Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Cryogenic Storage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

184 records · Page 11

Heterotrophic respiration by soil microbes in a changing climate

Soil microbes strongly influence the soil organic carbon (SOC) pool, which globally stores ~2,000 PgC. Specifically, the balance between microbial heterotrophic respiration (R H ), which degrades SOC, and plant–microbe interactions that stabilize SOC determines whether terrestrial ecosystems are a net source or sink of CO 2 to the atmosphere. Here, in this Review, we evaluate how climate change alters these competing processes. R H is approximately half of total soil respiration, at ~50 PgC yr −1 , with 70% occurring in topsoils. Warming accelerates microbial metabolism, with a 10 °C temperature increase estimated to raise R H by ~50%, an effect that is particularly strong in Arctic soils. Warming also reduces soil moisture, further modulating R H , which responds nonlinearly to soil moisture, being limited by saturation and desiccation and meeting a maximum at intermediate levels. Consequently, R H is highly sensitive to future precipitation changes and drought. However, soil management strategies could enhance SOC stocks and persistence under climate change. Bacterial and fungal inoculants can promote SOC production and stabilization, while deep-rooting plants increase SOC inputs to deeper layers that experience lower R H . Agricultural practices and biochar amendments can also enhance SOC and reduce R H . Expanding field trials across regions, climates and soil types would improve empirical understanding of these responses and support better representation of R H in predictive models, enabling more accurate assessments of climate impacts on SOC storage.

Jansson, Janet K. [Pacific Northwest National Labo

Thermal Reservoir Networks for Modularly Expandable Thermal Microgrids

The Department of Defense (DoD) faces the substantial challenge of cost-effectively retrofitting one to two installations per month, each comprising approximately 1,000 buildings, to improve resilience, reduce energy consumption, and enhance energy supply security. Achieving these objectives requires optimal system selection and effective risk mitigation during system integration. To address this need, we introduce Platform-Based Design (PBD), a structured, hierarchical methodology adapted from other industrial sectors to the domain of energy system retrofits. We demonstrate the effectiveness of PBD through a techno-economic feasibility study comparing geothermal-coupled thermal energy networks (TENs) with conventional energy systems for heating, cooling, and powering 17 buildings at Joint Base Andrews (JBA) in Maryland. Our analysis illustrates that the PBD approach enables rigorous, data-driven, sequential decision making, resulting in a family of Pareto-optimal systems, among which the TEN emerged as the most promising solution. The selected TEN design integrates geothermal borefields, heat recovery heat pumps, photovoltaic (PV) arrays, and battery storage. Compared to the baseline system – gas heating combined with air-source chillers – the proposed TEN reduces annual imported energy by 74% and peak electricity demand by 45%, achieves a levelized cost of energy of $\$0.210$/kWh, and substantially enhances resilience. Life-cycle costs increase by approximately 6%, and initial investment costs are about 2.5 times higher than the baseline. However, if central plant infrastructure, district loops, and utility-scale PV and battery systems are privately funded and operated, the initial investment would fall below the baseline system cost. Critical to achieving these significant performance improvements were detailed nonlinear dynamic simulations coupling geothermal heat transfer, energy system operation, and realistic feedback control logic. These simulations identified essential design modifications and control strategy refinements that substantially reduced energy use, peak demand, and compressor shortcycling, thereby improving durability and reliability—issues that would have been significantly more expensive to resolve during operation. Additionally, the verification step highlighted sensitivities to key design parameters that could reduce initial investment by approximately $\$2$ million and reduce annual life-cycle costs more than $\$300,000$. We recommend adopting the PBD methodology for future feasibility studies and TEN pilot projects to gain valuable operational experience. Furthermore, we recommend that DoD invest in transferring and scaling the PBD methodology to other installations. This entails developing standardized computational frameworks and component libraries as well as training industry in conducting PBD. Such investments would enable rapid, robust, reliable, and cost-effective retrofits, supporting DoD’s ambitious energy system modernization goals.

