S. Government fiscal years 2012-2014. The ARREM project critically assessed the International Space Station (ISS) ARS and EMS architectures and process technologies as the foundation for an architecture suitable for deep space exploration vehicles. The project's technical content included technical tasks focused on improving the reliability and life cycle cost of ARS and EMS technologies as well as reducing future flight project developmental risk and design, development, test, and evaluation costs. Targeted technology development and maturation tasks, including key technical trade assessments, were accomplished and integrated ARS architectures were demonstrated. The ARREM project developed, demonstrated, and tested leading process technology candidates and subsystem architectures that met or exceeded key figures of merit, addressed capability gaps, and significantly improved the efficiency, safety, and reliability over the state-of-the-art ISS figures of merit. Promising EMS instruments were developed and functionally demonstrated in a simulated cabin environment. The project's technical approach and results are described and recommendations for continued development are provided.

Perry, J.↗

The Integrated Hazard Analysis Integrator

Hazard analysis addresses hazards that arise in the design, development, manufacturing, construction, facilities, transportation, operations and disposal activities associated with hardware, software, maintenance, operations and environments. An integrated hazard is an event or condition that is caused by or controlled by multiple systems, elements, or subsystems. Integrated hazard analysis (IHA) is especially daunting and ambitious for large, complex systems such as NASA s Constellation program which incorporates program, systems and element components that impact others (International Space Station, public, International Partners, etc.). An appropriate IHA should identify all hazards, causes, controls and verifications used to mitigate the risk of catastrophic loss of crew, vehicle and/or mission. Unfortunately, in the current age of increased technology dependence, there is the tendency to sometimes overlook the necessary and sufficient qualifications of the integrator, that is, the person/team that identifies the parts, analyzes the architectural structure, aligns the analysis with the program plan and then communicates/coordinates with large and small components, each contributing necessary hardware, software and/or information to prevent catastrophic loss. As viewed from both Challenger and Columbia accidents, lack of appropriate communication, management errors and lack of resources dedicated to safety were cited as major contributors to these fatalities. From the accident reports, it would appear that the organizational impact of managers, integrators and safety personnel contributes more significantly to mission success and mission failure than purely technological components. If this is so, then organizations who sincerely desire mission success must put as much effort in selecting managers and integrators as they do when designing the hardware, writing the software code and analyzing competitive proposals. This paper will discuss the necessary and sufficient requirements of one of the significant contributors to mission success, the IHA integrator. Discussions will be provided to describe both the mindset required as well as deleterious assumptions/behaviors to avoid when integrating within a large scale system.

Morris, A. Terry↗

The Integration and Mapping of an Open-Source National Well Resource to Inform Geologic Carbon Storage Site Selection and Risk Prevention: The CO2-Locate Database

Geologic carbon storage (GCS) offers a way to capture and permanently store CO₂ from fossil fuel operations in underground geologic structures, aiding in the transition to a carbon-neutral energy economy. However, CO₂ injection sites can experience gas leakage through existing wells that penetrate storage reservoirs, making knowledge of well locations and characteristics crucial for permitting, infrastructure reusability, and risk assessment in GCS. Currently, public wellbore data from state, federal, and tribal entities are inconsistent and fragmented, with gaps and redundancies. To address this, the National Energy Technology Laboratory (NETL) developed CO2-Locate, an open-source, geospatial database and online application. CO2-Locate integrates over 50 data sources from federal, state, and tribal entities, creating a standardized national well database. Funded by the Bipartisan Infrastructure Law, the database is publicly available through the Energy Data eXchange (EDX) and viewable via the CO2-Locate web mapping application. This tool allows users to query, filter, and visualize well data to support GCS planning, permitting, and risk assessments. This presentation covers the methods used to create CO2-Locate, including data acquisition, processing, attribute mapping, and integration, much of which is automated for future updates. The web mapping application and its role in GCS site selection will also be discussed.

Tetteh, Daniel A.↗

Human Research Program Integrated Research Plan

Crew health and performance are critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes (1) HRP's approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and (2) the method of integration for risk mitigation. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.

