Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “mitigation risks”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Solar Photovaltaics Durability and Resilience - A Win-Win

Solar photovoltaics (PV) will play a crucial role in decarbonizing the electrical grid and limit the effects of detrimental climate change. Long lifetimes of PV installations are a win-win situation, as it not only reduces carbon emissions directly through avoidance of fossil fuel emissions but also indirectly, as it reduces the demand of needed materials and potentially recycling. However, during their decades-long lifetime expectations installations are also more commonly exposed to extreme weather events. Building durable solar system to withstand extreme weather events is essential in the electrification of the economy and will save lives, particularly when they power critical infrastructure such as hospitals. As more PV is installed in regions prone to extreme weather events, high-quality materials, installation and monitoring practices can mitigate risk. Evaluating resilience requires combined computational, analytical, and experimental capabilities that are best leveraged by teams working across multiple disciplines.

durability↗

Characterization of the Aerosol Source Term in Dry Storage Canisters

As long-term dry storage of used nuclear fuel at independent spent fuel storage installations (ISFSI) trends toward the de facto back end of the US fuel cycle, it becomes appropriate to investigate potential degradation and dispersion scenarios for suitable risk mitigation purposes. Pitting and subsequent stress corrosion cracking of the canister wall is currently viewed as a potential scenario leading to a through-wall pathway for contamination to be transferred from within the storage container to the surrounding environment. While stress corrosion cracking measurements are currently underway to further characterize this scenario, a parallel effort endeavors to perform a consequence analysis of conditions in which through wall cracks are indeed formed. This effort consists of engineering scale modeling using the GOTHIC and MELCOR software packages along with experimental depletion and penetration tests.

spent fuel storage, aerosol deposition, Stress Cor↗

Historical Pattern Analysis of Global Geothermal Power Capacity Development: Preprint

Between 1913 and 1958, Italy was the only country with an operational geothermal power plant until New Zealand installed its first plant in 1958. At present, 24 countries are involved in the geothermal power market, and they have a combined installed capacity of 16,127 GW. This study analyzes the historical patterns of geothermal power capacity in the world and in individual countries to investigate the ideal global geothermal development pattern by examining the annual cumulative capacity (ACC) and the annual capacity addition (ACA) graphs of the historical development of geothermal power capacity in 24 countries. First, the global patterns are analyzed using these graphs in five periods (1945-1957, 1958-1976, 1977-1991, 1992-2002, and 2003-2020) that are marked by a series of characteristics of ACA peaks separated by two major troughs. Then, five characteristic patterns are developed in five periods globally. These patterns correspond to the early-stage linear, the first acceleration, the first steady-state linear, the second acceleration, and the second steady-state linear developments. A positive relationship exists between global patterns and the 5-year shifted oil-price curve: two major factors influenced global development: 1) increasing oil prices and increasing awareness of global climate change, and 2) global development of geothermal power. Last, we investigate these patterns in each country. The top ten countries, which comprise 93.3% of the world's total installed capacity are separated into five groups based on the availability and characteristics of patterns globally developed in five periods. Group-1 (the United States) has an installed capacity of 3,794 MW, Group-2 (Mexico and Philippines) 963-1935 MW, Group-3 (New Zealand, Italy, Iceland, and Japan) 601-1,037 MW, and Group-4 (Indonesia, Kenya, and Turkiye) 944-2,356 MW. The remaining 14 countries (6.7%), which are called Group 5, are still in an immature stage and have installed capacities of 7-262 MW and are not involved in pattern analysis. Overall, geothermal power in the world is in its third stage of development, which had its peak development after 1977. A fourth development peak may be expected to occur after this through business-as-usual cases. The biggest barrier to the development of the global geothermal power market is the risk associated with exploration and drilling. If risk mitigation systems and funds are employed, the growth of geothermal power production projects could accelerate.