Wetter, Michael [Lawrence Berkeley National Labora

The MuFusE large-volume diamond anvil cell for exploring muon-catalyzed fusion at higher pressures and temperatures

A new large-volume diamond anvil cell (DAC) has been developed for the Muon-catalyzed Fusion (μCF) Experiment (MuFusE), enabling the compression and heating of deuterium–tritium (d–t) mixtures to pressures and temperatures needed to advance μCF research. The MuFusE DAC achieves the large sample volumes necessary for high-precision fusion measurements while integrating cryogenic loading, all-metal sealing, and flexible bellows to maintain a secure environment during cell compression. Combined with remote pneumatic actuation and secondary containment, the DAC safely managed a 25 Ci tritium inventory while providing a clear optical path for in situ measurements of sample pressure and composition via laser spectroscopy. Utilizing 5 mm diameter diamond anvils oriented in the path of a high-intensity muon beam, the apparatus achieved a stable sample volume of 19.2 mm 3 at liquid density, pressures up to 933 MPa and temperatures up to 400 K—benchmarks that significantly exceed previously reported limits for static d–t targets.

Kalow, J. D. [Acceleron Fusion, Inc., Cambridge, M

Gear Test Assembly - Experimental Testing and Analysis of Gears and Bearings - FY2026

The Gear Test Assembly (GTA) is an experimental test apparatus built and installed in the Mechanisms and Engineering Test Loop (METL) at Argonne National Laboratory (ANL). While designed to accommodate a variety of components intended for use in advanced compact in-vessel transfer machine, the focus of GTA been the testing of large radial spur gears. The performance of the components used in GTA motivates the choices made in the design, components, and material choices for the forthcoming METL test articles; the Gripper Test Assembly (GrTA), and the Bearing Test Assembly (BTA). To date, GTA has completed nine experimental testing campaigns and achieved over 21 million revolutions under prototypic sodium fast reactor loads and operating conditions. This report provides an overview and results for the two most recent experiments Campaign #8 and Campaign #9. `Campaign #8 was the first campaign to make use of a set of nickel alloy radial spur gears, made from Hastelloy C-22HS, and combined with heat-treated tapered roller bearings. The bearings and torque profile used allowed Campaign #8 to be directly compared with Campaign #1 where Inconel 718 gears were used instead. Campaign #8 attained 1,058,880 shaft revolutions within 23% of the 1,314,855 revolutions achieved in Campaign #1. These results demonstrate that the heat-treated tapered roller bearings show consistent increased lifetimes, approximately three times longer than for non heat-treated taper rollers, and that the particular material of the gear does not play a substantial role in performance. Similar to Campaign #7 where bearing failure resulted in fragmentation and transport of bearing material into the gear teeth led to tooth damage in the Inconel gears, a similar process led to the damage of the Hastelloy gears. Subsequent NDE analysis showed that the damage was only limited to the tooth surface and does not extend into the gear interiors. Based on the NDE reports, the Hastelloy gears can be reconditioned and put back into service for future campaigns as was done for the Inconel gears. Reconditioned Inconel 718 gears damaged in Campaign #7 were returned to service in Campaign #9 and paired with non heat-treated tapered roller bearings. In Campaign #9 a novel set of operating conditions were implemented whereby the gears and bearings were cycled between hot, submerged refueling conditions where fuel handling operations occurred and cold, dry, and inert conditions where the sodium was drained and the vessel was allowed to cool simulating long, ex-vessel storage of the fuel handling machine. A total of eight of these operating cycles were achieved before a bearing failure occurred after the accumulation of 475,692 shaft revolutions were achieved. During Campaign #9, one of the drive motors was damaged and over the course of a 240 day standby period, the entire GTA drive system was upgraded from a 480VAC system to a 240VAC system that provided the opportunity to consolidate wall-space in the METL facility and provide more space for additional test articles being installed in the coming year. The over 475,000 shaft revolutions achieved in Campaign #9 eclipses the previous record for lifetime of non heat-treated tapered roller bearings held by Campaign #3 of 392,000 shaft revolutions. Further analysis and future campaigns hope to shed light on the cause of this approximately 17% increase in lifetime.

42 ENGINEERING