Steinberg, Susan↗

CIE Curriculum Guide (V.2.0)

The Cyber-Informed Engineering (CIE) Curriculum Guide offers a comprehensive framework, guidance, and resources for integrating CIE into university-level engineering programs and related educational activities. The primary goal is to help educators adopt CIE principles into their teaching to produce future engineers and technicians who understand digital risks in modern engineered systems, thereby addressing the nation’s infrastructure resilience needs. This guide outlines practical integration examples, links to resources to accelerate CIE adoption, and shares insights from partner academic institutions on various implementation strategies. CIE is a framework for embedding engineered controls that mitigate the impact of cyber-attacks in any cyber-physical system used in critical energy infrastructure and other sectors. Developed by the U.S. Department of Energy’s Office of Cybersecurity, Energy Security, and Emergency Response (CESER), the National Cyber-Informed Engineering Strategy emphasizes embedding CIE into formal education, training, and credentialing. This guide supports this strategic objective by providing examples of integrating CIE concepts into engineering curricula, from class activities to new courses and certificate programs. The importance of educating cyber-informed engineers is underscored by the evolving cybersecurity threats facing engineered systems. As industrial control systems (ICS) increasingly incorporate digital technologies, the responsibility for security extends to both cyber professionals and engineers. CIE addresses critical gaps in designing and protecting physical systems with digital components against cyber risks, ensuring engineers consider digital risk throughout the engineering design lifecycle. Currently, engineering education does not routinely include cyber-informed principles, highlighting a gap in addressing modern engineering system risks. This guide advocates for updating engineering curricula to include digital risk management as a fundamental element. By doing so, future engineers will be equipped to design resilient systems that mitigate digital risks from the outset. Through this guide, engineering faculty can integrate CIE into their curricula, bridging the gap between digital risk and engineering. This approach prepares a cyber-informed workforce capable of safeguarding the cyber-physical systems crucial to national security and public welfare. By embedding CIE into education and training, institutions can produce engineers and technicians who can effectively mitigate cyber impacts throughout the engineering design lifecycle, resulting in more secure critical infrastructures.

42 - ENGINEERING↗

An Update on the Status of a Reduced Flow Test of a 10MW 700°C sCO2 Integrally Geared Compander

. In order to maintain viability as a future power-generating technology, concentrating solar power (CSP) must reduce its levelized cost of electricity (LCOE). One component of solving this problem is reducing the cost of the power block while simultaneously increasing the efficiency of the thermodynamic cycle. One disruptive technology that has the promise to accomplish this is supercritical CO2 based power cycles. These cycles are conceptually similar to steam cycles; however, they have substantially smaller turbomachinery at equivalent power while also delivering more efficiency at turbine inlet temperatures of 500-700 degrees Celsius. This paper will summarize the current status of a US Department of Energy project to develop machinery to support a 10 MW sCO2 power cycle. The team of Southwest Research Institute® (SwRI®) and Hanwha Power Systems America, proposed to develop an integrally-geared (IG) compressor-expander (compander) for use in a nominal 10 MW-scale concentrated solar power (CSP) supercritical carbon dioxide (sCO2) plant application. This integrally-geared compander (IGC) comprises multiple pinion shafts interconnected on a single bull gear to create a compact package, and utilizes a low-cost, low-speed driver. In addition, the integrally geared architecture allows each pinion to operate at different rotational speeds to optimize performance and easily allow for inter-stage cooling and turbine re-heat to further enhance both stage and cycle efficiency. The close integration of all turbomachinery elements into a single integrally-geared (IG) machine creates a design that lends itself to power block modularization, which makes it suitable for waste heat recovery, fossil fuel power plants, and especially CSP applications. As part of the commercialization of this technology, it is necessary to reduce risk by validation testing of key components. In the current work, the focus is developing a test loop to enable safe testing of the main compressor stage across a wide range of operating conditions, and to validate the mechanical integrity of the turbine at full pressure, temperature, and speed. Developing a test loop for sCO2 requires balancing a number of design alternatives that impact cost, lead time, safety, and performance. The current work discusses the design process for the reduced flow test loop for the compander, and supporting documentation supporting the viability of the test loop

wilkes, jason↗

Hybrid Power Purchase Agreements for Flexible 24/7 Energy Delivery – A Comprehensive Review of Current Practices and Research Pathways