GEOTHERMAL ENERGY↗

Historical Pattern Analysis of Global Geothermal Power Capacity Development

Between 1913 and 1958, Italy was the only country with an operational geothermal power plant until New Zealand installed its first plant in 1958. At present, 24 countries are involved in the geothermal power market, and they have a combined installed capacity of 16,127 GW. This study analyzes the historical patterns of geothermal power capacity in the world and in individual countries to investigate the ideal global geothermal development pattern by examining the annual cumulative capacity (ACC) and the annual capacity addition (ACA) graphs of the historical development of geothermal power capacity in 24 countries. First, the global patterns are analyzed using these graphs in five periods (1945-1957, 1958-1976, 1977-1991, 1992-2002, and 2003-2020) that are marked by a series of characteristics of ACA peaks separated by two major troughs. Then, five characteristic patterns are developed in five periods globally. These patterns correspond to the early-stage linear, the first acceleration, the first steady-state linear, the second acceleration, and the second steady-state linear developments. A positive relationship exists between global patterns and the 5-year shifted oil-price curve: two major factors influenced global development: 1) increasing oil prices and increasing awareness of global climate change, and 2) global development of geothermal power. Last, we investigate these patterns in each country. The top ten countries, which comprise 93.3% of the world's total installed capacity are separated into five groups based on the availability and characteristics of patterns globally developed in five periods. Group-1 (the United States) has an installed capacity of 3,794 MW, Group-2 (Mexico and Philippines) 963-1935 MW, Group-3 (New Zealand, Italy, Iceland, and Japan) 601-1,037 MW, and Group-4 (Indonesia, Kenya, and Turkiye) 944-2,356 MW. The remaining 14 countries (6.7%), which are called Group 5, are still in an immature stage and have installed capacities of 7-262 MW and are not involved in pattern analysis. Overall, geothermal power in the world is in its third stage of development, which had its peak development after 1977. A fourth development peak may be expected to occur after this through business-as-usual cases. The biggest barrier to the development of the global geothermal power market is the risk associated with exploration and drilling. If risk mitigation systems and funds are employed, the growth of geothermal power production projects could accelerate.

GEOTHERMAL ENERGY↗

Challenges and Solutions in Operation and Lay-Up of the Modular Caustic- Side Solvent Extraction Unit - 20078

The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) was designed and constructed to provide interim salt waste processing so that the Liquid Waste Disposition Program (LWDP) could continue waste removal and tank closure until start-up of the Salt Waste Processing Facility (SWPF). MCU processes Clarified Salt Solution (CSS), or salt solution (SS) that has undergone actinide removal/filtration, to produce two waste streams: the cesium laden Strip Effluent (SE), which is incorporated into glass at the Defense Waste Processing Facility (DWPF), and the cesium depleted Decontaminated SS (DSS), which is incorporated into grout at the Saltstone Production Facility (SPF). MCU completed start-up in 2008 with an initial operating life of 3 years and design life of 5 years. Prior to reaching the end of the design life, multiple critical components were upgraded and/or replaced to mitigate risks associated with any delays in SWPF start-up. During the remainder of operation (until June 2019), MCU was challenged to maximize processing with minimal additional modifications to repair/improve aging infrastructure, while maintaining low levels of risk to workers and the environment. Notable challenges during the extended operating life of the facility involved both mechanical and operational issues. Two of the most significant issues were the increased frequency of Process Vessel Ventilation (PVV) High Efficiency Particulate Air (HEPA) filter change-outs and the biofouling of the SE coalescer (SEC). The major impacts of both issues were that replacement of these components 1) resulted in high exposure to workers, and 2) required substantial downtime, thus hindering achievement of processing goals. PVV HEPA filter replacements are required based on dose rate and differential pressure (dP) limits. After introducing a higher-curie feed to MCU, the operating time between change outs was reduced by approximately half. SEC replacements are required based on dP limits. After restarting from an extended outage, the operating life of the SEC was significantly reduced by more than half due to biofouling. As a result of extensive troubleshooting and process improvements, the facility was able to recover performance and extend the operating life of the PVV HEPA filters and the SEC media. Through troubleshooting both of these issues, the facility was also able to learn from prior experience and adapt in order to minimize down time and maintain throughput. Although the facility took advantage of short periods of downtime to perform nonintrusive troubleshooting and minor corrective/preventative maintenance activities, longer outages were periodically required for corrective maintenance involving process cell entry. During these outages, remote tools and specialized shield plates were employed to minimize dose to workers. Mock-ups of non-routine maintenance activities were critical to early identification of potential issues and improvements, which shortened outage duration. Consistent with the facility's operational strategy, evolutions needed for MCU layup were identified and sequenced to ensure safe conditions within the facility, meet pre-defined criteria for lay-up configuration, and protect workers, while minimizing the impact to SWPF integration. De-inventory and flushing of process areas was prioritized so that the total residual inventory was reduced as efficiently as possible. This paper discusses lessons learned and best practices from troubleshooting unique issues, performing complex maintenance activities, and implementing a layup strategy that best supports the overall system mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of Radiological Contamination at Parks in the Gateway National Recreation Area - 20350