Power Purchase Agreements (PPAs) are becoming increasingly preferred among large energy consumers, such as data centers, to secure cost-effective energy and meet accelerating demand growth. Traditionally, variable renewable energy (VRE)-based PPAs operate on a pay-as-produced basis, balancing supply and demand for a relatively longer duration (e.g., annually). However, the focus is shifting toward matching supply and demand on an hourly basis to fully meet energy needs. This shift requires the integration of flexible energy resources, such as hydropower, thermal generation, and energy storage, to complement VRE sources like wind and solar, forming the foundation for 24/7 PPA. This work contributes by: (i) reviewing emerging market trends and current practices in PPA procurement, supported by data on PPA prices and technology portfolios; (ii) synthesizing the existing literature on modeling approaches for contract pricing, quantities, hybrid resource procurement, and risk management in 24/7 PPA design, while identifying key research gaps; and (iii) proposing an integrated 24/7 PPA design framework along with two contracting mechanisms from the perspectives of both PPA providers and consumers. The proposed framework highlights critical modeling challenges, risk-allocation issues, and future research opportunities for 24/7 PPA design.

24/7↗

Progress Towards SiC ASICs for Extreme Temperature and Radiation Environments

This presentation describes development and demonstrations of semiconductor integrated circuits (ICs) and ceramic packaging that are arguably the most environmentally durable transistor electronics ever demonstrated. Silicon carbide (SiC) junction field effect transistor-resistor (JFET-R) ICs fabricated by NASA Glenn Research Center with two-level interconnect have successfully operated for over 1 year in 500 °C air-ambient, 60 days in 460 °C and 9.3 MPa pressure caustic Venus surface environment test chamber, and radiation exposure through 7 Mrad(Si) total ionizing dose (TID) and 86 MeV-cm2/mg heavy ion strikes. Furthermore, these ICs have also demonstrated operation from -190 °C to +812 °C (over 1000 °C temperature span) without significant change in signal (input /output) or power supply voltages. While the operating frequency and functional complexity is far below silicon-based ICs, these SiC application specific ICs (ASICs) are nevertheless becoming capable of providing unique and advantageous harsh-environment circuit functionality without cooling/sheltering overhead. With modest adjustments, the SiC JFET-R fabrication process is compatible with semiconductor mass-production tools and materials. As an initial step towards manufacture, a majority of processing steps to realize the next SiC JFET-R IC prototype wafer run have been outsourced to commercial foundry. It is expected that further upscaling combined with technology transfer to commercial production will lower investment and risk barriers to useful application deployment.

high temperature↗

Technology Challenges and Opportunities for Very Large In-Space Structural Systems

Space solar power satellites and other large space systems will require creative and innovative concepts in order to achieve economically viable designs. The mass and volume constraints of current and planned launch vehicles necessitate highly efficient structural systems be developed. In addition, modularity and in-space deployment/construction will be enabling design attributes. While current space systems allocate nearly 20 percent of the mass to the primary structure, the very large space systems of the future must overcome subsystem mass allocations by achieving a level of functional integration not yet realized. A proposed building block approach with two phases is presented to achieve near-term solar power satellite risk reduction with accompanying long-term technology advances. This paper reviews the current challenges of launching and building very large space systems from a structures and materials perspective utilizing recent experience. Promising technology advances anticipated in the coming decades in modularity, material systems, structural concepts, and in-space operations are presented. It is shown that, together, the current challenges and future advances in very large in-space structural systems may provide the technology pull/push necessary to make solar power satellite systems more technically and economically feasible.