In 2005, the National Park Service was notified that elevated radiation levels were detected at Great Kills Park during a baseline radiological mapping effort conducted by the Counter Terrorism Bureau of the New York City Police Department and the United States Department of Energy. Great Kills Park is in the Staten Island Unit of the Gateway National Recreation Area. A records search determined that approximately 280 acres of the park was established over an area in which the New York City Department of Sanitation placed approximately 15.1 million cubic yards of waste fill from 1944 to 1948. Since 2005, a series of response actions and investigations were conducted on behalf of the National Park Service to mitigate risk to human health and the environment and to determine the nature of radiological contamination at Great Kills Park. The findings support that radiological contamination is related to certain components of waste fill, including incinerator residue from both on and offsite incinerators, coal ash from the historical use of coal-fired boilers for heating, and incidental radiological artifacts in the waste fill due to their historical use and subsequent disposal. A majority of the radiological artifacts were determined to contain radium-226 and included radioluminescent markers, radium impregnated switch board buttons, radium paint containers, and brachytherapy devices. The National Park Service has several other Parks in the Gateway National Recreation Area that were established in areas with a similar history to Great Kills Park, and overlie waste fill historically placed during landfilling operations, including Spring Creek Park and Dead Horse Bay. Over the last year, the National Park Service has performed additional radiological investigations at Great Kills Park as part of the ongoing Remedial Investigation under the Comprehensive Environmental Response, Compensation, and Liability Act. In addition, preliminary radiological investigations were performed at Spring Creek Park and Dead Horse Bay Park in the Jamaica Bay Unit of Gateway National Recreation Area. These investigation activities identified gamma radiation levels above the ambient level, several of which were attributable to radiological artifacts similar in nature to those recovered at Great Kills Park. Ongoing investigations at Parks in the Gateway National Recreation Area support an association between radiological contamination and historical landfilling practices that were common prior to the regulation and control of radioactive materials. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of a Soil Flushing Treatability Test for Hanford Site Hexavalent Chromium Removal - 20446