Belvin, W. Keith↗

An Integrated Framework for Risk Assessment of Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology Advancement and Application

This report documents activities performed by Idaho National Laboratory (INL) during fiscal year (FY) 2024 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, Digital Instrumentation and Control (DI&C) Risk Assessment project. The goal of the RISA Pathway is to optimize safety margins and minimize uncertainties to achieve economic efficiencies while maintaining high levels of safety. This is accomplished by providing scientific basis to better represent safety margins and factors that contribute to cost and safety, and by developing new technologies that reduce operating costs. The research efforts for FY 2024 encompass methodology refinement and exploration. The efforts include: (1) The implementation of a natural language processing tool to expedite key aspects of the reliability analysis methods developed by INL; (2) advances to support intersystem CCF analysis by providing guidance for and identification of coupling mechanisms that may contribute to CCF; (3) the investigation of how generative artificial intelligence tools can aid in hazard analysis and diversity and defense in depth (i.e., D3) assessments; (4) Industry collaboration, allowing the demonstration of and INL's risk assessment tools to support risk assessment of DI&C systems at early and late stages of development; (4) a roadmap for the development of a software for each of INL's risk assessment tools; (5) The development of a theory and methodology manual for a risk quantification methodology; (6) the development of a reliability analysis for machine learning (ML)-integrated control systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Important Human Actions for Advanced Reactors: Implications for Human Factors

As advanced reactor platforms continue to develop and gain traction in the energy sector there is a need for risk-informed, scalable regulations that match that progress. This is a core component of the U.S. Nuclear Regulatory Commission’s proposed Part 53 Rule Making; the Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy (ADVANCE) Act; and other efforts that seek to update nuclear power regulations. This paper covers one key aspect of that regulatory evolution: Important Human Actions (IHA). In this paper, we discuss how the understanding and definitions of IHAs have changed and what that means for human factors engagement through the process of developing these technologies. Instead of a narrow focus on control actions that led to an increase in core damage risk, the new focus is on IHAs is “wherever they occur.” What this means is that having a highly automated or passive safety system does not eliminate IHAs. Rather, it shifts the focus point to all the actions that enable these systems. Everything from maintenance, to design, to training can be considered an IHA and that dramatically shifts the efforts and level of engagement necessary for human factors to enable these technologies. We discuss the notions of risk-informed human factors that underpin these efforts, give several examples, and briefly describe the risk assessment methodologies that will be needed. In the past, IHAs were identified and then became a focus point of human factors engineering (HFE) activities to ensure a robust evaluation of the task was completed. The future is less clear. HFE for nuclear energy will need to evolve and become more integrated in technology development than ever before.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Research and Technology Challenges for Human Data Analysts in Future Safety Management Systems

Enabling new and novel concepts of operations for Advanced Air Mobility poses an important need to evolve current safety management systems (SMS) and is posited to be realized through advances in Machine Learning (ML) Data Sciences and Artificial Intelligence. The “In-time Aviation Safety Management System” (IASMS) concept of operations supports the need to evolve today’s SMS to become more tailorable, scalable, and interoperable in response to forecasted changes expected for the future airspace system. Key to IASMS is integration of proactive and predictive ML algorithms trained to provide “in time” detection and mitigation of hazards and emergent risks through new methods and novel data types. IASMS research and technology development includes human factors design considerations for these systems to include human-system teaming, innovations in human interfaces and management of complex digital data information, human-system interaction/model-based system engineering, and verification and validation for data assurance and trust.

Chad L Stephens↗

Integrated Docking Simulation and Testing with the Johnson Space Center Six-Degree of Freedom Dynamic Test System

The Exploration Systems Architecture defines missions that require rendezvous, proximity operations, and docking (RPOD) of two spacecraft both in Low Earth Orbit (LEO) and in Low Lunar Orbit (LLO). Uncrewed spacecraft must perform automated and/or autonomous rendezvous, proximity operations and docking operations (commonly known as Automated Rendezvous and Docking, AR&D). The crewed versions may also perform AR&D, possibly with a different level of automation and/or autonomy, and must also provide the crew with relative navigation information for manual piloting. The capabilities of the RPOD sensors are critical to the success of the Constellation Program; this is carried as one of the CEV Project top risks. The Exploration Technology Development Program (ETDP) AR&D Sensor Technology Project seeks to reduce this risk by increasing technology maturation of selected relative navigation sensor technologies through testing and simulation. One of the project activities is a series of "pathfinder" testing and simulation activities to integrate relative navigation sensors with the Johnson Space Center Six-Degree-of-Freedom Test System (SDTS). The SDTS will be the primary testing location for the Orion spacecraft s Low Impact Docking System (LIDS). Project team members have integrated the Orion simulation with the SDTS computer system so that real-time closed loop testing can be performed with relative navigation sensors and the docking system in the loop during docking and undocking scenarios. Two relative navigation sensors are being used as part of a "pathfinder" activity in order to pave the way for future testing with the actual Orion sensors. This paper describes the test configuration and test results.