U.S. Department of Energy contractor CH2M Hill Plateau Remediation Company has made significant progress remediating hexavalent chromium in groundwater near the Columbia River through the operation of pump and treat facilities and source removal activities. To mitigate risks associated with hexavalent chromium contamination, which was identified in a CERCLA interim action record of decision as the primary groundwater contaminant of concern for the 100-KR-4 Operable Unit from discharging to the Columbia River, three ion-exchange pump and treat systems were installed between 1997 and 2009. Between 2010 and 2016, operation of the K West pump and treat system, located near the former 105K West plutonium production reactor, reduced concentrations below the groundwater remediation target for hexavalent chromium. In 2016, a rebound study was performed to evaluate the effectiveness of the pump and treat remedy and assess the potential for any residual hexavalent chromium sources continuing to contribute to groundwater contamination. As a result of the rebound study, a source of continued groundwater contamination was identified. To address this condition, a soil flushing treatability test was written and approved by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The test included saturating about a 1-acre area of soil with treated water with the goal of forcing the residual hexavalent chromium to groundwater where existing extraction wells could remove it for treatment, accelerating the cleanup process. In spring and summer 2019, CH2M Hill Plateau Remediation Company installed and began operating a shallow underground leach system to support the treatability test. Preliminary sampling data show the test was effective in removing the residual contamination. Following further evaluation and analysis from the initial test, the process will be considered for implementation elsewhere on the Hanford Site, particularly at locations where there is a known or suspected continuing contamination source in the soil column. The paper will cover the goals of the study, as well as more details about the following: - Overview of pump and treat exit strategy (using U.S. Environmental Protection Agency guidance); - The design and installation of the soil flushing technology in the 100-K Area; - The testing process and results of sampling data; - Post-study evaluation and potential for implementation in other locations at the Hanford Site. Innovative solutions for cleanup, such as the soil flushing technology, have resulted in substantial progress in the removal of groundwater contaminants at the Hanford Site, potentially shortening the time frame required to meet cleanup goals and resulting in significant cost savings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hardware-in-the-Loop Evaluation for Potential High Limit Estimation-Based PV Plant Active Control: Preprint

This paper validates the effectiveness of an Artificial Intelligence (AI)-driven PV plant control and optimization approach, namely, the Automated Learner for Intermittency Control by Extrapolation (ALICE), in empowering PV plant as a dependable grid reliability service provider. The validation is performed in a realistic laboratory controller-hardware-in-the-loop (CHIL) environment, leveraging accurate PV plant modeling and standard industrial communication protocol. Simulation results, considering both varying weather conditions and active control scenarios, demonstrate the superior performance of ALICE in improving the grid service delivery precision and reducing the over-curtailment compared to a state-of-the-art approach, i.e., reference-control grouping based approach. Such a work could help mitigate risks and provide practical guidance during the field deployment of ALICE, while establishing a standardized testing framework for evaluating various PV active control strategies.

hardware-in-the-loop↗

Cybersecurity Considerations for Emerging Energy Technologies

AI, cloud computing, post-quantum cryptography, zero-trust architectures, microgrids, and virtual power plants. What do these things have in common? They are all emerging technologies in the clean energy space that will be a critical part of grid modernization efforts. As we work towards clean energy and decarbonization targets, these technologies, developed to solve real-world problems, will help us reach goals and achieve new efficiencies as the paradigm of grid operation shifts. However, there are growing concerns about the cybersecurity risks associated with these trending topics as they are used in critical infrastructure applications. This talk will cover gaps, challenges, and opportunities for the secure implementation of grid modernization solutions and novel energy applications of state-of-the-art networking and communications. Proactive risk mitigation strategies, including the application of cyber-informed engineering, will be discussed. Practical applications of these techniques will help provide countermeasures to the impact of cyberattacks on critical infrastructure technologies in a new, digitized grid landscape.

14 SOLAR ENERGY↗

The Building Business Network (B-Biz): Addressing Gaps in the High-Performance Building Technology Market, Especially for Underserved Customers

Increased market intelligence and business model innovation is needed to build contractor confidence in high-performance building technologies in order to increase the speed and scale of adoption to meet the U.S. Department of Energy's building stock decarbonization goals. Although there have been important innovations in energy efficiency, affordability, and decarbonization of building technologies, consumers are not purchasing these technologies at the necessary speed and scale partially due to a gap in institutional understanding around barriers contractors face in providing and servicing these technologies. Small businesses in this market must mitigate risk around high-performance building technologies, limiting their opportunities in the market and impacting the rate of adoption. The Building Business Network (B-Biz) aims to provide high-performance building technology solutions to underserved customers by collaborating with local small businesses that provide and service high-performance building technologies in communities with the lowest rates of adoption. This research explores the current market, the importance of business models, and the opportunity to utilize small businesses to address market gaps in underserved communities.

B-Biz↗

Hydrogen Equipment Enclosure Risk Reduction through Earlier Detection of Component Failures

Hydrogen component reliability and the hazard associated with failure rates is a critical area of research for the successful implementation and growth of hydrogen technology across the globe. The research team has partnered to quantify system risk reduction through earlier detection of hydrogen component failures. A model of hydrogen dispersion in a hydrogen equipment enclosure has been developed utilizing experimentally quantified hydrogen component leak rates as inputs. This model provides insight into the impact of hydrogen safety sensors and ventilation on the flammable mass within a hydrogen equipment enclosure. This model also demonstrates the change in safety sensor response time due to detector placement under various leak scenarios. The team looks to improve overall hydrogen system safety through an improved understanding of hydrogen component reliability and risk mitigation methods. This collaboration fits under the work program of IEA Hydrogen Task 43 Subtask E Hydrogen System Safety.

CFD↗

Comparison of Loads and Aeroacoustics Between Upwind and Downwind Wind Turbine Rotors

This presentation discusses the motivation, preparation, risk mitigation, execution, and results of a full-scale experiment where the rotor of a 1.5 megawatt wind turbine was operated in a downwind configuration. The experiment took place at the National Renewable Energy Laboratory Flatirons Campus in Colorado, USA, and collected conventional loads and power together with acoustic measurements from an array of four microphones. Results from load simulations complement the experiment. Fatigue loads and performance are compared between 410 minutes of downwind operation with 960 minutes of conventional upwind operations. Downwind operations cause an increase in damage equivalent loads in a few load channels. Damage equivalent load of blade root flapwise and edgewise moment and the damage equivalent load of tower base fore aft moment increase between 2% and 20% depending on the wind speed. The comparison in active power is less conclusive, but experimental results show more power in downwind than predicted by simulations. In terms of acoustics, the overall sound pressure levels are similar between upwind and downwind, but downwind worsens the metrics describing amplitude modulation.

aeroacoustics↗

Intern Deliverable Poster 2025

An Incident Response Plan (IRP) is a document that is created and maintained by an organization that provides guidance in the event of a cyber incident. The primary objectives of an IRP are to aid in the detection, response, and recovery from incidents, as well as to enhance preparation and preventative measures. An IRP should outline specific procedures at each stage of an incident, with the goal of minimizing asset damage, data leakage, and operational impact. By investing in a well-defined IRP, organizations can better manage and mitigate risks associated with cyber threats, ensuring business continuity and resilience. This poster summarizes incident response guidelines for wind energy, which faces unique cybersecurity and physical challenges.

17 - WIND ENERGY↗

Data Centers and Digital Assurance Introduction to Supply Chain and Cybersecurity for Data Centers, Session 1

The first session of the TADA (Technical Assistance for Digital Assurance) Data Centers Cohort Workshop, held on October 30, 2025, introduced foundational concepts of Digital Assurance in the context of data center and grid integration. Sponsored by the U.S. Department of Energy, the workshop brought together utilities, data center operators, developers, and vendors to address cybersecurity and supply chain vulnerabilities. The session emphasized the growing criticality of data centers within the electric grid and the need for secure, real-time, bidirectional communication. Participants explored the principles of Digital Assurance, including cybersecurity, cyber-informed engineering (CIE), and lifecycle security, and applied a threat-vulnerability-consequence framework to identify and mitigate risks at the data center–grid interface. Discussions covered a range of threats such as spoofed dispatch signals and insider threats, architectural vulnerabilities like SCADA interfaces and insecure protocols, and potential consequences including cascading grid failures. The session also raised strategic questions about business value, vendor assurance, and defining cyber boundaries and responsibilities. This foundational workshop set the stage for deeper technical analysis and the development of actionable frameworks in subsequent sessions. Session 1 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Studies of Alternative Ventilation Configurations to Mitigate Airborne Exposure Risks in Office Spaces