Mitchell, Jennifer D.↗

VA EDH Advanced Software Pipeline Framework Report: Enhancing Automation and Scalability

The VA Environmental Determinants of Health (EDH) Advanced Software Pipeline Framework is designed to enhance the efficiency, scalability, and security of geospatial data processing workflows. This framework integrates modern data orchestration and containerization technologies, including Prefect for workflow automation, Docker for containerization, and PostgreSQL/PostGIS for geospatial data storage and analysis. It ensures standardized, reproducible, and automated data processing, supporting VA objectives related to substance use risk assessment and recovery research. The pipeline addresses key scalability and performance challenges through horizontal and vertical scaling, high-performance computing (HPC) integration, parallel processing, task caching, and dynamic resource allocation. These optimizations improve throughput and reduce latency, allowing the system to efficiently manage large and complex datasets. Additionally, security and compliance measures—such as data encryption (SSL), Role-Based Access Control (RBAC), and adherence to GDPR and HIPAA standards—safeguard sensitive information throughout data transmission and storage. A key implementation of this framework includes the automation of shelter list geolocation workflows, ensuring that up-to-date data is readily available for VA decision-making. Lessons learned from this project include the transition from in-memory processing to incremental storage writes, improving resource management and reliability. Future enhancements aim to expand automation, integrate AI-driven anomaly detection, and incorporate high-performance computing resources. This framework provides a scalable, secure, and adaptable solution for managing geospatial datasets, reinforcing the VA’s ability to support clinical and strategic initiatives through data-driven decision-making.

97 MATHEMATICS AND COMPUTING↗

Advanced Transmission Technologies (ATTs) Supplier Cohort Workshops Cohort Summary [Slides]

This Summary slide deck summarizes the key outcomes of the Advanced Transmission Technologies (ATTs) supplier cohort, part of Idaho National Laboratory’s (INL) Technical Assistance for Digital Assurance (TADA) program. The program aimed to strengthen grid resilience through cybersecurity controls, supply-chain security, and Cyber-Informed Engineering (CIE) for advanced transmission technologies. The cohort brought together vendors representing the full range of Grid-Enhancing Technologies (GETs), including providers of Dynamic Line Ratings (DLR), Advanced Power Flow Control (APFC), Transmission Topology Optimization (TTO), and High-Performance Conductors (HPCs). Discussions focused on institutional, integration, and operational barriers limiting GET adoption; cybersecurity risks at EMS/SCADA, cloud, and network integration points; and supply-chain transparency issues such as semiconductor dependence and SBOM/HBOM expectations. Participants also addressed operator trust, human-in-the-loop requirements, and challenges with utility adoption, while exploring how CIE can support secure deployment of GETs. This deck represents a consolidated summary of challenges and risks identified by vendors, cross-cutting themes and technology-specific insights from three cohort workshops, and actionable mitigations to guide utilities, vendors, and the Department of Energy in advancing secure, trusted deployment of GETs.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Session 3: Agrivoltaics Pathways [Slides]

This presentation was developed for a webinar series for the USAID's South Asia Group for Energy (SAGE) and South Asia Regional Energy Partnership (SAREP). The presentation includes insights into agrivoltaic site assessment planning, including what is needed for a farm assessment, solar panel system design from the agricultural perspective, variables that go into crop selection, and environmental impact, sustainability, and agritourism, technical parameters for developing an agrivoltaics project, including what makes up a PV feasibility study, understanding variables that go into technology and equipment selection, agrivoltaic installation and agricultural integration, and monitoring and maintenance throughout the life of the project, and agrivoltaic financial planning, risk mitigation, and debt equity issues.

14 SOLAR ENERGY↗