The objective of this study was to evaluate the impact of alternative ventilation configurations on airflow patterns and potential exposure risks in office spaces. Two existing conference rooms at Sandia NM were modeled using Computational Fluid Dynamics (CFD) simulations to characterize airflow patterns and potential airborne exposure risks in well-mixed and once-through (through-flow) ventilation conditions. Multiple scenarios were studied to evaluate the impact of occupancy, Plexiglass barriers, and a modified-return airflow configuration. Experimental and visualization tests were also conducted to validate the well-mixed and through-flow models and findings. The simulations demonstrated that the modified-return airflow configuration that promoted through-flow conditions reduced pathogen concentrations within the space compared to the well-mixed airflow configuration; occupancy reduction only reduced the number of exposed individuals, and Plexiglass barriers had almost no effect. The experimentally measured air speeds at nine anemometer locations generally matched the simulated airflow velocities, and a fog-purge visualization test was also consistent with simulated results of plume movement and dissipation. The visualization tests demonstrated improvements in air change rate with the modified return, which promoted through-flow conditions, versus the original well-mixed ventilation configuration. The results of this study demonstrate that minor modifications to a space that promote through-flow conditions can improve air quality and reduce pathogen concentrations. Additional airflow modeling and testing of alternative occupied space configurations are recommended to further inform room designs that mitigate airborne exposure risks for occupants.

42 ENGINEERING↗

GPS Spoofing Mitigation and Timing Risk Analysis in Networked Phasor Measurement Units via Stochastic Reachability

To address phasor measurement unit (PMU) vulnerability to spoofing, we propose the use of a set-valued state estimation technique known as stochastic reachability (SR)-based distributed Kalman filter (DKF) that computes secure global positioning system (GPS) timing across a network of receivers. Utilizing SR, we estimate not only GPS time but also its stochastic reachable set, which is parameterized by probabilistic zonotope (p-Zonotope). While requiring known measurement error bounds in only non-spoofed conditions, we designed a two-tiered approach. We first performed measurement-level spoofing mitigation via deviation of a measurement innovation from its expected p-Zonotope. We then performed state-level timing risk analysis via a determination of the intersection probability of the estimated p-Zonotope with an unsafe set that violates IEEE C37.118.1a-2014 standards. Finally, we validated our SR-DKF algorithm by subjecting it to a simulated receiver network to coordinate signal-level spoofing. We demonstrate improved timing accuracy and successful spoofing mitigation via the use of our SR-DKF algorithm. We also validated the robustness of the estimated timing risk as the number of receivers were varied.

47 OTHER INSTRUMENTATION↗

A prototype cooling blanket for mitigating occupant overheating risk in a hot indoor environment: Modeling and assessments

Conventional ways of cooling a room or an entire house for occupant thermal comfort during summer consume a significant amount of energy and are vulnerable to overheating risk during power outages that lead to loss of cooling system operations. This study investigates a low-power cooling blanket, as a Personal Cooling System (PCS), that covers the upper human body for direct cooling during a five-day heat wave in a single-family house. A modeling framework is developed for evaluating the thermal and energy performance of the cooling blanket, which builds upon the co-simulation of three models: a house energy model, a personal thermal comfort model, and a cooling blanket model. Simulation results show that under the power outage scenario, the cooling blanket can greatly reduce the occupant heat stress with a reduction of daily hours of exceedance (discomfort hours defined as TSV>2) by up to 17.2 h (a 95.3 % improvement from the baseline power outage without the blanket). The cooling blanket, equipped with an innovative electrocaloric heat pump (COP as high as 10.1) consumes 6.31 W and can be operated by a portable battery for several days. The cooling blanket consumes only 0.28 % of the electricity of a central air-conditioning system running to provide cooling for the whole house during the five-day heatwave period. The findings justify further research of electrocaloric wearable PCS as low-power effective cooling to ensure thermal survivability of occupants during extreme indoor environments.

Electrocaloric heat pump↗